Protest of Exclusion From Competitive Range

B-204701 Published: Jun 02, 1982. Publicly Released: Jun 02, 1982.
Jump To:
Skip to Highlights

Highlights

A firm protested the Air Force's decision to exclude its proposal from the competitive range in connection with a request for proposals (RFP). The procurement was for the development of a laser source for an airborne laser radar system. The Air Force found the protester's proposal to be technically unacceptable because its proposed baseline design was a high-risk approach to solving the problems presented in the RFP and because it did not address the issue of heterodyning. The protester contended that: (1) Air Force objections to its proposal were not sufficient to exclude it from the competitive range, but should been resolved through discussion; (2) the Air Force misapplied the evaluation criteria in evaluating its proposal and improperly treated its baseline approach as a design study rather than a flexible starting point; (3) even though its proposed large-bore approach involved risk, this did not justify the rejection of the proposal; (4) various aspects of the proposal implied heterodyne capabilities; and (5) since its proposed personnel are the leading authorities in their field, the proposal should not have been excluded from the competitive range. GAO found that: (1) the determination that the protester's proposal was unacceptable was not clearly unreasonable or arbitrary; (2) the proposed baseline design limited the reasonably available options in the remainder of the program and had to be evaluated as proposed; (3) implications scattered throughout the proposal were not an adequate way of addressing the critical and complex issue of heterodyning; (4) regardless of the excellence of the protester's personnel, the proposal had to be evaluated on its merits as written; and (5) the baseline design proposed by the protester was unproven, not based on demonstrated technology, and therefore presented an unnecessarily high risk. Accordingly, the protest was denied.

Full Report

Media Inquiries

Sarah Kaczmarek
Managing Director
Office of Public Affairs

Public Inquiries