Reports & Testimonies
Recommendations Database
GAO’s recommendations database contains report recommendations that still need to be addressed. GAO’s priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. Below you can search only priority recommendations, or search all recommendations.
Our recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Moreover, when implemented, some of our priority recommendations can save large amounts of money, help Congress make decisions on major issues, and substantially improve or transform major government programs or agencies, among other benefits.
As of October 25, 2020, there are 4812 open recommendations, of which 473 are priority recommendations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented.
Browse or Search Open Recommendations
Have a Question about a Recommendation?
- For questions about a specific recommendation, contact the person or office listed with the recommendation.
- For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
Results:
Subject Term: Tenants
GAO-20-361, Mar 31, 2020
Phone: (202) 512-2834
including 1 priority recommendation
Agency: General Services Administration
Status: Open
Priority recommendation
Comments: In June 2020, GSA said the agency would validate system data through regional and broker outreach and fully utilize validated system data to manage the broker program. The agency also said it will develop a quality control plan and follow-up on outcomes. We will continue to monitor GSA's progress with implementing this recommendation.
Agency: General Services Administration
Status: Open
Comments: Although GSA initially did not concur with this recommendation, the agency stated in June 2020 that it agrees with the recommendation and will take steps to implement it. Specifically, GSA plans to revise the broker performance standards and document broker effectiveness through lease cost avoidance, timely lease replacement, and earned commission credits. We will continue to monitor GSA's progress with implementing this recommendation.
GAO-20-281, Mar 26, 2020
Phone: (202) 512-2775
Agency: Department of Defense: Office of the Secretary of Defense
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Assistant Secretary of Defense for Sustainment (ASD (S)), as the Chief Housing Officer, issued guidance requiring the military departments to monitor work order completion for housing privatized under the Military Housing Privatization Initiative based on a combination of resident input, timeliness of work order completion, and number of repeat work orders for the same repair. The guidance also required increased tracking of MHPI project work orders by installation staff. Moving forward, the ASD(S) plans to issue quarterly program review guidance that establishes oversight objectives for the military departments to monitor the physical condition of MHPI housing over the duration of their project ground leases, formalizing the requirement that the data be monitored by the Chief Housing Officer. DOD expects this to be completed by December 2020. We will continue to monitor the status of this recommendation.
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Secretary of the Army has taken several steps toward addressing this recommendation. For example, the Army published the Portfolio and Asset Management Handbook creating a multi-tiered assessment approach of performance metrics to measure the health of each privatized home through inspection, assessment, satisfaction, and feedback. The Army and the private housing partners revised the Incentive Fee Performance Management Plan, placing increased emphasis on resident satisfaction and work order/maintenance management. The Army also put Commanders in charge, ensuring Army leadership at every Army installation is tracking housing quality and safety. In late 2020, the Army plans to review and evaluate these actions and make a determination by 31 Jan 2021 if any changes or revisions are needed to best implement the recommendation. As such, we will continue to monitor the status of this recommendation.
Agency: Department of Defense: Department of the Air Force: Office of the Secretary of the Air Force
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Air Force is engaging in several steps to address this recommendation. Specifically, in March 2020, the Air Force tasked each of the Military Housing Offices to inspect all move-in, move-out, and change of occupancy maintenance events and all emergency, urgent, and life, health, and safety work orders, which is outlined in Air Force guidance. The Air Force is also engaging in several ongoing actions. In response to a memo to the military departments to provide consistency of performance incentive fees, the Air Force was negotiating with the privatized housing project owners to update performance incentive fee metrics in accordance with ASD directed categories and weightings. As of August 2020, agreements had been finalized with 2 partners and work was ongoing with the remaining partners. In addition, the Air Force was working with the project owners to deploy Satisfacts, a survey tool to independently measure resident satisfaction with projects' work order performance, across all Air Force projects with an expected completion by December 2020. We will continue to monitor the status of these recommendations.
