  • GAO’s recommendations database contains report recommendations that still need to be addressed.

    GAO’s recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented. You can explore open recommendations by searching or browsing.

    GAO's priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. These recommendations are labeled as such. You can find priority recommendations by searching or browsing our open recommendations below, or through our mobile app.

  • Browse Open Recommendations

    Explore priority recommendations by subject terms or browse by federal agency

    Search Open Recommendations

    Search for a specific priority recommendation by word or phrase



  • Governing on the go?

    Our Priorities for Policy Makers app makes it easier for leaders to search our recommendations on the go.

    See the November 10th Press Release


  • Have a Question about a Recommendation?

    • For questions about a specific recommendation, contact the person or office listed with the recommendation.
    • For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
  • « Back to Results List Sort by   

    Results:

    Subject Term: "Best practices"

    212 publications with a total of 715 open recommendations including 71 priority recommendations
    Director: Jessica Lucas-Judy
    Phone: (202) 512-9110

    2 open recommendations
    Recommendation: The Acting Commissioner of Internal Revenue should ensure that the Information Sharing and Analysis Center (ISAC) pilot better aligns with leading practices for effective pilot design. This should include (1) establishing criteria for assessing whether the pilot's objectives have been met before making decisions about its scalability and whether, how, and when to when to proceed to full implementation; and (2) developing a data analysis plan that identifies data sources and criteria necessary for effectively evaluating the pilot. (Recommendation 1)

    Agency: Department of the Treasury: Internal Revenue Service
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Acting Commissioner of Internal Revenue should ensure that the ISAC Partnership develops an outreach plan to expand membership and improve states' and industry partners' understanding of the ISAC's benefits. (Recommendation 2)

    Agency: Department of the Treasury: Internal Revenue Service
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Jennifer Grover
    Phone: (202) 512-7141

    5 open recommendations
    Recommendation: The Commandant of the Coast Guard should either develop new performance goals to address mission activity gaps, or explain in the Coast Guard's Annual Performance Report (APR) why certain aspects of mission performance are measured while others are not. (Recommendation 1)

    Agency: Department of Homeland Security: United States Coast Guard
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Commandant of the Coast Guard, in coordination with the Secretary of Homeland Security, should make the Coast Guard's future Annual Performance Reports publicly available on the Coast Guard's website. (Recommendation 2)

    Agency: Department of Homeland Security: United States Coast Guard
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Commandant of the Coast Guard, should coordinate with the Secretary of Homeland Security, and assess the extent to which documentation on performance data reliability, including Performance Measure Definition Forums and DHS and Coast Guard APRs, contain appropriate information on known data reliability limitations, and update these documents, as needed, based on the results of the assessment. (Recommendation 3)

    Agency: Department of Homeland Security: United States Coast Guard
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Commandant of the Coast Guard should develop and document, in its APR or elsewhere, corrective actions for unmet performance goals that are measurable and include time frames for implementation. (Recommendation 4)

    Agency: Department of Homeland Security: United States Coast Guard
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Commandant of the Coast Guard should document, in its APR or elsewhere, its efforts to monitor and evaluate the implementation of corrective actions for unmet performance goals. (Recommendation 5)

    Agency: Department of Homeland Security: United States Coast Guard
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Carol Harris
    Phone: (202) 512-4456

    14 open recommendations
    Recommendation: The TSA Administrator should ensure that the TIM program management office establishes and implements specific time frames for determining key strategic implementation details, including how the program will transition from the current state to the final TIM state. (Recommendation 1)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office establishes a schedule that provides planned completion dates based on realistic estimates of how long it will take to deliver capabilities. (Recommendation 2)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office establishes new time frames for implementing the actions identified in the organizational change management strategy and effectively executes against these time frames. (Recommendation 3)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office defines and documents the roles and responsibilities among product owners, the solution team, and any other relevant stakeholders for prioritizing and approving Agile software development work. (Recommendation 4)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office establishes specific prioritization levels for current and future features and user stories. (Recommendation 5)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office implements automated Agile management testing and deployment tools, as soon as possible. (Recommendation 6)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office updates the Systems Engineering Life Cycle Tailoring Plan to reflect the current governance framework and milestone review processes. (Recommendation 7)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office establishes thresholds or targets for acceptable performance-levels. (Recommendation 8)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office begins collecting and reporting on Agile-related cost metrics. (Recommendation 9)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office ensures that program velocity is measured and reported consistently. (Recommendation 10)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The TSA Administrator should ensure that the TIM program management office ensures that unit test coverage for software releases is measured and reported accurately. (Recommendation 11)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Secretary of Homeland Security should direct the Under Secretary for Management to ensure that appropriate DHS leadership reaches consensus on needed oversight and governance changes related to the frequency of reviewing Agile programs, and then documents and implements associated changes. (Recommendation 12)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Secretary of Homeland Security should direct the Under Secretary for Management to ensure that the Office of the Chief Technology Officer completes guidance for Agile programs to use for collecting and reporting on performance metrics. (Recommendation 13)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Secretary of Homeland Security should direct the Under Secretary for Management to ensure that DHS-level oversight bodies review key Agile performance and cost metrics for the TIM program and use them to inform management oversight decisions. (Recommendation 14)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Seto J. Bagdoyan
    Phone: (202) 512-6722

    4 open recommendations
    Recommendation: The NIST Director should incorporate elements of key practices into the implementation of the Security Sprint action plans, by establishing a comprehensive communication strategy for employees; interim milestone dates; and measures to assess effectiveness. (Recommendation 1)

    Agency: Department of Commerce: National Institute of Standards and Technology
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the Office of Security (OSY), in coordination with the NIST Director, should conduct an evaluation of the effectiveness of the current security management structure as compared to a consolidated security structure, centrally managed by OSY, to identify the most effective and feasible approach to physical security at NIST. (Recommendation 2)

    Agency: Department of Commerce: Office of Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of OSY should ensure that the draft Commerce risk management policy is finalized and implemented in accordance with the ISC's RMP Standard, by requiring the following: (1) Use and documentation of a sound risk assessment methodology that assesses the threats, vulnerabilities, and consequences for each of the undesirable events required by the RMP Standard, and use of these three factors to measure risk. (2) Documentation of key risk management decisions, such as justification and tenants' approval for facility security level (FSL) determinations, justification for deviation from baseline levels of risk or protection, as well as risk acceptance and consideration of alternative countermeasures. (3) Establishment of a facility security committee (FSC) at multitenant facilities and campuses, including locations such as the NIST Boulder campus. (4) ISC training for all OSY assessors and the individuals responsible for deciding to implement countermeasures and accepting risk. (Recommendation 3)

    Agency: Department of Commerce: Office of Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The NIST Director should finalize and implement risk management policies and procedures, ensuring that they contain a formal coordination mechanism between OSY and NIST and are aligned with Commerce's revised risk management policy, particularly with regard to establishing FSCs. (Recommendation 4)

    Agency: Department of Commerce: National Institute of Standards and Technology
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Shelby S. Oakley
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: The NNSA Deputy Administrator for DNN should revise the DNN program management policy to require DNN programs and subprograms to follow life-cycle program management. These requirements should include development of schedule and cost estimates that cover the life cycle of DNN programs and subprograms, use of methods to account for uncertainty and risk in such estimates, use of cost and schedule baselines to measure performance over program and subprogram life cycles, and development of program management plans. (Recommendation 1)

    Agency: Department of Energy: National Nuclear Security Administration: Office of Defense Nuclear Nonproliferation
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Asif A. Khan
    Phone: (202) 512-9869

    2 open recommendations
    Recommendation: The DHS Under Secretary for Management should develop and implement effective processes and improve guidance to reasonably assure that future AAs fully follow AOA process best practices and reflect the four characteristics of a reliable, high-quality AOA process. (Recommendation 1)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The DHS Under Secretary for Management should improve the Risk Management Planning Handbook and other relevant guidance for managing risks associated with financial management system modernization projects to fully incorporate risk management best practices, including (1) defining thresholds to facilitate review of performance metrics to determine when risks become unacceptable; (2) identifying and analyzing risks to include periodically reconsidering risk sources, documenting risks specifically related to the lack of sufficient, reliable cost and schedule information needed to help properly manage and oversee the project, and timely disposition of IV&V contractor-identified risks; (3) developing risk mitigation plans with specific risk-handling activities, the costs and benefits of implementing them, and contingency plans for selected critical risks; and (4) implementing risk mitigation plans to include establishing periods of performance for risk-handling activities and defining time intervals for updating and certifying the accuracy and completeness of information on risks in DHS's risk register. (Recommendation 2)

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Grover, Jennifer A
    Phone: 202-512-7141

    1 open recommendations
    Recommendation: The Commandant of the Coast Guard should complete a comprehensive cost estimate for a limited service life extension of the Polar Star that follows cost estimating best practices before committing to this approach for bridging the potential capability gap. (Recommendation 1)

    Agency: Department of Homeland Security: United States Coast Guard
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: David Trimble
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: The NNSA Administrator should set a time frame for when the agency will (1) develop the complete scope of work for the overall uranium program to the extent practicable and (2) prepare a life-cycle cost estimate and an integrated master schedule for the overall uranium program.

    Agency: Department of Energy: National Nuclear Security Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Melito, Thomas
    Phone: (202) 512-9601

    3 open recommendations
    Recommendation: To support efforts to reduce staff fraud at RSCs, the Secretary of State should direct the Bureau of Population, Refugees, and Migration to actively pursue efforts to ensure that RSCs comply with required, applicable measures in the Program Integrity Guidelines.

    Agency: Department of State
    Status: Open

    Comments: The State Department concurred with our recommendation and agreed with GAO's assessment that these measures will support efforts to reduce staff fraud at Resettlement Support Centers (RSC). According to State officials, the Bureau of Population, Refugees, and Migration (PRM) has developed new guidance to enhance monitoring of RSCs. They explained that a new monitoring and evaluation framework serves as the foundational document for this guidance, which has incorporated and formalized PRM's existing RSC monitoring practices and established further requirements to address gaps identified by internal and external evaluative processes. According to the officials, the framework outlines roles, responsibilities, and tools for program officers and refugee coordinators. These responsibilities include formalizing and expanding monitoring of RSC compliance with the Program Integrity Guidelines. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To better identify risks from RSC staff fraud, the Secretary of State should direct the Bureau of Population, Refugees, and Migration to update guidance, such as the Program Integrity Guidelines, to require each RSC to conduct regular staff fraud risk assessments that are tailored to each RSC's specific operations.

    Agency: Department of State
    Status: Open

    Comments: The State Department concurred with our recommendation and agreed with GAO's assessment that this requirement would strengthen Resettlement Support Centers' (RSCs) ability to identify risks of staff fraud. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure that control activities are designed to mitigate identified RSC staff fraud risks, the Secretary of State should direct the Bureau of Population, Refugees, and Migration to regularly review RSC staff fraud risk assessments and use them to examine the suitability of existing staff fraud controls and revise controls as appropriate.

    Agency: Department of State
    Status: Open

    Comments: The State Department concurred with our recommendation and agreed with GAO's assessment that this would help ensure that control activities are designed to mitigate identified Resettlement Support Centers (RSC) staff fraud risks. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Dave Wise
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: The Secretary of Transportation should direct NHTSA to define, document, and externally communicate the agency's roles and responsibilities in relation to connected vehicle data privacy.

    Agency: Department of Transportation
    Status: Open

    Comments: As described in the 60-day letter from October 17, 2017, NHTSA plans to create a vehicle data privacy page to be added to their website that will include information on the types of personal data collected by motor vehicles and provide links to additional resources, including the Federal Trade Commission(FTC) and industry groups. On this web page, NHTSA also plans to outline its roles and responsibilities related to vehicle data privacy. In addition, NHTSA will consult with FTC as it develops the web page content and allow for industry and public comments. We will continue to monitor NHTSA's actions related to these efforts.
    Director: Lori Rectanus
    Phone: (202) 512-2834

    7 open recommendations
    Recommendation: The Secretary of the Interior should direct the Director of the National Park Service to direct the U.S. Park Police to ensure that performance measures linked to program goals are included as part of its updated strategic plan and direct it to develop a timeline for completion of this plan.

    Agency: Department of the Interior
    Status: Open

    Comments: Interior concurred with this recommendation and said it would take steps to implement it. When we confirm what actions Interior has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Secretary of the Interior should direct the Director of the National Park Service to direct the U.S. Park Police to seek additional input from federal entities with expertise regarding ways to enhance testing of its physical security program.

    Agency: Department of the Interior
    Status: Open

    Comments: Interior concurred with this recommendation and said it would take steps to implement it. When we confirm what actions Interior has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Secretary of the Smithsonian Institution should direct the Office of Protection Services to develop program goals and ensure that performance measures linked to those goals are included as part of the strategic plan for security and develop a timeline for completion of this plan.

    Agency: Smithsonian Institution
    Status: Open

    Comments: The Smithsonian concurred with this recommendation and said it would take steps to implement it. When we confirm what actions the Smithsonian has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Secretary of the Smithsonian Institution should direct the Office of Protection Services to seek additional input from federal entities with expertise regarding ways to enhance testing of the physical security program.

    Agency: Smithsonian Institution
    Status: Open

    Comments: The Smithsonian concurred with this recommendation and said it would take steps to implement it. When we confirm what actions the Smithsonian has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the National Gallery of Art should direct the Office of Protection Services to develop a process for documenting risk management decisions.

    Agency: National Gallery of Art
    Status: Open

    Comments: The National Gallery concurred with this recommendation and said it would take steps to implement it. When we confirm what actions the National Gallery has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the National Gallery of Art should direct the Office of Protection Services to ensure that program goals and performance measures linked to those goals are included as part of the master security plan and develop a timeline for completion of this plan.

    Agency: National Gallery of Art
    Status: Open

    Comments: The National Gallery concurred with this recommendation and said it would take steps to implement it. When we confirm what actions the National Gallery has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the National Gallery of Art should direct the Office of Protection Services to seek additional input from federal entities with expertise regarding ways to enhance testing of the physical security program.

    Agency: National Gallery of Art
    Status: Open

    Comments: The National Gallery concurred with this recommendation and said it would take steps to implement it. When we confirm what actions the National Gallery has taken in response to this recommendation, we will provide updated information.
    Director: Mike Sullivan
    Phone: (202) 512-4841

    5 open recommendations
    Recommendation: To ensure that DOD is positioned to counter both near and far term threats, consistent with its S&T framework, the Secretary of Defense should direct the new Under Secretary of Defense for Research and Engineering to annually define the mix of incremental and disruptive innovation investments for each military department.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To ensure that DOD is positioned to counter both near and far term threats, consistent with its S&T framework, the Secretary of Defense should direct the new Under Secretary of Defense for Research and Engineering to annually assess whether that mix is achieved.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To ensure that DOD is positioned to more comprehensively implement leading practices for managing science and technology programs, the Secretary of Defense should direct the new Under Secretary of Defense for Research and Engineering to define, in policy or guidance, an S&T management framework that includes emphasizing greater use of existing flexibilities to more quickly initiate and discontinue projects to respond to the rapid pace of innovation.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To ensure that DOD is positioned to more comprehensively implement leading practices for managing science and technology programs, the Secretary of Defense should direct the new Under Secretary of Defense for Research and Engineering to define, in policy or guidance, an S&T management framework that includes incorporating acquisition stakeholders into technology development programs to ensure they are relevant to customers.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To ensure that DOD is positioned to more comprehensively implement leading practices for managing science and technology programs, the Secretary of Defense should direct the new Under Secretary of Defense for Research and Engineering to define, in policy or guidance, an S&T management framework that includes promoting advanced prototyping of disruptive technologies within the labs so the S&T community can prove these technologies work to generate demand from future acquisition programs.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Marie A. Mak
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: The Secretary of the Army should conduct a comprehensive assessment to better understand the resources necessary for the requirements development process and determine the extent to which the shortfalls can be addressed given other funding priorities.

    Agency: Department of Defense: Department of the Army
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: David A. Powner
    Phone: (202) 512-9286

    4 open recommendations
    Recommendation: To assist VA in improving key IT management processes to ensure that investments support the delivery of health care services, the Secretary of Veterans Affairs should direct the Under Secretary for Health and the Chief Information Officer to identify performance metrics and associated targets for the goals and objectives in the department's IT strategic plans, including the Information Resources Management strategic plan and the Health Information Strategic Plan, as they relate to the delivery of health IT and the VHA mission.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In comments on our report, VA concurred with our recommendation and described planned coordination with the Office of Information and Technology and the Veterans Health Administration to develop or revise and maintain performance metrics that support the strategic and health information technology goals and objectives. The department plans to revise performance metrics to align to new goals and objectives by June 2018.
    Recommendation: To assist VA in improving key IT management processes to ensure that investments support the delivery of health care services, the Secretary of Veterans Affairs should direct the Under Secretary for Health and the Chief Information Officer to ensure that the department-level investment review structure is implemented as planned and that guidance on the IT governance process is documented and identifies criteria for selecting new investments, and reselecting investments currently operational at VHA.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In comments on our report, VA concurred with our recommendation and provided meeting minutes for its Portfolio Investment Management Board and a document describing the proposed alignment and interdependencies between the 11 governance boards. We will continue to monitor the implementation of the proposed relationships and review any additional guidance issued that further describes the process used by the governance boards for selecting and reselecting information technology investments.
    Recommendation: To assist VA in improving key IT management processes to ensure that investments support the delivery of health care services, the Secretary of Veterans Affairs should direct the Under Secretary for Health and the Chief Information Officer to identify additional performance metrics to align with VHA's core business functions, and then use these metrics to determine the extent to which the department's IT systems support performance of VHA's mission.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In comments on our report, VA concurred with our recommendation. In addition, the department outlined steps it intends to take to address our recommendation. These steps include developing a set of core metrics to provide continuous input into investment portfolio decisions and establishing a methodology for ensuring that information technology investments are aligned to business needs and that expected outcomes are defined prior to making the investments. The department plans to complete this work by September 2018. We will continue to monitor VA's progress on these efforts.
    Recommendation: To assist VA in improving key IT management processes to ensure that investments support the delivery of health care services, the Secretary of Veterans Affairs should direct the Under Secretary for Health and the Chief Information Officer to ensure that unmet IT needs identified by key program areas--pharmacy benefits management, scheduling, and community care--are addressed appropriately and that related business functions are supported by IT systems to the extent required.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In comments on our report, VA concurred with our recommendation. The department has described its intention to ensure that unmet information technology needs for the pharmacy benefits management, scheduling, and community care program areas are addressed appropriately during fiscal year 2018 budget formulation. We will follow-up with VA to ascertain what needs have been addressed, closed, or reprioritized for each program office during fiscal year 2018.
    Director: J. Christopher Mihm
    Phone: (202) 512-6806

    55 open recommendations
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to clearly define the purpose of engaging the public.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to clearly define the purpose of engaging the public.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to clearly define the purpose of engaging the public.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to consider the agency's capability to implement a strategy, including leadership support, legal authority, the availability of resources, and capacity.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to consider the agency's capability to implement a strategy, including leadership support, legal authority, the availability of resources, and capacity.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to consider the agency's capability to implement a strategy, including leadership support, legal authority, the availability of resources, and capacity.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to define specific and measurable goals for the initiative.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to define specific and measurable goals for the initiative.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to define specific and measurable goals for the initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to identify performance measures to assess progress.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to identify performance measures to assess progress.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to identify performance measures to assess progress.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to align goals of the initiative with the agency's broader mission and goals.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to align goals of the initiative with the agency's broader mission and goals.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to align goals of the initiative with the agency's broader mission and goals.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to document the roles and responsibilities for all involved in the initiative.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to document the roles and responsibilities for all involved in the initiative.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to document the roles and responsibilities for all involved in the initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to develop a plan that identifies specific implementation tasks and time frames, including those for participant outreach and data collection.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to develop a plan that identifies specific implementation tasks and time frames, including those for participant outreach and data collection.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to develop a plan that identifies specific implementation tasks and time frames, including those for participant outreach and data collection.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to use multiple outlets and venues to announce the initiative.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to use multiple outlets and venues to announce the initiative.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to use multiple outlets and venues to announce the initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to craft announcements to respond to the interests and motivations of potential participants.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to craft announcements to respond to the interests and motivations of potential participants.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to craft announcements to respond to the interests and motivations of potential participants.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to hold regular check-ins for those involved in the implementation of the initiative.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to hold regular check-ins for those involved in the implementation of the initiative.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to hold regular check-ins for those involved in the implementation of the initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to collect and analyze data to assess goal achievement and results of the initiative.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to collect and analyze data to assess goal achievement and results of the initiative.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to collect and analyze data to assess goal achievement and results of the initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to conduct an after-action review to identify lessons learned and potential improvements.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to conduct an after-action review to identify lessons learned and potential improvements.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to conduct an after-action review to identify lessons learned and potential improvements.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to report on results and lessons learned publicly.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to report on results and lessons learned publicly.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to report on results and lessons learned publicly.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to acknowledge and, where appropriate, reward the efforts and achievements of partners and participants.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to acknowledge and, where appropriate, reward the efforts and achievements of partners and participants.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to acknowledge and, where appropriate, reward the efforts and achievements of partners and participants.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to seek to maintain communication with, and promote communication among, members of the community.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to seek to maintain communication with, and promote communication among, members of the community.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget, the Director of the Office of Science and Technology Policy, and the Administrator of the General Services Administration should enhance key guidance for open data collaboration initiatives to seek to maintain communication with, and promote communication among, members of the community.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Administrator of the General Services Administration should enhance key guidance for ideation and open dialogue initiatives to develop a plan that identifies specific implementation tasks and time frames, including those for participant outreach and data collection.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Administrator of the General Services Administration should enhance key guidance for ideation and open dialogue initiatives to hold regular check-ins for those involved in the implementation of the initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Administrator of the General Services Administration should enhance key guidance for ideation and open dialogue initiatives to report on results and lessons learned publicly.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Administrator of the General Services Administration should enhance key guidance for ideation and open dialogue initiatives to acknowledge the efforts and achievements of partners that have contributed to the implementation of an initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Science and Technology Policy and Administrator of the General Services Administration should enhance key guidance for crowdsourcing and citizen science initiatives to fully reflect the key action to acknowledge the efforts and achievements of partners that have contributed to implementing an initiative.

    Agency: Executive Office of the President: Office of Science and Technology Policy
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Science and Technology Policy and Administrator of the General Services Administration should enhance key guidance for crowdsourcing and citizen science initiatives to fully reflect the key action to acknowledge the efforts and achievements of partners that have contributed to implementing an initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget and the Administrator of the General Services Administration should enhance key guidance for prize competitions and challenges to hold regular check-ins with those involved in the implementation of an initiative.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget and the Administrator of the General Services Administration should enhance key guidance for prize competitions and challenges to hold regular check-ins with those involved in the implementation of an initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget and the Administrator of the General Services Administration should enhance key guidance for prize competitions and challenges to acknowledge the efforts and achievements of partners who contributed to the implementation of an initiative.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help ensure federal agencies effectively design, implement, and assess open innovation initiatives in line with the practices and key actions identified in our past report, the Director of the Office of Management and Budget and the Administrator of the General Services Administration should enhance key guidance for prize competitions and challenges to acknowledge the efforts and achievements of partners who contributed to the implementation of an initiative.

