GAO’s recommendations database contains report recommendations that still need to be addressed. GAO’s priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. Below you can search only priority recommendations, or search all recommendations.
Our recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Moreover, when implemented, some of our priority recommendations can save large amounts of money, help Congress make decisions on major issues, and substantially improve or transform major government programs or agencies, among other benefits.
As of October 25, 2020, there are 4812 open recommendations, of which 473 are priority recommendations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented.
Browse or Search Open Recommendations
Have a Question about a Recommendation?
- For questions about a specific recommendation, contact the person or office listed with the recommendation.
- For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
Results:
Subject Term: "Environmental management"
GAO-20-373, May 13, 2020
Phone: (202) 512-3841
Agency: Department of Energy
Status: Open
Comments: In providing comments on this report, DOE concurred with this recommendation but has not yet taken actions necessary to implement it. In July 2020, DOE officials told us that the Office of Legacy Management (LM) and the Office of Environmental Management will work together to expand on agreements and procedures for identifying and addressing new cleanup work beyond LM's mission scope of providing long-term stewardship. DOE officials estimated that this effort would be completed by September 30, 2021.
Agency: Department of Energy
Status: Open
Comments: In providing comments on this report, DOE concurred with this recommendation but has not yet taken actions necessary to implement it. In July 2020, DOE officials told us that the Office of Legacy Management (LM) will work with the Nuclear Regulatory Commission to develop agreements and procedures for identifying and addressing new cleanup work beyond LM's mission scope of providing long-term stewardship. DOE officials estimated that this effort would be completed by September 30, 2021.
Agency: Department of Energy
Status: Open
Comments: In providing comments on this report, DOE concurred with this recommendation but has not yet taken actions necessary to implement it. In July 2020, DOE officials told us that the Office of Legacy Management (LM) uses models to evaluate sites' vulnerability and resilience to environmental trends over time. DOE officials said that LM will build upon its current operations to develop assessment and mitigation plans that take into account any significant effects of climate change and that incorporate principles from GAO's Disaster Resilience Framework, as appropriate. DOE officials estimated that this effort would be completed by September 2022.
GAO-20-161, Jan 21, 2020
Phone: (202) 512-3841
Agency: Department of Energy: Office of the Assistant Secretary for Environmental Management: Environmental Management Consolidated Business Center
Status: Open
Comments: DOE concurs with this recommendations and has agreed to conduct a root cause analysis examining the programmatic cause leading to the Hanford PUREX tunnel collapse. In DOE's October 2020 Audit Report regarding the implementation of recommendations in our report, DOE states that the Office of Environmental Management is taking action to implement this recommendation, but that action is still insufficient to satisfy the recommendation.
Agency: Department of Energy: Office of the Secretary
Status: Open
Comments: DOE concurs with this recommendation and the Office of Environmental Management agreed to conduct an assessment, in coordination with headquarters oversight offices, of the Richland Operations Office's management and oversight of the Hanford Site contractor's surveillance and maintenance activities for contaminated excess facilities. In DOE's October 2020 Audit Report regarding the implementation of recommendations in our report, DOE states that the Office of Environmental Management is taking action to implement this recommendation, but that action is still insufficient to satisfy the recommendation.
GAO-20-63, Dec 17, 2019
Phone: (202) 512-3841
Agency: Department of Energy: Office of the Secretary
Status: Open
Comments: In June 2020, DOE officials told us that its Office of Environmental Management (EM) Portsmouth/Paducah Project Office (PPPO) is in the process of developing a program management master plan, to include site-integrated master schedules and life-cycle cost estimates, for the Portsmouth and Paducah gaseous diffusion plants (GDPs). Officials stated that the plan will incorporate program management leading practices as appropriate. According to DOE officials, EM will direct PPPO to use actual collected cost and schedule information for integration of relevant lessons learned from ETTP cleanup into integrated program plans, schedules, and estimates. DOE officials estimated that this effort would be completed by December 31, 2020.
