GAO’s recommendations database contains report recommendations that still need to be addressed. GAO’s priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. Below you can search only priority recommendations, or search all recommendations.
Our recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Moreover, when implemented, some of our priority recommendations can save large amounts of money, help Congress make decisions on major issues, and substantially improve or transform major government programs or agencies, among other benefits.
As of October 25, 2020, there are 4812 open recommendations, of which 473 are priority recommendations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented.
Browse or Search Open Recommendations
Have a Question about a Recommendation?
- For questions about a specific recommendation, contact the person or office listed with the recommendation.
- For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
Results:
Federal Agency: "Department of the Army"
GAO-21-8, Oct 1, 2020
Phone: (202) 512-4841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-20-579, Aug 6, 2020
Phone: (202) 512-4841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation and stated that it plans to provide decision makers a range of possible cost outcomes to support future program milestone decisions. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation and stated that it plans to provide decision makers a range of possible cost outcomes to support future program milestone decisions. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation and stated that it plans to perform system and design reviews to inform the development of final requirements. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-20-401, Jul 16, 2020
Phone: (202) 512-9627
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The agency concurred with this recommendation.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The agency concurred with this recommendation.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The agency concurred with this recommendation.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The agency concurred with this recommendation.
GAO-20-511, Jun 25, 2020
Phone: (202) 512-2775
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD concurred with this recommendation. In its response, the department noted that the Army would update, as appropriate, Army guidance related to acquisition and supply upon updates to DOD's climate adaptation directive and other applicable DOD or federal regulations. However, DOD noted that it does not plan to update its acquisition guidance in response to our recommendation that DOD do so. We will continue to monitor the status of this recommendation.
GAO-20-61, May 19, 2020
Phone: (202) 512-3604
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-20-303, Apr 22, 2020
Phone: (202) 512-9627
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD concurred with this April 2020 recommendation. In June 2020, DOD provided information that it had developed a corrective action plan and identified an action officer to lead implementation of this recommendation. DOD stated that it is developing a sampling plan with criteria to consider for assessing the consistent use of standard designs. DOD stated that it would identify projects that were completed during the year that used standard designs and that it would then assess the progress that the Centers are making in ensuring that standard designs are used consistently by sampling from the completed projects. DOD stated that, based on the results of this analysis, it would adjust the metrics and frequency of future analyses, as appropriate. DOD stated that it expects this effort to be completed in Spring 2021.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD concurred with this April 2020 recommendation. In June 2020, DOD provided information that it had developed a corrective action plan and stated that it planned to establish relevant performance measures to analyze efforts to reduce design costs and time, construction costs and time, and the number of change orders. DOD stated that it expects to develop standards containing the metrics, frequency of analysis, and means of reporting. DOD stated that it expects to present the results of its analysis at the FY2020 Military Programs After Action Review in January 2021.
GAO-20-281, Mar 26, 2020
Phone: (202) 512-2775
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its August 2020 response, DOD noted that the Secretary of the Army has taken several steps toward addressing this recommendation. For example, the Army published the Portfolio and Asset Management Handbook creating a multi-tiered assessment approach of performance metrics to measure the health of each privatized home through inspection, assessment, satisfaction, and feedback. The Army and the private housing partners revised the Incentive Fee Performance Management Plan, placing increased emphasis on resident satisfaction and work order/maintenance management. The Army also put Commanders in charge, ensuring Army leadership at every Army installation is tracking housing quality and safety. In late 2020, the Army plans to review and evaluate these actions and make a determination by 31 Jan 2021 if any changes or revisions are needed to best implement the recommendation. As such, we will continue to monitor the status of this recommendation.
