GAO’s recommendations database contains report recommendations that still need to be addressed. GAO’s priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. Below you can search only priority recommendations, or search all recommendations.
Our recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Moreover, when implemented, some of our priority recommendations can save large amounts of money, help Congress make decisions on major issues, and substantially improve or transform major government programs or agencies, among other benefits.
As of October 25, 2020, there are 4812 open recommendations, of which 473 are priority recommendations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented.
Browse or Search Open Recommendations
Have a Question about a Recommendation?
- For questions about a specific recommendation, contact the person or office listed with the recommendation.
- For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
Results:
Subject Term: "Defense operations"
GAO-18-206, Nov 13, 2017
Phone: (202) 512-4523
Agency: Department of Defense: Department of the Air Force
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Navy
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Air Force
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Navy
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD non-concurred with our recommendation. In August 2018, an official from the Office of the Assistant Secretary of Defense (Energy, Installations & Environment) stated that because DOD non-concurred with this recommendation, the department has no plans to implement it. As of June 2020, DOD has not provided evidence that the department intends to implement it. Thus, the recommendation remains open and we will continue to follow up on it, if DOD decides to take relevant actions.
Agency: Department of Defense: Department of the Air Force
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, it was continuing to review DOD Directive (DODD) 4715.21 on climate resilience; DOD reissued the directive in August 2018. The directive requires the military departments to incorporate adaptation to climate change impacts into their planning for facilities. Further, DOD has incorporated adaptation into other guidance that applies to each of the departments. For example, with revisions to DOD's Unified Facilities Criteria for Master Planning and High Performance and Sustainable Building Requirements, as well the issuance of the guide "Climate Adaptation for DOD Natural Resource Managers," DOD has instructed the military departments' planners to incorporate adaptation into installation-level plans. Further, in 2020 DOD issued guidance that requires the military departments to use a DOD database on sea level changes in their planning for coastal infrastructure (sea level change is one impact of climate change). However, as of June 2020, the Air Force had not provided evidence of required training for installation-level planners that incorporates the DOD guidance discussed in this summary. Thus, the recommendation remains open and we will review evidence of such training if that evidence becomes available.
Agency: Department of Defense: Department of the Navy
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, it was continuing to review DOD Directive (DODD) 4715.21 on climate resilience; DOD reissued the directive in August 2018. The directive requires the military departments to incorporate adaptation to climate change impacts into their planning for facilities. Further, DOD has incorporated adaptation into other guidance that applies to each of the departments. For example, with revisions to DOD's Unified Facilities Criteria for Master Planning and High Performance and Sustainable Building Requirements, as well the issuance of the guide "Climate Adaptation for DOD Natural Resource Managers," DOD has instructed the military departments' planners to incorporate adaptation into installation-level plans. Further, in 2020, DOD issued guidance that requires the military departments to use a DOD database on sea level changes in their planning for coastal infrastructure (sea level change is one impact of climate change). However, as of June 2020, the Navy had not provided evidence of required training for installation-level planners that incorporates the DOD guidance discussed in this summary. Thus, the recommendation remains open and we will review evidence of such training if that evidence becomes available.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, it was continuing to review DOD Directive (DODD) 4715.21 on climate resilience; DOD reissued the directive in August 2018. The directive requires the military departments to incorporate adaptation to climate change impacts into their planning for facilities. Further, DOD has incorporated adaptation into other guidance that applies to each of the departments. For example, with revisions to DOD's Unified Facilities Criteria for Master Planning and High Performance and Sustainable Building Requirements, as well the issuance of the guide "Climate Adaptation for DOD Natural Resource Managers," DOD has instructed the military departments' planners to incorporate adaptation into installation-level plans. Further, in 2020, DOD issued guidance that requires the military departments to use a DOD database on sea level changes in their planning for coastal infrastructure (sea level change is one impact of climate change). However, as of June 2020, the Army had not provided evidence of required training for installation-level planners that incorporates the DOD guidance discussed in this summary. Thus, the recommendation remains open and we will review evidence of such training if that evidence becomes available.
Agency: Department of Defense: Department of the Air Force
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, the Office of the Secretary of Defense continues to work with the military departments to evaluate how best to incorporate resilience measures into Unified Facilities Criteria (UFCs), as appropriate. DOD also stated that UFCs are reviewed and revised on a rolling basis. As of June 2020, DOD has not provided evidence of climate change data and projections integrated into UFCs. Thus, the recommendation remains open and as UFCs are updated, we will assess the extent to which the revised versions addresses the recommendation.