Agency: Department of Energy: Office of the Secretary
Status: Open
Comments: In June 2020, DOE officials told us that its Office of Environmental Management (EM) is assessing and identifying an appropriate mechanism for tracking expenditures for both the Portsmouth and Paducah GDP sites, using a standardized approach with an Earned Value Management System (EVMS) reporting on, at a minimum, an annual basis. According to DOE officials, PPPO is in the process of using the ETTP data as a basis of comparison for contractor estimates and assessing the potential development of cost estimating tools for independent cost estimating. DOE officials estimated that this effort would be completed by December 31, 2020.
Agency: Department of Energy: Office of the Secretary
Status: Open
Comments: In June 2020, DOE officials told us that its Office of Environmental Management (EM) has directed the Portsmouth and Paducah GDP sites to review and incorporate the practices from GAO's Cost Estimating Guide (GAO-20-195G), as appropriate, into the next revision of each site's life-cycle cost baselines. According to DOE officials, Oak Ridge is in the process of procuring a follow-on cleanup contract, which includes the scope to complete the cleanup of ETTP. According to DOE officials, given that the cleanup of the ETTP GDP is nearly complete, the baseline for the entire ETTP GDP will not be included in the life cycle cost estimate review. Officials stated the remaining scope of work for the ETTP GDP will, however, become part of the performance baseline for the next Oak Ridge cleanup contractor. DOE officials estimated that this effort would be completed by December 31, 2020.
Agency: Department of Energy: Office of the Secretary
Status: Open
Comments: In June 2020, DOE officials told us that its Office of Environmental Management (EM) has incorporated the use of an independent facilitator on a case-by-case basis to help resolve any disagreements, in conjunction with the Environmental Protection Agency (EPA), and Kentucky and Tennessee state regulators over cleanup priorities, remedies, and cost estimation assumptions. Officials stated that most recently, the Paducah GDP site used an independent facilitator to resolve disagreements with EPA Region IV and Kentucky state regulators. According to DOE officials, in the future, EM will continue the use of an independent facilitator, as deemed appropriate. DOE officials estimated that this effort would be completed by December 31, 2020.
Agency: Department of Energy: Office of the Secretary
Status: Open
Comments: In June 2020, DOE officials told us that its Office of Environmental Management (EM) has prepared the triennial Uranium Enrichment Decontamination and Decommissioning Fund Report, providing accomplishments through fiscal year 2019 and disclosing the most recent environmental liability estimate associated with remaining challenges and scope of cleanup at the GDPs. Officials stated that the report is being circulated for approval. DOE officials estimated that this effort would be completed by December 31, 2020.
GAO-20-122, Oct 29, 2019
Phone: (202) 512-3841
Agency: Department of Energy
Status: Open
Comments: In May 2020, DOE officials told us that DOE convened a working group to identify high-level options for the PILT program and recommend appropriate changes to DOE leadership. According to DOE officials, the working group will consider GAO's findings and recommendations.
Agency: Department of Energy
Status: Open
Comments: In May 2020, DOE officials told us that DOE convened a working group to identify high-level options for the PILT program and recommend appropriate changes to DOE leadership. According to DOE officials, the working group will consider GAO's findings and recommendations.
Agency: Department of Energy
Status: Open
Comments: In May 2020, DOE officials told us that DOE convened a working group to identify high-level options for the PILT program and recommend appropriate changes to DOE leadership. According to DOE officials, the working group will consider GAO's findings and recommendations.
GAO-19-339, Sep 18, 2019
Phone: (202) 512-3841
Agency: Department of Energy
Status: Open
Comments: In April 2020, DOE officials told us that its Office of Environmental Management (EM) had recently reinvigorated efforts to develop a comprehensive program-wide strategy to address risks in a consistent manner to align cleanup plans and activities with programmatic priorities and available budgets. According to DOE officials, EM plans to revise and replace its 2017 Cleanup Policy with a Cleanup Project Management Protocol and and EM Cleanup Program Management Policy. Officials stated that the Cleanup Program Management Policy will establish an approach for the EM program and DOE sites to apply the essential elements of risk-informed decision-making framework. DOE officials estimated that this effort would be completed by December 31, 2020.