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. In its response, DOD noted that the Army developed a "Plain Language" briefing as required by the 2020 National Defense Authorization Act that included the Army Housing Office's roles, responsibilities, location, and contact information at each privatized housing project site. DOD noted that the intent of the briefing was to ensure that all residents were aware of their ability to directly contact Army Housing Office and/or the Garrison Commanders. DOD stated that the briefing was disseminated to all of the Military Housing Offices, who are using it in newcomer briefings, and stated that the briefing would be provided to all current residents of privatized military housing, but that measure would not be tracked due to attrition. In addition, DOD noted that Headquarters, Department of the Army was tasking Army Materiel Command to develop a more detailed plan to communicate to residents the difference between the Army Housing Office and the private housing partner. The Army's intent is to not only capture residents upon their arrival at an installation, but making the services of the MHO known over the duration of a resident's time on at installation. We will continue to monitor the status of this recommendation.
GAO-20-110, Feb 12, 2020
Phone: (202) 512-3604
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: The Army concurred with this recommendation. As of April 2020, this recommendation remains open.
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: The Army concurred with this recommendation. As of April 2020, this recommendation remains open.
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: The Army partially concurred with this recommendation. As of April 2020, this recommendation remains open.
GAO-20-116, Jan 30, 2020
Phone: (202) 512-9627
Agency: Department of Defense: Department of the Army: Office of the Secretary
Status: Open
Comments: DOD concurred with this recommendation. In response to our report, the Army is working to update policies to accurately reflect current activities for capturing, preserving, and distributing lessons learned and best practices throughout the organic industrial base. The estimated completion date is no later than December 2022. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-20-43, Nov 26, 2019
Phone: (202) 512-3841
Agency: Department of Defense: Department of the Army: Office of the Assistant Secretary (Civil Works)
Status: Open
Comments: In its letter dated January 14, 2020, the Department of Defense concurred with GAO's recommendation and provided a corrective action plan in response to the recommendation. According to the corrective action plan, the Corps estimates that guidance will be issued to ensure that Corps reports adequately describe and justify the models, analytical choices, assumptions, and data used such that it is consistent with best practices by December 31, 2020.
GAO-19-649, Aug 22, 2019
Phone: (202) 512-9627
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-19-570, Aug 15, 2019
Phone: (202) 512-3489
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation. In its February 2020 corrective action plan, the Army indicated that it will conduct a FIFA or similar risk assessment in accordance with its policy and procedures before activating any new units for MDO employment. The Army has indicated that it plans to create additional units in support of multi-domain operations in coming years, so we will continue to monitor.
GAO-19-511, Jul 17, 2019
Phone: (202) 512-4841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In fiscal year 2020, AFC developed both short-term and long-term performance measures to capture and monitor information on small business engagements across the command, but are still developing a database to systematically track the progression of engagements and outcomes. Officials expect to establish a database by fiscal year 2021.
GAO-19-500, Jul 2, 2019
Phone: (202) 512-4841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD agreed with this recommendation. In July 2020, DOD officials told us that it has developed a corrective action plan to address the recommendation, which is estimated to be completed at the end of August 2020. We will continue to monitor progress once we receive the corrective action plan.
GAO-19-487, Jun 13, 2019
Phone: (202) 512-3841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In November 2019, the Department of Defense indicated that the Army Corps of Engineers plans to develop and implement written criteria for ranking Section 219 projects by March 2020. We will evaluate actions taken by the Corps once they are complete.
GAO-19-453, Jun 12, 2019
Phone: (202) 512-9627
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD concurred with this recommendation. As of April 2020, DOD stated that the update of Unified Facilities Criteria to implement this recommendation was pending the issuance of additional guidance by DOD on the use of such projections in project designs, as recommended by GAO. DOD estimated it would complete the actions to implement this recommendation in the second quarter of fiscal year 2021. We will continue to monitor the status of this effort.