    Agency: General Services Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Rebecca Gambler
    Phone: (202) 512-8777

    11 open recommendations
    Recommendation: To better address current and future staffing needs, the Director of EOIR should develop and implement a strategic workforce plan that addresses, among other areas, key principles of effective strategic workforce planning, including (1) determining critical skills and competencies needed to achieve current and future programmatic results; (2) developing strategies that are tailored to address gaps in number, deployment, and alignment of human capital approaches for enabling and sustaining the contributions of all critical skills and competencies; and (3) monitoring and evaluation of the agency's progress toward its human capital goals and the contribution that human capital results have made toward achieving programmatic results.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR officials reported that its Immigration Court Staffing Committee, established in April 2017, would, among other things, examine how to best leverage the judicial and court staff workload model to address its short- and long-term staffing needs, assess the critical skills and competencies needed to achieve future programmatic results, and develop strategies to address human capital gaps. This committee expects to complete its work in March 2018. EOIR also reported that it is developing an agency-wide strategic plan that includes human capital planning as a critical component, which will be used to guide workforce planning for the entire agency. To fully address this recommendation, EOIR's Immigration Court Staffing Committee should complete its work and provide documentation demonstrating that it: 1) addressed the agency's short- and long-term staffing needs; 2) identified the critical skills and competencies needed to achieve future programmatic results; and 3) developed strategies to address human capital gaps. EOIR should also provide documentation, including the completed strategic plan, describing how the agency tailored its human capital strategies to address gaps in the number, deployment, and alignment of human capital approaches; and is monitoring and evaluating the agency's progress toward its human capital goals.
    Recommendation: To better address EOIR's immigration judge staffing needs, the Director of EOIR should: (1) assess the immigration judge hiring process to identify opportunities for efficiency; (2) use the assessment results to develop a hiring strategy that targets short- and long-term human capital needs; and (3) implement any corrective actions related to the hiring process resulting from this assessment.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it is actively implementing a new streamlined hiring plan that aims to reduce the hiring timeline. According to EOIR, this revised hiring plan, among other things, sets clear deadlines for assessing applicants moving through different stages of the process and for making decisions on advancing applicants to the next stage, as well as allows for temporary appointments for all selected judges pending full background investigations. EOIR stated that it will use this revised process in the future to fill judge vacancies. Regarding the development of a hiring strategy, EOIR stated that it recognizes the importance of assessing immigration judge hiring needs holistically to continue to develop an overall immigration judge hiring strategy, and will utilize a planned human capital strategy and additional data to further refine the hiring process. To fully address this recommendation, EOIR should continue its efforts to assess and improve its hiring process and provide documentation describing: 1) its new hiring process, including how EOIR assessed the prior hiring process to identify opportunities for efficiency; 2) its hiring strategy targeting short- and long-term human capital needs; and (3) the corrective actions EOIR implemented in response to the assessment results, such as eliminating procedures that increased the length of the hiring process.
    Recommendation: To help ensure that EOIR meets its cost and schedule expectations for EOIR Courts and Appeals Systems (ECAS), the EOIR Director should identify and establish the appropriate entity for exercising oversight over ECAS through full implementation.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: As of August 2017, EOIR reported that it had selected the EOIR Investment Review Board to serve as the ECAS oversight body with the Office of Information Technology (OIT) directly responsible for the management of the ECAS program. To fully address this recommendation, EOIR should provide documentation related to this decision.
    Recommendation: To help ensure that EOIR meets its cost and schedule expectations for ECAS, the EOIR Director should document and implement an oversight plan that is consistent with best practices for overseeing IT projects, including (1) establishing how the oversight body is to monitor program performance and progress toward expected cost, schedule, and benefits; (2) ensuring that corrective actions are identified and assigned to the appropriate parties at the first sign of cost, schedule, or performance slippages; and (3) ensuring that corrective actions are tracked until the desired outcomes are achieved.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: As of August 2017, EOIR reported that it had selected the EOIR Investment Review Board to serve as the ECAS oversight body with the Office of Information Technology (OIT) directly responsible for the management of the ECAS program. According to EOIR, OIT will record on a weekly basis all financial metrics, risks, issues, and corrective actions in EOIR's project management tool, as well as regularly evaluating the program's performance and progress and immediately implementing any needed corrective actions. To fully address this recommendation, EOIR should document and implement an oversight plan that describes how the EOIR Investment Review Board and OIT will oversee the full implementation of ECAS, including how these bodies will, consistent with best practices for overseeing IT projects: 1) monitor program performance and progress toward expected cost, schedule, and benefits; (2) ensure that corrective actions are identified and assigned to the appropriate parties at the first sign of cost, schedule, or performance slippages; and (3) ensure that corrective actions are tracked until the desired outcomes are achieved.
    Recommendation: To provide further assurance that EOIR's use of video teleconference (VTC) in immigration hearings is outcome-neutral, the Director of EOIR should collect more complete and reliable data on the number and type of hearings it conducts through VTC.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it is studying how to collect more complete and reliable data on the number and type of hearings it conducts through video teleconference (VTC). To fully address this recommendation, once EOIR determines how to collect more complete and reliable VTC hearing data, EOIR should provide documentation describing its approach and evidence of its implementation.
    Recommendation: To provide further assurance that EOIR's use of VTC in immigration hearings is outcome-neutral, the Director of EOIR should collect data on appeals in which the use of VTC formed some basis for the appeal, and the number of in-person hearing motions filed.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it is planning a pilot project to collect data on the number and type of appeals to the Board of Immigration Appeals (BIA) in which the use of video teleconference (VTC) formed an element of the basis for the appeal. EOIR expects to begin this 6-month pilot project in the first quarter of fiscal year 2018. Additionally, EOIR stated that it will assess the feasibility of collecting data on the number of filed motions requesting an in-person hearing instead of a VTC hearing. To fully address this recommendation, EOIR should continue these efforts and begin systematically collecting data on appeals in which the use of VTC formed some basis for the appeal and the number of in-person hearing motions filed.
    Recommendation: To provide further assurance that EOIR's use of VTC in immigration hearings is outcome-neutral, the Director of EOIR should use these and other data to assess any effects of VTC on immigration hearings and, as appropriate, address any issues identified through such an assessment.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it intends to analyze data on appeals in which the use of VTC formed some basis for the appeal from the Board of Immigration Appeals' pilot program as well as other data to further assess any effects of video teleconference (VTC) usage on immigration hearings. To fully address this recommendation, EOIR should, pending the results of the pilot program, use these and other data to assess any effects of VTC on immigration hearings and, as appropriate, address any issues identified through such an assessment.
    Recommendation: To further ensure that EOIR's VTC hearings meet all user needs and help EOIR identify and address technical issues with VTC hearings, the Director of EOIR should develop and implement a mechanism to solicit and monitor feedback from respondents regarding their satisfaction and experiences with VTC hearings, including the audio and visual quality of the hearing.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it partially agreed with this recommendation and would create a mechanism to solicit open-ended feedback from respondents regarding their satisfaction and experience with video teleconference (VTC) hearings, including the audio and visual quality of the hearing. EOIR reported that it is exploring and expects to implement some options by the first quarter of fiscal year 2018, such as a feedback portal on the EOIR website, a dedicated e-mail box, or a comment card for distribution to respondents at immigration courts and detention centers where VTC hearings are held. To fully address this recommendation, EOIR should continue to explore and implement a mechanism to solicit and monitor feedback from respondents regarding their satisfaction and experiences with VTC hearings, including the audio and visual quality of the hearing.
    Recommendation: To better assess court performance and use data to identify potential management challenges, the Director of EOIR should establish and monitor comprehensive case completion goals, including a goal for completing non-detained cases not currently captured by performance measures, and goals for cases it considers a priority.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it agrees that the agency should measure case completions in all categories and is evaluating the best way to measure its courts' performance to improve efficiency and productivity. Additionally, EOIR reported that it is working with the immigration judges' union to conduct this assessment and expects to complete this evaluation and begin working toward making any changes to its performance assessment system by the second quarter of fiscal year 2018. To fully address this recommendation, EOIR should continue these efforts and establish and monitor comprehensive case completion goals, including a goal for completing non-detained cases not currently captured by performance measures, and goals for cases it considers a priority.
    Recommendation: To better assess court performance and use data to identify potential management challenges, the Director of EOIR should systematically analyze immigration court continuance data to identify and address any operational challenges faced by courts or areas for additional guidance or training.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it will further analyze continuance data to identify and address operational challenges as well as determine areas where immigration judges might benefit from additional guidance or training on the use of continuances. EOIR plans to prepare new reports assessing continuance data by the first quarter of fiscal year 2018. Additionally, EOIR reported that it anticipates releasing a new Operating Policies and Procedures Memorandum addressing the appropriate use of continuances in August 2017. To fully address this recommendation, EOIR should continue to systematically analyze continuance data to identify any operational challenges faced by courts or areas for additional guidance or training, and address any challenges through taking actions such as issuing the new memorandum on continuances.
    Recommendation: To better assess court performance and use data to identify potential management challenges, the Director of EOIR should update policies and procedures to ensure the timely and accurate recording of Notices to Appear.

    Agency: Department of Justice: Executive Office for Immigration Review
    Status: Open

    Comments: In August 2017, EOIR stated that it partially agreed with this recommendation and will continue to monitor the timeliness and accuracy of NTA recording and implement corrective actions as needed. Additionally, EOIR stated that it will explore the need to create new guidance for immigration court staff to address instances where EOIR exceeds average recording times timeframes in the future. To fully implement this recommendation, EOIR should update its policies and procedures to better ensure the timely and accurate recording of NTAs, and thus provide greater assurance that EOIR's case management data are accurate, including case completion times and the size of its case backlog.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    4 open recommendations
    Recommendation: To strengthen MDA's acquisition efforts and strengthen oversight, and to increase traceability and insight into MDA's test program, the Secretary of Defense should require MDA to (a) include a detailed crosswalk of changes to each test, such as names, planned execution dates, test types, targets, and other modifications, in each iteration of its Integrated Master Test Plan; (b) address deficiencies in its test scheduling policy by better aligning it with best practices for scheduling, including the use of a schedule work breakdown structure (WBS) that clearly traces each activity to the cost WBS, properly assigning resources to schedules, and clarifying guidance on when and how to conduct schedule risk analysis; (c) rectify deficiencies in its element and test level cost estimates by requiring the use of the common test WBS, documenting the traceability of source data, and codifying the processes and associated information for the software application Test Resource Mission Planning-Tool used to create the test level cost estimates in policy; and (d) break out funding requests by test in the BMDS Accountability Report and other budget documentation submitted during the annual budget submission.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To strengthen MDA's acquisition efforts and strengthen oversight, and to improve MDA's requirement-setting process and ensure it includes an appropriate balance between MDA and warfighter priorities, the Secretary of Defense should require MDA to develop a plan to transition operational requirements analysis currently performed within MDA's Achievable Capabilities List to the U.S. Combatant Commanders, with U.S. Strategic Command as the lead entity and, in the interim, require MDA to obtain their concurrence of the Achievable Capabilities List prior to its release.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To strengthen MDA's acquisition efforts and strengthen oversight, and to ensure that the Redesigned Kill Vehicle (RKV) acquisition strategy continues to remain viable, promotes effective competition, and addresses concerns raised by DOD components, the Secretary of Defense should require the Director, DOD's Office of Cost Assessment and Program Evaluation (CAPE) to perform a comprehensive review of the RKV acquisition strategy and provide any recommendations to the Secretary of Defense that the Director deems necessary and appropriate to obtain CAPE's concurrence for the RKV program's acquisition strategy. Any decision to award a full-rate production contract should be delayed until after MDA has received approval from the Under Secretary of Defense for Acquisition, Technology, and Logistics (USD(AT&L) to proceed to full-rate production.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To strengthen MDA's acquisition efforts and strengthen oversight, and to ensure that future acquisition strategies MDA develops for its new efforts reflect an appropriate balance between timeliness, affordability, reliability, and effectiveness and achieve department-wide buy-in, the Secretary of Defense should require MDA to produce acquisition strategies for all its major new efforts that are subject to review by the Director, CAPE and review and approval by the USD(AT&L).

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Randall B. Williamson
    Phone: (202) 512-7114

    4 open recommendations
    Recommendation: To improve the completeness and accuracy of VA's productivity metrics and efficiency models and strengthen the monitoring of clinical productivity and efficiency VA-wide, the Secretary of the Department of Veterans Affairs should direct the Undersecretary for Health to expand existing productivity metrics to track the productivity of all providers of care to veterans by, for example, including contract physicians who are not VA employees as well as advance practice providers acting as sole providers.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the completeness and accuracy of VA's productivity metrics and efficiency models and strengthen the monitoring of clinical productivity and efficiency VA-wide, the Secretary of the Department of Veterans Affairs should direct the Undersecretary for Health to help ensure the accuracy of underlying staffing and workload data by, for example, developing training to all providers on coding clinical procedures.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the completeness and accuracy of VA's productivity metrics and efficiency models and strengthen the monitoring of clinical productivity and efficiency VA-wide, the Secretary of the Department of Veterans Affairs should direct the Undersecretary for Health to develop a policy requiring VAMCs to monitor and improve clinical efficiency through a standard process, such as establishing performance standards based on VA's efficiency models and developing a remediation plan for addressing clinical inefficiency.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the completeness and accuracy of VA's productivity metrics and efficiency models and strengthen the monitoring of clinical productivity and efficiency VA-wide, the Secretary of the Department of Veterans Affairs should direct the Undersecretary for Health to establish an ongoing process to systematically review VAMCs' remediation plans and ensure that VAMCs and Veterans Integrated Service Networks are successfully implementing remediation plans for addressing low clinical productivity and inefficiency.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Rebecca Gambler
    Phone: (202) 512-8777

    5 open recommendations
    Recommendation: To help ensure that efforts to address smuggling through cross-border tunnels, ultralight aircraft, panga boats, and recreational vessels are effective and that managers and stakeholders have the information needed to make decisions, the Secretary of Homeland Security should direct the Commissioner of CBP to assess and document how the alternative technological solutions being considered will fully meet operational needs related to ultralight aircraft.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS concurred with this recommendation and stated that it plans to assess and document requirements related to ultralight aircraft threats and how technological solutions will address these requirements as part of U.S. Customs and Border Protection Air and Marine Operations air domain awareness efforts. DHS plans to complete these efforts by July 2018.
    Recommendation: To help ensure that efforts to address smuggling through cross-border tunnels, ultralight aircraft, panga boats, and recreational vessels are effective and that managers and stakeholders have the information needed to make decisions, the Secretary of Homeland Security should direct the Commissioner of CBP and the Director of ICE to jointly establish and monitor performance measures and targets related to cross-border tunnels.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS concurred with this recommendation and stated that U.S. Customs and Border Protection and U.S. Immigration and Customs Enforcement will review available information and develop performance measures and targets as deemed appropriate by February 2018.
    Recommendation: To help ensure that efforts to address smuggling through cross-border tunnels, ultralight aircraft, panga boats, and recreational vessels are effective and that managers and stakeholders have the information needed to make decisions, the Secretary of Homeland Security should direct the Commissioner of CBP to establish and monitor performance targets related to ultralight aircraft.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS concurred and stated that within U.S. Customs and Border Protection, Air and Marine Operations and the U.S. Border Patrol are developing a joint performance measure and targets for interdicting ultralight aircraft. DHS plans to complete these efforts by October 2017.
    Recommendation: To help ensure that efforts to address smuggling through cross-border tunnels, ultralight aircraft, panga boats, and recreational vessels are effective and that managers and stakeholders have the information needed to make decisions, the Secretary of Homeland Security should direct the U.S. Customs and Border Protection (CBP)-U.S. Immigration and Customs Enforcement (ICE) tunnel committee to convene and establish standard operating procedures for addressing cross-border tunnels, including procedures for sharing information.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS did not concur with this recommendation. However, CBP and ICE agreed that strengthening operational procedures may be beneficial and stated that they will jointly review procedures and discuss revising and/or consolidating the procedures. We continue to believe that the recommendation is valid and will monitor DHS's efforts to address it.
    Recommendation: To help ensure that efforts to address smuggling through cross-border tunnels, ultralight aircraft, panga boats, and recreational vessels are effective and that managers and stakeholders have the information needed to make decisions, the Secretary of Homeland Security should direct the Commandant of the Coast Guard, Commissioner of CBP, and the Director of ICE to establish and monitor Regional Coordinating Mechanisms performance measures and targets related to panga boat and recreational vessel smuggling.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS did not concur with this recommendation. DHS stated that that it believes that by establishing common terminology to address our first recommendation, the RECOMs will have more reliable, usable analyses to inform their maritime interdiction efforts. However, DHS did not believe that performance measures and targets related to smuggling by panga boats would provide the most useful strategic assessment of operations to prevent all illicit trafficking, regardless of area of operations or mode of transportation. DHS also cited the recent creation of the DHS Office of Policy, Strategy, and Plans that is to work with U.S. Coast Guard, U.S. Customs and Border Protection, U.S. Immigration and Customs Enforcement, and other components and offices to better evaluate the effectiveness of all operations that work to prevent the illegal entry of goods and people into the country, as appropriate. We continue to believe that the recommendation is valid and will monitor DHS's efforts to address it.
    Director: Frank Rusco
    Phone: (202) 512-3841

    3 open recommendations
    including 1 priority recommendation
    Recommendation: To improve NRC's ability to strategically manage the size and composition of its workforce and respond to changes in the nuclear industry, the Chairman of the Nuclear Regulatory Commission should set agencywide goals, which could be ranges, for overall workforce size and skills composition that extend beyond the 2-year budget cycle.

    Agency: Nuclear Regulatory Commission
    Status: Open
    Priority recommendation

    Comments: In comments on a draft of the report, NRC generally agreed with the recommendation. In its June 2017 letter on plans for implementing the recommendation, NRC stated that it will implement a new activity to project workload over a 5-year time period. The resulting workload projections will be used to identify core staff positions needed to perform the work. NRC expects that this effort will facilitate setting agency goals for FTE and appropriate agency size beyond the current 2 year budget cycle and will support the agency's effort to enhance its human capital practices. We will review NRC's actions, once completed, to determine whether they meet the intent of this recommendation.
    Recommendation: To improve NRC's ability to strategically manage the size and composition of its workforce and respond to changes in the nuclear industry, the Chairman of the Nuclear Regulatory Commission should establish a systematic, comprehensive approach for tracking employee skills information, either through the system developed through the competency modeling pilot program or some other system.

    Agency: Nuclear Regulatory Commission
    Status: Open

    Comments: In comments on a draft of the report, NRC generally agreed with the recommendation. In its June 2017 letter on plans for implementing the recommendation, NRC stated that it will develop and deploy a standard agencywide system to track core staff positions and their related skills. Skills and competencies for each of the core positions will be identified and catalogued, allowing employees and supervisors to search for specific competencies needed to support work throughout the agency. We will review NRC's actions, once completed, to determine whether they meet the intent of this recommendation.
    Recommendation: To improve NRC's ability to strategically manage the size and composition of its workforce and respond to changes in the nuclear industry, the Chairman of the Nuclear Regulatory Commission should consistently train managers and supervisors in strategic human capital management and assessing employee skillsets.

    Agency: Nuclear Regulatory Commission
    Status: Open

    Comments: In comments on a draft of the report, NRC generally agreed with the recommendation. In its June 2017 letter on plans for implementing the recommendation, NRC stated that it developed a Supervisor Development Program SharePoint site to centrally house information pertinent to management activities and required training. NRC will provide information on the agency's strategic workforce planning process as it evolves via this site. Additionally, NRC plans to incorporate the strategic workforce planning process and concepts into existing management training that will be delivered in-person and available on-line. We will review NRC's actions, once completed, to determine whether they meet the intent of this recommendation.
    Director: Frank Rusco
    Phone: (202) 512-3841

    6 open recommendations
    Recommendation: The Director of the Bureau of Land Management should develop a policy to ensure that field offices consistently track exception data.

    Agency: Department of the Interior: Bureau of Land Management
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the Bureau of Land Management should develop bureau-wide written procedures for consistently considering and clearly documenting the information and processes used to make exception decisions.

    Agency: Department of the Interior: Bureau of Land Management
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the Bureau of Land Management should direct field offices to make the results of exception request decisions available to the public, such as on BLM's public website.

    Agency: Department of the Interior: Bureau of Land Management
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the Bureau of Land Management should clarify guidance related to documentation of environmental inspections to ensure that inspections are documented in a manner that indicates whether all permit requirements were checked as part of the inspection.

    Agency: Department of the Interior: Bureau of Land Management
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the Bureau of Land Management should provide additional guidance to field offices on how to collect and use data collected during monitoring inspections and, in doing so, determine and implement an approach for using the data to assess the effectiveness of the agency's mitigation efforts, including its best management practices.

    Agency: Department of the Interior: Bureau of Land Management
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Director of the Bureau of Land Management should establish a policy requiring staff responsible for conducting environmental and monitoring inspections to take standardized training.

    Agency: Department of the Interior: Bureau of Land Management
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Dillingham, Gerald L
    Phone: (202) 512-2834

    3 open recommendations
    Recommendation: To help FAA better manage and oversee its portfolio of R&D activities, the Secretary of Transportation should direct the FAA to take a more strategic approach to identifying research priorities across the agency, including developing guidance to identify long-term priorities and emerging issue areas, as part of FAA's portfolio development process.

    Agency: Department of Transportation
    Status: Open

    Comments: As of June 2017, FAA officials said they were redesigning the agency?s National Aviation Research Plan (NARP) to, among other things, better align research to agency outcomes. FAA officials said that the redesigned NARP will provide the agency a strategic view of R&D and a better understanding of the driving forces for research, such as longer term strategic needs and emerging issues. The officials also said that the redesigned NARP will allow for a more effective framework from which to prioritize research. FAA plans to finalize the redesign of the NARP by February 2019.
    Recommendation: To help FAA better manage and oversee its portfolio of R&D activities, the Secretary of Transportation should direct the FAA to clarify its portfolio development guidance to call for each Program Planning Teams to disclose the process it used for prioritizing and selecting research projects so that decision-making is more transparent for FAA management.

    Agency: Department of Transportation
    Status: Open

    Comments: As of June 2017, FAA officials said they were developing guidance that will require the Program Planning Teams to identify and document their process for prioritizing and selecting research projects. FAA plans to finalize the guidance by November 2017.
    Recommendation: To help FAA better manage and oversee its portfolio of R&D activities, the Secretary of Transportation should direct the FAA to develop guidance to ensure that future National Aviation Research Plans (NARP) and R&D Annual Reviews meet statutory requirements to the extent practicable, including (a) The NARP lists activities that are carried under cooperative agreements. (b) The NARP describes the rationale for the prioritized research programs. (c) The NARP identifies how resources were allocated for long-term and near-term research. (d) The NARP identifies REDAC recommendations that are accepted, not accepted, and the reasons for non-acceptance. (e) The NARP provides a detailed description of technology transfer to government, industry, and academia. (f) The Annual Review describes new technologies developed and the dissemination of research results to the private sector. (g) The Annual Review allows a comparison to the NARP. (h) The Annual Review is prepared and presented in accordance with agency performance reporting requirements.

    Agency: Department of Transportation
    Status: Open

    Comments: As of June 2017, FAA officials said they were redesigning the National Aviation Research Plan (NARP) and R&D Annual Review to include, among other things, information required by statute. FAA plans to finalize the redesign of the NARP and Annual Review by February 2019.
    Director: Marie A. Mak
    Phone: (202) 512-4841

    2 open recommendations
    Recommendation: The Secretary of Defense should direct the Secretary of the Navy to adjust the number of AAVs used in calculating AAV operations and support costs in the SAR to reflect a more realistic comparison to the 204 ACV 1.1s being procured.

    Agency: Department of Defense
    Status: Open

    Comments: DOD concurred with our recommendation to update this assumption, and made a partial update to the December 2016 ACV SAR in an effort to address it. In the updated SAR, DOD changed the number of AAVs being replaced from 204 to 180 as we recommended, but did not fully update the total AAV O&S cost figure based on that updated number. Therefore, this recommendation remains open.
    Recommendation: The Secretary of Defense should direct the Secretary of the Navy to postpone the ACV 1.1 program's production decision until early fiscal year 2019 to reduce concurrency between testing and production.