Agency: Department of Energy
Status: Open
Comments: In April 2020, DOE officials told us that DOE's Office of Environmental Management (EM) is developing a new Cleanup Program Management Policy that will incorporate the essential elements of risk-informed decision-making, as appropriate, into EM program management policy. DOE officials estimated that this effort will be completed by December 31, 2020.
GAO-19-494, Sep 9, 2019
Phone: (202) 512-3841
Agency: Department of Energy
Status: Open
Comments: In an update provided in April 2020, DOE said that it had taken steps to ensure the cost estimates will meet best practices for being comprehensive (e.g., account for all costs) as part of contract negotiations for the cleanup project. GAO has requested additional information from DOE and will update the status of this recommendation after it has received and analyzed this information.
Agency: Department of Energy
Status: Open
Comments: In an update provided by DOE in April 2020, DOE said that in negotiating the Idaho Cleanup Project contract it had taken steps to ensure the schedule estimates for the IWTU reengineering project and the SBW treatment operations will meet best practices for being well constructed. Further, DOE stated that the remaining baseline scope and schedule estimate received an external review by its contractor's parent corporation and DOE's Office of Environmental Management to ensure that the schedule meets best practices for being well-constructed. GAO has requested additional information from DOE and will update the status of this recommendation after it has received and analyzed this information.
Agency: Department of Energy
Status: Open
Comments: In an update provided by DOE in April 2020, DOE said that cost and performance data for the IWTU is being tracked against the cost and schedule baselines incorporated in the core contract for the Idaho Cleanup Project, and that the data meets best practices for reliability. GAO has requested additional information from DOE and will update the status of this recommendation after it has received and analyzed this information.
Agency: Department of Energy
Status: Open
Comments: In an update provided by DOE in April 2020, DOE said that EM will assess the range of potential strategies and pathways for disposal of the treated SBW. Once this effort is completed, GAO will review EM's strategy and timeline for achieving its preferred disposal pathway, or an alternative, and update the status of this recommendation accordingly.
Agency: Department of Energy
Status: Open
Comments: In an update provided by DOE in April 2020, DOE said that DOE's Idaho Operations Office is in the process of chartering a team of subject matter experts to update an analysis of alternatives for calcine treatment and disposal. DOE said that this evaluation will be completed by September 30, 2020. GAO will request additional information from DOE on this analysis once completed and will update the status of this recommendation after it has received and analyzed this information.
GAO-19-223, Feb 19, 2019
Phone: (202) 512-3841
including 2 priority recommendations
Agency: Department of Energy
Status: Open
Comments: DOE partially concurred with this recommendation. In August 2019, in a letter to GAO on how EM will address our recommendation, the Senior Advisor for Environmental Management to the Under Secretary for Science stated that DOE developed a draft Cleanup Project Management Policy to clarify the expectations for EM's management of discrete work, such as operations activities that could be considered projects. In February 2020, EM officials stated that they are addressing this recommendation in two steps. First, EM is working with DOE's Office of Project Management to draft a Cleanup Project Management Policy (expected to be completed in spring 2020) to address the Decommissioning and Deactivation (D&D) phase of cleanup. This policy will become an appendix in DOE's Order 413.3B. EM officials further stated that EM plans to develop an additional Cleanup Program Management Policy that would classify the remaining types of activities not covered by the Cleanup Project Management Policy, including what EM currently classifies as operations activities. EM plans to implement this policy by the end of fiscal year 2020.
Agency: Department of Energy
Status: Open
Comments: DOE partially concurred with this recommendation. In August 2019, in a letter to GAO on how EM will address our recommendation, the Senior Advisor for Environmental Management to the Under Secretary for Science stated that DOE developed a draft Cleanup Project Management Policy to clarify the expectations for EM's management of discrete work, such as operations activities that could be considered projects. In February 2020, EM officials stated that they are addressing this recommendation in two steps. First, EM is working with DOE's Office of Project Management to draft a Cleanup Project Management Policy (expected to be completed in spring 2020) to address the Decommissioning and Deactivation (D&D) phase of cleanup. This policy will become an appendix in DOE's Order 413.3B. EM officials further stated that EM plans to develop an additional Cleanup Program Management Policy that would classify the remaining types of activities not covered by the Cleanup Project Management Policy, including what EM currently classifies as operations activities. EM plans to implement this policy by the end of fiscal year 2020.
