GAO’s recommendations database contains report recommendations that still need to be addressed. GAO’s priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. Below you can search only priority recommendations, or search all recommendations.
Our recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Moreover, when implemented, some of our priority recommendations can save large amounts of money, help Congress make decisions on major issues, and substantially improve or transform major government programs or agencies, among other benefits.
As of October 25, 2020, there are 4812 open recommendations, of which 473 are priority recommendations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented.
Browse or Search Open Recommendations
Have a Question about a Recommendation?
- For questions about a specific recommendation, contact the person or office listed with the recommendation.
- For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
Results:
Subject Term: Contracts
GAO-18-34, Nov 9, 2017
Phone: (202) 512-4841
including 1 priority recommendation
Agency: Department of Veterans Affairs
Status: Open
Priority recommendation
Comments: The Department of Veterans Affairs (VA) agreed with GAO's November 2017 recommendation. VA planned to implement a new Medical-Surgical Prime Vendor (MSPV) program, called MSPV 2.0, by March 2020; however, this program has been delayed to at least January 2021. MSPV 2.0 includes a process where clinicians review requirements for a set list of products. As of August 2020, VA is beginning the national rollout of this clinician review process, but the results of this process won't be implemented until after MSPV 2.0 begins. VA's strategy for its MSPV program depends on full implementation of this clinician review process.
Agency: Department of Veterans Affairs
Status: Open
Comments: The Department of Veterans Affairs (VA) agreed with GAO's November 2017 recommendation. VA implemented a tool-the Medical Product Data Bank's eZSAVE application-to improve the matching of equivalent supply items. In November 2018, VA reported that it holds monthly meetings with selected clinical and logistics staff to obtain their input on the matching process. However, as of August 2020, VA has not provided documentation showing how it has defined the role of clinical staff, including Clinical Product Review Committees, in this process. Without documentary support, GAO cannot assess the extent of the clinical staff role in the matching process. If the roles of clinicians are not clearly defined, it increases the risk of inconsistent involvement in the matching process.
Agency: Department of Veterans Affairs
Status: Open
Comments: The Department of Veterans Affairs (VA) agreed with GAO's November 2017 recommendation. VA's planned Medical-Surgical Prime Vendor (MSPV) 2.0 program includes engaging selected clinicians in its requirement development for a set list of products, known as Clinician-Driven Strategic Sourcing. In April 2019, VA began a pilot for this clinician review process, including input from national clinical program offices. As of August 2020, VA is beginning the national rollout of this process. VA does not plan to incorporate the results of this clinician review process in the list of available supplies until after MSPV 2.0 is implemented, which has been delayed until at least January 2021. Until VA implements MSPV 2.0 and incorporates the results of the Clinician-Driven Strategic Sourcing process, it will not be able to achieve its goals of cost savings and improved clinical consistency.
Agency: Department of Veterans Affairs
Status: Open
Comments: The Department of Veterans Affairs (VA) agreed with GAO's November 2017 recommendation. In August 2019, senior VA acquisition officials agreed to conduct an analysis of its spending to identify items that the department frequently purchases on an emergency basis and to develop plans to purchase those goods and services more strategically, such as by issuing a national contract or adding the items to the formulary as needed. As of August 2020, these officials indicated they would provide this analysis to GAO by the end of 2020.
Agency: Department of Veterans Affairs
Status: Open
Comments: The Department of Veterans Affairs (VA) agreed with GAO's November 2017 recommendation. VA reported that it added thousands of items to the Medical-Surgical Prime Vendor (MSPV) formulary from June 2018 through December 2018, some of which had previously been purchased on an emergency basis. VA also reported in June 2018 and updated in March of 2020 that it is tracking items purchased on an emergency basis. However, as of August 2020, VA has not provided documentation showing whether and how this analysis has informed its selection of which products to add to the formulary. Without documentary support, GAO cannot assess the extent to which items that VA added to the formulary were previously purchased on an emergency basis. If VA does not use analysis of emergency procurements to help inform which items should be added to the MSPV formulary, it will miss opportunities to avoid emergency procurements and increase efficiency.
GAO-17-738, Sep 28, 2017
Phone: (202) 512-4841
Agency: Department of Health and Human Services
Status: Open
Comments: The Department of Health and Human Services agreed with the recommendation and has developed a template and instructions for quarterly reporting from its divisions. The Department identified some performance measures that it will monitor on a quarterly basis, such as contracts closed on time and total backlog. Due to competing priorities and focus on the COVID-19 response, the Department plans to provide additional steps toward progress at the next reporting cycle.