    Agency: Department of Defense
    Status: Open

    Comments: In its written comments, DOD contended that delaying the production decision could delay the ACV fielding schedule and impact the affordability and sequencing of the Marine Corps' overarching Vehicle Replacement Strategy. Although DOD does not plan to take action on our recommendation, Congress has yet to fund the start of ACV production in fiscal year 2018. Therefore, this recommendation remains open.
    Director: Seto Bagdoyan
    Phone: (202) 512-6722

    4 open recommendations
    Recommendation: The Commissioner (or Acting Commissioner) of SSA should direct the OAFP to lead a comprehensive fraud risk assessment that is consistent with leading practices, and develop a plan for regularly updating the assessment.

    Agency: Social Security Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Commissioner (or Acting Commissioner) of SSA should direct the OAFP to develop, document, and implement an antifraud strategy that is aligned to its assessed fraud risks.

    Agency: Social Security Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Commissioner (or Acting Commissioner) of SSA should direct the OAFP to work with components responsible for implementing antifraud initiatives to develop outcome-oriented metrics, including baselines and goals, where appropriate for antifraud activities.

    Agency: Social Security Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Commissioner (or Acting Commissioner) of SSA should direct the OAFP to review progress toward meeting goals on a regular basis, and recommend that the NAFC make changes to control activities or take other corrective actions on any initiatives that are not meeting goals.

    Agency: Social Security Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Mark Goldstein
    Phone: (202) 512-2834

    5 open recommendations
    Recommendation: To improve RUS's management of the Infrastructure Program, Broadband Program, and Community Connect by more closely following leading practices for broadband loan- and grant-program management, the Secretary of Agriculture should direct RUS to develop and document clear goals and performance measures linked to those goals, for each program.

    Agency: Department of Agriculture
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve RUS's management of the Infrastructure Program, Broadband Program, and Community Connect by more closely following leading practices for broadband loan- and grant-program management, the Secretary of Agriculture should direct RUS to establish and implement procedures to conduct a risk assessment of each program, including an examination of risk at both the programmatic and portfolio level for each program.

    Agency: Department of Agriculture
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve RUS's management of the Infrastructure Program, Broadband Program, and Community Connect by more closely following leading practices for broadband loan- and grant-program management, the Secretary of Agriculture should direct RUS to establish and implement procedures to conduct periodic evaluations of completed grant projects to determine the outcomes associated with these projects, and analyze the information gained to assess if any programmatic changes are needed to improve the Community Connect program.

    Agency: Department of Agriculture
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve RUS's management of the Infrastructure Program, Broadband Program, and Community Connect by more closely following leading practices for broadband loan- and grant-program management, the Secretary of Agriculture should direct RUS to establish a timeline for implementing a centralized internal system for staff to obtain relevant and timely program data for use in managing and monitoring loans and grant awards.

    Agency: Department of Agriculture
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve RUS's management of the Infrastructure Program, Broadband Program, and Community Connect by more closely following leading practices for broadband loan- and grant-program management, the Secretary of Agriculture should direct RUS to develop, update, and maintain complete written policies and procedures for RUS's programs as a way to retain and communicate organizational knowledge internally among agency staff. RUS should determine the critical documentation that should be created or updated, including considering documentation such as loan-application review guidance and employee manuals for each of the three programs.

    Agency: Department of Agriculture
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Maurer, Diana C
    Phone: (202) 512-8777

    4 open recommendations
    Recommendation: To help identify what domestic CVE efforts are to achieve and the extent to which investments in CVE result in measureable success, the Secretary of Homeland Security and the Attorney General--as heads of the two lead agencies responsible for coordinating CVE efforts--should direct the CVE Task Force to develop a cohesive strategy that includes measurable outcomes for CVE activities.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of May 2017, CVE Task Force officials stated that they are identifying concrete outputs and outcomes for CVE efforts outlined in the 2016 Strategic Implementation Plan. CVE Task Force officials also stated that they plan to develop short-term, medium-term, and long-term outcomes for these efforts. The Task Force plans to report to the White House Homeland Security Advisor on their implementation progress in January 2018. GAO will continue to monitor the CVE Task Force's progress in this area.
    Recommendation: To help identify what domestic CVE efforts are to achieve and the extent to which investments in CVE result in measureable success, the Secretary of Homeland Security and the Attorney General--as heads of the two lead agencies responsible for coordinating CVE efforts--should direct the CVE Task Force to develop a cohesive strategy that includes measurable outcomes for CVE activities.

    Agency: Department of Justice
    Status: Open

    Comments: As of May 2017, CVE Task Force officials stated that they are identifying concrete outputs and outcomes for CVE efforts outlined in the 2016 Strategic Implementation Plan. CVE Task Force officials also stated that they plan to develop short-term, medium-term, and long-term outcomes for these efforts. The Task Force plans to report to the White House Homeland Security Advisor on their implementation progress in January 2018. GAO will continue to monitor the CVE Task Force's progress in this area.
    Recommendation: To help identify what domestic CVE efforts are to achieve and the extent to which investments in CVE result in measureable success, the Secretary of Homeland Security and the Attorney General--as heads of the two lead agencies responsible for coordinating CVE efforts--should direct the CVE Task Force to establish and implement a process to assess overall progress in CVE, including its effectiveness.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of May 2017, CVE Task Force officials stated that they have begun consulting with departments and agencies that have already invested in CVE program assessment and are developing a research-based framework for designing and assessing CVE metrics. The CVE Task Force plans to report to the White House Homeland Security Advisor on their implementation progress in January 2018. GAO will continue to monitor the CVE Task Force's progress in this area.
    Recommendation: To help identify what domestic CVE efforts are to achieve and the extent to which investments in CVE result in measureable success, the Secretary of Homeland Security and the Attorney General--as heads of the two lead agencies responsible for coordinating CVE efforts--should direct the CVE Task Force to establish and implement a process to assess overall progress in CVE, including its effectiveness.

    Agency: Department of Justice
    Status: Open

    Comments: As of May 2017, CVE Task Force officials stated that they have begun consulting with departments and agencies that have already invested in CVE program assessment and are developing a research-based framework for designing and assessing CVE metrics. The CVE Task Force plans to report to the White House Homeland Security Advisor on their implementation progress in January 2018. GAO will continue to monitor the CVE Task Force's progress in this area.
    Director: Brian Lepore
    Phone: (202) 512-4523

    9 open recommendations
    Recommendation: To improve the Department of Defense's ability to maintain its capability in the Asia-Pacific region, the Secretary of Defense should direct the appropriate entities to resolve selected identified capability deficiencies associated with the relocation in the movement of Marine Corps units by, for example, reconsidering when units should move to Guam to minimize leaving facilities vacant.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with this recommendation and stated that the Marine Corps' plans for movement of units from Okinawa to Guam has considered many factors, including, among others, the capabilities required to support Pacific Command and the logistical requirements associated with the movement of forces. In its response, DOD stated that the Marine Corps is already working to ensure that its plan is continually refined to balance fiscal and construction realities with operational risk, capability requirements, and readiness. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the Department of Defense's ability to maintain its capability in the Asia-Pacific region, the Secretary of Defense should direct the appropriate entities to resolve selected identified capability deficiencies associated with the relocation in training needs in Iwakuni, Hawaii, and CNMI by, for example, identifying other suitable training areas.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with this recommendation and stated that it has already conducted an extensive analysis of training needs. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the Department of Defense's ability to maintain its capability in the Asia-Pacific region, the Secretary of Defense should direct the appropriate entities to resolve selected identified capability deficiencies associated with the relocation in reduction in runway length at the Futenma Replacement Facility by, for example, selecting other runways that would support mission requirements.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with this recommendation and stated that it disagreed that the length of the runway planned at the Futenma Replacement Facility is a capability deficiency for the Marine Corps. DOD stated that, at the time of its agreement with Japan, it understood that the Futenma Replacement Facility would not possess a long runway and that the Marine Corps drove the final requirements to support the capabilities required for their missions at the Futenma Replacement Facility. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the Department of Defense's ability to maintain its capability in the Asia-Pacific region, the Secretary of Defense should direct the appropriate entities to resolve selected identified capability deficiencies associated with the relocation in challenges in Australia regarding seasonal changes and biosecurity requirements that affect equipment downtime by, for example, deciding on a location for the wet season and identifying a solution for biosecurity requirements.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with this recommendation and stated that these factors are not capability deficiencies but rather real-world constraints around which DOD and Australia are working to develop the most bilaterally beneficial annual program possible. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To provide DOD with reliable information on potential sources of delays for the design and construction of infrastructure in Guam, the Secretary of Defense should direct the appropriate entities to update the Marine Corps' integrated master schedule for Guam so that it meets the comprehensive, well-constructed, and credible characteristics for a reliable schedule. For example, the update to the schedule should include resources for nonconstruction activities.

    Agency: Department of Defense
    Status: Open

    Comments: DOD concurred with this recommendation and stated it has begun updating its integrated master schedule based on our review to conform to the GAO Schedule Assessment Guide and plans to adopt the best practices of assigning resources and establishing activity durations to ensure the schedule is comprehensive. In its response, DOD also stated it plans to continue to work to verify that the schedule can be traced horizontally and vertically and conduct a schedule risk analysis. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To provide DOD and Congress with sufficient information to mitigate risks for infrastructure construction and sustainment, the Secretary of Defense should direct the appropriate entities to complete a Risk Management Plan for Guam, and include, at a minimum, plans to address: (1) construction labor shortages, (2) explosive--ordnance detection, (3) cultural-artifact discovery and preservation, and (4) protection of endangered species.

    Agency: Department of Defense
    Status: Open

    Comments: DOD concurred with this recommendation and identified plans to mitigate risks for infrastructure construction and sustainment, such as coordinating with the U.S. Citizenship and Immigration Services to address foreign-worker visas, approving an explosive-safety exemption for construction projects in Guam and CNMI, and developing a monitoring and mitigation tracking plan to ensure Navy compliance and execution of environmental requirements. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To provide DOD and Congress with more-reliable information to inform funding decisions associated with the relocation of Marines to Guam, the Secretary of Defense should direct the appropriate entities to revise the cost estimates for Guam to address all best practices established by GAO's cost estimating guide. Specifically, the revisions to the cost estimates should include: a unifying Work Breakdown Structure, risk and sensitivity analyses, and an independent cost estimate.

    Agency: Department of Defense
    Status: Open

    Comments: DOD nonconcurred with this recommendation and stated that the department does not accept the assertion that GAO's best practices are universally applicable to a wide range of activities that includes military construction, acquisition, or basing. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To provide DOD and Congress with more-reliable information to inform funding decisions associated with the relocation of Marines to Hawaii and the establishment of a rotational presence in Australia, the Secretary of Defense should direct the appropriate entities to revise the DOD cost estimates for Hawaii to address all best practices for the comprehensive characteristic established by the GAO cost estimating guide, specifically to capture entire life-cycle costs and develop a Work Breakdown Structure.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with this recommendation. In its response, the department agreed that good cost estimating practices are prudent for good decision making but did not agree that it should expend effort to update its cost estimates for the Hawaii program due to reasons of timing. Specifically, DOD stated that, for Hawaii, high-level cost estimates are sufficient at this early planning stage and a detailed Work Breakdown Structure is not needed. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To provide DOD and Congress with more-reliable information to inform funding decisions associated with the relocation of Marines to Hawaii and the establishment of a rotational presence in Australia, the Secretary of Defense should revise the DOD cost estimates for Australia to address all best practices for the comprehensive characteristic established by the GAO cost estimating guide, specifically to capture entire life-cycle costs and develop a Work Breakdown Structure.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with this recommendation. In its response, the department agreed that good cost estimating practices are prudent for good decision making but did not agree that it should expend effort to update its cost estimates for the Australia program due to reasons of international agreements. Specifically, DOD stated in its response that, for Australia, the costs borne by DOD under this program will be subject to international agreement rather than the GAO cost estimating guide. When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Carol C. Harris
    Phone: (202) 512-4456

    3 open recommendations
    Recommendation: To help improve the management of DOD's MAIS programs, the Secretary of Defense should direct the Secretary of the Army to direct the program manager for Global Combat Support System-Army Increment 1 to establish standard operating procedures for managing risks that include guidance for establishing thresholds and bounds for key risk areas.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help improve the management of DOD's MAIS programs, the Secretary of Defense should direct the Secretary of the Air Force to direct the program manager for Air and Space Operations Center-Weapon System Increment 10.2 to develop an overall risk mitigation plan to guide the implementation of individual risk mitigation and contingency plan activities.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help improve the management of DOD's MAIS programs, the Secretary of Defense should direct the Secretary of the Air Force to direct the program manager for Joint Space Operations Center, Mission System Increment 2 to appoint a chief developmental tester to oversee systems testing and integration activities.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: David C. Trimble
    Phone: (202) 512-3841

    6 open recommendations
    Recommendation: To allow DOE management to effectively monitor invoice reviews and have assurance that this control activity is operating as intended, the Secretary of Energy should establish a DOE-wide invoice review policy that includes requirements for sites to establish well-documented invoice review operating procedures.

    Agency: Department of Energy
    Status: Open

    Comments: DOE stated that it already has an established, detailed DOE-wide invoice review policy provided in DOE's Financial Management Handbook and in the DOE Acquisition Guide, and that they are updating the Financial Management Handbook to include additional procedures to address intra-governmental payment and collection transactions that they believe will allow the recommendation to be closed by September 30, 2017. However, DOE officials with the office of the CFO at DOE headquarters previously told us that they do not have department-wide invoice review policies and procedures, and that CFOs and contracting officials in DOE field offices are responsible to develop their own invoice review policies and procedures. In addition, we reviewed the Financial Management Handbook and the Acquisition Guide and found that these documents do not contain the detail necessary to serve as an invoice review policy. We will continue to review DOE's implementation of this recommendation to determine whether its actions meet the intent of the recommendation.
    Recommendation: To help DOE take a more strategic approach to managing improper payments and risk, including fraud risk, the Secretary of Energy should implement leading practices for managing the department's risk of fraud, including creating a structure with a dedicated entity within DOE to design and oversee fraud risk management activities.

    Agency: Department of Energy
    Status: Open

    Comments: DOE considers this recommendation to be closed without corrective action. Instead of establishing a dedicated entity within DOE to design and oversee fraud risk management activities, DOE will rely on the existing Office of Financial Policy and Internal Controls and on the DOE Office of Inspector General (OIG)to design and oversee financial fraud risk management activities. We disagree that reliance on these offices meets best practices because neither office is solely dedicated to designing or overseeing fraud risk management activities. Furthermore, according the best practices in GAO's Fraud Risk Framework, the dedicated entity should not be the OIG.
    Recommendation: To help DOE take a more strategic approach to managing improper payments and risk, including fraud risk, the Secretary of Energy should implement leading practices for managing the department's risk of fraud, including conducting fraud risk assessments that are tailored to each program and use the assessments to develop a fraud risk profile

    Agency: Department of Energy
    Status: Open

    Comments: DOE concurred with the substance of the recommendation; however they consider the recommendation to be closed without corrective action because its risk assessments meet the requirements of the Improper Payments Elimination and Recovery Improvement Act of 2012, as reported by the Office of Inspector General (OIG), and because it has implemented updates to OMB Circular A-123 that added requirements related to managing fraud risk and adherence to GAO's Fraud Risk Framework. However, we found that DOE has not conducted fraud risk assessments that are tailored to its programs and therefore do not allow the department to create a fraud risk profile. We also found that, although DOE updated its internal control assessment tools with a list of fraud risks as required by OMB Circular A-123, the list of risks were the same for all DOE sites and were not tailored to the sites' different programs.
    Recommendation: To help DOE take a more strategic approach to managing improper payments and risk, including fraud risk, the Secretary of Energy should implement leading practices for managing the department's risk of fraud, including developing and documenting an antifraud strategy that describes the programs' approaches for addressing the prioritized fraud risks identified during the fraud risk assessment.

    Agency: Department of Energy
    Status: Open

    Comments: DOE concurred with this recommendation but considers the recommendation closed without corrective action because DOE has implemented the updated OMB Circular A-123 and because DOE's anti-fraud strategy is imbedded in the DOE internal control program. However, DOE officials told us that they have not developed or documented a DOE-wide antifraud strategy or directed individual programs to develop program-specific strategies. Furthermore, DOE's implementation of OMB Circular A-123 included adding a list of potential risks to their internal control assessment tool that were the same for all DOE sites and were not tailored to the sites' different programs.
    Recommendation: To help DOE take a more strategic approach to managing improper payments and risk, including fraud risk, the Secretary of Energy should implement leading practices for managing the department's risk of fraud, including designing and implementing specific control activities, including fraud awareness training and data analytics, to prevent and detect fraud and other improper payments.

    Agency: Department of Energy
    Status: Open

    Comments: DOE believes that they are either implementing or have already implemented this recommendation and considers the recommendation closed without additional action. Specifically, DOE stated that the Office of Inspector General (OIG) already provides fraud awareness training and that the OIG provided expanded fraud risk training on June 12, 2017 through a CFO-hosted webinar. However, of the 10 field offices responsible for overseeing contractor costs, none required employees responsible for overseeing contractor costs to attend fraud awareness training.
    Recommendation: To help ensure that necessary data are available to employ data analytics as a tool to perform contractor cost-surveillance activities, the Secretary of Energy should require contractors to maintain sufficiently detailed transaction-level cost data that are reconcilable with amounts charged to the government, including (1) cost data that, at a minimum, represent a full data population and (2) the details necessary to determine the nature of each cost transaction, with such identifiers as transaction date, dollar amount, item or service description, and transaction codes to indicate the type of cost represented (e.g., construction materials, property lease, and office supplies).

    Agency: Department of Energy
    Status: Open

    Comments: DOE did not agree to implement this recommendation because they believe that the recommendation establishes agency-specific requirements for DOE contractors that are more prescriptive than current federal requirements. DOE states that they plan to evaluate the merits of government-wide guidance for applying data-analytics to contract costs only if an OMB working group--established as a requirement of the Fraud Reduction and Data Analytics Act of 2015 to promote interagency coordination on fraud reduction and data analytics--requires them to do so. However, the purpose of the working group is to share fraud management best practices. It is not an implementing body and agencies do not need its permission before proceeding with fraud risk reduction efforts.
    Director: Timothy J. DiNapoli
    Phone: (202) 512-4841

    2 open recommendations
    Recommendation: The Director of Human Capital Initiatives should clarify whether and under what conditions DAWDF funds could be used to pay for personnel to help manage the fund.

    Agency: Department of Defense: Office of the Secretary of Defense: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics: Office of Human Capital Initiatives
    Status: Open

    Comments: DOD partially concurred with this recommendation, and indicated that it plans to take action to address it. Section 822 of H.R. 2810, the National Defense Authorization Act for Fiscal Year 2018, authorizes the use of DAWDF to pay salaries of personnel at the Office of the Secretary of Defense, military departments, and Defense Agencies to manage the fund. The Human Capital Initiatives Office plans to update the DAWDF Desk Operating Guide based on the final legislation.
    Recommendation: In collaboration with cognizant officials within DOD components, the Director of Human Capital Initiatives should ensure that components have processes in place to verify the accuracy and completeness of data on the execution of initiatives funded by DAWDF.

    Agency: Department of Defense: Office of the Secretary of Defense: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics: Office of Human Capital Initiatives
    Status: Open

    Comments: DOD partially concurred with this recommendation, and indicated that actions will be taken or have already been taken to address it. DOD noted that it had made significant management and other changes to improve the accuracy and completeness of data used and provided by components on the execution of initiatives funded by DAWDF. DOD noted that it had, among other actions, issued guidance to improve data validity, consistency, and alignment; instituted a midyear program execution review; and established a requirement for a data-driven year in review. The midyear program execution review now requires additional information from components. In addition, as part of the fiscal year 2018 proposal process, components were required to propose hiring by career field. If these management and policy changes are effectively translated into practice, we believe these actions will address the intent of the recommendation.
    Director: Dave Wise
    Phone: (202) 512-5731

    3 open recommendations
    including 1 priority recommendation
    Recommendation: To improve VA's management of medical-facility construction projects and its accountability and to allow for more informed decision making by Congress and VA, the Secretary of Veterans Affairs should establish a mechanism to monitor the extent that major facilities projects are following guidelines on change orders' time frames and design changes.

    Agency: Department of Veterans Affairs
    Status: Open
    Priority recommendation

    Comments: GAO reviewed VA's 60 day letter and identified that VA did not address the part of GAO?s recommendation that is intended to help VA ensure that information on the reasons for change orders is collected to better inform managers whether guidelines regarding changes are being followed on construction projects. Consequently, in May 2017, GAO requested that VA provide documentation indicating that its current system collects the necessary information on change order processing timeframes for managers to ensure compliance with processing time guidelines. GAO will continue to monitor and update the status of this recommendation.
    Recommendation: To improve VA's management of medical-facility construction projects and its accountability and to allow for more informed decision making by Congress and VA, the Secretary of Veterans Affairs should develop an activation cost estimate for the Denver project that is reliable and conforms with best practices as described in the GAO Cost Estimating and Assessment Guide.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In its 60-day letter to Congress, VA said that it had analyzed its Activation Cost Budget Model (ACBM), which VA uses to estimate activation costs for new medical facilities, and its activation funding process, to improve cost forecasting and management of the activations process. VA said that it has modified ACBM to better support funding estimates and began using it in February 2017. GAO will continue to monitor and update the status of this recommendation.
    Recommendation: To improve VA's management of medical-facility construction projects and its accountability and to allow for more informed decision making by Congress and VA, the Secretary of Veterans Affairs should clarify Office of Construction and Facilities Management (CFM) policies to require that: (1) all projects have an integrated master schedule to ensure that the integrated master schedules include and link all construction and activation activities, and (2) the policies on integrated master schedule for projects managed by CFM and USACE are consistent.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In its 60-day letter to Congress, VA said that it is clarifying its policy and standard operation procedure on developing and maintaining an integrated master schedule. VA will also develop a standard operation procedure specifically for projects that the U.S. Army Corps of Engineers (USACE) is managing for VA. GAO will continue to monitor and update the status of this recommendation.
    Director: Jessica Farb
    Phone: (202) 512-6991

    9 open recommendations
    Recommendation: To improve the reliability and usefulness of program evaluations for agency program and budget decisions, the Chief Executive Officer of MCC, the Administrator of USAID, the Secretary of Agriculture, the Secretary of Defense, the Secretary of State, and the Secretary of Health and Human Services (in cooperation with State's Office of the U.S. Global AIDS Coordinator and Health Diplomacy) should each develop a plan for improving the quality of evaluations for the programs included in our review, focusing on areas where our analysis has shown the largest areas for potential improvement.

    Agency: Millennium Challenge Corporation
    Status: Open

    Comments: In a letter provided to GAO in May 2017, MCC stated that it had responded to our finding that MCC needed to more clearly document the independence of its evaluators and fully disclose any potential conflicts of interest in the published final evaluations. In response to this recommendation, MCC revised its standard evaluator contract language and now requires the evaluator's independence, and any potential conflicts of interest, be fully documented in the published evaluation report. GAO will follow up on documentation of this and any other steps responsive to our recommendation.
    Recommendation: To improve the reliability and usefulness of program evaluations for agency program and budget decisions, the Chief Executive Officer of MCC, the Administrator of USAID, the Secretary of Agriculture, the Secretary of Defense, the Secretary of State, and the Secretary of Health and Human Services (in cooperation with State's Office of the U.S. Global AIDS Coordinator and Health Diplomacy) should each develop a plan for improving the quality of evaluations for the programs included in our review, focusing on areas where our analysis has shown the largest areas for potential improvement.

    Agency: Department of Agriculture
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the reliability and usefulness of program evaluations for agency program and budget decisions, the Chief Executive Officer of MCC, the Administrator of USAID, the Secretary of Agriculture, the Secretary of Defense, the Secretary of State, and the Secretary of Health and Human Services (in cooperation with State's Office of the U.S. Global AIDS Coordinator and Health Diplomacy) should each develop a plan for improving the quality of evaluations for the programs included in our review, focusing on areas where our analysis has shown the largest areas for potential improvement.

