Reports & Testimonies
Recommendations Database
GAO’s recommendations database contains report recommendations that still need to be addressed. GAO’s priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. Below you can search only priority recommendations, or search all recommendations.
Our recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Moreover, when implemented, some of our priority recommendations can save large amounts of money, help Congress make decisions on major issues, and substantially improve or transform major government programs or agencies, among other benefits.
As of October 25, 2020, there are 4812 open recommendations, of which 473 are priority recommendations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented.
Browse or Search Open Recommendations
Have a Question about a Recommendation?
- For questions about a specific recommendation, contact the person or office listed with the recommendation.
- For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
Results:
Subject Term: "Federal procurement"
GAO-20-567, Sep 30, 2020
Phone: (202) 512-4456
Agency: Department of Agriculture
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Agriculture
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Agriculture
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Agriculture
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Agriculture
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Health and Human Services
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Justice
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Justice
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Justice
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Justice
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Justice
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of State
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Veterans Affairs
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Veterans Affairs
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Veterans Affairs
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Veterans Affairs
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Veterans Affairs
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Veterans Affairs
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-20-417, May 7, 2020
Phone: (202) 512-4841
Agency: Department of Homeland Security
Status: Open
Comments: DHS disagreed with our recommendation, preferring to maintain the status quo in its policy and procedures. However, by doing so, DHS is missing important opportunities to prevent negative acquisition outcomes and the potential for wasted resources. In its response, DHS noted its processes for major acquisitions, however, DHS service programs and contracts did not rise to the level of being classified a major service acquisition.
Agency: Department of Homeland Security
Status: Open
Comments: DHS did not concur with this recommendation, maintaining that the factors considered when waiving a Procurement Strategy Roadmap are not static. We believe, however, that documenting the factors considered will help ensure that the decisions to waive the Procurement Strategy Roadmaps are made consistently, transparently, and help maintain institutional knowledge.
Agency: Department of Homeland Security
Status: Open
Comments: DHS concurred with this recommendation and stated that it will update the Inherently Governmental and Critical Functions Analysis job aid to require the identification of a special interest function when applicable.
Agency: Department of Homeland Security
Status: Open
Comments: DHS did not concur with this recommendation maintaining that the components are certifying that they have sufficient internal capacity or federal employees available for oversight within the Inherently Governmental and Critical Functions Analysis. We continue to believe, however, that without guidance, each component is making its own determination about which factors to consider, and DHS does not know how or whether the components are considering the federal workforce available to oversee service contracts in need of heightened management attention, or what steps, if any, the components are taking to mitigate risks if there are not enough federal personnel available to oversee the contracts after award.
Agency: Department of Homeland Security
Status: Open
Comments: DHS concurred with this recommendation and stated that it will develop guidance that identifies oversight tasks or safeguards that personnel can perform, when needed, to mitigate the risk associated with contracts containing closely associated with inherently governmental, special interest, or critical functions.
Agency: Department of Homeland Security
Status: Open
Comments: DHS did not concur with this recommendation stating that its annual Congressional Budget Justification already contains substantial service contract information. We maintain, however, that the service contract information currently included limits visibility for both DHS and Congress into requested and actual service requirements costs.
GAO-20-279, Mar 5, 2020
Phone: (202) 512-4456
Agency: Executive Office of the President: Office of Management and Budget
Status: Open
Comments: The Office of Management and Budget (OMB) has not yet taken action to address this recommendation. We will continue to monitor the agency's efforts to implement this recommendation.
Agency: Executive Office of the President: Office of Management and Budget
Status: Open
Comments: The Office of Management and Budget (OMB) has not yet taken action to address this recommendation. We will continue to monitor the agency's efforts to implement this recommendation.
Agency: Executive Office of the President: Office of Management and Budget
Status: Open
Comments: The Office of Management and Budget (OMB) has not yet taken action to address this recommendation. We will continue to monitor the agency's efforts to implement this recommendation.
Agency: Executive Office of the President: Office of Management and Budget
Status: Open
Comments: The Office of Management and Budget (OMB) has not yet taken action to address this recommendation. We will continue to monitor the agency's efforts to implement this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: In comments on our report, the Department of Agriculture (Agriculture) agreed with our recommendation and stated that it planned to meet the cost savings target in 2020. We will continue to monitor Agriculture's efforts to implement this recommendation.
Agency: Department of Commerce: Office of the Secretary
Status: Open
Comments: In comments on our report, the Department of Commerce (Commerce) agreed with our recommendation and described actions that they planned to take in order to address the recommendation. We will continue to monitor Commerce's efforts to implement this recommendation.
Agency: Department of Commerce: Office of the Secretary
Status: Open
Comments: In comments on our report, the Department of Commerce (Commerce) agreed with our recommendation and described actions that they planned to take in order to address the recommendation. We will continue to monitor Commerce's efforts to implement this recommendation.
Agency: National Aeronautics and Space Administration
Status: Open
Comments: In comments on our report, the National Aeronautics and Space Administration (NASA) agreed with our recommendation and described actions that the agency planned to take to address the recommendation. NASA stated that it expected to complete these actions by March 31, 2020. Once we have obtained and assessed evidence of the agency's actions taken, we will update the status of this recommendation.