Agency: Department of Defense: Department of the Navy
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, the Office of the Secretary of Defense continues to work with the military departments to evaluate how best to incorporate resilience measures into Unified Facilities Criteria (UFCs), as appropriate. DOD also stated that UFCs are reviewed and revised on a rolling basis. As of June 2020, DOD has not provided evidence of climate change data and projections integrated into UFCs. Thus, the recommendation remains open and as UFCs are updated, we will assess the extent to which the revised versions addresses the recommendation.
Agency: Department of Defense: Department of the Army
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, the Office of the Secretary of Defense continues to work with the military departments to evaluate how best to incorporate resilience measures into Unified Facilities Criteria (UFCs), as appropriate. DOD also stated that UFCs are reviewed and revised on a rolling basis. As of June 2020, DOD has not provided evidence of climate change data and projections integrated into UFCs. Thus, the recommendation remains open and as UFCs are updated, we will assess the extent to which the revised versions addresses the recommendation.
Agency: Department of Defense
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, the Department is continuing to review and update the processes and criteria governing host-nation cost-sharing negotiations to strengthen or incorporate resilience measures. Since each bilateral agreement is unique, these must be completed on a case-by-case basis. Further, DOD noted that any updates would occur on a "rolling basis." As of June 2020, DOD has not provided evidence that the department has engaged in such updates. Thus, the recommendation remains open and as we become aware of new or updated host-nation cost-sharing agreements, we will assess the extent to which they (or the processes and criteria governing them) address the recommendation.
Agency: Department of Defense
Status: Open
Comments: In October 2017, DOD partially concurred with our recommendation. According to a July 2018 Corrective Action Plan provided by DOD, the Department is continuing to review guidance for establishing agreements between host-nation communities and DOD installations. Further, DOD noted that any updates would occur on a "rolling basis." As of June 2020, DOD has not provided evidence that the department has engaged in such updates. Thus, the recommendation remains open and as we become aware of new or updated agreements between host-nation communities and DOD installations, we will assess the extent to which they (or the guidance governing them) address the recommendation.
GAO-17-9, Dec 7, 2016
Phone: (202) 512-5257
Agency: Department of Defense
Status: Open
Comments: DOD concurred with this recommendation. In response to an Office of Management and Budget (OMB) memorandum requiring agencies to develop a reform plan to improve the efficiency, effectiveness, and accountability, the Deputy Chief Management Officer issued a memorandum requiring each DOD component--including the military departments--to conduct a thorough review of business operations and to propose reform initiatives to improve the efficiency, effectiveness, and accountability within their respective organizations. For those initiatives selected for implementation, components were required to provide additional information on their initiatives, to include performance goals and measures. DOD submitted its agency reform plan to OMB in September 2017, which included military department-level reform initiatives. According to an Office of the Chief Management Officer (OCMO) official, OCMO was in the process of incorporating the military department-level reform initiatives into weekly updates to the Deputy Secretary of Defense and monthly reports to the Secretary of Defense. Once the military department-level reform initiatives are incorporated into these regular reporting mechanisms, we believe DOD's efforts will meet the intent of our recommendation. As of December 2019, DOD has not provided additional information related to this recommendation.
GAO-16-406, Sep 8, 2016
Phone: (202) 512-5431
Agency: Department of Defense
Status: Open
Comments: DOD non concurred with this recommendation and, as of August 2020, has not altered its position or taken action to address the recommendation. According to DOD officials, the department does not have the data systems that can track and report projects executed using O&M appropriations and that doing so is not cost effective and would not improve decision making. However, we continue to believe DOD could adapt an existing system or mechanism for recording and capturing these data in an automated form. For example, as we noted in our report, we believe through appropriate modifications, the cost of contingency construction projects could be readily available in the Army's existing accounting and finance system. Further, we continue to believe that knowing the universe and cost of all O&M-funded construction projects supporting contingency operations is important for decision making.
Agency: Department of Defense
Status: Open
Comments: DOD partially concurred with this recommendation. In response to a GAO follow-up request in August 2020, DOD stated that it continues to review current processes and authorities annually and submits legislative proposals and changes policies when appropriate. For example, DOD is working to revise authorities and designations for construction agents in Joint Operational Areas executing contingency construction to improve flexibility and responsiveness. According to the department, this change will be effective once DOD Directive 4270.5, Military Construction is completed in the second quarter of fiscal year 2012. As DOD's process is continuous, there will be no end date for completion of all actions associated with this recommendation, according to a DOD official.