    Agency: Department of Defense
    Status: Open

    Comments: In May 2017, DOD provided a response to our final report, dated March 30, 2017. The response noted that, in January 2017, the Department established policy on assessment, monitoring, and evaluation (AM&E) for security cooperation with the goal of improving the quality of program evaluation across the Department. DOD also stated that it would review best practices for AM&E to determine those that are best suited for security assistance, and will discuss our findings and recommendations with the independent evaluator who conducts security assistance evaluations and encourage them to consider the recommendations in future evaluations. GAO will review the January 2017 guidance and will follow-up on specific steps taken by the DOD to incorporate best practices.
    Recommendation: To improve the reliability and usefulness of program evaluations for agency program and budget decisions, the Chief Executive Officer of MCC, the Administrator of USAID, the Secretary of Agriculture, the Secretary of Defense, the Secretary of State, and the Secretary of Health and Human Services (in cooperation with State's Office of the U.S. Global AIDS Coordinator and Health Diplomacy) should each develop a plan for improving the quality of evaluations for the programs included in our review, focusing on areas where our analysis has shown the largest areas for potential improvement.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In a response to GAO in May 2017, HHS stated that the CDC Operationalization of the Evaluation Standards of Practice (ESOP) was updated in January 2017 and provides guidance on evaluation planning, protocol development, implementation, reporting, dissemination, and use of evaluation results, as well as reporting requirements. HHS also stated that it now reviews all evaluation and performance monitoring plans and assess report quality at several stages prior to publication and has begun to provide webinars and templates for evaluators to ensure that standards are addressed and reflected in the report. GAO will review the updated documents and request documentation of the actions taken for responsiveness to our recommendation.
    Recommendation: To improve the reliability and usefulness of program evaluations for agency program and budget decisions, the Chief Executive Officer of MCC, the Administrator of USAID, the Secretary of Agriculture, the Secretary of Defense, the Secretary of State, and the Secretary of Health and Human Services (in cooperation with State's Office of the U.S. Global AIDS Coordinator and Health Diplomacy) should each develop a plan for improving the quality of evaluations for the programs included in our review, focusing on areas where our analysis has shown the largest areas for potential improvement.

    Agency: Department of State
    Status: Open

    Comments: In a letter dated March 31, 2017, State reported that it would be expanding its evaluation policy into the new Program Design and Performance Management Policy for Programs, Projects, and Processes, expected to be in place by summer 2017. The policy and its implementation, along with the recently published Program Design and Performance Management toolkit, as well as updated policy guidance, constitute State's plan to improve evaluations. GAO will review the updated policy when it is released for its responsiveness to our recommendation.
    Recommendation: To improve the reliability and usefulness of program evaluations for agency program and budget decisions, the Chief Executive Officer of MCC, the Administrator of USAID, the Secretary of Agriculture, the Secretary of Defense, the Secretary of State, and the Secretary of Health and Human Services (in cooperation with State's Office of the U.S. Global AIDS Coordinator and Health Diplomacy) should each develop a plan for improving the quality of evaluations for the programs included in our review, focusing on areas where our analysis has shown the largest areas for potential improvement.

    Agency: United States Agency for International Development
    Status: Open

    Comments: In a letter provided to GAO in follow-up to our report, USAID stated that steps already taken include (1)recently updating and clarifying the requirements and quality standards for evaluations and (2) working to ensure that staff has the skills they need to manage evaluations through training and other capacity building actions. As of September 2017, GAO is reviewing the updated guidance and actions against the specific findings in our report to assess their responsiveness in addressing our findings.
    Recommendation: To better ensure that the evaluation findings reach their intended audiences and are available to facilitate incorporating lessons learned into future program design or budget decisions, the Chief Executive Officer of MCC should adjust MCC evaluation practices to make evaluation reports available within the timeframe required by MCC guidance.

    Agency: Millennium Challenge Corporation
    Status: Open

    Comments: In a letter provided to GAO in May 2017, MCC stated that it had initiated a re-design of its evaluation monitoring information system to provide MCC with detailed timelines of each component of the evaluation review and publication process. GAO will follow up on documentation of this and any other steps responsive to our recommendation.
    Recommendation: To better ensure that the evaluation findings reach their intended audiences and are available to facilitate incorporating lessons learned into future program design or budget decisions, the Secretary of State should amend State's evaluation policy to require the completion of dissemination plans for all agency evaluations

    Agency: Department of State
    Status: Open

    Comments: In a letter dated March 31, 2017, State reported that it would be expanding its evaluation policy into the new Program Design and Performance Management Policy for Programs, Projects, and Processes, expected to be in place by summer 2017. State reported that it would add a requirement for dissemination plans to the new policy. GAO will review the updated policy when it is released for its responsiveness to our recommendation.
    Recommendation: To better ensure that the evaluation findings reach their intended audiences and are available to facilitate incorporating lessons learned into future program design or budget decisions, the Secretary of Agriculture should implement guidance and procedures for making FAS evaluations available online and searchable on a single website that can be accessed by the general public.

    Agency: Department of Agriculture
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: David J. Wise
    Phone: (202) 512-2834

    2 open recommendations
    Recommendation: To improve the reliability of FRPP disposal data, the Administrator of GSA should implement a data validation procedure to prevent reporting the same building disposal multiple times.

    Agency: General Services Administration
    Status: Open

    Comments: In 2017, GAO reported that government-wide data were generally reliable for reporting on real property disposals for fiscal years 2014 and 2015. However, GAO identified a minor inconsistency wherein agencies can report the same building disposed of multiple times. Specifically, GAO found 132 buildings that were reported as disposed of in fiscal years 2014 and 2015 that had already been reported as disposed of in a previous reporting cycle. For the 2015 reporting year, 121 buildings reported as disposed of were also reported in other fiscal years from 2011 through 2014. When GAO asked about these cases in which buildings were reported as disposed of multiple times, GSA officials stated that the Federal Real Property Profile (FRPP) does not have a data validation procedure that prevents agencies from reporting disposals in multiple reporting cycles. Ensuring that a data validation procedure is put in place is important because without this control, building disposals can be overstated. GAO recommended that GSA implement a data validation procedure to prevent reporting the same building disposal multiple times. In response to GAO's recommendation, GSA developed a business validation procedure and added the following language to its 2017 FRPP data dictionary to prevent over-reporting: FRPP business rule validation prohibits reporting a disposed asset multiple times. An asset that has been reported disposed cannot be reported disposed in subsequent years. Agencies cannot dispose of the same asset multiple times. For example, if an asset was reported disposed by an agency in fiscal year 2014, then the agency should not report the asset as disposed in the current fiscal year. Instead, it should delete the record from its data submission, so that the asset appears in FRPP's missing asset report. In the missing asset report, the agency should note that the asset had been reported disposed in a prior fiscal year. This business rule should result in fewer over-reported disposed buildings to FRPP thereby enabling agencies to make sound real property management decisions based on more reliable disposal data.
    Recommendation: To improve the accuracy of reporting on progress in reducing the inventory of federal buildings, the Director of OMB, in coordination with the GSA Administrator, should establish a procedure to verify that the OMB's reports include the intended data, such as, reporting individual buildings only once and reporting only federally owned buildings.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of September 2017, OMB has taken some initial steps to coordinate with GSA to establish a procedure to verify that OMB's reports included the intended data.
    Director: Gretta L. Goodwin
    Phone: (202) 512-8777

    1 open recommendations
    Recommendation: To ensure that the Capitol Police Board's current and any new approaches help enhance accountability, transparency, and effective external communication with its stakeholders, the Board should revise its Manual of Procedures to fully incorporate each of the leading practices for internal control and governance standards discussed in this report. In so doing, the Board should engage stakeholders in the revision process, such as by soliciting their input on any non-statutory changes that could particularly address the concerns stakeholders have raised, and incorporating their views as appropriate. If, in making revisions to its Manual, the Board determines that statutory changes may be helpful to enhance Board operations, then the Board should also engage with stakeholders on such proposed changes.

    Agency: Capitol Police Board
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Valerie Melvin
    Phone: (202) 512-6304

    1 open recommendations
    Recommendation: To increase the likelihood that its IT investments develop reliable cost estimates, the Secretary of HUD should finalize, and ensure the implementation of, guidance that incorporates the best practices called for in the GAO Cost Estimating and Assessment Guide.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: In April 2017, HUD reported that the department concurred with the recommendation and noted that the Office of the Chief Information Officer (OCIO) intends to establish cost estimation guidance for IT projects within its IT Management Framework Guide, incorporating appropriate best practices from the GAO Cost Estimating and Assessment Guide. HUD anticipates completing the OCIO IT Management Framework guidance that is intended to incorporate cost estimating principles for IT projects by September 1, 2017.
    Director: David Trimble
    Phone: (202) 512-3841

    2 open recommendations
    Recommendation: The Secretary of Energy should direct the Office of Nuclear Energy to reassess its decision to engage in discussions with potential host communities, screen sites, or conduct other site selection activities until key prerequisites to these efforts--such as revising health and safety regulations--have been addressed.

    Agency: Department of Energy
    Status: Open

    Comments: The National Defense Authorization Act for Fiscal Year 2017 prohibited DOE from spending money on a defense repository until the Secretary has developed an understanding of the costs and impacts to other priority programs within atomic energy defense activities. However, the President's fiscal year 2018 budget priorities include $120 million for DOE to resume licensing activities for the Yucca Mountain repository in Nevada. As of March 2017, a DOE official said they were waiting for authorization and direction on how to proceed.
    Recommendation: The Secretary of Energy should direct the Office of Nuclear Energy to conduct a comprehensive assessment, which adheres to the Office of Management and Budget guidance and best practices, of the benefits, costs, and schedules of the options it reviewed and provided to the President in 2015, and, in light of the new information and results of its assessment, revise--if needed--the report's conclusion that a strong basis exists to find that a defense HLW repository is required.

    Agency: Department of Energy
    Status: Open

    Comments: The Department of Energy (DOE) agreed with this recommendation in principle and the National Defense Authorization Act for Fiscal Year 2017 prohibited DOE from spending money on a defense repository until the Secretary has developed an understanding of the costs and impacts to other priority programs within atomic energy defense activities. However, the President's fiscal year 2018 budget priorities include $120 million for DOE to resume licensing activities for the Yucca Mountain repository in Nevada. As of March 2017, a DOE official said they were waiting for authorization and direction on how to proceed.
    Director: Yocom, Carolyn L
    Phone: (202) 512-7114

    2 open recommendations
    Recommendation: To improve efforts to promote EHR use and electronic exchange of health information in post-acute care settings, the Secretary of Health and Human Services should direct the Centers for Medicare & Medicaid Services (CMS) and ONC to evaluate the effectiveness of HHS's key efforts to determine whether they are contributing to HHS's goal for increasing the use of EHRs and electronic exchange of health information in post-acute care settings.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve efforts to promote EHR use and electronic exchange of health information in post-acute care settings, the Secretary of Health and Human Services should direct CMS and ONC to comprehensively plan for how to achieve the department's goal related to the use of EHRs and electronic information exchange in post-acute care settings. This planning may include, for example, identifying specific actions related to post-acute care settings and identifying and considering external factors.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: David C. Trimble
    Phone: (202) 512-3841

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To help provide a roadmap to effectively guide NNSA's effort to integrate and improve its financial management, the NNSA Administrator should direct the Program Director of Financial Integration to develop a plan for producing cost information that fully incorporates leading practices.

    Agency: Department of Energy: National Nuclear Security Administration
    Status: Open
    Priority recommendation

    Comments: NNSA agreed with the recommendation. In its written responses to our report, NNSA stated that it will address the items we identified in its annual update to Congress on its financial integration initiative.
    Director: Brian Lepore
    Phone: (202) 512-4523

    2 open recommendations
    Recommendation: To provide Congress with better visibility over the costs for the environmental cleanup of properties from all Base Realignment and Closure rounds to inform future funding decisions, the Secretary of Defense should direct the Secretaries of the military departments to include in future annual reports to Congress that environmental cleanup costs will increase due to the cleanup of perfluorinated compounds and other emerging contaminants, and to include best estimates of these costs as additional information becomes available.

    Agency: Department of Defense
    Status: Open

    Comments: In written comments on a draft of this report, DOD concurred with this recommendation and stated that information on cleanup of perfluorinated compounds would be included in the fiscal year 2017 annual report to Congress. In November 2017, DOD told us that the Defense Environmental Restoration Programs Annual Report to Congress for Fiscal Year 2016 will include language related to the possible increase in cost estimates due to emerging contaminants like PFOS and PFOA. In November 2017, this report was going through the final coordination and signature process.
    Recommendation: To help the services more effectively share information and address environmental cleanups and transfers, the Secretary of Defense should direct the Secretaries of the military departments to create a repository or method to record and share lessons learned about how various locations have successfully addressed cleanup challenges.

    Agency: Department of Defense
    Status: Open

    Comments: In written comments on a draft of this report, DOD stated that it will develop a process to record and share lessons learned in conjunction with its fiscal year 2017 annual report to Congress. In November 2017, DOD stated that it was collecting lessons learned on BRAC sites as part of its fiscal year 2017 information collection process.
    Director: J. Alfredo Gómez
    Phone: (202) 512-3841

    4 open recommendations
    Recommendation: To help the agency make strategic decisions about how to prioritize and efficiently use available personnel, the Administrator, recognizing the agency's limited resources, should direct the Assistant Administrator for the Office of Administration and Resources Management to develop a documented process that can be consistently applied by regional and national program offices to collect and analyze data on project officer FTEs.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: In correspondence to GAO in fiscal year 2017, EPA agreed with this recommendation and planned to address the recommendation in two phases. During the first phase, EPA planned to conduct a thorough review of project officer data from the Integrated Grants Management System to provide a basis for further data collection and planned to provide clarity on additional data needed. During the second phase, EPA planned to consider which additional data were needed, collect data, and make these data available for regional and program offices to integrate into the fiscal year 2020 budget development process. EPA expects to complete both phases by March 31, 2018.
    Recommendation: To help the agency make strategic decisions about how to prioritize and efficiently use available personnel, the Administrator, recognizing the agency's limited resources, should direct the Assistant Administrator for the Office of Administration and Resources Management to develop a documented process that can be consistently applied by regional and national program offices to collect and analyze data on grants management workloads.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: In correspondence to GAO in fiscal year 2017, EPA agreed with this recommendation. To address this recommendation, EPA's Office of Grants and Debarment planned to recommend a set of data to collect on a regular and consistent basis. Then, EPA's regional and program offices would review the draft data recommendation and resolve any issues at the agency's 2017 Grants Management Council meeting. EPA anticipated that the grants data collection plan would be fully implemented during fiscal year 2018.
    Recommendation: To help the agency make strategic decisions about how to prioritize and efficiently use available personnel, the Administrator, recognizing the agency's limited resources, should direct the Assistant Administrator for the Office of Administration and Resources Management to develop a documented process that can be consistently applied by regional and national program offices to use project officer FTE and workload data to inform FTE allocations.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: According to a December 2016 letter providing comments on the draft report, EPA agreed with this recommendation and planned to initiate implementation in fiscal year 2017 by developing and issuing a survey tool to collect relevant information on project officer FTE and workload. In correspondence to GAO in fiscal year 2017, EPA planned to incorporate the results of its project officer data collection efforts into the fiscal year 2019 budget development process.
    Recommendation: To enhance EPA's ability to identify performance shortfalls and appropriate corrective actions, the Administrator should direct the Assistant Administrator for the Office of Administration and Resources Management to develop performance measures to track the effectiveness of the recruitment and retention efforts for grant specialists and collect performance data for these measures.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: In correspondence to GAO in fiscal year 2017, EPA agreed with this recommendation. To implement this recommendation, EPA anticipated that its Office of Grants and Debarment (OGD) would formalize a process in fiscal year 2017 for collecting information on grant specialists' recruitment and retention. OGD planned to develop draft measures with input from the agency's grants management officers and finalize the measures after review and input from assistant regional administrators. During fiscal year 2018, EPA anticipated that the agency would begin tracking these measures regularly.
    Director: John Dicken
    Phone: (202) 512-7114

    1 open recommendations
    Recommendation: The Executive Director of NCD should assign responsibilities for conducting future campaign activities and develop an evaluation plan for its activities.

    Agency: National Council on Disability
    Status: Open

    Comments: As of July 2017, the National Council on Disability (NCD) had developed a plan for conducting campaign activities that had assigned responsibilities. However, as a result of recent changes in leadership and staff, several key activities do not have staff assigned and will need to be updated to ensure responsibility for completing the plan. Additionally, NCD said that they plan to conduct an internal audit in December 2017 to monitor the progress of their activities. While this audit is helpful in identifying progress to date, our recommendation suggests that NCD should also plan to evaluate the effectiveness of its activities.
    Director: Elizabeth H. Curda
    Phone: (202) 512-7114

    3 open recommendations
    Recommendation: In order to ensure that the agency is adequately protecting the White Oak campus as a designated high-risk facility and strategically planning for the White Oak campus's future, as FDA moves forward with its proposed planning efforts, the Commissioner of FDA, in consultation with the Administrator of GSA, should implement vehicular access control measures on the White Oak campus to meet the requirements of the high-risk facility level designation assigned in the 2014 risk assessment report, or fully document the rationale for any deviations from these requirements.

    Agency: Department of Health and Human Services: Food and Drug Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: In order to ensure that the agency is adequately protecting the White Oak campus as a designated high-risk facility and strategically planning for the White Oak campus's future, as FDA moves forward with its proposed planning efforts, the Commissioner of FDA, in consultation with the Administrator of GSA, should further incorporate leading strategic facilities planning practices into FDA's proposed planning efforts by ensuring that FDA establish strategic linkage between its strategic priorities and its facilities plans.

    Agency: Department of Health and Human Services: Food and Drug Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: In order to ensure that the agency is adequately protecting the White Oak campus as a designated high-risk facility and strategically planning for the White Oak campus's future, as FDA moves forward with its proposed planning efforts, the Commissioner of FDA, in consultation with the Administrator of GSA, should document the key information related to daily operational activities and ongoing benefits and challenges that are needed to inform FDA's proposed planning efforts in the areas of needs assessment, gap identification, and alternatives analysis, and incorporate into proposed planning efforts a detailed strategy for collecting and analyzing this information.

    Agency: Department of Health and Human Services: Food and Drug Administration
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Powner, David A
    Phone: (202) 512-9286

    5 open recommendations
    including 2 priority recommendations
    Recommendation: To facilitate the analysis of gaps between current skills and future needs, the development of strategies for filling the gaps, and succession planning, the Secretary of Commerce should require the Chief Information Officer, Chief Human Capital Officer, and other senior managers as appropriate to address the shortfalls in IT workforce planning noted in this report, including the following actions: (1) establish and maintain a workforce planning process; (2) develop competency and staffing requirements; (3) assess competency and staffing needs regularly; (4) assess gaps in competencies for all components of the workforce; (5) develop strategies and plans to address gaps in competencies and staffing; (6) implement activities that address gaps, including an IT acquisition cadre, cross-functional training of acquisition and program personnel, a career path for program managers, and special hiring authorities, if justified and cost-effective; (7) monitor the department's progress in addressing IT competency and staffing gaps; and (8) report to department leadership on progress in addressing competency and staffing gaps.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The department has not yet provided its written response to this recommendation. We will continue to monitor the department's progress in implementing the recommendation.
    Recommendation: To facilitate the analysis of gaps between current skills and future needs, the development of strategies for filling the gaps, and succession planning, the Secretary of Defense should require the Chief Information Officer, the Under Secretary of Defense for Personnel and Readiness, and other senior managers as appropriate to address the shortfalls in IT workforce planning noted in this report, including the following actions: (1) develop competencies for all staff; (2) assess competency needs regularly for all positions; (3) assess gaps in competencies for all components of the workforce; (4) develop strategies and plans to address gaps in competencies; (5) implement activities that address gaps, including developing a program management career path, if justified and cost-effective; (6) monitor the department's progress in addressing competency gaps identified for IT staff; and (7) report to department leadership on progress in addressing competency gaps.

    Agency: Department of Defense
    Status: Open

    Comments: The department has provided a written response to this recommendation and we are currently evaluating it.
    Recommendation: To facilitate the analysis of gaps between current skills and future needs, the development of strategies for filling the gaps, and succession planning, the Secretary of Health and Human Services should require the Chief Information Officer, Chief Human Capital Officer, and other senior managers as appropriate to address the shortfalls in IT workforce planning noted in this report, including the following actions: (1) establish and maintain a workforce planning process inclusive of all staff; (2) develop staffing requirements for all positions; (3) assess staffing needs regularly; (4) assess gaps in competencies and staffing for all components of the workforce; (5) develop strategies and plans to address gaps in competencies and staffing; (6) implement activities that address gaps, including an IT acquisition cadre, if justified and cost-effective; (7) monitor the department's progress in addressing competency and staffing gaps; and (8) report to department leadership on progress in addressing competency and staffing gaps.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: The department has provided a written response to this recommendation and we are currently evaluating it.
    Recommendation: To facilitate the analysis of gaps between current skills and future needs, the development of strategies for filling the gaps, and succession planning, the Secretary of Transportation should require the Chief Information Officer, Chief Human Capital Officer, and other senior managers as appropriate to address the shortfalls in IT workforce planning noted in this report, including the following actions: (1) establish a time frame for when the department is to finalize its draft workforce planning process and maintain that process; (2) develop staffing requirements for all positions; (3) assess competency and staffing needs regularly for all positions; (4) assess gaps in staffing for all components of the workforce; (5) develop strategies and plans to address gaps in competencies and staffing; (6) implement activities that address gaps, including an IT acquisition cadre, cross-functional training of acquisition and program personnel, a career path for program managers, and use of special hiring authorities, if justified and cost-effective;e (7) monitor the department's progress in addressing competency and staffing gaps; and (8) report to department leadership on progress in addressing competency and staffing gaps.

    Agency: Department of Transportation
    Status: Open
    Priority recommendation

    Comments: The department agreed with the recommendation and stated that it plans to fully implement the recommendation by December 2019. To fully implement this recommendation, DOT should prioritize the completion of its IT workforce planning process and then begin implementing the process in phases based on the availability of resources.
    Recommendation: To facilitate the analysis of gaps between current skills and future needs, the development of strategies for filling the gaps, and succession planning, the Secretary of the Treasury should require the Chief Information Officer, Chief Human Capital Officer, and other senior managers as appropriate to address the shortfalls in IT workforce planning noted in this report, including the following actions: (1) establish and maintain a workforce planning process; (2) develop competency and staffing requirements for all positions; (3) assess competency and staffing needs regularly; (4) assess gaps in competencies and staffing for all components of the workforce; (5) develop strategies and plans to address gaps in competencies and staffing for all components of the workforce; (6) implement activities that address gaps, including a career path for program managers and special hiring authorities, if justified and cost-effective; (7) monitor the department's progress in addressing competency and staffing gaps; and (8) report to department leadership on progress in addressing competency and staffing gaps for all components of the workforce.

    Agency: Department of the Treasury
    Status: Open

    Comments: The department has not yet provided its written response to this recommendation. We will continue to monitor the department's progress in implementing the recommendation.
    Director: David Trimble
    Phone: (202) 512-3841

    2 open recommendations
    Recommendation: To help ensure that NNSA effectively manages the performance of its programs, the Secretary of Energy should establish a program management policy that (1) assigns responsibilities and delegates authority to program managers and establishes expectations of competence for them, in accordance with federal internal control standards, and (2) addresses leading program management practices, such as developing program plans.

    Agency: Department of Energy
    Status: Open

    Comments: As of January 2017, DOE stated that it will address our recommendation as part of its effort to meet the requirements of the Program Management Improvement Accountability Act of 2016. This Act requires the Office of Management and Budget (OMB) to adopt government-wide standards, policies, and guidelines for program and project management for agencies. It also requires agencies to appoint program management improvement officers, establishes training competencies for program managers, and creates a job series and career path for program managers. According to the Act, OMB will issue the standards, policies, and guidelines required under the Act no later than December 14, 2017.
    Recommendation: To help ensure that NNSA develops and maintains a cadre of professional, effective, and capable program managers in accordance with leading program management practices and federal internal control standards, the Secretary of Energy should establish a training program for program managers.