GAO-19-281, Apr 24, 2019
Phone: (202) 512-4841
Agency: General Services Administration
Status: Open
Comments: The General Services Administration (GSA) and the Department of Defense (DOD) concurred with the recommendation and the need to regularly review the memorandum of agreement (MOA) and make revisions as applicable. The Department of Homeland Security (DHS) did not respond to the recommendation. In August 2019, GSA, DHS, and DOD revised the agreement, but the revisions did not fully address the recommendation. The revisions included a change to one criterion for closing National Interest Action (NIA) codes--adding consistent decline in contract actions as a criterion and removing the criterion that relied on alternative tracking methods at agencies. However, the revisions to the MOA did not include changes that provide a process to ensure consistent implementation of criteria, or address long-term visibility needs, or account for the needs of users. In July 2020, a DHS official stated that DOD and DHS had conducted an annual review of the MOA and determined no changes were necessary, and that DOD and DHS would consider potential updates to the MOA during their next annual review. GSA officials clarified that, in terms of updating the MOA, GSA is the servicing agency and does not have the authority to determine the criteria for establishing, extending, or end-dating NIA codes. GSA officials stated, and DHS officials agreed, that DHS and DOD determine the criteria for whether a NIA code needs to be established, extended, or end-dated.
Agency: Executive Office of the President: Office of Management and Budget: Office of Federal Procurement Policy
Status: Open
Comments: The Office of Federal Procurement Policy concurred with this recommendation. In September 2019, officials identified the Emergency Acquisition Guide as a vehicle to address this recommendation. The Emergency Acquisition Guide, last updated in 2011, is intended to assist the federal contracting community with planning and carrying out procurement activities during contingency events. However, officials did not provide details on how this recommendation would be incorporated or provide time frames for when the guide would be updated. As of July 2020, Office of Federal Procurement Policy staff had not provided an update on implementation of this recommendation.
Agency: Department of Homeland Security: United States Coast Guard
Status: Open
Comments: The US Coast Guard concurred with this recommendation. In its agency response, the Coast Guard stated that it was reviewing its current policies and processes to update its After Action Report Policy or to identify and implement other policy improvements. As of July 2020, these actions were still in progress.
Agency: Department of Homeland Security: Directorate of Emergency Preparedness and Response: Federal Emergency Management Agency
Status: Open
Comments: The Federal Emergency Management Agency (FEMA) concurred with the recommendation. In its response, FEMA stated it would work with its federal partners and develop mission assignment project management tools and training. In addition, FEMA is planning to develop a Mission Assignment Project Manager Guide to provide guidance to address the issues GAO identified. As of July 2020, FEMA indicated it would develop a new project plan and timeline for completing these actions in the winter of 2020.
Agency: Department of Homeland Security: Directorate of Emergency Preparedness and Response: Federal Emergency Management Agency
Status: Open
Comments: The Federal Emergency Management Agency (FEMA) concurred with this recommendation. In its official response, FEMA stated it would take actions to address this recommendation, including hiring contractor support and additional Cadre of On-Call Response/Recovery Employees. As of August 2020, these actions were still in progress. FEMA officials indicated that its workforce assessment was expected to be complete in December 2020.
GAO-19-63, Dec 11, 2018
Phone: (202) 512-4841
Agency: Department of Defense
Status: Open
Comments: In November 2018, and in response to our draft report, DOD stated that it would analyze the Federal Procurement Data System- Next Generation data in an effort to identify why the miscoding of orders under multiple award contracts occurs, and use this information to advise the contracting community of actions to improve the reliability of the competition data. In July 2019, DOD officials stated they did not have an update regarding planned actions to address the recommendation. As of September 2020, DOD officials did not respond to our multiple requests for updates to this recommendation.
Agency: Department of Health and Human Services
Status: Open
Comments: In February 2019, HHS stated it was performing analysis and research to understand the reasons for the miscoding of orders. Once this analysis and research is completed, HHS reported it plans to work to address the root causes of the previously identified miscodings, so as to prevent future errors. In July 2019, HHS officials stated they did not have an update regarding planned actions to address the recommendation. As of September 2020, HHS officials did not respond to our multiple requests for updates to this recommendation.
GAO-19-54, Nov 13, 2018
Phone: (202) 512-4841
Agency: Department of Defense
Status: Open
Comments: DOD agreed with this recommendation and issued supplemental guidance in September 2019. The guidance does not clarify what goods qualify as being predominantly expendable in nature, nontechnical, or have a short life expectancy or shelf life. It states contracting officers should check with the requiring activity to make this determination. However, since there is no clear definition of these terms, requiring activities will not have any better insight how to apply this criterion than contracting officers. We maintain that DOD needs to clarify how these terms should apply to goods..
Agency: Department of Defense
Status: Open
Comments: DOD agreed with this recommendation and issued supplemental guidance in September 2019. This guidance states it is up to the requiring activity to document that the lowest price reflects the full life cycle costs. However, through our work it was unclear to those we interviewed how to determine a full life cycle costs for services. The guidance cites DoD Instruction 4140.01, DoD Supply Chain Material Management Policy for further guidance on how to determine life cycle costs for services. This policy does not clarify how life cycle costs should be applied to services. We maintain that DOD needs to clarify how this requirement should be implemented by contracting officers as the guidance issued does not do this.