Agency: Department of Defense
Status: Open
Comments: DOD partially concurred with this recommendation stating that the appropriate level of construction is a function of required service life and mission requirements, both of which are determined by the facility user rather than the construction agent. The Department agreed that these parameters must be defined and documented during the facility planning process by the Component responsible for developing facility requirements, and then communicated to the appropriate construction agent (i.e. the Army Corps of Engineers, Naval Facilities Engineering Command, or the Air Force Civil Engineer Center). In response to a GAO follow-up request in August 2020, a DOD official stated that the department is revising DOD guidance to clarify that level-of-construction determinations are to be documented by construction agents once received from facility user. The revision will be included in an update of DOD Directive 4270.5, Military Construction, which is to be completed in the second quarter of fiscal year 2012. Once completed, this should address the intent and close out GAO's recommendation as implemented.
Agency: Department of Defense
Status: Open
Comments: DOD partially concurred with this recommendation. In response to a GAO follow-up request in August 2020, a DOD official stated that the Department believes all combatant commanders involved in contingency operations should conduct periodic reviews of new or ongoing construction projects to ensure they still meet operational needs. As a result, the Secretary of Defense plans to, in coordination with the Chairman of the Joint Chiefs of Staff, direct the Secretaries of the military departments and the Combatant Commanders to develop guidance for the review and verification of ongoing contingency construction projects when mission changes occur. According to the DOD official, the Secretary of Defense plans to provide this direction in the pending update of DOD Directive 4270.5, Military Construction for application in Joint Operational Areas and contingency operations. The expected completion of this action is during the second quarter of fiscal year 2012, at which point the intent of GAO's recommendation will have been addressed.
Agency: Department of Defense
Status: Open
Comments: DOD concurred with this recommendation. In August 2020, DOD stated that CENTCOM Regulation 525-4 chapter 10-3 establishes comprehensive reporting requirements for the Joint Lessons Learned program that encompass the contingency construction function. Further, while this information does not need to be repeated in CENTCOM regulation 415-1, DOD stated that the application of 525-4 to contingency construction would be reinforced by referencing it in 415-1. Accordingly, in February 2020, the Deputy Assistant Secretary of Defense-Facilities Management DOD issued a memo directing the Commander, USCENTCOM, to revise CENTCOM Regulation 415-1 accordingly. We will continue to monitor to evaluate whether the Commander, USCENTCOM completes this tasking and whether the resulting guidance addresses our recommendation.
Agency: Department of Defense
Status: Open
Comments: DOD did not concur with this recommendation. At the time of our report, the department stated that the recommendation is redundant of current practice and referenced department processes to conduct periodic reviews to ensure compliance, among other processes, guidance, and training. In response to a GAO follow-up request in August 2020, DOD's position on the recommendation has not changed, However, as we noted in our report, our recommendation is not that DOD create new processes but instead that DOD use the periodic review processes it referenced to evaluate the examples in our report and ensure that funds were appropriately used. The examples in our report present instances where the department had developed multiple construction projects, each below the O&M maximum for unspecified minor military construction, to meet what may have been an overarching construction requirement. We noted a similar instance where the department had used its review process and found that an Antidefiency Act violation had occurred. In light of the concerns raised by the examples in our report, we continue to believe that DOD should use its existing processes to review the facts and circumstances presented by these examples and determine whether funds were appropriately used.
GAO-16-636, Aug 16, 2016
Phone: (202) 512-5431
Agency: Department of Defense
Status: Open
Comments: The Department of Defense (DOD) concurred with this recommendation. As of December 2019, the Army had taken some steps to improve its guidance, as GAO recommended in August 2016, but did not plan to fully address the recommendation until 2021. Officials stated that the Army established target usage rates for existing virtual training devices and issued guidance and tracking tools for recording device usage. However, the Army had not modified the guidance, cited in GAO's August 2016 report, to require that training developers consider the amount of time available to train with or expected usage rates of new virtual training devices. According to Army officials, they will implement GAO's recommendation in a planned update to guidance on the justification and validation of new virtual training devices scheduled for 2021. By updating this guidance, the Army will have the information it requires to evaluate the amount of virtual training capabilities needed to achieve training tasks and proficiency goals during operational training.