Agency: Department of Defense: Department of the Navy: Office of the Secretary
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Navy and Marine Corps are engaging in several steps to address this recommendation. Specifically, the Navy and Marine Corps have developed a centralized electronic data warehouse, which receives data from privatized housing partner maintenance systems to display work order and survey performance dashboards. By February 2021, the Navy expects to complete the development of metrics displayed by the data warehouse to include key service call performance metrics and resident feedback data. The Navy and Marine Corps are also developing a web-based monitoring matrix tool housing officials can use to evaluate the performance of privatized housing partners. The tool is intended to provide improved tracking capabilities and improved accessibility to information, thus providing more consistent oversight and improved advocacy service members and their families. The Navy is also working to hire 247 additional Navy and Marine Corps housing staff to review and analyze private partner provided recurring maintenance and customer satisfaction reports in an effort to strengthen oversight and monitoring, with an estimated completion of September 2020. Moving forward, we will continue to monitor the status of these and other efforts.
Agency: Department of Defense: Office of the Secretary of Defense
Status: Open
Comments: e Department of Defense (DOD) partially concurred with this recommendation. In its August 2020 response, DOD stated that the Assistant Secretary of Defense for Sustainment (ASD(S)), as the Chief Housing Officer, plans to issue a policy directing the military departments to establish, to the maximum extent practical, minimum data requirements and consistent terminology and practices for MHPI housing unit work order collection to aid in comparability across installations and projects, and for tracking trends over time. However, DOD noted that the department cannot mandate changes to existing MHPI project legal documents. DOD estimates that this effort will be completed by December 2021. We will continue to monitor the status of this recommendation.
Agency: Department of Defense: Office of the Secretary of Defense
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Assistant Secretary of Defense for Sustainment (ASD(S)), as the Chief Housing Officer, issued guidance directing the military departments to exercise proper oversight to ensure Military Housing Privatization Initiative (MHPI) projects perform in accordance with legal agreements, to include due diligence in monitoring and auditing project maintenance records and other project performance data. The guidance also required military departments to review their entire portfolios of MHPI projects to ensure accurate and appropriate work order management processes. In response to the new guidance, DOD noted that the military departments put in place appropriate oversight measures and undertook the required reviews, though the investigations of project business practices were ongoing in some cases. As another step, the ASD(S) plans to issue guidance directing the military departments to establish a process to validate data collected by their respective MHPI Project Owners to better ensure the reliability and validity of work order data and to allow for more effective use of these data for monitoring and tracking purposes. DOD expects this to be completed by the end of September 2020. We will continue to monitor the status of this recommendation.
Agency: Department of Defense: Office of the Secretary of Defense
Status: Open
Comments: The Department of Defense (DOD) partially concurred with this recommendation based on the fact that the draft report listed the incorrect office as the source for addressing the deficiency, but subsequently changed its response to concur after the recommendation was directed to the appropriate office in the final report. In its August 2020 response, DOD noted that the Assistant Secretary of Defense for Sustainment (ASD(S)) plans to issue guidance establishing a department-wide process for collecting and calculating resident satisfaction data to ensure that the data are compiled and calculated in a standardized and accurate way effective with the survey collection effort in Fiscal Year 2021. The department expects this effort to be completed by October 2020. We will continue to monitor the status of this recommendation.
Agency: Department of Defense: Office of the Secretary of Defense
Status: Open
Comments: The Department of Defense (DOD) partially concurred with this recommendation. In its August 2020 response, DOD noted that the Assistant Secretary of Defense for Sustainment (ASD(S)) would provide additional explanation of the MHPI resident satisfaction data collected and reported in future annual Military Housing Privatization Initiative (MHPI) reports to Congress, effective with the annual report covering fiscal year 2019. DOD noted that the additional information will include, among other things, an explanation of the limitations of available survey data, how resident satisfaction was calculated, and reasons for any missing data. As of August 2020, the annual MHPI report covering fiscal year 2018 was in final coordination and the department noted that the report would addresses a vast majority, but not all, of the requirements identified in our recommendation. DOD noted that the additional information would be provided in the next annual MHPI report. We will continue to monitor the status of this recommendation.
