Reformation of Contract to Permit Additional Payment

B-188823: May 10, 1977

Additional Materials:

Contact:

Ralph O. White
(202) 512-8278
WhiteRO@gao.gov

Kenneth E. Patton
(202) 512-8205
PattonK@gao.gov

 

Office of Public Affairs
(202) 512-4800
youngc1@gao.gov

A contractor requested reformation of contract on the grounds of a costing error in its bid, discovered after the award. The prospective contractor's "on-the-spot" verification at bid opening that he was satisfied with the bid was inadequate verification. Prior to the award the contracting officer should have known, but failed to apprise the bidder, of the basis for the suspected mistake.