Agency: Department of Justice
Status: Open
Comments: The Department of Justice agreed with the recommendation and in early fiscal year 2020 enhanced its financial management system to allow the Bureaus to assess whether a contract needs to be closed out. The Department anticipates that the associated guidance, which includes performance measures, will be issued in late summer 2020.
Agency: Department of State
Status: Open
Comments: The Department of State agreed with the recommendation and is upgrading its system to improve data quality and enable the tracking and sharing of contract closeout information. The enhancements to the contracting system would allow the Department to establish a baseline and develop metrics to measure progress on closing contracts. The Department anticipates that the upgrades and data utilization will continue into fiscal year 2021.
GAO-17-464, Sep 21, 2017
Phone: (202) 512-4456
Agency: Department of Agriculture
Status: Open
Comments: The U.S. Department of Agriculture (USDA) concurred with our recommendation and stated that it plans to, among other things, provide the EIS vendor community with USDA's future vision and requirements in order to enable each vendor to propose optimal solutions; and update the cost benefit analysis of new technologies while reviewing vendor proposals. However, USDA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor USDA's progress on these efforts.
Agency: Department of Agriculture
Status: Open
Comments: As we recommended, the U.S. Department of Agriculture (USDA) identified transition roles and responsibilities related to the management of assets, human capital, and information security, and legal expertise. USDA also developed a communications plan and change management plan for the transition. However, the department has not yet demonstrated that it has implemented change management, nor that it is using configuration management for the transition. We will continue to monitor USDA's progress in implementing this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: U.S. Department of Agriculture (USDA) officials stated that they are in the process of completing an Independent Government Cost Estimate for the transition. The officials also stated that the department is creating an EIS support organization that will address staffing needs for the transition. However, USDA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor USDA's progress in implementing this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: The U.S. Department of Agriculture (USDA) concurred with our recommendation and stated that it plans to (1) incorporate mission-critical priorities into USDA's requests for quotes; (2) ensure that critical systems are inventoried and that their respective transition plans ensure continuity of operations; and (3) prioritize mission-critical functions within its transition timeline. However, USDA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor USDA's progress in implementing this recommendation.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the agency is in the process of developing an inventory of its telecommunications assets and services that are associated with GSA's expiring contracts (e.g., Networx). The officials noted that, as part of the department's transition to EIS, DOL plans to include only limited non-GSA/commercial telecommunications assets and services in its initial transition efforts and inventory. The officials further stated that DOL will not focus on these non-GSA/commercial assets and services until the department completes its transition of assets and services associated with GSA's expiring contracts. We will continue to monitor the department's efforts to develop a complete telecommunications inventory, including assets and services associated with both GSA and non-GSA/commercial contracts, and associated maintenance processes for this inventory.
Agency: Department of Labor
Status: Open
Comments: The Department of Labor (DOL) provided documentation demonstrating that it has identified certain future telecommunications needs for the department, but DOL did not identify these needs using a complete inventory of its current telecommunications assets and services. In addition, the department demonstrated that it had completed a draft strategic analysis of its telecommunications requirements, but this analysis was not yet finalized and approved. Further, the department has not yet demonstrated that it has aligned its identified telecommunications needs with its long-term plans and enterprise architecture. We will continue to monitor DOT's efforts to implement this recommendation.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the department is in the process of selecting a project manager to develop the Transition Project Plan and other supporting documentation for the transition, including a communications plan. DOL expects to develop this documentation around March 2020. We will continue to monitor the department's progress on these efforts.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the department is in the process of selecting a project manager to develop the Transition Project Plan and other documentation that would address this recommendation. The officials expect to develop this documentation around March 2020. We will continue to monitor the department's efforts to implement this recommendation.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the department is in the process of selecting a project manager to develop the Transition Project Plan and other documentation that would address this recommendation. The officials expect to develop this documentation around March 2020. We will continue to monitor the department's efforts to implement this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: The Securities and Exchange Commission (SEC) concurred with our recommendation. SEC stated that it plans to establish an EIS planning team comprised of key IT personnel from across the agency to identify, among other things, future needs and areas for improvement, so that SEC can incorporate the results into its transition planning. However, SEC has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor SEC's progress implementing this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: The Securities and Exchange Commission (SEC) concurred with our recommendation and stated that it plans to document the roles and responsibilities of key EIS transition team members across the agency. The agency also plans to develop a transition communications plan that includes configuration and change management practices. However, SEC has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor SEC's progress implementing this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: In response to our recommendation, the Securities and Exchange Commission (SEC) provided a high-level budget estimate for the transition. However, it was unclear what costs were included in this estimate and the agency did not provide documentation that justified the costs identified. In addition, SEC has not yet provided an analysis of the staff resources it needs for the transition, nor an analysis of the training needs for the staff assisting with the transition. We will continue to monitor SEC's efforts to implement this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: The Securities and Exchange Commission (SEC) has demonstrated that its transition goals and measures align with its mission. In addition, the commission has identified transition risks related to continuity of operations. However, SEC has not yet identified transition risks related to its critical systems, nor identified mission-critical priorities in its transition timeline. We will continue to monitor SEC's progress on these efforts.