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its response, DOD noted that the Army developed a "Plain Language" briefing as required by the 2020 National Defense Authorization Act that included the Army Housing Office's roles, responsibilities, location, and contact information at each privatized housing project site. DOD noted that the intent of the briefing was to ensure that all residents were aware of their ability to directly contact Army Housing Office and/or the Garrison Commanders. DOD stated that the briefing was disseminated to all of the Military Housing Offices, who are using it in newcomer briefings, and stated that the briefing would be provided to all current residents of privatized military housing, but that measure would not be tracked due to attrition. In addition, DOD noted that Headquarters, Department of the Army was tasking Army Materiel Command to develop a more detailed plan to communicate to residents the difference between the Army Housing Office and the private housing partner. The Army's intent is to not only capture residents upon their arrival at an installation, but making the services of the MHO known over the duration of a resident's time on at installation. We will continue to monitor the status of this recommendation.
Agency: Department of Defense: Department of the Navy: Office of the Secretary
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Navy has taken various steps to address this recommendation, with additional steps planned. For example, the Navy has ensured that each installation has a specific issue resolution process description marketing flyer available, both in hard copy and on the public housing websites, with a reminder that residents can contact both the privatized housing property manager and the Navy housing office with any issues. Moreover, every housing unit has been provided with a refrigerator magnet reminding residents that they can and should contact the Navy housing office if they have any issues with their home. In addition, the Navy and Marine Corps have established a requirement to contact each privatized housing resident not later than 15 days after move-in and again 60 days after move-in to provide an opportunity to request assistance and remind them of available support. Moving forward, the Navy has an ongoing effort to require private housing companies to market the same messaging as the service issue resolution processes for the MHOs that they support, for consistent advocacy messaging to the tenants. The information will be added to PPV partner websites, printed material and resident handbooks. The Navy also plans to use its annual survey to tracks resident satisfaction and awareness of the Navy's issue resolution process, with expected completion by October 2020. In addition, the Marine Corps has identified a near-term initiative to procure name tags for all MHO employees to wear, identifying themselves as distinct and separate from privatized housing property management company, which will be standardized across all USMC installations. The Marine Corps also plans to develop a standard welcome aboard package to include magnets and other items with key point of contact information. The Marine Corps expects these efforts to be completed by the end of September 2020.
Agency: Department of Defense: Office of the Secretary of Defense
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Assistant Secretary of Defense for Sustainment, as the Chief Housing Officer, planned to issue a policy establishing the assessment of Military Housing Privatization Initiative (MHPI) project financial viability as part of quarterly program reviews as a long-term requirement. The department noted that the program review data would be augmented by input from the MHPI companies, who are assessing the likely impact of proposed initiatives in conjunction with their third party lenders. The department expected this effort to be completed by December 2020. We will continue to monitor the status of this recommendation.
GAO-20-181, Dec 18, 2019
Phone: (202) 512-2834
Agency: General Services Administration: Office of the Administrator
Status: Open
Comments: GSA agreed with this recommendation. In its 180-day letter to the congressional clients dated March 25, 2020, GSA stated that it would provide additional documentation of invitations to its industry outreach efforts. We will review this information when it is available.
Agency: General Services Administration: Office of the Administrator
Status: Open
Comments: GSA agreed with this recommendation. In its 180-day letter to the congressional clients dated March 25, 2020, GSA stated that it would document and assess the feedback received from lessors during its outreach efforts. We will review this information when it is available.
Agency: General Services Administration: Office of the Administrator
Status: Open
Comments: GSA agreed with this recommendation. In its 180-day letter to the congressional clients dated March 25, 2020, GSA stated that it would evaluate its simplified lease model and provide documentation of the evaluation's methodology, findings, and recommendations. We will review information related to this evaluation when it is available.
GAO-20-144, Dec 12, 2019
Phone: (202) 512-2834
Agency: General Services Administration: Office of the Administrator
Status: Open
Comments: The General Services Administration (GSA) partially concurred with this recommendation. On February 6, 2020, GSA stated that it will publish summary schedule and budget results for completed projects on GSA's public-accessible prospectus website. GAO will continue to monitor GSA's actions related to this recommendation and update information accordingly.
Agency: General Services Administration: Office of the Administrator
Status: Open
Comments: GSA concurred with this recommendation, and on February 6, 2020, stated that GSA will publish updated Commissioning Guidance. GAO will continue to monitor GSA's actions related to this recommendation and update information accordingly.