GAO-18-672, Sep 27, 2018
Phone: (202) 512-8678
Agency: Small Business Administration
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Small Business Administration
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-18-148, Nov 7, 2017
Phone: (202) 512-9286
Agency: Department of Agriculture
Status: Open
Comments: In September 2019, a Department of Agriculture official stated that the department was working to establish a policy to include the information noted in our recommendation and planned to finalize a policy by the end of December 2019. We will continue to monitor the department's progress on these efforts.
Agency: Department of Veterans Affairs
Status: Open
Comments: The Department of Veterans Affairs (VA) has taken action, and stated that it would draft a policy to address our recommendation. In November 2019, a VA official stated that the department is working to address our recommendation but did not identify timeframes for when all activities would be completed. We will continue to evaluate the department's progress in implementing this recommendation.
Agency: Environmental Protection Agency
Status: Open
Comments: The Environmental Protection Agency (EPA) concurred with our recommendation and stated that it planned to develop a policy to implement this recommendation and other FITARA issues. Specifically, EPA officials reported in July 2019 that the agency was continuing to work to address the recommendation but did not provided a time frame for when a policy would be finalized. We will continue to monitor EPA's progress on these efforts.
Agency: National Aeronautics and Space Administration
Status: Open
Comments: The National Aeronautics and Space Administration (NASA) concurred with our recommendation and reported that the agency was in the process of addressing it. Specifically, NASA officials reported in June 2020 that its guidance is currently being updated to include the information noted in our recommendation and will be finalized by September 2020. We will continue to monitor NASA's progress on these efforts.
Agency: Office of Personnel Management
Status: Open
Comments: The Office of Personnel Management (OPM) concurred with our recommendation and stated that it would update its policies and processes to include the elements we recommended. Specifically, OPM officials reported in November 2019 that guidance on CIO certification was being developed but the agency had not yet determined a time frame for finalizing the policy. We will continue to monitor OPM's progress on these efforts.
GAO-17-738, Sep 28, 2017
Phone: (202) 512-4841
Agency: Department of Health and Human Services
Status: Open
Comments: The Department of Health and Human Services agreed with the recommendation and has developed a template and instructions for quarterly reporting from its divisions. The Department identified some performance measures that it will monitor on a quarterly basis, such as contracts closed on time and total backlog. Due to competing priorities and focus on the COVID-19 response, the Department plans to provide additional steps toward progress at the next reporting cycle.
Agency: Department of Justice
Status: Open
Comments: The Department of Justice agreed with the recommendation and in early fiscal year 2020 enhanced its financial management system to allow the Bureaus to assess whether a contract needs to be closed out. The Department anticipates that the associated guidance, which includes performance measures, will be issued in late summer 2020.
Agency: Department of State
Status: Open
Comments: The Department of State agreed with the recommendation and is upgrading its system to improve data quality and enable the tracking and sharing of contract closeout information. The enhancements to the contracting system would allow the Department to establish a baseline and develop metrics to measure progress on closing contracts. The Department anticipates that the upgrades and data utilization will continue into fiscal year 2021.
GAO-17-464, Sep 21, 2017
Phone: (202) 512-4456
Agency: Department of Agriculture
Status: Open
Comments: The U.S. Department of Agriculture (USDA) concurred with our recommendation and stated that it plans to, among other things, provide the EIS vendor community with USDA's future vision and requirements in order to enable each vendor to propose optimal solutions; and update the cost benefit analysis of new technologies while reviewing vendor proposals. However, USDA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor USDA's progress on these efforts.
Agency: Department of Agriculture
Status: Open
Comments: As we recommended, the U.S. Department of Agriculture (USDA) identified transition roles and responsibilities related to the management of assets, human capital, and information security, and legal expertise. USDA also developed a communications plan and change management plan for the transition. However, the department has not yet demonstrated that it has implemented change management, nor that it is using configuration management for the transition. We will continue to monitor USDA's progress in implementing this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: U.S. Department of Agriculture (USDA) officials stated that they are in the process of completing an Independent Government Cost Estimate for the transition. The officials also stated that the department is creating an EIS support organization that will address staffing needs for the transition. However, USDA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor USDA's progress in implementing this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: The U.S. Department of Agriculture (USDA) concurred with our recommendation and stated that it plans to (1) incorporate mission-critical priorities into USDA's requests for quotes; (2) ensure that critical systems are inventoried and that their respective transition plans ensure continuity of operations; and (3) prioritize mission-critical functions within its transition timeline. However, USDA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor USDA's progress in implementing this recommendation.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the agency is in the process of developing an inventory of its telecommunications assets and services that are associated with GSA's expiring contracts (e.g., Networx). The officials noted that, as part of the department's transition to EIS, DOL plans to include only limited non-GSA/commercial telecommunications assets and services in its initial transition efforts and inventory. The officials further stated that DOL will not focus on these non-GSA/commercial assets and services until the department completes its transition of assets and services associated with GSA's expiring contracts. We will continue to monitor the department's efforts to develop a complete telecommunications inventory, including assets and services associated with both GSA and non-GSA/commercial contracts, and associated maintenance processes for this inventory.