GAO-19-344, May 30, 2019
Phone: (202)512-3604
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD concurred with this recommendation. In October 2019, Army officials said that the Army was working to implement the uniform standards for race and ethnicity and the ability to aggregate the data, in accordance with the criteria established by the General Counsel of the Department of Defense on December 17, 2018. They expected to implement these categories in December 2020.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD concurred with this recommendation. In October 2019, Army officials said that the Army was developing the capability to collect data of race, ethnicity, gender, offense and punishment imposed for nonjudicial punishments in accordance with the criteria established by the General Counsel of the Department of Defense on December 17, 2018. They expected to complete this action in December 2020.
GAO-19-243, Apr 15, 2019
Phone: (202) 512-6722
Agency: Department of Defense: Department of the Army
Status: Open
Comments: Army provided us information on their review of the contracts that reported qualifying federal tax debt under FAR ? 52.209-11. We are assessing Army's review of these contracts and will provide updated information when we confirm whether the agency's review, and any subsequent actions stemming from its review, are consistent with our recommendation.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: Army provided us information on their review of the contracts that reported qualifying federal tax debt under FAR ? 52.209-5. We are assessing Army's review of these contracts and will provide updated information when we confirm whether the agency's review, and any subsequent actions stemming from its review, are consistent with our recommendation.
GAO-19-22, Mar 20, 2019
Phone: (202) 512-3841
Agency: Department of Defense: Department of the Army: Corps of Engineers: Civil Works
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-19-132, Jan 23, 2019
Phone: (202) 512-4841
including 1 priority recommendation
Agency: Department of Defense: Department of the Army
Status: Open
Priority recommendation
Comments: The Army concurred with this recommendation. Army officials acknowledged the importance of demonstrating technology in an operation environment prior to starting system development and stated that they have taken steps to assist in the identification and removal of infeasible or immature technologies. For example, development of the Integrated Visual Augmentation System includes a series of user engagements where soldiers interact with the system in a field environment and provide feedback to guide development and design. To fully implement this recommendation the Army will need to demonstrate that all of the technologies it is developing are matured in accordance with leading practices. Including soldier engagement in the development of the Integrated Visual Augmentation System is a positive step in that it uses operational experience to determine the utility of technologies on the battlefield. However, demonstrating that those technologies function as expected in an operational environment is equally important. Our past work has shown that demonstrations in an operational environment reduce the risk that technologies will not operate as intended or desired. It is important that the Army continue and expand its efforts to eliminate infeasible, or immature technologies across all of its development programs.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation. According to Army officials, cross-functional teams routinely meet to discuss both successes and challenges. Additionally, senior Army leadership hosts weekly meetings with cross-functional teams to discuss decision points and concerns. Army Futures Command plans to include leadership from all cross-functional teams at future meetings to enhance knowledge sharing and ensure leadership viewpoints are communicated across the enterprise. These actions do incorporate elements of leading practices for cross-functional teams such as open and regular communication and senior management support. To fully implement this recommendation the Army should continue and expand this knowledge sharing as planned as well as ensure other elements of leading practices for effective cross-functional teams are implemented. These include the establishment of well-defined team operations with project-specific rules and procedures as well as appropriate training and learning environments for all cross-functional team members.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation. According to Army officials an analyst from the Center for Army Lessons Learned has embedded a permanent analyst at Army Futures Command who is capturing lessons learned and best practices from across the cross-functional teams. The results of this analysis are provided across Army Futures Command and to other stakeholders. Additionally, Army Futures Command has established the Directorate of Systems Integration to act as a repository and action office for lessons learned. This office hosts recurring coordination events to further the communication of lessons learned .