    Agency: Department of Energy
    Status: Open

    Comments: As of January 2017, DOE stated that it will address our recommendation as part of its effort to meet the requirements of the Program Management Improvement Accountability Act of 2016. This Act requires the Office of Management and Budget (OMB) to adopt government-wide standards, policies, and guidelines for program and project management for agencies. It also requires agencies to appoint program management improvement officers, establishes training competencies for program managers, and creates a job series and career path for program managers. According to the Act, OMB will issue the standards, policies, and guidelines required under the Act no later than December 14, 2017.
    Director: Michael J. Sullivan
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: To enhance program oversight and provide more robust input to budget deliberations, Congress should consider requiring DOD to report on each major acquisition program's systems engineering status in the department's annual budget request, beginning with the budget requesting funds to start development. The information could be presented on a simple timeline--as done for the case studies in this report--and at a minimum should reflect the status of a program's functional and allocated baselines as contained in the most current version of the program's systems engineering plan.

    Agency: Congress
    Status: Open

    Comments: Congress has not yet taken action on the matter for consideration. GAO will continue to monitor.
    Director: Kathleen M. King
    Phone: (202) 512-7114

    1 open recommendations
    Recommendation: To improve the efficiency and effectiveness of the agency's enrollment screening process, the Administrator of CMS should establish objectives and performance measures for assessing progress toward achieving its goals.

    Agency: Department of Health and Human Services: Centers for Medicare and Medicaid Services
    Status: Open

    Comments: As of August 2017, the Department of Health and Human Services (HHS) considers this recommendation still open. HHS noted that the Centers for Medicare & Medicaid Services is planning to implement this recommendation in early 2018. GAO will continue to monitor the agency's progress and will update the status of the recommendation when we receive additional information.
    Director: Brian Lepore
    Phone: (202) 512-4523

    1 open recommendations
    Recommendation: To better enable DOD to provide congressional decision makers with complete and reliable information on the total anticipated costs for the JIAC consolidation efforts, the Office of the Assistant Secretary of Defense for Energy, Installations, and Environment's Basing Office--in coordination with the Office of the Assistant Secretary of the Air Force Installations, Environment and Energy-- should update future construction cost estimates for consolidating the JIAC at RAF Croughton using best practices for cost estimating as identified in the GAO Cost Estimating and Assessment Guide. Specifically, cost estimates for the JIAC consolidation should fully incorporate all four characteristics of a high-quality, reliable estimate.

    Agency: Department of Defense: Office of the Secretary of Defense: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics: Office of the Assistant Secretary of Defense for Energy, Installations, and Environment
    Status: Open

    Comments: In commenting on this report, DOD did not concur with our recommendation. DOD agreed that many components in the GAO Cost Estimating and Assessment Guide are broadly applicable in the decision process leading up to a military construction budget request. However, DOD further stated that once military construction funds are authorized and appropriated by Congress, the department transitions to a project management mode, and it would be a waste of resources to continue to generate cost estimates once they have transitioned to managing project execution using actual cost data. However, as we note in the report, DOD guidance for estimating construction costs, DOD?s Unified Facilities Criteria 3-740-05, states that in the MILCON program, construction cost estimates are prepared throughout the planning, design, and construction phases of a construction project to account for the refinement of the project?s design and requirements. The final estimate should document the department?s assessment of the program's most probable cost and ensure that enough funds are available to execute it. As of October 2016, the military construction funds had not been authorized by Congress for the third phase of the JIAC construction project. According to DOD officials, construction is not scheduled to begin until fall of 2017, and the contract has not yet been awarded. Further, the GAO Cost Estimating and Assessment Guide states that regardless of whether changes to the program result from a major contract modification or an overtarget budget, the cost estimate should be regularly updated to reflect all changes. This is also a requirement outlined in OMB?s Capital Programming Guide. The purpose of updating the cost estimate is to check its accuracy, defend the estimate over time, and archive cost and technical data for use in future estimates. After the internal agency and congressional budgets are prepared and submitted, it is imperative that cost estimators continue to monitor the program to determine whether the preliminary information and assumptions remain relevant and accurate. Keeping the estimate updated gives decision makers accurate information for assessing alternative decisions. Cost estimates must also be updated whenever requirements change, and the results should be reconciled and recorded against the old estimate baseline. Therefore, we continue to believe that DOD?s implementation of our recommendation to update future JIAC cost estimates using the best practices identified in the GAO Cost Estimating and Assessment Guide would assist in ensuring that decision makers have complete and reliable information about costs associated with the JIAC consolidation and as the third phase of the JIAC project is authorized. Implementing our recommendation would also ensure that DOD develops a reliable historical record for the cost of the JIAC that can be used to estimate other similar projects in the future. As of June 2017, the agency had not taken any action to implement this recommendation.
    Director: Timothy J. DiNapoli
    Phone: (202) 512-4841

    5 open recommendations
    including 4 priority recommendations
    Recommendation: To better promote federal agency accountability for implementing the FSSI and category management initiatives, the Administrator of Federal Procurement Policy should ensure that transition plans are submitted and monitored as required by FSSI guidance and guidance governing specific category management initiatives.

    Agency: Executive Office of the President: Office of Management and Budget: Office of Federal Procurement Policy
    Status: Open
    Priority recommendation

    Comments: In October 2016, Office of Management and Budget (OMB) staff agreed that agency transitions plans should be submitted and monitored in accordance with guidance, as GAO recommended in October 2016. OMB staff indicated that all FSSIs are now being evaluated against best in class criteria as part of the migration to a category management approach to federal procurement. Further, OMB staff stated that OMB will issue additional policy or guidance as necessary. GAO believes these actions, if implemented, would meet the intent of the recommendation. As of August 1, 2017, OMB staff indicated they are continuing efforts to implement this recommendation. Given that transition plans were also required under FSSI guidance but were not submitted or monitored, it will be important for OMB to ensure that agencies follow through on submitting required plans going forward.
    Recommendation: To better promote federal agency accountability for implementing the FSSI and category management initiatives, the Administrator of Federal Procurement Policy should update the Leadership Council charter to establish an expectation that Leadership Council agencies develop agency-specific targets for use of the solutions approved.

    Agency: Executive Office of the President: Office of Management and Budget: Office of Federal Procurement Policy
    Status: Open
    Priority recommendation

    Comments: In October 2016, OMB staff agreed with the need for agency-specific targets for use of FSSI and category management initiatives as GAO recommended. OMB staff recommended, however, that this be accomplished through the Category Management governance and reporting procedures and processes that will be instituted in upcoming guidance, rather than an update to the Leadership Council charter. In October 2016, OMB issued a draft circular on category management establishing that spend under management will be the principal measure OMB will use to assess agency adoption of category management. OMB staff indicated that they plan to evaluate at least annually agencies' spend under management results, which includes agency adoption of best in class solutions, and then review with agency leaders progress toward meeting goals. As of August 1, 2017, OMB staff indicated they are continuing efforts to implement this recommendation. Given the low agency usage of the FSSIs, without such actions, and ensuring these targets and measures are set, OMB, and specifically the Office of Federal Procurement Policy, will lack the means to monitor progress and hold large procurement agencies accountable for using existing FSSIs or best in class solutions identified under subsequent category management efforts.
    Recommendation: To better promote federal agency accountability for implementing the FSSI and category management initiatives, the Administrator of Federal Procurement Policy should revise the 2015 category management guidance to establish a process for setting targets and performance measures for each Leadership Council agency's adoption of proposed FSSIs and category management solutions and ensure agency specific targets and measures are set.

    Agency: Executive Office of the President: Office of Management and Budget: Office of Federal Procurement Policy
    Status: Open
    Priority recommendation

    Comments: In October 2016, Office of Management and Budget (OMB) staff agreed that Leadership Council agency progress towards implementing category management should be tracked and measured as we recommended. OMB staff reported that guidance is in draft form in which agency progress will be measured using the Spend Under Management (SUM) model which provides an assessment of category management maturity for each of the ten government-wide categories as evaluated against five attributes: leadership, strategy, data, tools, and metrics. OMB will assess agency progress no less than annually and will engage agency leaders in regularly reviewing progress toward their goals. In addition, OMB will track agency spend through best in class contracts and these data will likely be used as an internal category metric and shared with the agencies. Taken together, these actions are responsive to GAO?s recommendations. As of August 1, 2017, OMB staff indicated they are continuing efforts to implement this recommendation. Given the low use of the FSSIs, OMB should continue to carefully monitor category management implementations as it moves forward and ensure that OFPP uses the planned targets and measures to hold agencies accountable for individual results. In short, greater accountability can lead to increased savings.
    Recommendation: To better promote federal agency accountability for implementing the FSSI and category management initiatives, the Administrator of Federal Procurement Policy should report on agency specific targets and metrics as part of the category management Cross-Agency Priority goal.

    Agency: Executive Office of the President: Office of Management and Budget: Office of Federal Procurement Policy
    Status: Open
    Priority recommendation

    Comments: In October 2016, Office of Management and Budget (OMB) staff agreed that agency specific targets and metrics should be reported as GAO recommended in October 2016. OMB staff indicated that results achieved relative to the Category Management Cross Agency Priority (CAP) goal targets will continue to be reported on a quarterly basis on Peformance.gov but that they will likely not include agency specific targets and metrics. Rather, OMB staff indicated that agency spending through best in class solutions will be tracked and used as an internal category metric and that OMB will engage agency leaders in regularly reviewing progress toward their goals and assess agencies no less than annually. GAO believes these actions, if implemented, would meet the intent of the recommendation. As of August 1, 2017, OMB staff indicated they are continuing efforts to implement this recommendation. Given the low agency usage of the FSSIs, OMB needs to monitor progress and hold large procurement agencies accountable for using existing FSSIs or best in class solutions identified under subsequent category management efforts.
    Recommendation: To improve the management of current FSSIs, the GSA FSSI program management office should provide oversight and support to the Information Retrieval FSSI to better align their practices with current strategic sourcing guidance related to collecting and using transactional data to calculate savings.

    Agency: General Services Administration
    Status: Open

    Comments: In response to our recommendation, GSA conducted a gap analysis of the Information Retrieval FSSI and its compliance with FSSI standards and provided the Library of Congress with FSSI best practice tools and resources related to collecting transactional data and calculating savings. According to GSA, the Library of Congress intends to address gaps to support the goal of implementation in the next Information Retrieval award in 2018. GSA will monitor progress, and provide feedback and assistance.
    Director: Debra A. Draper
    Phone: (202) 512-7114

    3 open recommendations
    Recommendation: The Secretary of Veterans Affairs should direct the Under Secretary for Health to define the roles and responsibilities of VAMCs in operationalizing VHA's strategic goals and objectives; this could be accomplished by establishing roles and responsibilities for VAMCs similar to how VHA defines roles and responsibilities for VISNs in VHA Directive 1075 and by developing guidance for VAMCs similar to guidance developed for VISNs.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: According to officials, VHA's Office of Policy and Planning continues to routinely communicate that all components of the organization should align their activities and resources to VA's 2014-2020 strategic goals and objectives, the MyVA Priority and Management Initiatives, and to the five VHA Priorities for Strategic Action. VHA's Office of Policy and Planning has also developed and disseminated Strategic Principals for Operational and Programmatic Decision Making, which was intended to provide a set of unifying principles for operational and programmatic decision-making. In its September 2017 update, VHA provided GAO with a copy of its draft FY 2018-2019 Operational and Modernization Plan. VHA is also in process of developing an Operational Planning Worksheet that is intended to provide instructions, definitions and examples to help create meaningful tactics, identify accountable leads, and document relevant interdependencies and requirements across the organization for VAMCs, VISNs and Program Offices. In its September 2017 update, VHA also noted that the National Leadership Council Strategic Planning Summit was held in June 2017, and that the focus of the summit was to ensure a clear understanding of the five VA/VHA priorities and how to operationalize the priorities at all levels of the organization. According to officials, VHA also held its National Planning Training (NPT) in August 2017 and the training was designed around the five VA/VHA priorities with a significant emphasis on clarifying the roles and responsibilities of VA Health Care Systems, VISNs and Program Offices in operationalizing the five priorities. According to officials, presentations incorporated the five priorities and a discussion on the various operational roles across the organization. VHA also noted that an online discussion board was opened at the conclusion of each NPT session with discussion questions specific to clarifying implementation responsibilities for the five VA/VHA priorities and other strategic initiatives. GAO has requested that VHA provide documentary evidence of these activities to support closure of this recommendation.
    Recommendation: The Secretary of Veterans Affairs should direct the Under Secretary for Health to consistently develop strategies that can be used by VISNs and VAMCs to operationalize VHA's goals and objectives, ensuring that they clearly link directly to VHA's goals and objectives.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: According to officials, VHA held its annual National Leadership Council Strategic Planning Summit in June 2017, during which NLC members and other strategic thinkers representing Program Office and VA Health Care Systems identified a set of strategies and milestones that link to and support operationalizing the five VA/VHA priorities. According to officials, these 16 strategies and milestones serve as the initial framework for operational planning at the VA Health Care System, VISN, and Program Office levels. VHA has provided evidence that it is currently developing its 2018 modernization and operational planning guidance, which is expected to link VA's strategic goals and objectives to the modernization plan and the five VA/VHA priorities. The guidance is also expected to require program offices, VISNs, and VAMCs to submit plans that articulate tactics and milestones and identify requirements that clearly link organizational activities back to operationalizing strategies and accomplishing priorities and goals. According to officials, the next phase of operational planning will occur at the VA Senior Leaders' Business Meeting, during which VA Health Care System, VISN, and Program Office leaders will further detail plans by identifying the tactics and requirements each will implement to operationalize the strategies and achieve the priorities, including identifying individuals that will be responsible for leading implementation of tactics. According to officials, VHA will initiate the final phase of operational planning following this meeting. During this final phase, VHA expects to disseminate its operational plan, and guidance, to VISNs and Program Offices with guidance to work with their subcomponents (VAMCs and other divisions) to finalize details in support of the operational plan. Following, the VISNs and Program Offices are expected to return their plans to VHA's Office of Policy and Planning to be incorporated into VHA's final modernization and operational plan. According to officials, VHA's Office of Policy and Planning has also continued to work very closely with the VA Office of Enterprise Integration to link VHA's strategies and measures with VA's draft 2018-2024 goals, objectives, strategies and measures to ensure consistency and alignment in planning and operationalization. According to officials, these linkages will enable VHA and VA to monitor and report progress on achieving the five VA/VHA priorities.
    Recommendation: The Secretary of Veterans Affairs should direct the Under Secretary for Health to develop an oversight process to assess progress made in meeting VHA's strategic goals and objectives, including feedback on how well activities and programs are contributing to achieving these goals and objectives.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In its 60-day update, VHA notified GAO that performance plans for senior executives will be updated to include requirements to provide oversight to assure that day-to-day activities on initiatives and programs are consistent with organizational goals, objectives and priorities. Furthermore, VHA informed GAO that executive performance, and performance of the organizations they lead, will be assessed using periodic review of performance against established organizational metrics associated with priorities, and annual performance plans of senior executives. In its 60 day update, VHA also notified GAO that VHA's Office of Policy and Planning will monitor implementation on a periodic basis to identify when initiatives or programs are progressing appropriately or at risk of not achieving goals and objectives in accordance with priorities. In VHA's August 2017 update on open recommendations, officials noted that VHA has also developed an internal Healthcare Operations Dashboard--which provides immediate and daily information regarding veterans' health care access, including wait times, productivity, and utilization--and an externally-facing Access and Quality in VA Healthcare web site--which provides veterans, caregivers, and other stakeholders with tools to view access and quality performance for specific VA facilities. According to VHA officials, both VA and VHA are monitoring strategic programs and activities to identify barriers that may impede progress towards the achievement of goals and objectives, which can then be elevated to leadership, as appropriate. In VHA's September 2017 update, officials also noted that VHA's Office of Policy and Planning and Office of Strategic Integration are coordinating the monitoring and quarterly reporting of progress on achievements related to the five VA/VHA priorities and the supporting strategies. According to officials, Priority and Strategy leads have been identified and are responsible for reporting operational progress and for managing any challenges that slow or prevent operationalization. According to officials, progress on all strategies and priorities is being reported at the VHA senior leaders morning meeting on a routine basis. GAO has requested that VHA provide documentary evidence of these activities to support closure of this recommendation.
    Director: Kay E. Brown
    Phone: (202) 512-7215

    2 open recommendations
    including 1 priority recommendation
    Recommendation: The Secretary of Agriculture should take additional steps to collect and disseminate information on promising practices that could help improve data matching processes among state SNAP agencies, including broad and timely dissemination of information on results of recent relevant pilots or demonstrations.

    Agency: Department of Agriculture
    Status: Open
    Priority recommendation

    Comments: The U.S. Department of Agriculture's (USDA) Food and Nutrition Service (FNS) agreed with this recommendation. The agency noted it is moving in this direction and would build on current efforts to address them. GAO will monitor these efforts and consider closing the recommendation when these efforts have been completed.
    Recommendation: The Secretary of Agriculture should work with the Department of Health and Human Services (as appropriate) to analyze spending and understand data needs for SNAP across federal and state contracts and in relation to other programs as FNS explores ways to potentially reduce the costs of using commercial data services.

    Agency: Department of Agriculture
    Status: Open

    Comments: The U.S. Department of Agriculture's (USDA) Food and Nutrition Service (FNS) agreed with this recommendation. The agency noted it has been moving in this general direction and would build on current efforts to address it. GAO will monitor these efforts and consider closing the recommendation when these efforts have been completed.
    Director: Brian J. Lepore
    Phone: (202) 512-4523

    1 open recommendations
    Recommendation: To aid DOD in conducting future AOA processes that fully follow best practices, the Secretary of Defense should direct the Assistant Secretary of Defense for Energy, Installations, and the Environment to develop guidance requiring the use of AOA best practices, including those practices we have identified, and in this guidance, the Assistant Secretary should define the types of military construction decisions for which these AOA best practices should be required.

    Agency: Department of Defense
    Status: Open

    Comments: In its written comments, DOD did not concur with our recommendation. Specifically, DOD disputes that our 22 best practices for a reliable Analysis of Alternatives (AOA) process apply to basing or military construction decision-making processes and therefore does not believe that the department should incorporate these best practices into its military construction decision-making process. We continue to believe that our AOA best practices can be applied to a wide range of activities in which an alternative must be selected from a set of possible options, as well as to a broad range of capability areas, projects, and programs including DOD's military construction decision-making processes. As of June 22, 2017, DOD had not taken any action to implement this recommendation.
    Director: David Trimble
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: To help ensure that NNSA can better inform long-term planning and management decision making as well as to ensure that the Enhanced Surveillance Program complements NNSA's other efforts to assess the nuclear weapons stockpile, the NNSA Administrator should develop a long-term strategy for the Enhanced Surveillance Program that incorporates outcome-oriented strategic goals, addresses management challenges and identifies resources needed to achieve these goals, and develops and uses performance measures to track progress in achieving these goals.

    Agency: Department of Energy: National Nuclear Security Administration
    Status: Open

    Comments: Fiscal year 2018 budget submission data indicates some new activities but not yet mention a strategy change.
    Director: Seto Bagdoyan
    Phone: (202) 512-6722

    1 open recommendations
    Recommendation: To strengthen USCIS's EB-5 Program fraud risk management, the Director of USCIS should develop a fraud risk profile that aligns with leading practices identified in GAO's Fraud Risk Framework.

    Agency: Department of Homeland Security: United States Citizenship and Immigration Services
    Status: Open

    Comments: In November 2016, Department of Homeland Security's (DHS) U.S. Citizenship and Immigration Services (USCIS)stated that the program would implement GAO's recommendation to develop a fraud risk profile and anticipated completion by September 30, 2017. In April 2017, USCIS provided an update including supporting documentation which reported that USCIS had contracted with an outside consultant to, among other things, develop a fraud risk profile that aligns with leading practices identified in GAO's Fraud Risk Framework. According to its response, USCIS expected to complete development of the profile by September 30, 2017.
    Director: J. Christopher Mihm
    Phone: (202) 512-6806

    3 open recommendations
    Recommendation: The Director of the Office of Management and Budget, in consultation with the Performance Improvement Council and General Services Administration, should ensure the information presented on Performance.gov consistently complies with GPRAMA public reporting requirements for the website's content.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: In July 2017, Office of Management and Budget (OMB) staff informed us that they will be partnering with a vendor to redesign Performance.gov, and that they plan to launch the new site in February 2018, concurrent with the President's Budget for fiscal year 2019. OMB staff also told us they will ensure that the redesigned site includes content that meets public reporting requirements, and anticipate releasing updated agency reporting guidance in the fall of 2017 to help ensure agencies are prepared to report required data. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: The Director of the Office of Management and Budget, in consultation with the Performance Improvement Council and General Services Administration, should analyze and, where appropriate, implement usability test results to improve Performance.gov.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: In July 2017, Office of Management and Budget (OMB) staff informed us that they will be partnering with a vendor to redesign Performance.gov, and that they plan to launch the new site in February 2018, concurrent with the President's Budget for fiscal year 2019. According to OMB staff, results from previous usability tests of the website will be used to inform the redesign of the site to make it more user-friendly and accessible. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: The Director of the Office of Management and Budget, in consultation with the Performance Improvement Council and General Services Administration, should develop a strategic plan for the future of Performance.gov. Among other things, this plan should include: (A) the goals, objectives, and resources needed to consistently meet Digitalgov.gov and GPRAMA requirements; (B) a customer outreach plan that considers how (1) OMB informs users of changes in Performance.gov, (2) OMB uses social media as a method of communication, and (3) users access Performance.gov so that OMB could, as appropriate, deploy mobile applications to communicate effectively; and (C) a strategy to manage and archive the content and data on Performance.gov in accordance with National Archives and Records Administration guidance.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: In July 2017, Office of Management and Budget (OMB) staff informed us that they will be partnering with a vendor to redesign Performance.gov, and that they plan to launch the new site in February 2018, concurrent with the President's Budget for fiscal year 2019. OMB and PIC staff stated that the vendor will help them develop a strategic plan for Performance.gov. According to OMB staff, once selected, the new vendor will also be charged with developing a stakeholder outreach plan that will encompass diverse groups including Congress, federal agency managers and staff, and other interested groups. We will continue to monitor the status of actions to address this recommendation.
    Director: Kimberly M. Gianopoulos
    Phone: (202) 512-8612

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To improve the effectiveness of the SEC's conflict minerals disclosure rule, the Secretary of Commerce should submit to the appropriate congressional committees a plan outlining steps that Commerce will take, with associated time frames, to (1) assess the accuracy of the independent private sector audits (IPSA) and other due diligence processes described under section 13(p) of the Securities Exchange Act of 1934; (2) develop recommendations for the process used to carry out such audits, including ways to improve the accuracy of the audits and establish standards of best practices for such audits; and (3) acquire the necessary knowledge, skills, and abilities to carry out these responsibilities.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: Commerce agreed with this recommendation. In response to this recommendation, Commerce indicated in an October 25, 2016 letter to GAO that it has developed a three-step approach which parallels the three distinct elements of the recommendation. To fully implement this recommendation, Commerce needs to submit the said three-step plan, including associated timeframes for their completion, to the appropriate congressional committees. Section 1502 of the Dodd-Frank Act defines "appropriate committees" to mean the Committee on Appropriations, the Committee on Foreign Affairs, the Committee on Ways and Means, and the Committee on Financial Services of the House of Representatives; and the Committee on Appropriations, the Committee on Foreign Relations, the Committee on Finance, and the Committee on Banking, Housing, and Urban Affairs of the Senate.
    Director: John H. Pendleton
    Phone: (202) 512-3489

    3 open recommendations
    Recommendation: To make a well-informed decision about the future of its A-10 aircraft, before again recommending divestment of the A-10, the Secretary of the Air Force should: (1) Develop quality information that fully identifies gaps in capacity or capability that would result from A-10 divestment, including the timing and duration of any identified gaps, and the risks associated with those gaps; and (2) Use that information to develop strategies to mitigate any identified gaps.