Agency: Department of Labor
Status: Open
Comments: The Department of Labor (DOL) provided documentation demonstrating that it has identified certain future telecommunications needs for the department, but DOL did not identify these needs using a complete inventory of its current telecommunications assets and services. In addition, the department demonstrated that it had completed a draft strategic analysis of its telecommunications requirements, but this analysis was not yet finalized and approved. Further, the department has not yet demonstrated that it has aligned its identified telecommunications needs with its long-term plans and enterprise architecture. We will continue to monitor DOT's efforts to implement this recommendation.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the department is in the process of selecting a project manager to develop the Transition Project Plan and other supporting documentation for the transition, including a communications plan. DOL expects to develop this documentation around March 2020. We will continue to monitor the department's progress on these efforts.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the department is in the process of selecting a project manager to develop the Transition Project Plan and other documentation that would address this recommendation. The officials expect to develop this documentation around March 2020. We will continue to monitor the department's efforts to implement this recommendation.
Agency: Department of Labor
Status: Open
Comments: Department of Labor (DOL) officials stated that the department is in the process of selecting a project manager to develop the Transition Project Plan and other documentation that would address this recommendation. The officials expect to develop this documentation around March 2020. We will continue to monitor the department's efforts to implement this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: The Securities and Exchange Commission (SEC) concurred with our recommendation. SEC stated that it plans to establish an EIS planning team comprised of key IT personnel from across the agency to identify, among other things, future needs and areas for improvement, so that SEC can incorporate the results into its transition planning. However, SEC has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor SEC's progress implementing this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: The Securities and Exchange Commission (SEC) concurred with our recommendation and stated that it plans to document the roles and responsibilities of key EIS transition team members across the agency. The agency also plans to develop a transition communications plan that includes configuration and change management practices. However, SEC has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor SEC's progress implementing this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: In response to our recommendation, the Securities and Exchange Commission (SEC) provided a high-level budget estimate for the transition. However, it was unclear what costs were included in this estimate and the agency did not provide documentation that justified the costs identified. In addition, SEC has not yet provided an analysis of the staff resources it needs for the transition, nor an analysis of the training needs for the staff assisting with the transition. We will continue to monitor SEC's efforts to implement this recommendation.
Agency: United States Securities and Exchange Commission
Status: Open
Comments: The Securities and Exchange Commission (SEC) has demonstrated that its transition goals and measures align with its mission. In addition, the commission has identified transition risks related to continuity of operations. However, SEC has not yet identified transition risks related to its critical systems, nor identified mission-critical priorities in its transition timeline. We will continue to monitor SEC's progress on these efforts.
Agency: Social Security Administration
Status: Open
Comments: Social Security Administration (SSA) officials stated that the agency is in the process of making significant changes to its procedures and policy for its telecommunications inventory. The officials expect to have a complete inventory of their telecommunications assets and services by 2021. We will continue to monitor SSA's efforts to implement this recommendation.
Agency: Social Security Administration
Status: Open
Comments: Social Security Administration (SSA) officials stated that the agency's priority is to transition its telecommunications services on a like-for-like basis, in order to complete the transition before its existing contracts expire, as well as to receive immediate cost savings. Officials also stated that, once SSA has released its EIS solicitations, they plan to analyze the alignment of their future telecommunications needs with the agency's enterprise architecture. However, SSA has not yet provided documentation demonstrating that it has completed this analysis. We will continue to monitor SSA's progress on these efforts.
Agency: Social Security Administration
Status: Open
Comments: The Social Security Administration (SSA) provided documentation demonstrating that it has implemented a change management process, including establishing a change control board that is scheduled to meet on a weekly basis and tracking change requests in its IT Service Management tool. However, SSA has not yet demonstrated that it has implemented configuration management processes for its transition. We will continue to monitor SSA's efforts to implement these processes.
Agency: Social Security Administration
Status: Open
Comments: The Social Security Administration (SSA) provided documentation demonstrating that it has identified the staff resources and required training for staff working on the transition. However, SSA has not yet provided documentation demonstrating that it has identified the funding resources needed for the full transition, nor documented the costs and benefits of transition investments, such as for resource requests related to transition program management staff. We will continue to monitor SSA's efforts to fully implement this recommendation.
Agency: Social Security Administration
Status: Open
Comments: The Social Security Administration (SSA) has identified transition risks related to critical systems and continuity of operations. In addition, SSA officials stated that the agency is in the process of identifying (1) agency-specific measures of success for the transition and (2) mission-critical priorities that need to be incorporated into its transition timeline. However, SSA has not yet provided documentation demonstrating that it has completed these efforts. We will continue to monitor SSA's efforts to fully implement this recommendation.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) officials stated that the department has developed a comprehensive inventory of its telecommunications assets and services, and maintains this inventory on a regular basis. However, as of August 2020, the department has not yet provided documentation of its inventory or the associated maintenance processes. We will continue to monitor DOT's efforts to complete this inventory and establish a maintenance process for it.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) officials stated that they conducted an assessment of the department's future telecommunication requirements. According to officials, the results of this analysis were included in an EIS Statement of Work. However, DOT has not demonstrated that it used its complete inventory of existing services to identify its future needs. DOT also stated that it has conducted extensive research to identify areas for optimization and sharing, but did not provide documentation of this research. Further, DOT has not provided evidence that the department has aligned its transition approach with its long-term plans and enterprise architecture. We will continue to follow-up with DOT regarding these efforts.