Agency: Social Security Administration
Status: Open
Comments: Social Security Administration (SSA) officials stated that the agency is in the process of making significant changes to its procedures and policy for its telecommunications inventory. The officials expect to have a complete inventory of their telecommunications assets and services by 2021. We will continue to monitor SSA's efforts to implement this recommendation.
Agency: Social Security Administration
Status: Open
Comments: Social Security Administration (SSA) officials stated that the agency's priority is to transition its telecommunications services on a like-for-like basis, in order to complete the transition before its existing contracts expire, as well as to receive immediate cost savings. Officials also stated that, once SSA has released its EIS solicitations, they plan to analyze the alignment of their future telecommunications needs with the agency's enterprise architecture. However, SSA has not yet provided documentation demonstrating that it has completed this analysis. We will continue to monitor SSA's progress on these efforts.
Agency: Social Security Administration
Status: Open
Comments: The Social Security Administration (SSA) provided documentation demonstrating that it has implemented a change management process, including establishing a change control board that is scheduled to meet on a weekly basis and tracking change requests in its IT Service Management tool. However, SSA has not yet demonstrated that it has implemented configuration management processes for its transition. We will continue to monitor SSA's efforts to implement these processes.
Agency: Social Security Administration
Status: Open
Comments: The Social Security Administration (SSA) provided documentation demonstrating that it has identified the staff resources and required training for staff working on the transition. However, SSA has not yet provided documentation demonstrating that it has identified the funding resources needed for the full transition, nor documented the costs and benefits of transition investments, such as for resource requests related to transition program management staff. We will continue to monitor SSA's efforts to fully implement this recommendation.
Agency: Social Security Administration
Status: Open
Comments: The Social Security Administration (SSA) has identified transition risks related to critical systems and continuity of operations. In addition, SSA officials stated that the agency is in the process of identifying (1) agency-specific measures of success for the transition and (2) mission-critical priorities that need to be incorporated into its transition timeline. However, SSA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor SSA's efforts to fully implement this recommendation.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) officials stated that the department has developed a comprehensive inventory of its telecommunications assets and services, and maintains this inventory on a regular basis. However, as of August 2020, the department has not yet provided documentation of its inventory or the associated maintenance processes. We will continue to monitor DOT's efforts to complete this inventory and establish a maintenance process for it.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) officials stated that they conducted an assessment of the department's future telecommunication requirements. According to officials, the results of this analysis were included in an EIS Statement of Work. However, DOT has not demonstrated that it used its complete inventory of existing services to identify its future needs. DOT also stated that it has conducted extensive research to identify areas for optimization and sharing, but did not provide documentation of this research. Further, DOT has not provided evidence that the department has aligned its transition approach with its long-term plans and enterprise architecture. We will continue to follow-up with DOT regarding these efforts.
Agency: Department of Transportation
Status: Open
Comments: The Department of Transportation (DOT) developed a transition communications plan and identified roles and responsibilities related to legal expertise, the management of assets and human capital. DOT has also provided evidence that they are requiring the use of change management in the transition. However, DOT has not demonstrated that it is applying configuration management processes to DOT's transition efforts. We will continue to monitor DOT's efforts to implement this recommendation.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) developed a transition resource plan that identifies functional roles needed for the transition, such as network engineers and staff to place new telecommunications orders. However, the transition resource plan did not identify the staffing levels needed for each of the functional roles, such as how many network engineers are necessary, and DOT did not provide other documentation that fully identifies these resources needs. In addition, DOT has not yet provided documentation that it has identified the funding needed for the full transition, justified requests for transition resources, or fully analyzed training needs for staff assisting with the transition. We will continue to follow-up on DOT's efforts to implement this recommendation.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) provided evidence that its transition goals and measures align with its mission and that it has identified the risks associated with the EIS transition. However, DOT has not yet provided documentation demonstrating that it has identified mission-critical priorities in its transition timeline. We will continue to monitor DOT's efforts to implement this recommendation.