    Agency: Department of Defense: Department of the Air Force
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To further inform decisions about the future of the A-10, the Secretary of the Air Force should, in considering divestment, develop a high-quality, reliable cost estimate utilizing best practices.

    Agency: Department of Defense: Department of the Air Force
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To ensure that senior leaders have the quality information on which to base future force structure decisions, the Secretary of Defense should develop and promulgate department-wide guidance that establishes specific informational requirements to be met before proposing divestment of major weapon systems that have not reached the end of their expected service lives.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Valerie C. Melvin
    Phone: (202) 512-6304

    8 open recommendations
    Recommendation: To assist VA in sustaining an IT workforce with the necessary knowledge, skills, and abilities to execute its mission and goals, the Secretary of Veterans Affairs should direct the Chief Information Officer to track and review OI&T historical workforce data and projections related to leadership retirements.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and reported that OI&T's Human Capital Management Office (HCM) had completed a succession planning project that encompassed all senior leadership and included data review and risk assessment for each position. VA also stated that OI&T tracks the gains and losses associated with its leadership positions and provided this information for fiscal year 2016. However, the department has not provided documentation that supports the assertion that historical and projected OI&T leadership retirement data was presented and discussed as part of the succession planning project and did not provide data on projected retirements for OI&T's leadership positions. Additionally, the department stated that OI&T HCM has the ability to project retirement eligibility but has not provided documentation to support this assertion. It is important that VA tracks and reviews its OI&T historical workforce data and forecasts its leadership retirements to avoid being unprepared to effectively respond to vacancies in key leadership positions.
    Recommendation: To assist VA in sustaining an IT workforce with the necessary knowledge, skills, and abilities to execute its mission and goals, the Secretary of Veterans Affairs should direct the Chief Information Officer to identify IT skills needed beyond the current fiscal year to assist in identifying future skills gaps.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and reported that Information Technology Workforce Development (ITWD) will produce reports that identify skill gaps and will contain long-term recommendations that show the types of IT skills each organization needs to increase and which proficiency level targets need the most emphasis. As of July 2017, VA stated that ITWD reviewed, and updated where needed, the fiscal year 2017 competencies within each OI&T competency model role in order to align the models to the OI&T Transformation initiative. According to the department, the resulting updates support learning solutions that sustain and accelerate OI&T's transformation. Additionally, VA stated that 85 percent of OI&T staff completed a validated competency self-assessment and provided the OI&T fiscal year 2017 Training Gap Analysis Report which shows the strengths and gaps of OI&T by organization, trends between fiscal years 2016 and 2017, findings, next steps, and recommended actions for the next fiscal year. The department also stated that ITWD held meetings to review skill gap and learning solution reports. VA provided these reports and they present the top gaps and strengths, key findings, and next steps to address the skill gaps. While the department has taken these actions, its OI&T Training Gap Analysis Report does not identify IT skills needed beyond fiscal year 2017.
    Recommendation: To assist VA in establishing comprehensive and documented processes that reflect system development and acquisition best practices, the Secretary of Veterans Affairs should direct the Chief Information Officer to revise OI&T's documented processes related to project planning, to include (1) estimating the level of effort that will need to be expended for work products and tasks, and (2) making adjustments to the project plan to reconcile differences between estimated and available resources.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and stated that OI&T is documenting changes to processes related to project planning as it transitions from PMAS to the Veteran-Focused Integration Process (VIP). According to VA, the VIP processes will lead to better requirements elaboration and prioritization, increasing significantly the accuracy of estimates related to level of effort. Additionally, the department stated that by using short Agile sprints, the project team will be able adjust the project plan frequently to reconcile differences between estimated and available resources. As of July 2017, VA stated that all projects have transitioned to the VIP, which ensures they are incorporating the Agile methodology into the project lifecycle. According to the department, the latest version of its VIP Guide incorporates the use of daily scrum and weekly scrum of scrum meetings that can be used to frequently adjust the project plan to reconcile differences between estimated and available resources. VA stated that the project planning processes will continue to evolve beyond July and expects to complete its actions in response to this recommendation by the end of fiscal year 2017.
    Recommendation: To assist VA in establishing comprehensive and documented processes that reflect system development and acquisition best practices, the Secretary of Veterans Affairs should direct the Chief Information Officer to revise OI&T's documented processes related to requirements management, to include identifying changes to be made to plans and work products as a result of requirements baseline changes.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and reported that OI&T is revising its documentation related to requirements management as part of the transition to the Veteran-Focused Integration Process (VIP). According to VA, requirements will be tracked using the IBM Rational Tools Suite, which will be able to provide a snapshot of the original baseline and all captured changes in the form of an audit trail that captures the history of requirement changes. As of July 2017, the department stated that all projects have transitioned to the VIP and requirements baselines and subsequent changes are tracked in the Rational Tools Suite. VA also reported that efforts in fiscal year 2017 to consolidate all mandatory architectural, design, and process methodologies into a single library of requirements were successful, which resulted in combining the full body of requirements. Additionally according to the department, versioning of the requirements will allow the office to trace specific versions of individual requirements and their evolution by time period and project inheritance. VA stated that it expects to complete its actions in response to this recommendation by the end of fiscal year 2017.
    Recommendation: To assist VA in establishing comprehensive and documented processes that reflect system development and acquisition best practices, the Secretary of Veterans Affairs should direct the Chief Information Officer to revise OI&T's documented processes related to risk management, to include (1) determining costs and benefits of implementing the risk mitigation plan for each risk and (2) collecting performance measures on risk handling activities.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and reported that the IBM Rational Tools Suite will be used to manage risks and issues. According to VA, the tools suite will allow requirements to be linked to risks, which will provide traceability; teams will be able to track and report steps taken to mitigate risks; and an audit trail will show the history of changes made to each risk. The department also reported that the Office of Privacy and Risk will establish risk mitigation strategies for OI&T. As of July 2017, VA stated that risks data capture has been developed as a standardized process and that data on project and program risks in the Rational Tools Suite is aggregated and prepared for use to verify aggressive management, and will be included in enterprise reporting. The department stated that work is underway with the Performance Management Office and that OI&T expects to complete its actions in response to this recommendation by the end of fiscal year 2017.
    Recommendation: To assist VA in establishing comprehensive and documented processes that reflect system development and acquisition best practices, the Secretary of Veterans Affairs should direct the Chief Information Officer to revise OI&T's documented processes related to project monitoring and control, to include the 10 best practices that were missing from the guidance.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and reported that implementation of the Veteran-Focused Integration Process (VIP) and Agile processes within OI&T will address eight of the ten best practices related to project monitoring and control that were missing from its guidance. In regard to monitoring the knowledge and skills of project staff, OI&T's IT Workforce Development (ITWD) group collects and analyzes competency assessment data, which is used in requirements gathering meetings with OI&T leaders. According to VA, during these meetings organizational needs and next steps are discussed in detail. Additionally, the department's latest version of its VIP Guide states that the product team should be cross-functional and include all skills needed to deliver a product. Further, the department reported that data management activities, issues, and impacts will be managed using VIP, Agile, and IBM Rational Tools Suite. According to its VIP Guide, OI&T expects that all products follow the Agile product management process and use the Rational Tools Suite to manage scheduled product sprints and backlog, product requirements, risks and issues, and product planning and engineering documentation, among others. Also, VA stated that Agile methodologies will require stakeholders to be involved in the daily scrum meetings, user acceptance testing, and acceptance of deliverables, which will address stakeholders being involved regularly and documenting the results of stakeholder involvement status reviews. According to the VIP Guide, the Agile development methodologies require development teams to meet often with stakeholders to ensure transparency and foster a collaborative work environment. Additionally, the department stated that critical decision events are using Rational based data assessments to report on level of satisfaction of project controls and process compliance requirements. Further, according to the VIP Guide, the Product Owner will have a key role in the decision-making process during the development of the product and will be able to regularly express concerns and/or approvals to best meet user satisfaction. The department stated that critical decision events are being held at the portfolio level, and action items from these events are being tracked. VA provided meeting minutes from critical decision events that were held in October and December 2016. The December 2016 meeting minutes identified action items and the status of those items. Although VA has taken actions to address the majority of best practices related to project monitoring and control, the department's new VIP process does not include two practices that call for (1) tracking expended effort and (2) monitoring the utilization of staff and resources. Until OI&T's documented processes for project monitoring and control fully reflect best practices, the office is at risk that its projects will not achieve expected results.
    Recommendation: To assist VA in establishing comprehensive and documented processes that reflect system development and acquisition best practices, the Secretary of Veterans Affairs should direct the Chief Information Officer to revise OI&T's documented processes related to process and product quality assurance, to include (1) documenting a description of the quality assurance reporting chain and defining how objectivity will be ensured, and (2) periodically reviewing open noncompliance issues and trends with management that is designated to receive and act on them.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and reported that the implementation of the Veteran-Focused Integration Process (VIP), Agile processes, and the Rational Toolset within OI&T will address process and product quality assurance. According to VA, as a part of VIP, the Product Owner is engaged from intake through project completion, which will ensure that the quality of the product is maintained throughout the life cycle. Additionally the department reported that the process of periodically reviewing open non-compliance issues and trends with management that is designated to receive and act on them will be accomplished through CIOStat meetings held with OI&T senior leadership. VA also reported that the Rational Quality Manager tool is used to automate routine testing activities to identify non-compliance issues and trends. As of July 2017, the department stated that the Product Owner is beginning to have a stronger role on the project team, which enables them to assist in all types of issues, including quality assurance. VA also stated that Release Agents develop and distribute Release Readiness Reports, which provide a status of all release requirements and of traceability among requirements, deliverables, and test results. VA expects to complete its actions in response to this recommendation by the end of fiscal year 2017.
    Recommendation: To assist VA in establishing comprehensive and documented processes that reflect system development and acquisition best practices, the Secretary of Veterans Affairs should direct the Chief Information Officer to revise OI&T's documented processes related to project scheduling, to include the 9 best practices that were missing from the guidance and revise the documented processes where the guidance was contrary to best practices.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA concurred with our recommendation and reported that the implementation of VIP and Agile processes within OI&T will address five of the nine best practices related to project scheduling that are missing from its guidance. According to VA, business and compliance requirements will be captured during the planning phase and maintained in the IBM Rational Tools Suite to manage scheduled project/product builds and backlog which will allow the project to more accurately maintain the schedule baseline, capture all schedule changes, and provides an audit trail of all the changes. Additionally, the department reported that the IBM Rational Tools Suite connects requirements, change orders, test cases, and test results in order to have full traceability in a closed loop system. VA also noted that the use of short development builds within Agile increases the probability of successful adherence to the schedule; and Agile provides the flexibility to make schedule changes using the backlog to prioritize requirements. As of July 2017, VA stated that Project Build Planning sessions capture and prioritize all backlog items with high level activities captured in the VIP Dashboard; and that each project task receives an estimated duration. The department also stated that the project team commits to a high level scope for each build and then the scope is solidified and committed to in detail at each Sprint Plan. According to VA, at the end of each sprint the Product Owner accepts or rejects the product of what was committed to at Sprint Planning. The department also stated that there is a high-level commitment at the Critical Decision 1 meeting; that each build gets committed to at a more granular level; and that sprint planning includes establishing a firm commitment for exactly what will be completed during the sprint. The department further stated that part of the Agile process being used by OI&T removes rigid, mandatory constraints as long as project teams follow compliance epics. Additionally, the department reported that because of the use of Agile methodology, if a task is critical today, the project team can reprioritize and address the needs of the project immediately. According to VA, Agile supports both sustainment and development projects, by allowing changes to the project backlog to address high priority functionality. VA also stated that Agile allows flexibility to shift from one build to another based on priorities and to shift backlog items based on VIP Triad priorities. Additionally, according to the department, risks are managed in the Rational Tools Suite and impediments are raised and escalated during daily scrums and scrum of scrum calls. The VIP Guide indicates that product teams are required to make timely updates to the VIP Dashboard regarding schedule and that the Rational Tools Suite will be used to manage and administer source control and baselines; manage risks and issues; and manage scheduled product sprints and backlogs. However, the VIP Guide does not include practices to (1) document that each project task should receive a duration estimate; (2)require that the project schedule be traceable horizontally and vertically; (3) sequence all activities; and (4) confirm that the critical path is valid. Until OI&T's documented processes for developing schedules fully reflect best practices, the office is at risk that schedules created for its projects will not be reliable.
    Director: Chris Currie
    Phone: (404) 679-1875

    1 open recommendations
    Recommendation: If DHS's proposed CBRNE program consolidation is approved by Congress, the Secretary of Homeland Security should direct the Assistant Secretary for the Office of Policy to use, where appropriate, the key mergers and organizational transformation practices identified in our previous work to help ensure that a CBRNE consolidated office benefits from lessons learned from other organizational transformations.

    Agency: Department of Homeland Security
    Status: Open

    Comments: We found that key mergers and organizational transformation practices identified in previous GAO work could benefit the Department of Homeland Security (DHS) if Congress approves the proposed CBRNE consolidation. As a result, we recommended that should Congress approve DHS's CBRNE consolidation plan, the department use key mergers and organizational transformation practices identified in previous GAO work. In November 2016, DHS stated that while Congress had yet to authorize DHS's CBRNE reorganization proposal, DHS remained committed to evaluating GAO's identified practices when developing an implementation plan. We will update the status of this recommendation as additional information is made available.
    Director: Trimble, David C
    Phone: (202) 512-3841

    7 open recommendations
    Recommendation: To ensure that NNSA will acquire sufficient plutonium analysis equipment and space to meet its needs, including pit production to support critical life extension programs, the Secretary should direct that the Under Secretary for Nuclear Security, in his capacity as the NNSA Administrator, update the program requirements document for the revised CMRR project to identify a key performance parameter that describes the plutonium analysis capacity the CMRR project is required to provide to support specific pit production rates.

    Agency: Department of Energy
    Status: Open

    Comments: As of June 2017, NNSA plans to perform an analysis to identify the plutonium analysis capacity that the CMRR project is required to provide and reference that information in an updated version of the CMRR program requirements document. NNSA estimated that it will complete this action by September 30, 2017. We will evaluate NNSA's action once it is complete.
    Recommendation: To ensure that NNSA will acquire sufficient plutonium analysis equipment and space to meet its needs, including pit production to support critical life extension programs, the Secretary should direct that the Under Secretary for Nuclear Security, in his capacity as the NNSA Administrator, specify plans for how the agency will obtain additional plutonium analysis capacity if the revised CMRR project will not provide sufficient plutonium analysis capacity to support NNSA's pit production plans.

    Agency: Department of Energy
    Status: Open

    Comments: As of June 2017, NNSA planned to update its Plutonium Strategy to identify additional means, if necessary, to achieve sufficient plutonium analysis capacity to support pit production plans. NNSA estimated that it will complete this action by September 30, 2017. We will evaluate NNSA's action once it is complete.
    Recommendation: To ensure that NNSA will provide clear information to stakeholders about the program needs that the revised CMRR project will satisfy, the Secretary should direct the Under Secretary for Nuclear Security, in his capacity as the NNSA Administrator, to update the program requirements document for the revised CMRR project to clarify whether the project will provide plutonium analysis equipment to meet the needs of DOE and NNSA programs other than those in the Office of Defense Programs.

    Agency: Department of Energy
    Status: Open

    Comments: As of June 2017, NNSA planned to update the CMRR program requirements document to clarify that the CMRR project will not install any unique analysis equipment required solely for non-defense related programs. NNSA estimated that it would complete this action by December 31, 2017. We will evaluate NNSA's action once it is complete.
    Recommendation: To ensure that NNSA's future schedule estimates for the revised CMRR project provide the agency with reasonable assurance regarding meeting the project's completion dates, the Secretary should direct the Under Secretary for Nuclear Security, in his capacity as the NNSA Administrator, to develop future schedules for the revised CMRR project that are consistent with current DOE project management policy and scheduling best practices. Specifically, the Under Secretary should develop and maintain an integrated master schedule that includes all project activities under all subprojects prior to approving the project's first CD-2 decision.

    Agency: Department of Energy
    Status: Open

    Comments: As of June 2017, NNSA said it had identified the key milestone dates for the future subprojects including critical decisions and completion. We will update the status of this recommendation after we review the documentation.
    Recommendation: To ensure that NNSA's future schedule estimates for the revised CMRR project provide the agency with reasonable assurance regarding meeting the project's completion dates, the Secretary should direct the Under Secretary for Nuclear Security, in his capacity as the NNSA Administrator, to develop future schedules for the revised CMRR project that are consistent with current DOE project management policy and scheduling best practices. Specifically, the Under Secretary should conduct a comprehensive schedule risk analysis that applies to the integrated master schedule to identify the likelihood the project can meet its completion dates.

    Agency: Department of Energy
    Status: Open

    Comments: As of June 2017, NNSA said that it had completed risk analyses to satisfy the recommendation. We will update the status of this recommendation after we review the documentation.
    Recommendation: To ensure that NNSA is better positioned to objectively consider alternatives before making its selection of an alternative for the Plutonium Modular Approach, the Secretary should direct the Under Secretary for Nuclear Security, in his capacity as the NNSA Administrator, before completing the analysis of alternatives, to rephrase the statement of mission need and requirements for the Plutonium Modular Approach so that they are independent of a particular solution.

    Agency: Department of Energy
    Status: Open

    Comments: NNSA did not agree to implement the recommendation as stated in the report. However, NNSA stated that it would conduct the analysis of alternatives independent of a particular solution. NNSA has not estimated a completion date for the final analysis of alternatives. After the analysis is complete, we will review it to determine whether it includes information that meets the intent of our recommendation.
    Recommendation: To ensure that NNSA has information about program-specific needs to inform its analysis of alternatives for the Plutonium Modular Approach and to provide a clearer basis for selecting a project alternative, the Secretary should direct the Under Secretary for Nuclear Security, in his capacity as the NNSA Administrator, before completing the analysis of alternatives, to identify key performance parameters and program-specific requirements for the Plutonium Modular Approach.

    Agency: Department of Energy
    Status: Open

    Comments: NNSA did not agree to implement the recommendation as written in the report. However, NNSA stated that it would develop key parameters and project requirements as part of the analysis of alternatives. NNSA has not estimated a completion date for the AOA. After the analysis is complete, we will review it to determine whether it includes information that meets the intent of our recommendation.
    Director: Carol C. Harris
    Phone: (202) 512-4456

    7 open recommendations
    Recommendation: To ensure that the Bureau is better positioned to deliver CEDCAP, the Secretary of Commerce should direct the Director of the Census Bureau to update the CEDCAP program office cost estimate to reflect the current status of the program as soon as appropriate information becomes available.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation and has taken initial steps to implement it. In May 2017, the Census Bureau provided summary documentation that included the fiscal year 2015 through 2021 estimated lifecycle costs for the Census Enterprise Data Collection and Processing (CEDCAP) program; however, this information lacked the level of detail needed to determine whether the cost estimate reflects the current status of the program. In addition, in June 2017, the Bureau developed a draft version of the CEDCAP Cost Analysis Requirements Description (CARD), which included descriptions of technical and programmatic features of the program and is intended to serve as the basis for preparing the Program Office Estimate and the Independent Cost Estimate. However, as of August 2017, the CARD had not yet been finalized. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Recommendation: To ensure that the Bureau is better positioned to deliver CEDCAP, the Secretary of Commerce should direct the Director of the Census Bureau to ensure that updates to the status of risks are consistently documented for CEDCAP's Internet and Mobile Data Collection and Survey (and Listing) Interview Operational Control projects.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation and has taken initial steps to implement it. In August 2017, the Census Bureau provided risk management documentation, including a risk management plan and risk review board meeting minutes. However, this information did not include updated risk registers that documented risk status for the Census Enterprise Data Collection and Processing (CEDCAP) Internet and Mobile Data Collection and Survey (and Listing) Interview Operational Control projects. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Recommendation: TTo ensure that the Bureau is better positioned to deliver CEDCAP, the Secretary of Commerce should direct the Director of the Census Bureau to ensure that CEDCAP's Internet and Mobile Data Collection, Survey (and Listing) Interview Operational Control, and Centralized Operational Analysis and Control projects establish detailed risk mitigation plans on a consistent basis and that the Internet and Mobile Data Collection and Centralized Operational Analysis and Control projects establish trigger events for all relevant risks.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation and has taken initial steps to implement it. In August 2017, the Census Bureau provided risk management documentation, including a risk management plan and risk review board meeting minutes. However, this documentation did not include detailed risk mitigation plans for risks related to the Census Enterprise Data Collection and Processing (CEDCAP) Internet and Mobile Data Collection, Survey (and Listing) Interview Operational Control, and Centralized Operational Analysis and Control projects. The Bureau's risk management documentation also did not include trigger events for all relevant risks for the Internet and Mobile Data Collection and Centralized Operational Analysis and Control projects. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Recommendation: To ensure that the Bureau is better positioned to deliver CEDCAP, the Secretary of Commerce should direct the Director of the Census Bureau to define, document, and implement a repeatable process to establish complete alignment between CEDCAP and 2020 Census programs by, for example, maintaining a single dependency schedule.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation, but has not yet taken steps to implement it. In August 2016, we reported that several issues can result from the lack of a single dependency schedule, including the need to manually identify activities, the inability to be dynamically responsive to change, and a limited ability to ensure that both the Census Enterprise Data Collection and Processing (CEDCAP) and 2020 Census program are planning and measuring their activities according to the same agreed upon timeframe. However, as of August 2017, the Bureau had not yet established a single dependency schedule to ensure complete alignment between the CEDCAP and 2020 Census programs. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Recommendation: To ensure that the Bureau is better positioned to deliver CEDCAP, the Secretary of Commerce should direct the Director of the Census Bureau to establish a comprehensive and integrated list of all interdependent risks facing the CEDCAP and 2020 Census programs, and clearly identify roles and responsibilities for managing this list.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation, but has not yet taken steps to implement it. In August 2016, we reported that several issues can result from the lack of an integrated risk register, including inconsistencies in tracking and managing interdependent risks, redundant efforts to manage risks, and potentially conflicting risk mitigation efforts. As of August 2017, the Census Bureau had not yet developed an integrated risk register for the Census Enterprise Data Collection and Processing (CEDCAP) and 2020 Census programs or documented the roles for managing it. Instead, Bureau officials stated that they flag risks in the risk register that affect both programs. However, as of August 2017, the Bureau had not provided evidence that relevant risks for both programs are flagged in the risk registers. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Recommendation: To ensure that the Bureau is better positioned to deliver CEDCAP, the Secretary of Commerce should direct the Director of the Census Bureau to identify when the 74 requirements related to redistricting data program and data products and dissemination will be tested.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation and has taken initial steps to implement it. In June 2017, Census Bureau officials stated that, as part of the 2018 End-to-End Census Test, program-level integration testing of the requirements related to the redistricting program and the data products and dissemination are planned to occur from April 3, 2018, to August 1, 2018. However, as of August 2017, the Bureau had not provided supporting documentation for its plans for program-level integration testing of the requirements related to the redistricting program and data products and dissemination. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Recommendation: To ensure that the Bureau is better positioned to deliver CEDCAP, the Secretary of Commerce should direct the Director of the Census Bureau to make developing a better understanding of and identifying requirements related to non-ID response validation a high and immediate priority, or consider alternatives to avoid late definition of such requirements.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation and has taken initial steps to implement it. In April 2017, the Census Bureau documented high-level milestones related to implementing a fraud detection process in an initial effort to better understand non-ID response validation. However, as of August 2017, the Bureau had not finalized the fraud detection process or documented milestones for implementing the non-ID response validation process. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Director: David C. Trimble
    Phone: (202) 512-3841

    3 open recommendations
    including 1 priority recommendation
    Recommendation: To help ensure that DOE develops and uses reliable cost and schedule estimates and AOAs, the Secretary of Energy should direct Office of Environmental Management (EM) to revise its protocol governing cleanup operations activities to require use of best practices in developing cost and schedule estimates.