Agency: Department of Transportation
Status: Open
Comments: The Department of Transportation (DOT) developed a transition communications plan and identified roles and responsibilities related to legal expertise, the management of assets and human capital. DOT has also provided evidence that they are requiring the use of change management in the transition. However, DOT has not demonstrated that it is applying configuration management processes to DOT's transition efforts. We will continue to monitor DOT's efforts to implement this recommendation.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) developed a transition resource plan that identifies functional roles needed for the transition, such as network engineers and staff to place new telecommunications orders. However, the transition resource plan did not identify the staffing levels needed for each of the functional roles, such as how many network engineers are necessary, and DOT did not provide other documentation that fully identifies these resources needs. In addition, DOT has not yet provided documentation that it has identified the funding needed for the full transition, justified requests for transition resources, or fully analyzed training needs for staff assisting with the transition. We will continue to follow-up on DOT's efforts to implement this recommendation.
Agency: Department of Transportation
Status: Open
Comments: Department of Transportation (DOT) provided evidence that its transition goals and measures align with its mission and that it has identified the risks associated with the EIS transition. However, DOT has not yet provided documentation demonstrating that it has identified mission-critical priorities in its transition timeline. We will continue to monitor DOT's efforts to implement this recommendation.
GAO-17-398, May 17, 2017
Phone: (202) 512-4841
Agency: Department of Health and Human Services
Status: Open
Comments: HHS agreed with the recommendation and stated that it will revise guidance on independent government cost estimates. As of September 2020, despite numerous requests, we still have not received any information on steps HHS has taken to address this recommendation.
Agency: Department of Health and Human Services
Status: Open
Comments: HHS agreed with the recommendation and stated that it will revise guidance on independent government cost estimates. As of September 2020, despite numerous requests, we still have not received any information on steps HHS has taken to address this recommendation.
GAO-17-168, Feb 9, 2017
Phone: (202) 512-8612
Agency: Executive Office of the President: Office of the United States Trade Representative
Status: Open
Comments: In February 2017 we reported that the United States had revised its approach to statistical reporting to the World Trade Organization (WTO) about covered federal government procurement from an "award values" methodology to an actual "cumulative obligations" approach in October 2015. The "cumulative obligations" methodology resulted in a more accurate measure of covered federal procurement, but it introduced a 6-year delay in reporting. We found this reporting delay inconsistent with the 2014 WTO Agreement on Government Procurement (GPA) requirement of reporting within 2 years of the end of the reporting period. We recommended that the U.S. Trade Representative (USTR) should, with appropriate experts in Commerce, Office of Management and Budget, and General Services Administration, improve the U.S. methodology for providing covered federal government procurement statistics to the WTO to ensure both accurate and more timely reporting, consistent with GPA requirements--for example, by providing preliminary estimates and updated values of covered federal procurement or by using an alternative methodology that bases measures of covered government procurement on actual annual obligations, if USTR determines that such an approach is consistent with WTO obligations. Following the issuance of our report, in December 2017 USTR reported that they had worked with other agencies to improve their methods. While they decided to continue to report statistics using the "cumulative obligations" methodology they decided to also report "partially reported" (preliminary) statistics to improve the timeliness of U.S. reporting. This preliminary data was to be based on the same data used in the "cumulative obligations" methodology but can be submitted within two years of the end of the reporting period and therefore comply with GPA statistical reporting obligations. USTR submitted preliminary statistics for FY 2015 on November 15, 2017; for FY 2016 on October 31, 2018; and for FY 2017 on October 29, 2019. USTR will later update these statistics to reflect the "final" total value in 2021. GAO will continue to monitor this recommendation until that time.
GAO-16-810, Sep 16, 2016
Phone: (202) 512-4841
including 1 priority recommendation
Agency: Department of Veterans Affairs
Status: Open
Priority recommendation
Comments: VA concurred with this recommendation and has made progress in finalizing the update to its acquisition regulations and manual. In August 2020, VA reported that 31 of the 41 parts in its new acquisition regulations had been issued as draft or final rules. The remainder are at an earlier stage of the rulemaking process. VA also stated that it remains on track to release the final VA Acquisition Regulations in April 2021.
GAO-16-710, Aug 11, 2016
Phone: (202) 512-3841
Agency: Department of Energy
Status: Open
Comments: In an October 7, 2016, letter the Under Secretary for Nuclear Security and Administrator of the National Nuclear Security Administration (NNSA) said he agreed with GAO's recommendation to assess situations that might warrant the use of the enhanced procurement authority and, should specific circumstances be identified for use of the authority, NNSA would develop a process for its use. The assessment would include an examination of resources to support use of the authority. NNSA would work with other Department of Energy organizations as appropriate in conducting the assessment. NNSA officials said they submitted the assessment to the congressional committees in March 2020. We requested a copy of the assessment and will update the status of this recommendation after we receive and review it.