Agency: General Services Administration: Office of the Administrator
Status: Open
Comments: GSA concurred with this recommendation, and on February 6, 2020, stated that GSA will publish program guidance on how and when Post Occupancy Evaluations are conducted and communicate recommendations or lessons learned to future project teams. GAO will continue to monitor GSA's actions related to this recommendation and update information accordingly.
GAO-20-130, Dec 10, 2019
Phone: (202) 512-2834
Agency: General Services Administration: Office of the Administrator
Status: Open
Comments: GSA concurred with this recommendation and has developed an action plan to implement it. In January 2020, GSA officials told us that GSA will change the method for calculating the average cost per square foot performance measure by now using the actual rent agencies paid to GSA in the calculation. GSA officials also stated that GSA will post this information annually to performance.gov. We will continue to monitor GSA's implementation of these efforts.
GAO-18-285, May 17, 2018
Phone: (202) 512-8678
Agency: Congress
Status: Open
Comments: In September 2019, Sen. Jeanne Shaheen introduced S. 2567 that proposed decoupling Section 521 rental assistance from the Section 515 mortgage, allowing rental assistance to continue after the mortgage is paid in full. The bill also would expand the use of the Section 542 Rural Development Voucher program to include all tenants in properties with loans that had matured, rather than just tenants in properties with prepaid mortgages. Sen. Shaheen's bill was referred to the Senate Committee on Banking, Housing, and Urban Affairs. As of September 2020, no additional action had been taken.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: USDA said it would prioritize the development of options for the RHS Information Technology System , including dashboards and other protocols, to provide more analytical assessments and accurate data with respect to mortgage maturity dates and property-level information. It also said it would strengthen its partnership with Rural Development's Information Technology staff and develop more effective communication tools with RHS field personnel to highlight the importance of maintaining reliable data. USDA estimated it would complete these steps by September 30, 2019. However, as of May 2020, USDA officials had not provided us documentation of their efforts.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: USDA said it would embed quality assurance in the preservation tool to ensure that the underlying data are accurately sourced, maintained, and analyzed. USDA also said it would ensure involvement from RHS National Office staff and RHS field office staff in this process to maximize the resources allocated to ensuring that the tool's data are integral and timely. Finally, USDA said RHS National Office personnel in the Deputy Administrator's office will be assigned quality control responsibility for the accurate maintenance of the tool. USDA estimated it would complete these steps by September 30, 2019. However, as of May 2020, USDA officials had not provided us documentation of their efforts.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: USDA said it would incorporate preservation goals, objectives, and measures into its on-going updates and edits to handbook guidance. As an initial step, on June 4, 2018, the agency incorporated the guidance provided in the Unnumbered Letter titled "Dynamic Servicing Strategies for the Multi-family Housing Direct Loan Portfolio." The revisions also renamed Chapter 6 of the handbook to "Portfolio and Property Assessment." USDA said on-going guidance updates will prioritize preservation as the goal of servicing strategies and require program staff to exhaust all potential remedies to achieve this goal prior to proceeding to terminate assistance or otherwise not preserve the affordable housing property. USDA officials expected these and other steps to be completed by September 30, 2019. However, in May 2020, USDA officials said publication of the guidance had been delayed, and guidance was not expected to issue until early fiscal year 2022.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: USDA said that in conjunction with its establishment of preservation goals and objectives, it would utilize a performance tracking system and establish management routines to discuss and strategize how to achieve these goals. In November 2019, USDA officials said they had assessed the Section 515 Multi-Family Housing Preservation and Revitalization demonstration program and planned to finalize a plan that would enhance program delivery efficiency and consistency within 8 months (July 2020). However, as of May 2020, USDA officials had not provided documentation showing performance tracking or routine monitoring efforts. The officials said they planned to complete an evaluation of rural housing preservation goals or objectives by the third quarter of fiscal year 2022.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: USDA said it would utilize a performance tracking system and establish management routines to discuss and strategize how to achieve its goals. According to USDA, this will include an assessment of challenges and risks that may affect the achievement of performance and preservation objectives. However, as of May 2020, USDA had not provided us documentation of its efforts to identify, analyze and respond to risks to achieving its preservation goals.
GAO-18-150, Jan 25, 2018
Phone: (202) 512-8678
including 4 priority recommendations
Agency: Department of Housing and Urban Development
Status: Open
Priority recommendation
Comments: In February 2020, HUD officials stated that PIH was continuing its workforce planning efforts, including assessing the knowledge, skills, and abilities needed to implement the MTW expansion.