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation. According to Army officials Army Futures Command is applying leading practices for mergers and organizational transformations as it continues to establish the command. These practices include total employee involvement in the transformation process with senior leadership championing the overarching transformation. In addition, the command has worked to identify processes that need improvement as it incorporates the organizations transferred from other commands. It also continues to evolve its staff and functions as needs are identified. According to officials, Army Futures Command continues to select high-performing team members to guide its transformation through selective recruitment and talent management as well as augmenting its growing staff with other Army personnel selected for temporary assignments. The command is also involving employees to obtain their ideas and gain their ownership for the transformation by encouraging them to share their thoughts and ideas. Importantly, according to officials, the command recognizes the need to have an enduring change model to consistently reassess and reorganize the command to consistently deliver products in relevant timeframes. These actions do demonstrate elements of leading practices for mergers and organizational transformations. However, to fully implement this recommendation, Army Futures Command should formalize and institutionalize its authorities, responsibilities, policies and procedures as they relate to these leading practices, especially as leadership within the command and the Army change.
GAO-19-50, Dec 13, 2018
Phone: (202) 512-3604
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-19-73, Nov 13, 2018
Phone: (202) 512-4523
including 1 priority recommendation
Agency: Department of Defense: Department of the Army
Status: Open
Priority recommendation
Comments: The Army concurred with this recommendation. As of February 2020, DOD officials told us that the Army has required monitoring of its processes used for recording all real property information. Specifically, the Army developed a 5-year plan to address the recommendations to improve data quality and accountability in conjunction with the ongoing DOD financial statement audit. The plan reportedly requires measuring results through directed physical inspections and record updates, using a single, standardized Accountable Property System of Record (APSR) for all assets. DOD officials also told us that the Army developed an automated validation and second-person verification to comply with the requirements and business rules of the DOD Real Property Information Model (RPIM), and that it continue to use OSD's validation and verification tool when providing annual data inputs to OSD's Real Property Assets Database, with any feedback to be addressed at senior Army levels. However, DOD officials did not provide any documentation that these requirements have been established. Once we receive that documentation, we will review it to assess the extent to which it meets the intent of our recommendation.
GAO-19-20, Nov 7, 2018
Phone: (202) 512-2834
Agency: Department of Defense: Department of the Army: Corps of Engineers
Status: Open
Comments: As of December 2019, the Corps has developed a definition for "deferred maintenance" for civil works and plans to request funding to establish a team to review maintenance data. The Corps anticipates implementing this recommendation by the end of 2020.
Agency: Department of Defense: Department of the Army: Corps of Engineers
Status: Open
Comments: As of December 2019, the Corps is working to review existing authorities, funding, and contracting mechanisms to identify potential courses of action to address GAO's recommendation. The Corps anticipates implementing this recommendation in 2021.
GAO-19-118, Nov 5, 2018
Phone: (202) 512-9627
Agency: Department of Defense: Department of the Army
Status: Open
Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
GAO-18-206, Nov 13, 2017
Phone: (202) 512-4523
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, it was continuing to review DOD Directive (DODD) 4715.21 on climate resilience; DOD reissued the directive in August 2018. The directive requires the military departments to incorporate adaptation to climate change impacts into their planning for facilities. Further, DOD has incorporated adaptation into other guidance that applies to each of the departments. For example, with revisions to DOD's Unified Facilities Criteria for Master Planning and High Performance and Sustainable Building Requirements, as well the issuance of the guide "Climate Adaptation for DOD Natural Resource Managers," DOD has instructed the military departments' planners to incorporate adaptation into installation-level plans. Further, in 2020, DOD issued guidance that requires the military departments to use a DOD database on sea level changes in their planning for coastal infrastructure (sea level change is one impact of climate change). However, as of June 2020, the Army had not provided evidence of required training for installation-level planners that incorporates the DOD guidance discussed in this summary. Thus, the recommendation remains open and we will review evidence of such training if that evidence becomes available.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, the Office of the Secretary of Defense continues to work with the military departments to evaluate how best to incorporate resilience measures into Unified Facilities Criteria (UFCs), as appropriate. DOD also stated that UFCs are reviewed and revised on a rolling basis. As of June 2020, DOD has not provided evidence of climate change data and projections integrated into UFCs. Thus, the recommendation remains open and as UFCs are updated, we will assess the extent to which the revised versions addresses the recommendation.