GAO-16-450, Jun 9, 2016
Phone: (202) 512-5257
Agency: Department of Defense
Status: Open
Comments: DOD concurred with our recommendation. As of August 2018, DOD had designated the transfer of these retail functions as an operating priority and identified it as a key reform effort within logistics in the department. The Marine Corps has conducted its analysis and decided to transition additional supply, storage, and distribution functions to the Defense Logistics Agency (DLA) over a 4-year period, with all implementation activities scheduled to be complete by 2022. The Army continues to analyze requirements for the full transition of supply, storage, and distribution functions to DLA with final decisions to be made in late 2018. Lastly, the Navy and DLA are working on a strategic memorandum of understanding to guide decision on the role of DLA at the Navy shipyards, according to a senior DOD official. Without the Army and Navy finalizing its business case analyses, decision makers will not be positioned to make cost-effective decisions regarding supply operations at military depots.
Agency: Department of Defense
Status: Open
Comments: DOD concurred with our recommendation. As of August 2018, DOD had designated the transfer of these retail functions as an operating priority and identified it as a key reform effort within logistics in the department. The Marine Corps has conducted its analysis and decided to transition additional supply, storage, and distribution functions to the Defense Logistics Agency (DLA) over a 4-year period, with all implementation activities scheduled to be completed by 2022. However, the Army and Navy have not made any decisions regarding the additional transfer of supply, storage and distribution functions to DLA. Without the Army and Navy making decisions based on business case analyses on the degree to which additional supply, storage, and distribution functions will transfer to DLA, DOD will not be ensured that it is operating its supply operations at military depots in a cost-effective manner.
Agency: Department of Defense
Status: Open
Comments: DOD concurred with our recommendation. As of August 2018, DOD has begun to identify metrics that measure the accuracy of planning factors used for depot maintenance. However, these metrics are not scheduled to be implemented fully implemented in December 2018.
Agency: Department of Defense
Status: Open
Comments: DOD concurred with our recommendation. As of August 2018, DOD has begun to identify metrics that measure the accuracy of planning factors used for depot maintenance. However, these metrics are not scheduled to be implemented fully implemented in December 2018. Thus, no actions have been taken to resolve any identified issues based on the results of the metrics.
Agency: Department of Defense
Status: Open
Comments: DOD concurred with our recommendation. As of August 2018, DOD has begun to develop metrics that measure and track disruption costs created by the lack of parts at depot maintenance industrial sites. However, these metrics are not scheduled to be implemented until October 2018.
Agency: Department of Defense
Status: Open
Comments: DOD concurred with our recommendation. As of August 2018, DOD has begun to develop metrics that measure and track disruption costs created by the lack of parts at depot maintenance industrial sites. However, these metrics are not scheduled to be implemented until October 2018. Thus, no actions have been taken to resolve any identified issues based on the results of the metrics.
GAO-16-414, May 13, 2016
Phone: (202) 512- 5431
Agency: Department of Defense
Status: Open
Comments: DOD partially concurred with our recommendation in GAO-16-414. Although in its comments to that report DOD agreed that it should establish a strategic policy that incorporates key elements of leading practices for sound strategic management planning to inform the military services' plans for retrograde and reset to support overseas contingency operations, DOD did not agree with identifying the Under Secretary of Defense for Acquisition, Technology and Logistics as the lead for this recommendation. In our August 2018 update (GAO-18-621R) we found that DOD had not yet developed a strategic policy, had not yet determined which DOD organization would lead that effort, and that there was no consensus among officials we spoke with regarding which organization should lead that effort. In is comments to this update, DOD generally concurred with these findings and stated that it had established standardized terms and definitions for the services to use to assess the cost of contingency operations and that the Air Force had recommended OSD form a working group to develop a unified strategic implementation plan and standard terminology, to include a common operating picture. We agree that these are steps in the right direction, but until the department establishes a strategic policy for the retrograde and reset of equipment that incorporates key elements of leading practices for sound strategic management as we recommended in May 2016, it will not be positioned to effectively manage the retrograde and reset of equipment. As of September 2020, DOD has not taken any action to address this recommendation; DOD is in the process of determining who the appropriate PAO should be.
Agency: Department of Defense
Status: Open
Comments: DOD partially concurred with our recommendation in GAO-16-414. In December 2017, DOD updated the relevant chapter of the its Financial Management Regulation (DOD 7000.14-R) to include definitions of "reset" and "retrograde." However, in our August 2018 update (GAO-18-621R) we found that despite this action, the terms retrograde and reset were not being used or defined consistently by the department and the military services. Specifically, while some services were using the term reset as defined in the regulation, others were not. In commenting on our 2018 update, DOD noted that the Under Secretary of Defense Comptroller had established standardized terms and definitions for the services to use to assess the cost of contingency operations, which allows for a common budget framework, while retaining service flexibility to fulfill their Title 10 responsibilities to man, train, and equip. DOD further stated that the Air Force recommended the Office of the Secretary of Defense form a working group to develop a unified strategic implementation plan and standard terminology, to include a common operating picture. We believe that these actions would be a step in the right direction, but to fully meet the intent of our May 2016 recommendation, DOD needs to take action to ensure that these terms are uniformly defined and consistently used throughout the services. As of September 2020, DOD has not taken any action to address this recommendation; DOD is in the process of determining who the appropriate PAO should be.