GAO-16-168, Mar 15, 2016
Phone: (202) 512-3841
Agency: Department of Agriculture
Status: Open
Comments: As of June 2020, GAO is working with the agency to determine what actions the agency has taken related to this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: As of June 2020, GAO is working with the agency to determine what actions the agency has taken related to this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: As of June 2020, GAO is working with the agency to determine what actions the agency has taken related to this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: As of June 2020, GAO is working with the agency to determine what actions the agency has taken related to this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: As of June 2020, GAO is working with the agency to determine what actions the agency has taken related to this recommendation.
Agency: Department of Agriculture
Status: Open
Comments: As of June 2020, GAO is working with the agency to determine what actions the agency has taken related to this recommendation.
GAO-16-101, Mar 15, 2016
Phone: (202) 512-4523
Agency: Department of Defense
Status: Open
Comments: DOD concurred with GAO's March 2016 recommendation to enforce DOD's Real Property Inventory (RPI) Reporting Guidance to break out the annual rent plus other costs for each asset on the same lease to avoid overstating the costs associated with such leases. In July 2019, DOD provided GAO a copy of its annual guidance for end of year submission of its real property inventory, including notes and timeline for submission. DOD stated in its Corrective Action Plan that this annual guidance provided the requirements for proper submission of data to meet the issues identified in this recommendation. However, the documentation provided is generic language and does not provide any detailed information to support closure of this recommendation. In August 2020, we requested documentation that shows that the DOD has reiterated its RPI Reporting Guidance and that military departments and WHS have made the needed adjustments in the reporting of their leased facilities to show a breakout of the annual rent plus other costs for each asset on the same lease. We will continue to monitor this area and update this if DOD provides information showing that DOD has reiterated its RPI Reporting Guidance and that military departments and WHS have adjusted the reporting of their leased facilities to show a breakout of the annual rent plus other costs for each asset on the same lease. .
Agency: Department of Defense
Status: Open
Comments: DOD concurred with GAO's March 2016 recommendation. In its July 2019 Corrective Action Plan, DOD stated that it had coordinated with the Federal Protective Service (FPS) to obtain data pertaining to the 677 DOD facilities across 539 total locations (i.e., some locations have multiple tenants, hence more facilities than locations) for which FPS provides physical security. DOD stated that the data provided to them by FPS shows that, as of July 2018, 98 percent of DOD leased facilities met the established time frame for completing assessments and remaining 2 percent (15 of the 677 facilities) had out-of-date assessments. In January 2020, DOD provided GAO with the raw data it received from the Federal Protective Service that DOD said supported these assertions. While this data included the last and next facility assessment dates for each facility, along with several other variables, it did not include sufficient information for us to replicate DOD's analysis that 98 percent of assessments were completed in the 3 to 5 year period. We will continue to monitor this area and will update if DOD provides information that more fully explains DOD's analysis.
Agency: Department of Defense
Status: Open
Comments: DOD did not concur with GAO's March 2016 recommendation to capture the total square footage assigned to each individual lease when multiple leases exist for a single building and make a corresponding change to its guidance to avoid overstating the total square footage assigned to each lease in RPAD. In its comments, DOD stated that it agreed that the issue we identified existed regarding multiple leases that are assigned the same building (leases managed by WHS in the National Capital Region), but that DOD did not agree with GAO's recommended solution to this issue. DOD stated that it believed that the underlying cause for overstating the total square footage for these records in RPAD was a data aggregation issue. DOD stated that its Data Analytics and Integration Support (DAIS) platform that was in the process of being developed would include the capability to capture square footage for multiple leases in a single asset. GAO is not wedded to a particular solution, only that the issue be resolved to improve the accuracy and completeness of the data. As of August 2020, DAIS is fully operational. We will continue to monitor this area and will update if DOD provides information to support that DIAS includes the total square footage assigned to individual leases when multiple leases are assigned to the same building.
GAO-16-236, Feb 16, 2016
Phone: (202) 512-4841
Agency: Department of Defense: Office of the Secretary of Defense: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics
Status: Open
Comments: In providing comments to this report DOD concurred with this recommendation but has not completed actions to implement it. DOD has drafted new combined DOD instruction and guidance that addresses the process of reporting suspected counterfeit parts to GIDEP. As of August 2020, the document is still in the process of being formally approved. DOD estimated that it could be approved in the first quarter of fiscal year 2021.
Agency: Department of Defense: Office of the Secretary of Defense: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics
Status: Open
Comments: In providing comments to this report DOD concurred with this recommendation but has not completed actions to implement it. DOD has drafted new combined DOD instruction and guidance that addresses the process of reporting suspected counterfeit parts to GIDEP. As of August 2020, the document is still in the process of being formally approved. DOD estimated that it could be approved in the first quarter of fiscal year 2021.