GAO-17-675, Aug 25, 2017
Phone: (202) 512-8678
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD did not concur with this recommendation, related to assigning small business technical advisors, because it said that the Defense Federal Acquisition Regulation Supplement delegates the authority to appoint small business technical advisers to the head of the contracting activity. We continue to believe that the recommendation is valid because when a statutory provision such as section 15(k) and regulations such as the acquisition regulation conflict, the statute controls. An agency official said that the DOD OSBP recommended, as part of the legislative proposal process, changes to the National Defense Authorization Act to align with the DOD OSBP's interpretation of the statute, but it did not make it out of DOD. We will continue to monitor DOD's efforts to address this recommendation.
Phone: (202) 512-3841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: As of September 2020, based on information provided by the Corps, the agency has reviewed approximately half of the data and hopes to review the rest of the data by the end of June 2021.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: As of September 2020, the Corps is studying how data are captured in the OMBIL system to ensure the agency has a sustainable approach that can be used to collect and analyze data into the future. The Corps hopes to complete its actions on this recommendation by the end of December 2021.
GAO-17-580, Aug 7, 2017
Phone: (202) 512-9971
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD agreed with the recommendation. As of September 2019, DOD indicated that it has begun taking action to implement it. We will update the status of this recommendation once we confirm the actions DOD has taken.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: DOD agreed with the recommendation. As of September 2019, DOD indicated that it has begun taking action to implement it. We will update the status of this recommendation once we confirm the actions DOD has taken.
GAO-17-635, Jul 26, 2017
Phone: (202) 512-2834
Agency: Department of Defense: Department of the Army: Office of the Assistant Secretary (Civil Works)
Status: Open
Comments: DOD concurred with our recommendation. As of December 2019, officials from the Corps stated that they are working to develop additional metrics for dredging decisions and will brief congressional committees on the results. We will continue to follow the Corps' progress in addressing this recommendation.
GAO-17-457, Jun 22, 2017
Phone: (202) 512-4841
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation. DASA(P) officials indicated that organizations can determine cost savings attributable to contracting utilizing the Virtual Contracting Enterprise. However, this method is not formalized or documented in policy or guidance, and DASA(P) officials have not incorporated cost savings attributable to contracting into the CERs. We continue to believe that the Army should implement a CER metric to evaluate cost savings attributable to contracting activities.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation. DASA(P) officials noted that the Contractor Performance Assessment Reporting System (CPARS) is the system for processing and collecting contractor performance information, but also expressed that the information contained in the system may not be reliable for assessing contractor performance. The information contained in CPARS is subjective and has had thousands of overdue required entries. The DASA(P) officials subsequently stated that DOD made improvements to CPARS based on a 2017 DOD Inspector General report. However, the officials have not provided any information identifying specific improvements DOD made, or evidence that CPARS is now an effective means to collect and report contractor performance data.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation. DASA(P) is in the process of implementing talent management metrics through its Contracting Enterprise Review (CER) briefings. To this end, the 2nd quarter, fiscal year 2020 CER briefing included information about skill-based hiring and flexibilities for tailored training. However, the CER briefing did not address the department's contracting workforce requirements. We continue to believe that the ASA(ALT) should accurately determine the department's contracting workforce requirements in accordance with the Army's needs.
GAO-17-568, Jun 22, 2017
Phone: (202) 512-4841
including 1 priority recommendation
Agency: Department of Defense: Department of the Army
Status: Open
Priority recommendation
Comments: The Army concurred with our recommendation. Previously, Army officials told GAO that they planned to implement this recommendation after the new Army Futures Command-which currently manages capabilities development for the Army-became fully operational. Although this command became fully operational in July 2019, Army officials stated that more time is needed to fully coordinate and implement this recommendation. The Army Futures Command will work with the U.S. Army Manpower Analysis Agency to assess the capabilities development workforce focused on requirements prior to programs entering the system development phase. Army officials estimate that this assessment will be completed in March 2021. In June 2020, GAO staff received a brief status update from the Army PAO who confirmed that this is still the plan.