Agency: Department of Defense
Status: Open
Comments: In its response to our recommendation in GAO-16-414, DOD partially concurred, stating that the department would determine the appropriate Principal Staff Assistant to lead the development and application of service-related implementation plans. However, in our August 2018 update (GAO-18-621R) we found that DOD had not yet identified a lead for this effort, and that the Army, Navy, and Air Force had not yet developed implementation plans for the retrograde and reset of their equipment. Navy and Air Force officials further cited the need for a DOD-wide policy before they can establish service-specific plans for resetting equipment for contingency operations while Army officials told us that the Army relies on multiple guidance documents for the reset of equipment and does not currently have plans to develop a unified reset implementation plan. In its response to GAO-18-621R, DOD notes that detailed guidelines and processes for the rotation of personnel in contingency and non-contingency operations are in place, and that if a strategic policy is developed for the retrograde and reset of equipment, consideration should be given to the Under Secretary of Defense (Acquisition and Sustainment) as the lead. We continue to believe that our recommendation remains valid and that DOD also needs to establish a strategic policy consistent with leading practices on sound strategic management planning to guide and inform the services' plans, as we also recommended in 2016. As of September 2020, DOD has not taken any action to address this recommendation; DOD is in the process of determining who the appropriate PAO should be.
GAO-16-202, Feb 16, 2016
Phone: (202) 512-5257
Agency: Department of Defense
Status: Open
Comments: DOD concurred with this recommendation. As of January 2020, the Army is undergoing a financial audit of all munitions processes that affect the financial voucher, including the Material-In-Transit between locations, both wholesale and retail. The Army gained a consensus that until a unified record for both wholesale and retail is adopted, the shipping and receipt process will remain the same as that currently in use. An effort is underway to determine the best Army Enterprise Ammunition Supply Chain via an Other Transaction Agreement solution intended to provide a seamless supply chain from wholesale to the end user. The estimated completion date is September 2023.
GAO-12-345, Mar 21, 2012
Phone: (404) 679-1816
Agency: Department of Defense
Status: Open
Comments: The department partially concurred with this recommendation, stating that while it supports the refinement and update of DOD Instruction 5100.73, it uses the major headquarters activity designation to identify and manage the size of organizations in order to comply with statutory limits on headquarters personnel, not as tool to manage the organizational efficiency of the department or its components. With regard to the element of the recommendation concerning contractors, the department stated that in November of 2011 it had submitted a plan to the congressional defense committees for its Inventory of Contracts for Services that establishes both near and long term actions to improve visibility over all contracted services. This plan, and subsequent guidance issued in December 2011, describes the steps being taken to account for the level of effort of contracted support, based on the activity requiring the service. With regard to the element of the recommendation to meet reporting requirements for major headquarters activities, the department stated it had incorporated this requirement into the Defense Manpower Requirements Report in fiscal year 2012 and 2013. However, as of March 2020, DOD has not completed actions to address three of the four parts of this recommendation. In September 2017, DOD completed a revised framework for major DOD headquarters activities tied to funding, but as of March 2020 has not yet updated DOD Instruction 5100.73 to reflect all major DOD headquarters activity organizations included in the revised framework. DOD has also not identified an approach to include contractor personnel as part of its headquarters reporting. For fiscal year 2020 reporting, DOD intends to rely on the Federal Procurement Data System-Next Generation (FPDS-NG) as the basis for collecting information on contracted services. GAO has previously reported that FPDS-NG has certain limitations, including not being able to (a) identify and record more than one type of service purchased for each contracting action entered into the system, (b) identify the requiring activity specifically, and (c) determine the number of contractor full-time equivalents used to perform each service. Consequently, it is unclear the extent to which using FPDS-NG will enable DOD to determine the number of contractors and the functions they are performing in support of headquarters activities. DOD did clarify how it would respond to section 1109 of the fiscal year 2010 National Defense Authorization Act to satisfy this part of the recommendation. Lastly, DOD has also not yet established time frames for updating DOD Instruction 5100.73 or for determining how contractor personnel are to be included in major DOD headquarters activity reporting.