    Agency: Department of Energy
    Status: Open
    Priority recommendation

    Comments: DOE concurred with the recommendation. In its written comments, DOE stated that EM is transitioning from the operations activities protocol to a new directive that is expected to include a key decision approving a cost and schedule baseline. As EM develops the guidance for this key decision, it will include the use of cost and schedule best practices. In April 2017, however, EM indicated that it plans to issue a revised EM operations activities protocol in fiscal year 2017 for use in fiscal year 2018 instead of a new directive. According to an EM official, EM will include best practices for cost and schedule estimation in the revised protocol. When EM completes the revised protocol, we will evaluate the actions taken and whether the recommendation should be closed.
    Recommendation: To help ensure that DOE develops and uses reliable cost and schedule estimates and AOAs, the Secretary of Energy should direct EM to implement the recommendation made by DOE's Office of Project Management Oversight and Assessments in its independent review of the AOA for WIPP's new permanent ventilation system to perform a cost-benefit analysis consistent with best practices for conducting an AOA, or justify and document why the office does not intend to do so.

    Agency: Department of Energy
    Status: Open

    Comments: DOE concurred with clarification to the recommendation. In its written comments to our report, DOE stated that in accordance with GAO best practices, it will conduct further cost-benefit analysis on the WIPP ventilation system project prior to approval of Critical Decision-2, Approve Performance Baseline. DOE stated that several alternatives remain to be evaluated including the size of the ventilation system and the location of the exhaust shaft. In March 2017, a DOE Carlsbad Field Office official overseeing the project said that the project team completed an additional analysis of alternatives (AOA) for the ventilation system project at WIPP and a revised business case for the alternative to construct a safety significant confinement ventilation system and exhaust shaft that addresses the recommendations from the Department of Energy's Office of Project Management Oversight and Assessment. After we obtain a copy of the completed AOA, we will evaluate the action taken to determine whether to close the recommendation.
    Recommendation: To help ensure that DOE develops and uses reliable cost and schedule estimates and AOAs, the Secretary of Energy should direct DOE to revise its Order 413.3B to require that DOE offices implement any recommendations from an independent review of the extent to which an AOA followed best practices, or justify and document the rationale for not doing so.

    Agency: Department of Energy
    Status: Open

    Comments: DOE concurred with the recommendation and in its written comments to our report stated that it will prepare a project management policy on how DOE offices should respond to recommendations from independent reviews by December 2016. In addition, DOE stated that it will update DOE Order 413.3B with the new policy at the next available opportunity. In November 2017, a DOE official from the Office of Project Management, Oversight, and Assessments (PMOA) said that PMOA developed a project management policy statement on how DOE offices should disposition recommendations from independent reviews and PMOA intended to incorporate the policy into its planned update of DOE Guide 413.3-9 Project Review Guide for Capital Asset Projects, which was to be completed by December 2016. As of April 2017, according to a DOE official, development of the updated project review guide was on hold indefinitely along with all other actions to publish new, or update existing departmental directives in response to the two Presidential Executive Orders issued in January and February 2017 that directed federal agencies to, among other things, reduce and reform agency regulations.
    Director: Chaplain, Cristina T
    Phone: (202) 512-4841

    2 open recommendations
    including 1 priority recommendation
    Recommendation: To provide the Congress and NASA a reliable estimate of program cost and schedule that are useful to support management and stakeholder decisions, the NASA Administrator should direct the Orion program to perform an updated JCL analysis including updating cost and schedule estimates in adherence with cost and schedule estimating best practices.

    Agency: National Aeronautics and Space Administration
    Status: Open
    Priority recommendation

    Comments: NASA partially agreed with this recommendation, stating that the agency reviewed, in detail, the Orion integrated cost/schedule and risk analysis methodology and determined the rigor to be a sufficient basis for the agency commitments. We still contend that NASA should update its analysis that informed its baseline because we found that the cost and schedule estimates underlying those baselines are not reliable as they did not conform to best practices.
    Recommendation: To have a full understanding of the cost, schedule, and safety impact of deferring work, the NASA Administrator should direct the Orion program to perform an analysis on the cost of deferred work in relation to levels of management reserves and unallocated future expenses and actual contractor performance, and report the results of that analysis to NASA management.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: NASA concurred with this recommendation, but characterized its deferral of work to date as task-level deferrals, lasting only several months and not affecting major program milestone or the critical path. NASA did agree to include an analysis of how these deferrals affect budget reserves and program performance in future routine management reporting. NASA officials told us that they are currently evaluating work flow for the first and second mission as the agency revisits the launch date for the first mission. Given this is currently being analyzed, officials were not able to provide any analysis at this time about the potential cost impact of changes in scheduled work.
    Director: Sager, Michelle A
    Phone: (202) 512-6806

    1 open recommendations
    Recommendation: The Administrator of General Services, in consultation with the STOC, should develop a travel data management approach, including common reporting formats that would provide GSA with more consistent travel cost data allowing GSA to compare travel costs across federal agencies. GSA could also include in this data management approach the planned implementation of the shared services model that would allow agencies to share a wide range of travel services with each other. This process could reduce both administrative costs and burden to the government and enable data-driven decision making.

    Agency: General Services Administration
    Status: Open

    Comments: According to GSA officials, GSA will take the following actions: (1) conduct a rest program to determine the opportunities and barriers for creating a reliable, standardized data repository containing government-wide travel spending data (pending OMB Director approval); (2) develop and test, in coordination with volunteer agencies and the GSA City Pairs Program personnel, an airfare savings dashboard to assimilates data from multiple sources and provides information on savings and opportunities for additional airfare savings by agencies; (3) publish an FTR Bulletin that identifies 5 core travel Key Performance Indicators that all agencies should use to improve travel management via standardized data; and (4) Identify and promote consistent adaptation of standardized default configurations of air and lodging choices within all E-Gove Travel Service 2 systems. As of August 2017, according to agency officials, they expect to implement this recommendation by the end of September 2017.
    Director: Garcia-diaz, Daniel
    Phone: (202) 512-8678

    5 open recommendations
    Recommendation: In order to more fully implement key practices and meet requirements and to better institutionalize standards and practices, the Secretary of HUD should clearly link HUD's strategic goals and objectives with federal priority goals in the next annual performance plan.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information
    Recommendation: In order to more fully implement key practices and meet requirements and to better institutionalize standards and practices, the Secretary of HUD should describe the reasons that goals were not met and HUD's plans for achieving them in the next annual performance report.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information
    Recommendation: In order to more fully implement key practices and meet requirements and to better institutionalize standards and practices, the Secretary of HUD should establish a process and schedule for regularly reviewing, revising, and updating HUD's human capital strategic plan, strategic workforce plan, and succession plan.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information
    Recommendation: In order to more fully implement key practices and meet requirements and to better institutionalize standards and practices, the Secretary of HUD should establish a process and schedule for reviewing and updating policies and procedures to help ensure that policies and procedures for key management functions remain current and complete.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information
    Recommendation: In order to more fully implement key practices and meet requirements and to better institutionalize standards and practices, the Secretary of HUD should formalize lines of communication between the Chief Information Officer and the agency head, consistent with OMB guidance and internal control standards.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information
    Director: Carol C. Harris
    Phone: (202) 512-4456

    9 open recommendations
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD Chief Information Officer (CIO), and other entities, as appropriate, to develop a detailed JIE scope statement that is verified by stakeholders and approved by the Executive Committee.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the Department of Defense had made progress in implementing the recommendation. Specifically, the department developed a draft Joint Information Environment (JIE) scope statement that can provide the context and framework for reporting, tracking, and controlling JIE activities. According to written comments on the status of the recommendation provided by the department in July 2017, this scope statement will be presented to the JIE Executive Committee in August 2017 for approval. We will continue to monitor the department's efforts to implement the recommendation.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to establish a plan for managing, documenting, and communicating scope.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the Department of Defense had made progress in implementing the recommendation. Specifically, the department developed a draft JIE scope statement, which documents the scope of JIE and describes how updates to its scope will be periodically reviewed and approved. According to written comments on the status of the recommendation provided by the department in July 2017, the draft will be presented to the JIE Executive Committee in August 2017 for approval. We will continue to monitor the department's efforts to implement the recommendation.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to develop a reliable JIE cost estimate and baseline, consistent with the best practices described in this report.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the Department of Defense had not implemented the recommendation. According to written comments on the status of the recommendation provided by the department, it developed cost baselines for two components of JIE. However, it did not develop cost estimates for the other JIE components. Specifically, the JIE Executive Committee approved the cost estimate for the Joint Regional Security Stacks in April 2017. In addition, the department's comments stated that the cost baseline for the Mission Partner Environment-Information System (MPE-IS) was included in the MPE-IS Business Case Analysis and presented to the department's Office of Cost Assessment and Program Evaluation in July 2016. We are in the process of reviewing the cost estimates for these components. The department further stated that as solutions for other JIE efforts are established, their cost baselines will be added as appropriate.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to develop a JIE schedule management plan and reliable schedule, consistent with practices described in this report.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the department had not implemented the recommendation. We will continue to monitor the department's efforts to address this recommendation by periodically requesting and evaluating updated information.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to develop a JRSS schedule management plan and reliable JRSS schedule and schedule baseline, consistent with practices described in this report.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the Department of Defense had not fully implemented this recommendation. In March 2017, the JIE Executive Committee approved a schedule baseline for the Non-secure Internet Protocol Router network component of JRSS. In addition, the Executive Committee memo approving this schedule baseline indicated that the Executive Committee planned to review and approve a schedule baseline for the Secure Internet Protocol Router network component of JRSS by the end of fiscal year 2017. However, the department has not demonstrated that it has a schedule management plan or that its schedule was developed consistent with the practices described in our report.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to complete an assessment to determine the number of staff and the specific skills and abilities needed to effectively achieve JIE, consistent with the workforce planning practices described in this report.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the Department of Defense had not implemented the recommendation. In its June 2016 written comments on a draft of our report, the department stated that the National Institute of Standards and Technology and the Office of Personnel Management were to publish a coding structure in response to the Federal Cybersecurity Workforce Assessment Act of 2015. DOD stated that this structure would inform steps DOD planned to take to identify the type of personnel and specific skills required to support enterprise operations and services and the government capabilities needed to effectively achieve JIE. However, as of July 2017, the department had not demonstrated that it has taken action to implement our recommendation.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to develop a strategy for conducting JIE security assessments that describes the resources needed to execute the strategy, responsible organizations, and a schedule to complete the assessments.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the Department had not implemented the recommendation. We will continue to monitor the department's efforts to address this recommendation by periodically requesting and evaluating updated information.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to develop a strategy and schedule to transition JRSS to the Risk Management Framework, and develop the security plan required by the new framework.

    Agency: Department of Defense
    Status: Open

    Comments: As of July 2017, the Department of Defense had not implemented this recommendation. In January 2017, the Joint Regional Security Stacks (JRSS) program received a six-month provisional Risk Management Framework Authority to Operate. According to a July 2017 update from the department on the status of this recommendation, the JRSS program management office was in the process of requesting another six-month provisional authority to operate. However, the department has not developed a strategy and schedule to complete transition of JRSS to the Risk Management Framework or developed the security plan required by the framework.
    Recommendation: To help the department achieve the benefits anticipated from JIE, the Secretary should direct the DOD CIO and other entities, as appropriate, to develop a reliable Joint Regional Security Stacks (JRSS) cost estimate and baseline, consistent with practices described in this report.

    Agency: Department of Defense
    Status: Open

    Comments: The Department of Defense had taken steps to address the recommendation and we are in the process of reviewing documentation the department provided in July 2017 to determine if it sufficiently addresses the recommendation. Specifically, in April 2017, the JRSS program office documented the methodology, ground rules, and assumptions, among other things, used to develop the cost estimate we reviewed in our report, and the JIE Executive Committee established the estimate as its JRSS cost baseline. We are in the process of reviewing the cost estimate documentation and will update this status after completing the review.
    Director: Carol C. Harris
    Phone: (202) 512-4456

    9 open recommendations
    Recommendation: To provide reasonable assurance that the program executes Agile software development for USCIS ELIS consistent with its own policies and guidance and follows applicable leading practices, the Secretary of the Department of Homeland Security (DHS) should direct the Director of USCIS to direct the USCIS Chief Information Officer (CIO), in coordination with the DHS CIO and the Chief of the Office of Transformation Coordination (OTC), to review and update, as needed, existing policies and guidance and consider additional controls to complete planning for software releases prior to initiating development and ensure software meets business expectations prior to deployment.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, the U.S. Citizenship and Immigration Services (USCIS) within the Department of Homeland Security (DHS) had taken steps to address this recommendation. In particular, in June 2017, USCIS provided an updated policy, dated April 2017, governing planning and deploying software releases. USCIS also demonstrated partial compliance with that policy. For example, it provided some release planning review documentation for recent releases that are required by the updated policy, including readiness review memos for releases 7.2 and 8.1. However, USCIS did not demonstrate that the program responsible for developing the USCIS Electronic Immigration System (USCIS ELIS) was consistently following its updated policy. For example, USCIS did not demonstrate that the program was completing all planning activities prior to initiating development, as called for in its updated policy. Moreover, the agency did not demonstrate compliance with its previous policy for all software releases planned and deployed since our July 2016 report. We will continue to work with USCIS to monitor actions the agency is taking to address this recommendation.
    Recommendation: To provide reasonable assurance that the program executes Agile software development for USCIS ELIS consistent with its own policies and guidance and follows applicable leading practices, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update, as needed, existing policies and guidance and consider additional controls to consistently implement the principles of the framework adopted for Agile software development.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, USCIS had taken steps to address this recommendation. For example, in May 2017, USCIS provided updated policy governing the development of software releases, dated April 2017, along with release planning artifacts specific to USCIS ELIS. The updated policy included an appendix devoted to generally accepted agency practices and applying Agile principles in the agency. However, USCIS had not clearly indicated if USCIS ELIS was to implement the practices described in the policy. For example, the updated policy did not require program compliance with the generally accepted agency practices. Moreover, supporting artifacts from the release planning process did not always define a commitment to a particular development methodology or set of development practices. For example, the team process agreements, which describe how members of individual teams will work with each other, did not indicate if developers were to adhere to the practices described in updated USCIS policy. We will continue to work with USCIS to obtain additional documentation about actions it is taking to address this recommendation.
    Recommendation: To provide reasonable assurance that the program executes Agile software development for USCIS ELIS consistent with its own policies and guidance and follows applicable leading practices, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update, as needed, existing policies and guidance and consider additional controls to define and consistently execute appropriate roles and responsibilities for individuals responsible for development activities consistent with its selected development framework.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, USCIS had taken steps to address this recommendation. For example, in June 2017, USCIS provided updated policy, dated April 2017, governing the development of software releases and release planning artifacts. The updated policy and release documentation defined some roles and responsibilities that were previously only described by USCIS in its informal November 2014 management model, such as the authority and responsibility of a product owner. However, program documentation and policy did not define all of the roles and responsibilities. For example, program documentation and policy did not define the roles and responsibilities of a facilitator, or Scrum Master, which is a position identified in leading practices for software development using Scrum, the development methodology previously identified by the program. In addition, USCIS did not demonstrate that it had defined and committed to an updated development methodology for software releases. Such a defined methodology will impact expectations for the roles and responsibilities in software development. Without such a defined methodology or approach to Agile software development, it is not clear if roles and responsibilities defined by previously documented approach to Agile software development are still applicable for the current development approach. Moreover, documentation associated with program releases and updated policy did not define all of the roles and responsibilities for positions described by USCIS in its May 2017 written response to GAO. We will continue to work with USCIS to obtain additional documentation about actions it is taking to address this recommendation.
    Recommendation: To provide reasonable assurance that the program executes Agile software development for USCIS ELIS consistent with its own policies and guidance and follows applicable leading practices, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update, as needed, existing policies and guidance and consider additional controls to identify all system users and involve them in release planning activities.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, DHS and USCIS had not provided information demonstrating that the department has addressed this recommendation. In October 2016, DHS provided a written response stating that the USCIS Office of Information Technology and Office of Transformation Coordination were working closely with the various USCIS directorates to obtain and integrate feedback through regular review sessions with the end users and through additional end user testing. However, as of July 2017, DHS and USCIS have not provided new information about the status of this recommendation.
    Recommendation: To provide reasonable assurance that the program executes Agile software development for USCIS ELIS consistent with its own policies and guidance and follows applicable leading practices, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update, as needed, existing policies and guidance and consider additional controls to write user stories that identify user roles, include estimates of complexity, take no longer than one sprint to complete, and describe business value.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, USCIS had provided GAO with documentation intended to demonstrate that the agency had taken steps to address this recommendation. For example, in May 2017, USCIS provided updated policy governing the development of software releases along with release planning artifacts specific to USCIS ELIS and an Independent Verification and Validation assessment. The agency also provided a series of backlogs that captured user stories for some software releases. In addition, the Independent Verification and Validation assessment indicated that the program was tracking user story quality as part of assessing whether value was continuously discovered and aligned to the mission. However, the assessment report provided to GAO indicated a negative trend for this outcome. Moreover, USCIS policy no longer set expectations regarding user story development. In addition, supporting artifacts from the release planning process did not always define a commitment to a particular development methodology, which is turn impacts the expectations for writing user stories. Finally, backlogs provided by USCIS did not cover all releases in development since our July 2016 report and did not include enough detail to assess all aspects of the user story process (e.g., story size and user involvement). We will continue to work with USCIS to obtain additional documentation about actions it is taking to address this recommendation.
    Recommendation: To provide reasonable assurance that the program executes Agile software development for USCIS ELIS consistent with its own policies and guidance and follows applicable leading practices, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update, as needed, existing policies and guidance and consider additional controls to establish outcomes for Agile software development.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, USCIS had taken steps to address this recommendation. For example, in April 2017, USCIS issued updated policy governing software development at the agency. The updated policy included an appendix devoted to generally accepted agency practices and applying Agile principles in the agency. This appendix also included a set of ten outcomes associated with using Agile practices at USCIS. For example, outcomes included that value is continuously discovered and aligned to the mission. However, the updated policy did not require program compliance with the practices and principles described in the appendix. Moreover, the agency did not demonstrate that USCIS ELIS had committed to achieving a specific set of outcomes for Agile software development, such as the outcomes described in the USCIS policy. We will continue to work with USCIS to obtain additional documentation about actions it is taking to address this recommendation.
    Recommendation: To provide reasonable assurance that the program executes Agile software development for USCIS ELIS consistent with its own policies and guidance and follows applicable leading practices, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update, as needed, existing policies and guidance and consider additional controls to monitor program performance and report to appropriate entities through the collection of reliable metrics.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, USCIS had taken steps to address this recommendation. For example, in May 2017, USCIS provided updated policy governing the development of software that called for teams to prepare an Operations Monitoring Plan or dashboard showing the practices, tools, and measures that will monitor applications in production. The agency also provided a series of documents from internal systems and processes intended to monitor performance, such as a product dashboard for analyzing code quality (i.e., SonarQube) and a report from its Independent Verification and Validation team. However, the program was undergoing a re-baseline and had yet to document updated cost, schedule, and performance expectations against which to monitor. Moreover, the agency did not demonstrate that other metrics, such as customer satisfaction and team velocity, were being reliably collected. We will continue to work with USCIS to obtain additional documentation about actions it is taking to address this recommendation.
    Recommendation: To help manage the USCIS ELIS system, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update existing policies and guidance and consider additional controls to conduct unit and integration, and functional acceptance tests, and code inspection consistent with stated program goals.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, USCIS had taken steps to address this recommendation. For example, in May 2017, USCIS provided artifacts from internal systems in place to monitor software development performance. These metrics monitored aspects of testing, such as code quality and code coverage. However, the program did not provide an updated Test and Evaluation Master Plan, which is a document it will produce as part of its ongoing effort to re-baseline. A Test and Evaluation Master Plan sets the testing expectations for the program as agreed upon with its stakeholders in DHS and USCIS. The updated plan will provide a basis for further evaluation of the steps DHS and USCIS have taken to address this recommendation. Moreover, the agency did not demonstrate that functional acceptance tests were being conducted in accordance with stated program goals. For example, the agency did not provide acceptance criteria or the associated tests demonstrating that user stories passed the defined acceptance criteria. We will continue to work with USCIS to obtain additional documentation about actions it is taking to address this recommendation.
    Recommendation: To help manage the USCIS ELIS system, the Secretary of DHS should direct the Director of USCIS to direct the USCIS CIO, in coordination with the DHS CIO and the Chief of OTC, to review and update existing policies and guidance and consider additional controls to develop complete test plans and cases for interoperability and end user testing, as defined in the USCIS Transformation Program Test and Evaluation Master Plan, and document the results.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of July 2017, DHS and USCIS had not provided information demonstrating that they had addressed this recommendation. In October 2016, DHS provided a written response indicating that an internal process for revisiting the USCIS ELIS Test and Evaluation Master Plan had been initiated, with participation from all relevant stakeholder groups. A Test and Evaluation Master Plan sets the testing expectations for the program as agreed upon with its stakeholders in DHS and USCIS. The updated plan will provide a basis for further evaluation of the steps DHS and USCIS have taken to address this recommendation. The letter also stated that USCIS had begun to work on a policy for new interoperability test procedures. Moreover, the letter added that end user testing is a continuing activity, including providing feedback of observed issues into the development queue, with the slow launch of the naturalization capabilities in USCIS ELIS being a model. However, as of July 2017, DHS and USCIS had not provided new information about the status of this recommendation. We will continue to work with DHS and USCIS to obtain additional documentation about actions they are taking to address this recommendation.
    Director: David J. Wise
    Phone: (202) 512-2834

    2 open recommendations
    Recommendation: To increase the completeness of information on the federal government's real property holdings and improve the coordination among federal entities that lease real property, the Deputy Director of the OMB--as chair of the FRPC--should establish efficient methods for including data from non-FRPC member entities in the FRPP.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To increase the completeness of information on the federal government's real property holdings and improve the coordination among federal entities that lease real property, the Deputy Director of the OMB--as chair of the FRPC--should establish efficient methods for increasing collaboration between FRPC member and non-member entities, including sharing leading real-property management practices.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Kimberly Gianopoulos
    Phone: (202) 512-8612

    3 open recommendations
    Recommendation: To improve CERC's performance monitoring, the Secretary of Energy should ensure that for CERC's second phase the program creates targets and tracks progress against those targets in order to measure program performance.

    Agency: Department of Energy
    Status: Open

    Comments: DOE concurred with GAO's recommendation and has taken steps to implement it since our report. For example, DOE created a standardized reporting template with performance measures for CERC partners to complete on a quarterly basis. DOE officials informed GAO that they are working to develop targets for those performance measures. We will continue to monitor DOE's progress in implementing this recommendation.
    Recommendation: To improve the agency's performance monitoring, the Director of the U.S. Trade and Development Agency should develop and make public annual targets for the agency's performance measures.

    Agency: U.S. Trade and Development Agency
    Status: Open

    Comments: USTDA concurred with GAO's recommendation and has taken steps to implement it since our report. For example, USTDA revised its fiscal year 2016 through 2018 strategic plan to include an annual performance target for one of its two performance measures: the value of exports generated for every program dollar. We will continue to monitor USTDA's progress in developing an annual performance target for its performance measure on procurements awarded to small U.S. businesses.
    Recommendation: To improve the East Asia Program's performance monitoring, the Director of the U.S. Trade and Development Agency should ensure that the East Asia Program sets targets for its performance measures and tracks progress against those measures.