Agency: Department of Defense: Office of the Secretary of Defense: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics
Status: Open
Comments: In providing comments to this report DOD concurred with this recommendation but has not completed actions to implement it. DOD has drafted new combined DOD instruction and guidance that addresses the process of reporting suspected counterfeit parts to GIDEP. As of August 2020, the document is still in the process of being formally approved. DOD estimated that it could be approved in the first quarter of fiscal year 2021.
GAO-16-188, Jan 13, 2016
Phone: (202) 512-2834
Agency: General Services Administration
Status: Open
Comments: In November 2018, GSA officials said that they were unlikely to implement this recommendation because it would shift costs from the tenants to GSA but not reduce overall costs. GAO continues to believe that reducing unnecessary costs to tenant agencies would reduce overall leasing costs by encouraging GSA to be more efficient.
GAO-16-39, Oct 20, 2015
Phone: (202) 512-2834
Agency: General Services Administration
Status: Open
Comments: As of November 2019, GSA has informed us that it submitted a legislative proposal as part of the FY 2018 and FY 2019 budget cycle that was subsequently not included in the President's budget. We have asked GSA to provide us a copy of this proposal. We will evaluate whether this proposal is sufficient to close this recommendation.
GAO-15-302, Apr 28, 2015
Phone: (202) 512-3841
Agency: Congress
Status: Open
Comments: Congress has not taken action on this matter as of June 11, 2020.
Agency: Congress
Status: Open
Comments: Congress has not taken action on this matter as of June 11, 2020.
GAO-15-200, Dec 22, 2014
Phone: (202) 512-4841
Agency: Department of Defense
Status: Open
Comments: DOD concurred with GAO's recommendation. Following a May 2015 Federal Acquisition Regulation update to reflect the requirements of Section 802 of the National Defense Authorization Act for Fiscal Year 2013, the Office of Defense Procurement and Acquisition Policy drafted supplementary information for an update of the agency's Procedures, Guidance, and Information (PGI) that was considered and rejected by Defense Acquisition Regulation Council. In July 2019, the Office of Defense Pricing and Contracting reported that new PGI guidance would be drafted that will require management reviews to consider compliance with Section 802 requirements included in the Federal Acquisition Regulation. As of August 2020, we have been unable to determine the status of this guidance.
GAO-15-28, Oct 29, 2014
Phone: (202) 512-3841
Agency: Department of Homeland Security
Status: Open
Comments: In August 2019, a FEMA official stated that FEMA intends to implement the recommendation in full eventually, but it is unlikely that it will happen as a cohesive effort in 2020, given other ongoing flood insurance reforms. As of August 2020, the status of this recommendation remains unchanged.
GAO-15-54, Oct 8, 2014
Phone: (202) 512-8678
Agency: Small Business Administration
Status: Open
Comments: In response to this recommendation, SBA has taken some actions. For example, SBA created a standard operating procedure stating that third-party certifiers are subject to a compliance review by SBA at any time, and SBA has completed a review of the four authorized third-party certifiers. We continue to monitor SBA actions to address this recommendation.
Agency: Small Business Administration
Status: Open
Comments: In response to this recommendation, SBA has created a standard operating procedure that includes some procedures for annual eligibility examinations. We continue to monitor SBA actions to address this recommendation.
GAO-14-648, Sep 19, 2014
Phone: (202) 512-9627
including 4 priority recommendations
Agency: Department of Homeland Security
Status: Open
Priority recommendation
Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of April 2020, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Required information includes a comprehensive assessment of property and facilities utilized by DHS in the National Capital Region, and an analysis that identifies the costs and benefits of leasing and construction alternatives for the remainder of the consolidation project. DHS reported that DHS and GSA prepared a comprehensive response to P.L. No. 114-150, but that the consolidation plan and response needed to be revised based on changing budget circumstances, among other things. In April 2020, DHS estimated that the final consolidation plan will be completed and approved in 2020. GAO will review the latest information on DHS headquarters consolidation efforts when it is provided to Congress, and will assess the materials in the context of this recommendation at that time. Continued DHS and GSA attention to following leading capital planning practices is critical given the project's multi-billion dollar cost and impact on future departmental operations.
Agency: General Services Administration
Status: Open
Priority recommendation
Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150), enacted on April 29, 2016, mirrors GAO recommendations in this area. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS's headquarters consolidation efforts not later than 120 days of enactment. As of April 2020, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Required information includes a comprehensive assessment of property and facilities utilized by DHS in the National Capital Region, and an analysis that identifies the costs and benefits of leasing and construction alternatives for the remainder of the consolidation project. DHS reported that DHS and GSA prepared a comprehensive response to P.L. No. 114-150, but that the consolidation plan and response needed to be revised based on changing budget circumstances, among other things. In April 2020, DHS estimated that the final consolidation plan will be completed and approved in 2020. We will review the latest information on DHS's headquarters consolidation efforts when it is provided to Congress, and will assess the materials in the context of these recommendations at that time. Continued DHS and GSA attention to following leading practices for capital planning and cost and schedule estimation is critical given the project's multi-billion dollar cost and impact on future departmental operations.