Agency: Department of Housing and Urban Development
Status: Open
Comments: In February 2020, HUD officials stated that they had drafted written protocols for assessing compliance with the five demonstration requirements that would be finalized by May 2019.
Agency: Department of Housing and Urban Development
Status: Open
Priority recommendation
Comments: In February 2020, HUD officials stated that they were still determining the most cost effective way to track MTW demonstration funds being used for local, nontraditional activities.
Agency: Department of Housing and Urban Development
Status: Open
Comments: In February 2020, HUD officials stated that HUD planned to add fields for capturing data on households served through local, nontraditional activities to the next generation of PIC for expansion MTW agencies, which would be implemented in the summer of 2020. Officials said HUD is currently in the process of determining how the next generation of PIC will be rolled out for existing MTW agencies.
Agency: Department of Housing and Urban Development
Status: Open
Priority recommendation
Comments: In February 2020, HUD officials stated that they planned to monitor existing MTW agencies' Housing Choice Voucher reserves by revising their annual reporting requirements to require them to report their plans for and use of reserves.
Agency: Department of Housing and Urban Development
Status: Open
Comments: In February 2020, HUD officials stated that PIH would clarify the definition of rent reform for existing MTW agencies in a document responding to frequently asked questions on the annual reporting requirements and for expansion agencies in the operations notice that it was finalizing for the expansion of the MTW program.
Agency: Department of Housing and Urban Development
Status: Open
Comments: In February 2020, HUD officials stated that they planned to provide a range of suggested options for defining self-sufficiency in a document responding to frequently asked questions about the annual reporting requirements for MTW agencies.
Agency: Department of Housing and Urban Development
Status: Open
Comments: In February 2020, HUD officials stated that they planned to make it clear which elements are required in impact analyses, annual reevaluations, and hardship policies in the operations notice HUD was finalizing for the expansion of the MTW program. Further, HUD officials stated that the 2016 Appropriations Act that extended the standard agreement for the existing 39 MTW agencies limits HUD's ability to revise its guidance for these agencies to make it clear which elements are required in impact analyses, annual reevaluations, and hardship policies and the information required for each element. However, they stated that guidance related to the hardship policy and annual reevaluations has been updated to include more specific parameters for what an agency must submit to HUD. As we stated in our report, this guidance is set forth outside the standard agreement, which HUD already has revised without changes to the standard agreement. Therefore, we continue to believe that HUD could revise its guidance for the existing agencies to clarify which elements are required for these documents and the information each element should include.
Agency: Department of Housing and Urban Development
Status: Open
Comments: In February 2020, HUD officials stated that they had updated their most recent annual reporting requirements for MTW agencies to require a hardship policy for public housing time limits and that they were working on finalizing guidance to existing MTW agencies encouraging an impact analysis, annual reevaluation, and hardship policy for work-requirement and time-limit policies for public housing and voucher programs.
Agency: Department of Housing and Urban Development
Status: Open
Comments: In February 2020, HUD officials stated that the operations notice they were finalizing for the expansion of the MTW program would require an impact analysis, annual reevaluation, and hardship policy for work-requirement and time-limit policies new MTW agencies adopt for their public housing and voucher programs.
Agency: Department of Housing and Urban Development
Status: Open
Priority recommendation
Comments: In February 2020, HUD officials stated that they planned to develop separate analysis plans for existing and expansion MTW agencies due to differences in the types of performance information HUD can require them to report under their MTW agreements.
GAO-17-725, Sep 13, 2017
Phone: (202) 512-8678
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: In June 2019, RHS said that implementing the recommendation would require information technology funding.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: In June 2019, RHS said that implementing the recommendation would require information technology funding.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: In June 2019, RHS said it would incorporate the recommended controls into the fiscal year 2021 budget cycle.
Agency: Department of Agriculture: Rural Housing Service
Status: Open
Comments: In June 2019, RHS said it was working toward providing the recommended guidance to Rural Development state offices.
