Protest Involving Evaluation of Technical Proposal
B-185061: Jul 29, 1976
Additional Materials:
- Full Report:
Contact:
The protester objected to the award of a contract, alleging that it should have received the award since its proposal was technically acceptable and offered the lowest estimated cost. The agency's cost analysis, which reduced the entire evaluation to comparison of the averaged, verifiable labor rates, excluded subcontract labor rates in determining the protester's averaged labor rates since the subcontractor was not identified and the subcontractor labor rates could not be verified. The cost analysis was not arbitrary and the determination that the protester was not the low offeror was not disturbed. The protest with regard to the evaluation factors included in the solicitation was untimely since it was not filed until after the receipt of initial proposals.
Oct 26, 2020
-
Chronos Solutions, LLC; Inside Realty, LLC; BLB Resources, Inc.
We sustain the protests.
B-417870.2,B-417870.3,B-417870.4 -
-
Oct 23, 2020
Oct 22, 2020
Oct 20, 2020
Oct 16, 2020
Looking for more? Browse all our products here