Agency: Department of Energy
Status: Open
Priority recommendation
Comments: DOE concurred with this recommendation. In August 2019, in a letter to GAO on how EM will address our recommendation, the Senior Advisor for Environmental Management to the Under Secretary for Science stated that EM intends to replace its current EM Cleanup Policy with two separate project and program management policies that will incorporate leading practices related to scope, cost, and schedule, and independent reviews, as appropriate. In February 2020, EM officials stated that EM is working on a Cleanup Project Management Policy (expected to be completed in spring 2020) that will cover the Decommissioning and Deactivation (D&D) phase of cleanup. EM plans to develop an additional Cleanup Program Management Policy (expected to be completed by the end of fiscal year 2020), which will supersede EM's current cleanup policy and include leading program management practices-and possibly also project management practices-related to scope, cost, schedule performance, and independent reviews.
Agency: Department of Energy
Status: Open
Priority recommendation
Comments: DOE concurred with this recommendation. In August 2019, in a letter to GAO on how EM will address our recommendation, the Senior Advisor for Environmental Management to the Under Secretary for Science stated that EM intends to replace its current EM Cleanup Policy with two separate project and program management policies that will incorporate leading practices related to scope, cost, and schedule, and independent reviews, as appropriate. In February 2020, EM officials stated that EM is working on a Cleanup Project Management Policy (expected to be completed in spring 2020) that will cover the Decommissioning and Deactivation (D&D) phase of cleanup. EM plans to develop an additional Cleanup Program Management Policy (expected to be completed by the end of fiscal year 2020), which will supersede EM's current cleanup policy and include leading program management practices-and possibly also project management practices-related to scope, cost, schedule performance, and independent reviews.
Agency: Department of Energy
Status: Open
Comments: DOE concurred with this recommendation. In August 2019, in a letter to GAO on how EM will address our recommendation, the Senior Advisor for Environmental Management to the Under Secretary for Science stated that EM intends to replace its current EM Cleanup Policy with two separate project and program management policies that will incorporate earned value management best practices, as appropriate. In February 2020, EM officials stated that EM's forthcoming Cleanup Project Management Policy (expected to be completed in spring 2020) will require capital asset projects covered under the policy to use earned value management (EVM) systems that have been independently certified, which is an EVM best practice. However, EM officials told us that this policy will not require operations activities to follow EVM best practices. EM officials stated that EM is also considering including this requirement in its forthcoming Cleanup Program Management Policy (expected to be completed by the end of fiscal year 2020). In addition, EM officials told is that EM plans to require future end-state contracts to use EVM systems that have either been certified by the DOE Office of Project Management or been subject to a "compliance review" conducted by EM itself, depending on the dollar value of the contract.
Agency: Department of Energy
Status: Open
Comments: DOE concurred with this recommendation. In August 2019, in a letter to GAO on how EM will address our recommendation, the Senior Advisor for Environmental Management to the Under Secretary for Science stated that EM intends to include requirements related to the categorization of level of effort work in the project and program management policies EM is developing.
Agency: Department of Energy
Status: Open
Comments: DOE partially concurred with this recommendation. In August 2019, in a letter to GAO on how EM will address our recommendation, the Senior Advisor for Environmental Management to the Under Secretary for Science stated that DOE is in the process of developing a Cleanup Program Management Policy that will, among other things, incorporate changes relative to the integration of EVM data into performance metrics as appropriate. As of February 2020, EM officials told us that the new policy is expected to be completed by the end of fiscal year 2020. In February 2020, EM officials stated that EM plans to begin a new performance review process for operations activities that will include EVM-based performance metrics as part of annual reporting to the Assistant Secretary. The new process is expected to begin in October 2020, but EM officials have not determined whether this will be a requirement included in EM's forthcoming Cleanup Program Management Policy.