GAO-17-635, Jul 26, 2017
Phone: (202) 512-2834
Agency: Department of Defense: Department of the Army: Office of the Assistant Secretary (Civil Works)
Status: Open
Comments: DOD concurred with our recommendation. As of December 2019, officials from the Corps stated that they are working to develop additional metrics for dredging decisions and will brief congressional committees on the results. We will continue to follow the Corps' progress in addressing this recommendation.
GAO-16-188, Jan 13, 2016
Phone: (202) 512-2834
Agency: General Services Administration
Status: Open
Comments: In November 2018, GSA officials said that they were unlikely to implement this recommendation because it would shift costs from the tenants to GSA but not reduce overall costs. GAO continues to believe that reducing unnecessary costs to tenant agencies would reduce overall leasing costs by encouraging GSA to be more efficient.
GAO-16-105, Dec 17, 2015
Phone: (202) 512-5431
including 1 priority recommendation
Agency: Department of Defense
Status: Open
Comments: DOD concurred with this recommendation. DOD has taken steps to clarify what types of contractor personnel should be accounted for in its guidance on personnel status reports, but, as of July 2019, revision of that guidance is ongoing. According to Joint Staff officials in May 2018, CJCSM 3150.13C provides policy and guidance on what types of contractor personnel to account for in personnel status reports, and the updated guidance will incorporate lessons learned from USAFRICOM's implementation of that policy. The updated CJCSM 3150.13C is projected to be completed by Summer 2018. Once issued, USAFRICOM officials stated they will incorporate their local policies and standards into the CJCSM 3150.13C, and expect that a coordinated directive on local policies, procedures and standards will mitigate many of the previous interpretation issues. However, additional training and amplifying local procedures issued by the USAFRICOM J-1 may be necessary to fully implement its provisions and ensure consistent interpretation. Additionally, in February 2016, a class deviation became effective for the USAFRICOM area of responsibility (AOR). This deviation superseded Class Deviations 2014-O0005, and 2015-O0003. The deviation stated that contracting officers shall incorporate clause 252.225-7980, Contractor Personnel Performing in the United States Africa Command Area of Responsibility, in lieu of the clause at DFARS 252.225-7040, Contractor Personnel Supporting U.S. Armed Forces Deployed Outside the United States, in all solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items that will require contractor personnel to perform in the United States Africa Command (USAFRICOM) area of responsibility. In addition, to the extent practicable, contracting officers shall modify current, active contracts with performance in the USAFRICOM AOR to include the clause 252.225-7980. The USAFRICOM Commander has identified a need to utilize the Synchronized Pre-deployment and Operational Tracker for all contracts performed in the AOR during all operational phases (including Phase 0), not limited to declared contingency operations. However, until CJCSM 3150.13C clarifying the types of contractor personnel and incorporating lessons learned from AFRICOM's implementation is finalized, this recommendation will remain open. As of July 2020, this CJSM had not been updated. Moreover, in July 2020, DOD stated that reissuance of DOD Instruction 3020.41, Operational Contract Support, is required in order to implement this recommendation. When DOD takes further action, we will update this recommendation.
Agency: Department of Defense
Status: Open
Priority recommendation
Comments: DOD concurred with this recommendation. As of July 2019, DOD has taken steps to develop foreign vendor vetting guidance, but is still working to determine key components of that guidance. Office of the Deputy of the Secretary of Defense issued a directive type memorandum in April 2018 that establishes policy and assigns responsibility for developing vendor vetting guidance to the Under Secretary of Defense for Acquisition and Sustainment, the Under Secretary of Defense for Policy, the Under Secretary of Defense for Intelligence, and the Chairman of the Joint Chiefs of Staff. Additionally, DOD established a foreign vendor vetting working group in January 2017 to, among other things, develop guidance that will define foreign vendor vetting as a distinct function and provide combatant commanders with guidance on addressing the risks associated with relying on commercial vendors. As of November 2019, OSD officials stated the working group is making progress to develop a formal charter, identify tools and strategies to enhance vendor vetting across the combatant commands, and establish a department-wide vendor vetting policy. Until DOD develops vendor vetting guidance, this recommendation will remain open. As of July 2020, DOD had extended its directive type memorandum, but had not developed vendor vetting guidance. When we confirm what additional actions the agency has taken in response to this recommendation, we will provide updated information.