Phone: (202) 512-4841
Agency: Department of Defense: Office of the Secretary of Defense: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics
Status: Open
Comments: DOD concurred with our recommendation and has taken steps to address it. For example, in April 2018, the department developed a template for the military departments to use to identify specific types of information to collect. Since then, each of the military departments has initiated or planned to initiate efforts to collect and analyze information about outcomes of incentive contracts. In addition, in July 2020 DOD provided examples of selected DOD, Army, and Navy incentive contracts documented in the template previously noted. The department did not provide additional information about the Air Force's efforts, or about how DOD is analyzing the information to determine whether incentives can achieve desired outcomes. GAO has ongoing work to review DOD's use of fixed-price type contracts--including fixed-price incentive contracts--for major DOD systems, which may provide additional insights related to this recommendation.
GAO-17-457, Jun 22, 2017
Phone: (202) 512-4841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation. DASA(P) officials indicated that organizations can determine cost savings attributable to contracting utilizing the Virtual Contracting Enterprise. However, this method is not formalized or documented in policy or guidance, and DASA(P) officials have not incorporated cost savings attributable to contracting into the CERs. We continue to believe that the Army should implement a CER metric to evaluate cost savings attributable to contracting activities.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation. DASA(P) officials noted that the Contractor Performance Assessment Reporting System (CPARS) is the system for processing and collecting contractor performance information, but also expressed that the information contained in the system may not be reliable for assessing contractor performance. The information contained in CPARS is subjective and has had thousands of overdue required entries. The DASA(P) officials subsequently stated that DOD made improvements to CPARS based on a 2017 DOD Inspector General report. However, the officials have not provided any information identifying specific improvements DOD made, or evidence that CPARS is now an effective means to collect and report contractor performance data.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation. DASA(P) is in the process of implementing talent management metrics through its Contracting Enterprise Review (CER) briefings. To this end, the 2nd quarter, fiscal year 2020 CER briefing included information about skill-based hiring and flexibilities for tailored training. However, the CER briefing did not address the department's contracting workforce requirements. We continue to believe that the ASA(ALT) should accurately determine the department's contracting workforce requirements in accordance with the Army's needs.
GAO-15-588, Jul 9, 2015
Phone: (202) 512-4841
Agency: Department of Health and Human Services
Status: Open
Comments: The Department of Health and Human Services concurred with this recommendation. The Indian Health Service (IHS) informed GAO that in order to clarify and codify the policies related to priority for use of the Buy Indian Act, formal rulemaking was required. IHS published the intent to promulgate the regulation in the Fall 2019 and Spring 2020 Unified Agendas. According to IHS officials, the timeline for completion of the new regulation is December 31, 2020.
Agency: Department of Health and Human Services
Status: Open
Comments: The Department of Health and Human Services concurred with this recommendation. The Indian Health Service (IHS) informed GAO that in order to clarify and codify policies related to priority for use of the Buy Indian Act, formal rulemaking was required. IHS published the intent to promulgate the regulation in the Fall 2019 and Spring 2020 Unified Agendas. Further, the officials stated that once the new Buy Indian regulation is promulgated, IHS plans to identify a plan to collect data on area office implementation of key policy requirements, including monitoring authentication of contractor credentials. According to IHS officials, due to limitations within the Federal Procurement Data System- Next Generation IHS is unable to collect the necessary data until the rule is promulgated.
GAO-15-432, Jun 17, 2015
Phone: (202) 512-3841
Agency: Executive Office of the President: Office of Management and Budget
Status: Open
Comments: In July 2020, GAO requested information on the status of the recommendation. We will update the recommendation's status when information is received from OMB.
GAO-14-476, Jun 30, 2014
Phone: (202) 512-4456
including 1 priority recommendation
Agency: Executive Office of the President: Office of Management and Budget
Status: Open
Priority recommendation
Comments: OMB has taken several steps related to this recommendation as of December 2019, but have not fully addressed it. Specifically, working with the Department of the Treasury to implement the DATA Act, OMB took partial action on two aspects of the recommendation and are still considering actions on two others. 1) OMB staff said they continue to deliberate on agency responsibilities for reporting awards funded by non-annual appropriations. 2) OMB staff provided a Frequently Asked Question (FAQ) addressing the applicability of USASpending.gov reporting requirements for recipient information related to classified or sensitive information. GAO reviewed the FAQ and determined that additional guidance is still needed to ensure complete reporting of unclassified awards as required by FFATA. 3) OMB staff have agreed that it will be important to clarify guidance on how agencies can report on award titles that appropriately describes the awards' purposes and noted that they are working on providing additional guidance to agencies as part of their larger DATA Act implementation efforts. 4) OMB released policy guidance in May 2016 (MPM 2016-03) that identifies the authoritative sources for reporting procurement and award data. However, GAO's review of this policy guidance determined that it does not address the underlying source that can be used to verify the accuracy of non-financial procurement data or any source for data on assistance awards.