Agency: Department of Homeland Security
Status: Open
Priority recommendation
Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of April 2020, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Required information includes updated cost and schedule estimates for the consolidation project that are consistent with GAO's recommendations in GAO-14-648. Furthermore, the act requires the Comptroller General to evaluate the cost and schedule estimates not later than 90 days after their submittal to Congress. DHS reported that DHS and GSA prepared a comprehensive response to P.L. No. 114-150, but that the consolidation plan and response needed to be revised based on changing budget circumstances, among other things. In April 2020, DHS estimated that the final consolidation plan will be completed and approved in 2020. GAO will review the latest DHS headquarters consolidation cost and schedule estimates when they are provided to Congress, and will assess the materials in the context of this recommendation at that time. Continued DHS and GSA attention to following leading cost and schedule estimation practices is critical given the project's multi-billion dollar cost and impact on future departmental operations.
Agency: General Services Administration
Status: Open
Priority recommendation
Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of April 2020, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Required information includes updated cost and schedule estimates for the consolidation project that are consistent with GAO's recommendations in GAO-14-648. Furthermore, the act requires the Comptroller General to evaluate the cost and schedule estimates not later than 90 days after their submittal to Congress. DHS reported that DHS and GSA prepared a comprehensive response to P.L. No. 114-150, but that the consolidation plan and response needed to be revised based on changing budget circumstances, among other things. In April 2020, DHS estimated that the final consolidation plan will be completed and approved in 2020. GAO will review the latest DHS headquarters consolidation cost and schedule estimates when they are provided to Congress, and will assess the materials in the context of this recommendation at that time. Continued DHS and GSA attention to following leading cost and schedule estimation practices is critical given the project's multi-billion dollar cost and impact on future departmental operations.
Agency: Congress
Status: Open
Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of March 2019, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Required information includes: a comprehensive assessment of property and facilities utilized by DHS in the National Capital Region; an analysis that identifies the costs and benefits of leasing and construction alternatives for the remainder of the consolidation project; and updated cost and schedule estimates for the project that are consistent with GAO's recommendations in GAO-14-648. Furthermore, the act requires the Comptroller General to evaluate the cost and schedule estimates not later than 90 days after their submittal to Congress. DHS reported that DHS and GSA prepared a comprehensive response to P.L. No. 114-150, but that the consolidation plan and response needed to be revised based on changing budget circumstances, among other things. In April 2020, DHS estimated that the final consolidation plan will be completed and approved in 2020. A comprehensive report to Congress on DHS headquarters consolidation, along with reliable project cost and schedule estimates, could inform Congress's funding decisions.
Phone: (202) 512-3841
Agency: Congress
Status: Open
Comments: As of March 2020, Congress has not taken action to implement this matter.
GAO-14-476, Jun 30, 2014
Phone: (202) 512-4456
including 1 priority recommendation
Agency: Executive Office of the President: Office of Management and Budget
Status: Open
Priority recommendation
Comments: OMB has taken several steps related to this recommendation as of December 2019, but have not fully addressed it. Specifically, working with the Department of the Treasury to implement the DATA Act, OMB took partial action on two aspects of the recommendation and are still considering actions on two others. 1) OMB staff said they continue to deliberate on agency responsibilities for reporting awards funded by non-annual appropriations. 2) OMB staff provided a Frequently Asked Question (FAQ) addressing the applicability of USASpending.gov reporting requirements for recipient information related to classified or sensitive information. GAO reviewed the FAQ and determined that additional guidance is still needed to ensure complete reporting of unclassified awards as required by FFATA. 3) OMB staff have agreed that it will be important to clarify guidance on how agencies can report on award titles that appropriately describes the awards' purposes and noted that they are working on providing additional guidance to agencies as part of their larger DATA Act implementation efforts. 4) OMB released policy guidance in May 2016 (MPM 2016-03) that identifies the authoritative sources for reporting procurement and award data. However, GAO's review of this policy guidance determined that it does not address the underlying source that can be used to verify the accuracy of non-financial procurement data or any source for data on assistance awards.
GAO-14-450, Jun 5, 2014
Phone: (202) 512-4841
Agency: Congress
Status: Open
Comments: As of July 2020, Congressional action has not been taken. GAO will continue to follow up with relevant congressional committees.
Agency: Department of Homeland Security: United States Coast Guard
Status: Open
Comments: The agency concurred with this recommendation. Since the issuance of GAO's report, in February 2016, Congress directed the Coast Guard to develop a long-term plan to cover fiscal year 2017 and 20 years thereafter and that it should be updated every two years. In November 2017, officials told GAO that the Coast Guard was developing a 20-year long-term plan that specifically focused on the highest priority recapitalization and sustainment efforts for its assets and will focus on meeting the intent of the 2016 congressional mandate. However, as of July 2020, the Coast Guard has not completed this plan. At that time, officials said that the Coast Guard continues to refine the process to define the long term acquisition and capital sustainment needs of the Service and align them with published and anticipated fiscal top line budgets. The Coast Guard is working with internal and external stakeholders to define useful parameters in order to complete work to close this recommendation. GAO will continue to monitor the Coast Guard's actions in completing its long-term plan given that GAO's recent work has found that the Coast Guard continues to pursue an unaffordable acquisition portfolio that is not likely to fully address all known and anticipated capability gaps.