GAO-17-337, Apr 25, 2017
Phone: (202) 512-3841
Agency: Department of Defense: Department of the Army: Office of the Inspector General
Status: Open
Comments: DOD concurred with the recommendation in its comments on the draft report. As of July 2020, the Army had drafted a memorandum that would delegate the requirements to the investigative services or program office. We will update the status of this recommendation after the Army issues the final memorandum.
GAO-17-85, Feb 9, 2017
Phone: (202) 512-9869
including 1 priority recommendation
Agency: Department of Defense: Department of the Army
Status: Open
Priority recommendation
Comments: The Army concurred with this recommendation. The Army stated that the Accountability and Audit Readiness Directorate has completed actions to enhance its current standard operating procedures to include (1) updating its corrective action plan (CAP) database and reporting tool, (2) documenting its reporting procedures, and (3) updating its CAP template to include additional elements recommended by the Implementation Guide for OMB Circular A-123. In addition, the Army stated that its policies and procedures include steps to incorporate external financial management-related audit findings assigned to the Accountability and Audit Readiness Directorate by the Internal Review Directorate and that the existing process the Army uses to prioritize findings and the related CAPs and to monitor the progress and status of CAPs has been documented. We reviewed Army's documentation that was provided in January 2020. Army's documentation did not show that it has a process for ensuring that all financial management related findings and recommendations are identified and tracked. To implement this recommendations Army needs to enhance their policies and procedures related to tracking and monitoring the status of these audit findings.
GAO-16-583, Jul 12, 2016
Phone: (202) 512-3604
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with this recommendation. As of August 2020, an Army Medical Command official stated that the Warrior Transition Unit manpower model is under review by the U.S. Army Manpower Analysis Agency and that the scheduled date for the release of the review is unknown.
GAO-15-349, Jun 15, 2015
Phone: (202) 512-3604
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation and noted that it has an existing process for oversight and reporting of the use of soldiers replacing or converting functions previously performed by contractors and planned to develop a similar policy to address oversight on soldiers replacing or converting functions previously performed by civilians. As of July 2019, the Army has not provided an update on the development of this policy.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation and noted that it would be unreasonable to require tracking the amount of time soldiers are used as borrowed military personnel because it would be overly burdensome and that Army Regulation 570-4 allows for the use of soldiers for training purposes or for temporary functions. In July 2019, the Army indicated that the revision to Army Regulation 570-4 will be issued in December 2019.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army partially concurred with our recommendation. In their comments the Army noted that it has issued guidance establishing the appropriate use of military manpower and was in the process of incorporating this guidance into Army Regulation 570-4. In July 2019, the Army indicated that the revision of Army Regulation 570-4 would be issued in December 2019.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: The Army concurred with our recommendation. However, the Army noted that it already has a process requiring that a cost analysis take place. Additionally, the Army stated that the process of conducting a cost analysis should be conducted at the headquarter level and that the Army will issue policy to institute this. As of July 2019 the Army has not provided an update on the status of this policy or a status on implementing the recommendation.
GAO-12-791, Sep 26, 2012
Phone: (202) 512-3000
Agency: Department of Defense: Department of the Army
Status: Open
Comments: As of January 2020, the Department of the Army had taken steps to address this recommendation, but much more remains to be done. Specifically, in December 2013, the department developed its Army Business Management Strategy, which included metrics to measure the number of business systems retired over five years and cost savings and avoidance through use of the Army's business enterprise architecture. However, as of January 2020, the department had not demonstrated that it had documented the steps to measure the metrics. In January 2020, the department's chief architect stated that the department was in the process of establishing a baseline architecture. We will continue to monitor the Army's efforts to establish an architecture and an approach for measuring architecture outcomes in accordance with our recommendation.