GAO-19-207, Feb 14, 2019
Phone: (202) 512-3841
Agency: Department of Energy
Status: Open
Comments: DOE agreed with the recommendation, but as of March 2020, DOE has not fully implemented this recommendation. DOE officials told us that they established an Integrated Project Team (IPT) to review GAO's recommendation. The IPT recommended that DOE continue to use DOE's Integrated Planning, Accountability and Budgeting System (IPABS) for tracking compliance with milestones, accompanied by a new policy providing direction to the field to use IPABS, a new data dictionary for the use of IPABS, guidance, and training. Using recommendations from the IPT, DOE has drafted policy and guidance documents for tracking compliance and is in the process of testing the draft policy using a pilot site. DOE officials told us that they plan to update the schedule for completing the final policy and guidance by September 30, 2020.
Agency: Department of Energy
Status: Open
Comments: DOE agreed with the recommendation, but as of March 2020, DOE has not fully implemented the recommendation. DOE officials told us they have completed an options analysis to identify the costs and benefits of conducting root cause analyses of historical milestone changes. DOE officials said they recognized a benefit to a developing a more complete root cause analysis and considered whether an analysis of historical milestone changes could provide best practices in negotiating milestone changes. DOE said they have initiated a pilot project with a major DOE site to determine the benefit of additional analyses and that the analysis of historical milestone changes will be completed by December 2020.
Agency: Department of Energy
Status: Open
Comments: DOE agreed with the recommendation, but as of March 2020, DOE has not fully implemented the recommendation. DOE officials told us that DOE completed an options analysis to identify the costs and benefits of conducting root cause analyses of historical milestone changes. DOE officials added that they will identify what historical analyses are appropriate to conduct based on value to the government. According to DOE officials, the results of this analysis are being incorporated into a pilot project, and they plan to complete a final reporting methodology by the end of that pilot project.. DOE officials noted that they have analyzed options for reporting on regulatory compliance and the results will be part of DOE policy and guidance to be issued by June 2021.
Agency: Department of Energy
Status: Open
Comments: DOE agreed with the recommendation, but as of March 2020, DOE has not fully implemented the recommendation. DOE officials told us that they established an Integrated Project Team (IPT) to review GAO's recommendation. DOE officials told us that the IPT identified root causes for missed or delayed milestones, which according to DOE officials, will be used in a pilot test of the draft policy. DOE officials told us that they plan to develop an appropriate list of root causes after the pilot project is completed, and officials noted that they plan to revisit the list of root causes on a recurring basis to verify that the options are still valid. According to DOE officials, DOE plans to issue a final policy and guidance, which will include the list of root causes that sites will input into the tracking system (the Integrated Planning, Accountability and Budgeting System, or IPABS) when milestones are modified or cancelled. DOE plans to issue this guidance no later than June 30, 2021.
GAO-19-28, Jan 29, 2019
Phone: (202) 512-3841
including 1 priority recommendation
Agency: Department of Energy
Status: Open
Priority recommendation
Comments: As of February 2020, DOE's Office of Environmental Management has not developed a program-wide strategy that addresses this recommendation. DOE officials said they are "developing a strategic options analysis to evaluate the current approaches to cleanup and other recently identified opportunities across the complex that could reduce risk and life-cycle costs through more efficient and innovative approaches." According to DOE officials, the analysis will consider risk-based approaches across sites, with the goal of reducing human health and environmental risks and the associated environmental liability.
Agency: Department of Energy
Status: Open
Comments: As of February 2020, DOE's Office of Environmental Management has not implemented this recommendation. DOE officials stated that DOE will coordinate with the Office of Management and Budget on the preparation of the Future-Years Defense Environmental Management Plan, or other reporting, to supplement Congressional Budget documentation. Officials also stated that EM is currently undertaking an analysis of EM's environmental liability growth.
Agency: Department of Energy
Status: Open
Comments: As of February 2020, DOE's Office of Environmental Management has not implemented this recommendation. DOE officials stated that DOE will coordinate with the Office of Management and Budget to include such information in the Future-Years Defense Environmental Management Plan, or another appropriate report.