    Agency: U.S. Trade and Development Agency
    Status: Open

    Comments: USTDA concurred with GAO's recommendation. As of October 2016, USTDA had planned to review its internal goals for the East Asia Program, and other regional programs, and to begin to track progress against those goals. We will continue to monitor USTDA's progress in implementing this recommendation.
    Director: Robert Goldenkoff
    Phone: (202) 512-2757

    3 open recommendations
    including 3 priority recommendations
    Recommendation: To help ensure the Bureau produces a reliable cost estimate for the 2020 Census, the Secretary of Commerce and Under Secretary for Economic Affairs should direct the Census Bureau to take the following steps to meet the characteristics of a high-quality estimate: (1) Comprehensive--among other practices, ensure the estimate includes all life-cycle costs and documents all cost-influencing assumptions. (2) Well-documented--among other practices, ensure that its planned documentation plan captures the source data used; contains the calculations performed and the estimating methodologies used for each element; and describes step by step how the estimate was developed. (3) Accurate--among other practices, ensure the estimating technique for each cost element is used appropriately and that variances between planned and actual cost are documented, explained, and reviewed. (4) Credible--among other practices, ensure the estimate includes a sensitivity analysis, major cost elements are cross-checked to see whether results are similar, and an independent cost estimate is conducted to determine whether other estimating methods produce similar results.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: Commerce agreed with this recommendation. The Bureau should provide a cost estimate more current than the October 2015 estimate and ensure that the estimate is comprehensive, well-documented, accurate, and credible. In doing this the Bureau should consult the GAO's cost assessment guide (GAO-09-3SP) and Standards for Internal Control in the Federal Government (GAO-14-704G). High-quality estimates will: explicitly consider all life-cycle costs and assumptions, offer a clear step-by-step account of the methods and data sources used to compile the estimate, ensure the proper estimation techniques are used, reconcile any variances between actual and estimated costs, and allow cross-checking with independent cost estimates as verification of results. In August 2016, the Bureau laid out its action plan to implement this recommendation. The Bureau planned to develop a Cost Estimation Enhancement Plan that would mature the 2020 Census cost estimate and its associated processes via a series of 3-month sprints. According to the Bureau, the areas targeted for improvement were (I) Documentation, (2) Process, (3) Cost Estimate, and (4) Cost Integration. The Bureau's action plan reported the following deliverables: Incorporating the Decennial Census Management Division program work breakdown structure into the 2020 Census Cost Estimate (target completion was Q4 FY 2016); developing a formal basis of estimate document to address the cost elements, process flow, and calculations for the 2020 Census Cost Estimate (Q2 FY 2017); internal communication and training efforts to ensure these changes are widely shared and communicated (Q2 FY 2017); engaging with internal stakeholders to increase the amount of source and derivation documentation for estimates/model parameters currently based on expert judgment (Q4 FY 2016); developing a formal BOE document to address how 2020 Census program risk and uncertainty are dealt with in the 2020 Census Cost Estimate (Q2 FY 2017); and regularly comparing the results of the independent cost estimate conducted by the Office of Cost Estimation, Analysis and Assessment to the 2020 Census Cost Estimate and investigate/reconcile any significant differences (Q3 FY 2017). As of July 2017, we await this and other documentation from Bureau that may address this recommendation.
    Recommendation: To further ensure the credibility of data used in cost estimation, the Secretary of Commerce and Under Secretary for Economic Affairs should direct the Census Bureau to establish clear guidance on when information for cost assumptions can and should be changed as well as the procedures for documenting such changes and traceable sources for information being used.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: Commerce agreed with this recommendation. The Bureau should implement processes for controlling and changing cost assumptions. These processes should include methods for evaluating the justification for any changes and documentation requirements that clearly show the information changed and the basis for the change. In August 2016, Bureau officials laid out their action plan to address this recommendation. The action plan described developing a Decennial Census Cost Estimation and Analysis Process and supporting policy to improve the maturity levels in this area and mentioned developing a draft internal communication and training plan for staff--target date is Q2 FY 2017. As of July 2017, we await this and other documentation from Bureau that may address this recommendation.
    Recommendation: To ensure Bureau and congressional confidence that the Bureau's budgeted contingencies are at appropriate levels, the Secretary of Commerce and Under Secretary for Economic Affairs should direct the Census Bureau to improve control over how risk and uncertainty are accounted for and communicated with the Bureau's decennial cost estimation process, such as by implementing and institutionalizing processes or methods for doing so with clear guidance.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: Commerce agreed with this recommendation. The Bureau should ensure that its budget for contingencies reflects an accurate accounting of risk and uncertainty. In doing this, the Bureau should improve controls over risk and uncertainty accounting, ensure that risk accounting informs any relevant budgets and cost estimates, and institutionalize these controls by providing clear methods for their use. In August 2016, the Bureau laid out its action plan to implement this recommendation, describing that it would ensure regular review of 2020 Census program risks that would have high cost impacts if they occur and ensure estimates of these impacts are accounted for and documented in each iteration of the life-cycle cost estimates--target date is Q2 FY 2017. As of July 2017, we await documentation from Bureau that may address this recommendation.
    Director: David A. Powner
    Phone: (202) 512-9286

    3 open recommendations
    Recommendation: To help IRS improve its process for determining IT funding priorities and to provide timely information on the progress of its investments, the Commissioner of IRS should direct the Chief Technology Officer to establish, document, and implement policies and procedures for selecting new and reselecting ongoing business systems modernization activities, consistent with IRS's process for prioritizing operations support priorities, which addresses (1) prioritization and comparison of IT assets against each other, (2) criteria for making selection and prioritization decisions, and (3) ensuring IRS executives' final funding decisions on IT proposals are based on IRS's prioritization process.

    Agency: Department of the Treasury: Internal Revenue Service
    Status: Open

    Comments: In April 2017, IRS stated that it had several process improvements underway that would impact its documentation of policies and procedures for prioritizing business systems modernization activities. The agency committed to addressing the recommendation by December 2017.
    Recommendation: To help IRS improve its process for determining IT funding priorities and to provide timely information on the progress of its investments, the Commissioner of IRS should direct the Chief Technology Officer to modify existing processes for Foreign Account Tax Compliance Act (FATCA) and Return Review Program (RRP) for measuring work performed by IRS staff to incorporate best practices, including accounting for actual work performed and using the level of effort measure sparingly.

    Agency: Department of the Treasury: Internal Revenue Service
    Status: Open

    Comments: In April 2017, IRS reported that it was continuing to examine methods for modifying existing processes to measure work performed by IRS staff for the Foreign Account Tax Compliance Act and Return Review programs. We are monitoring IRS's efforts as part of an ongoing review of the agency's information technology operations.
    Recommendation: To help IRS improve its process for determining IT funding priorities and to provide timely information on the progress of its investments, the Commissioner of IRS should direct the Chief Technology Officer to report on actual costs and scope delivery at least quarterly for the Customer Account Data Engine 2 and the Affordable Care Act Administration. For these investments, IRS should develop metrics similar to FATCA and RRP.

    Agency: Department of the Treasury: Internal Revenue Service
    Status: Open

    Comments: IRS began reporting on actual costs and scope delivery at least quarterly using metrics similar to FATCA and RRP and provided the quarterly reports for fiscal year 2016 and the first two quarters of fiscal year 2017 to GAO. As of September 2017, the agency had not implemented the recommendation for the Affordable Care Act Administration investment because it did not see the benefit in doing so given that development work was minimal. We are following up with IRS on this as part of an ongoing review of the agency's information technology operations.
    Director: Shea, Rebecca
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To enhance transparency and allow for more informed decision making related to VA's major medical facility leases, the Secretary of Veterans Affairs should annually assess how VA has benefited from flexibilities afforded by leasing its major medical facilities and use information from these assessments in its annual capital plans.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: On September 30, 2016, VA reported to GAO that as VA develops its fiscal year 2018 Budget Request to Congress, the Department will continue assessing the benefits of its major medical lease program and will include the related documentation in its capital budget request.
    Director: Michelle Sager
    Phone: (202) 512-6806

    4 open recommendations
    Recommendation: To enable a more effective approach in working with states to adopt the NDRF, the Secretary of Homeland Security should direct the Administrator of FEMA to conduct a systematic analysis of the information generated from FEMA's readiness assessments to determine the extent of regional office efforts to help states implement the NDRF, including conducting education and outreach.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS concurred with this recommendation and said it would take steps to implement it. According to FEMA, its Office of Readiness Assessment (ORA) launched the 2016 bi-annual FEMA Readiness Assessment Program in April 2016, which includes NDRF related assessment discussions in five FEMA regions. We met with officials in April 2017, who told us that ORA plans to incorporate into this year's assessments, a retrospective review of NDRF findings and progress made in implementing the NDRF since 2013. We will continue to monitor this to see what additional actions the agency takes in response to this recommendation.
    Recommendation: To enable a more effective approach in working with states to adopt the NDRF, the Secretary of Homeland Security should direct the Administrator of FEMA to develop best practices and lessons learned with regard to conducting NDRF education and outreach to states based on the analysis of readiness assessments and create a mechanism to disseminate and share those best practices and lessons learned to FEMA regional offices.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS concurred with this recommendation and said it would take steps to implement it. According to FEMA, its Recovery Support Function Leadership Group initiated an information management workgroup, which shares best practices information as one of its objectives. The workgroup has piloted the use of an existing interagency portal as a potential platform for improved information sharing. We met with officials in April 2017, who told us that FEMA will incorporate its 2016 readiness review findings and best practices from regional Federal Disaster Recovery Coordinators for stakeholder outreach and education into the final platform build-out. We will continue to monitor this to see what additional actions the agency takes in response to this recommendation.
    Recommendation: To enable a more effective approach in working with states to adopt the NDRF, the Secretary of Homeland Security should direct the Administrator of FEMA to clarify with regional offices and Federal Disaster Recovery Coordinators (FDRCs) the role of the regional implementation plans in FDRC performance plans and how they will be used to assess NDRF regional implementation efforts.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS concurred with this recommendation and said it would take steps to implement it. According to FEMA, to achieve greater integration of FEMA's field leadership components, FEMA's Field Operations Directorate (FOD) convened a Field Leadership Working Group of senior subject matter experts to conduct a mission analysis of FEMA's Field Leadership function (which includes Federal Disaster Recovery Coordinators as well as Federal Coordinating Officers and Incident Management Assistance Teams team leads). According to FEMA, one of the assigned tasks of the group involves developing performance metrics to define a steady state and operational performance framework for field leaders, to include Federal Disaster Recovery Coordinators. According to FEMA, the Working Group is currently underway and is preparing a Field Leader Manual for review by FOD leadership. We will continue to monitor this to see what additional actions the agency takes in response to this recommendation.
    Recommendation: To enable a more effective approach in working with states to adopt the NDRF, the Secretary of Homeland Security should direct the Administrator of FEMA to align the annual FDRC performance expectations with clearly defined organizational goals and priorities, consistent with key management practices.

    Agency: Department of Homeland Security
    Status: Open

    Comments: DHS concurred with this recommendation and said it would take steps to implement it. According to FEMA, the Field Leadership Working Group will implement the elements of this recommendation alongside efforts to clarify the role of the regional National Disaster Recovery Framework implementation plans. FEMA also provided documentation to GAO noting that the Working Group is progressing in its work on its Field Leadership Professional Development Plan. We will continue to monitor this to see what additional actions the agency takes in response to this recommendation.
    Director: Susan A. Fleming
    Phone: (202) 512-2834

    3 open recommendations
    Recommendation: To strengthen FRA's grants management practices, the Secretary of Transportation should direct the FRA Administrator to enhance the process outlined in the Grants Manual to monitor project performance for future grants to include: (1) performance measures directly linked to project goals, and (2) fully incorporating timely and actionable information on grantee performance into FRA's review process to help determine whether current efforts are in line with the overall project goals.

    Agency: Department of Transportation
    Status: Open

    Comments: DOT agreed with this recommendation and stated that FRA will enhance the grants management manual content linking performance measures to project goals, and incorporating timely and actionable information on grant performance into monitoring and oversight activities. DOT stated FRA would complete these actions by June 30, 2017.
    Recommendation: To strengthen FRA's grants management practices, the Secretary of Transportation should direct the FRA Administrator to develop and provide written guidance to grantees to include FRA's expectations on the type of information grantees should provide, such as guidance specific to deliverables and milestones for each grant project.

    Agency: Department of Transportation
    Status: Open

    Comments: DOT agreed with this recommendation and stated that FRA will identify gaps in existing guidance and develop and disseminate revised guidance to grantees. DOT stated FRA would complete these actions by December 31, 2017.
    Recommendation: To strengthen FRA's grants management practices, the Secretary of Transportation should direct the FRA Administrator to analyze training needs and formalize a training plan for grantees and agency staff, which could include training on grant-specific procedures and policies.

    Agency: Department of Transportation
    Status: Open

    Comments: DOT agreed with this recommendation and FRA developed a revised formal training plan in March 2017. As of May 2017, we are reviewing this plan.
    Director: Cary Russell
    Phone: (202) 512- 5431

    3 open recommendations
    Recommendation: The Secretary of Defense should direct the Under Secretary of Defense for Acquisition, Technology and Logistics to establish a strategic policy that incorporates key elements of leading practices for sound strategic management planning, such as a mission statement and long-term goals, to inform the military services' plans for retrograde and reset to support overseas contingency operations and to improve DOD's response to section 324 of the NDAA for Fiscal Year 2014.

    Agency: Department of Defense
    Status: Open

    Comments: This recommendation remains open because we found in our review of DOD's second update (GAO-17-530R) that DOD has not established a strategic policy for retrograde and reset consistent with leading practices on sound strategic management planning. Nor has DOD, as of June 2017, selected an appropriate organization to lead the effort on developing such a policy. We continue to believe that our recommendation remains valid because without a strategic policy for retrograde and reset that incorporates key elements of strategic management planning, DOD cannot ensure that its efforts to develop retrograde and reset guidance provide the necessary strategic planning framework to inform the military services' implementation plans for retrograde and reset. A necessary first step, as DOD has indicated and as we stated in our May 2016 report, is the selection of an appropriate organization to lead the development of the policy.
    Recommendation: To enhance the accuracy of budget reporting to Congress, the Secretary of Defense should direct the Under Secretary of Defense for Acquisition, Technology and Logistics, in coordination with the DOD Comptroller, to develop and require the use of consistent information and descriptions of key terms regarding retrograde and reset in relevant policy and other guidance.

    Agency: Department of Defense
    Status: Open

    Comments: This recommendation remains open because we found in our review of DOD's second update (GAO-17-530R) that DOD has not developed and required the use of consistent information and descriptions of key terms regarding retrograde and reset in policy and guidance. Thus, descriptions of retrograde and reset still vary, and the services use the same terms differently. In its written comments on our report, DOD partially concurred with our recommendation and stated that the Financial Management Regulation had recently been updated to include the definitions of both reset and retrograde that will be used to estimate and report Overseas Contingency Operations costs starting in Fiscal Year 2018, referencing the chapter on Contingency Operations. However, contrary to the department's claim, as of April 2017, the Financial Management Regulation chapter regarding Contingency Operations has not been updated since September 2007.21 An official we met with from the Office of the Under Secretary of Defense (Comptroller) told us that this office will be updating DOD's Financial Management Regulation to include the expanded definition of reset. According to this official, however, the updated Financial Management Regulation will likely not include a definition for retrograde. As we reported in May 2016, major operations typically involve retrograde. However, the chapter of the DOD Financial Management Regulation specific to contingency operations does not provide a definition of retrograde or include any information describing how retrograde costs should be considered or calculated. We continue to believe that if DOD does not ensure the use of consistent terms--especially retrograde and reset--and descriptions in policy and other departmental documents used to inform budget estimates on retrograde and reset, Congress may not receive the consistent and accurate information that it needs to make informed decisions concerning retrograde and reset.
    Recommendation: To improve Army, Navy, and Air Force planning, budgeting, and execution for retrograde and reset efforts, the Secretary of Defense should direct the Secretaries of the Army, Navy, and Air Force to develop service-specific implementation plans for retrograde and reset that incorporate elements of leading practices for sound strategic management planning, such as strategies that include how a goal will be achieved, how an organization will carry out its mission, and the resources required to meet goals.

    Agency: Department of Defense
    Status: Open

    Comments: This recommendation remains open because we found in our review of DOD's second update (GAO-17-530R) that the Army, Navy, and Air Force have not yet developed implementation plans for the retrograde and reset of their equipment, according to service officials. As previously discussed, in May 2016 we recommended that the Secretaries of the Army, Navy, and Air Force develop service-specific implementation plans for retrograde and reset that incorporate elements of leading practices for sound strategic management planning. In its response to our recommendation, DOD partially concurred, stating that the department would determine the appropriate Principal Staff Assistant to lead the development and application of service-related implementation plans. However, as of June 2017, DOD has not identified a lead for this effort. We continue to believe that Army, Navy, and Air Force service-specific implementation plans that articulate goals and strategies for retrograde and reset of equipment, among other things, are important and that reset-related maintenance costs may not consistently be tracked, and resources and funding for retrograde and reset may not be consistently or effectively budgeted for and distributed within each service. For this reason, we continue to believe that our prior recommendation remains valid and reinforces the need for DOD to establish a strategic policy consistent with leading practices on sound strategic management planning to guide and inform the services' plans.
    Director: Andrew Von Ah
    Phone: (213) 830-1011

    3 open recommendations
    Recommendation: The Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in consultation with officials from the military service components and the JAMRS office, to develop a formal process for coordination on crosscutting issues to facilitate better leveraging of resources. As part of this process, DOD could review existing advertising programs to identify opportunities to reduce unnecessary duplication, overlap, and fragmentation and obtain potential efficiencies.

    Agency: Department of Defense
    Status: Open

    Comments: As of August 2017, a DOD official from the office of Under Secretary of Defense for Personnel and Readiness stated that a working group drafted an Instruction on DOD advertising and marketing and this instruction will be signed within the next 30 days. The instruction requires that the relevant departmentwide office will meet quarterly with the military service marketing representatives to discuss best practices and to look for efficiencies. Further, the official stated that the Army has directed the Army National Guard to work through Army Marketing and Research Group regarding their marketing efforts, which consolidates all Army marketing efforts within one office. The Air force is also in discussion to determine how best to consolidate the marketing efforts of its Guard and Reserve components with the Active Duty to gain efficiencies. We will monitor the issuance of the instruction and the efforts of the Air Force to consolidate activities.
    Recommendation: The Secretary of Defense should direct the Secretaries of the Departments of the Army, the Navy, and the Air Force to ensure that each military service component fully measure advertising performance. This should include both the identification of measurable goals in future versions of the service components' advertising plans and assurance that the service components have access to the necessary performance data to determine the effectiveness of their advertising activities for lead generation activities.

    Agency: Department of Defense
    Status: Open

    Comments: As of August 2017, a DOD official from the office of Under Secretary of Defense for Personnel and Readiness stated that a working group drafted an Instruction on DOD advertising and marketing and this instruction will be signed within the next 30 days. The instruction requires that the relevant department-level office will meet quarterly with the military service marketing representatives to discuss best practices and to look for efficiencies. Upon issuance of the instruction, we will assess the direction provided to the services in the instruction regarding performance measurement.
    Recommendation: The Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness to ensure, as the department undertakes its effort to issue a department-wide policy for advertising, that this policy (1) clearly defines DOD's role in overseeing the advertising activities of military service components; (2) clarifies issues related to sports-related advertising; and (3) outlines procedures that should guide the components' advertising activities for other types of advertising, such as music concerts, other event advertising, and digital advertising.

    Agency: Department of Defense
    Status: Open

    Comments: As of August 2017, a DOD official from the office of Under Secretary of Defense for Personnel and Readiness stated that a work group session was held in October 2016 and based on the outcome of that work group, DOD has drafted an Instruction on DOD advertising and marketing. That instruction is currently in the "Pre-Signature" phase as a priority instruction which means it should be signed and published within the next 30 days. We will continue to monitor the issuance of this instruction.
    Director: Brenda S. Farrell
    Phone: (202) 512-3604

    3 open recommendations
    Recommendation: The Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness to establish time frames to complete actions that its Federal Voting Assistance Program has identified it will take to address challenges, and also to use these time frames to demonstrate progress for stakeholders, including through its statutorily required annual reporting.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Under Secretary of Defense for Personnel and Readiness, through the Defense Human Resources Activity, should direct FVAP's Director to fully implement the six selected leading practices of federal strategic planning into the day-to-day operations of the program.

    Agency: Department of Defense: Office of the Under Secretary for Personnel and Readiness
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: The Under Secretary of Defense for Personnel and Readiness, through the Defense Human Resources Activity, should direct FVAP's Director to complete the development of a strategic plan that fully exhibits the six selected leading practices of federal strategic planning, including, but not limited to: (1) a statement of FVAP's revised mission and goals; (2) an identification of strategies that address management challenges and resources needed to achieve goals; (3) a description of leadership involvement and accountability; (4) a description of stakeholder involvement in the development of FVAP priorities; (5) a coordination strategy to communicate the program's mission and goals to other federal agencies; and (6) a description of performance measures, aligned with program goals that FVAP will use to track progress toward achieving goals.

    Agency: Department of Defense: Office of the Under Secretary for Personnel and Readiness
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Cary Russell
    Phone: (202) 512-5431

    2 open recommendations
    Recommendation: To ensure that risks associated with ALIS are addressed expediently and holistically, the Secretary of Defense should direct the F-35 Program Executive Officer to improve the reliability of its cost estimates, conduct uncertainty and sensitivity analyses consistent with cost-estimating best practices identified in GAO's Cost Estimating and Assessment Guide.

    Agency: Department of Defense
    Status: Open

    Comments: According to DOD officials, the F-35 Program regularly performs sensitivity analysis in its cost estimates. The F-35 Cost Team runs drills throughout the year on varying ground rules and assumptions for all elements of the sustainment Annual Cost Estimate (ACE), including ALIS cost elements. These drills are used to assess cost impacts of various proposed requirements changes from the F-35 Program Office and the Services. The cost models capture the sensitivity of those technical baseline changes and the F-35 Program Office and Services use those results to inform the final technical baseline definition that becomes the basis of the annual estimate update. Although these measures are regularly performed, they do not constitute a direct uncertainty or sensitivity analysis on ALIS itself. For that reason, as of September 2017, this recommendation remains open.
    Recommendation: To ensure that risks associated with ALIS are addressed expediently and holistically, the Secretary of Defense should direct the F-35 Program Executive Officer to improve the reliability of its cost estimates, ensure that future estimates of ALIS costs use historical data as available and reflect significant program changes consistent with cost-estimating best practices identified in GAO's Cost Estimating and Assessment Guide.

    Agency: Department of Defense
    Status: Open

    Comments: According to DOD officials, as part of the cost estimating processes in the F-35 Program Office, the sustainment Annual Cost Estimate does incorporate the latest available historical cost data and reflects the latest approved technical baseline. For example, the latest hardware procurement costs from the most recent annual contracts for the F-35 were incorporated into the 2016 Annual Cost Estimate update as were the manpower assembly installation costs based on final delivered item prices. Although these are positive measures for the program and the cost estimate, the program has not incorporated a range of potential future costs that may better reflect actual ALIS costs. Until this step is taken, the recommendation will remain open.
    Director: David A. Powner
    Phone: (202) 512-9286

    6 open recommendations
    Recommendation: To ensure that agencies are provided with more complete guidance for contracts for cloud computing services, the Director of OMB should include all ten key practices in future guidance to agencies.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: We are following up with OMB on its service level agreement (SLA) guidance to agencies.
    Recommendation: To help ensure continued progress in the implementation of effective cloud computing SLAs, the Secretary of Defense should direct the appropriate officials to ensure key practices are fully incorporated for cloud services as the contracts and associated SLAs expire. These efforts should include updating the Department of Defense memorandum on acquiring cloud services and current Defense Acquisition Regulations System to more completely include the key practices.

    Agency: Department of Defense
    Status: Open

    Comments: We are following up with DOD on updating their service level agreement (SLA) guidance.
    Recommendation: To help ensure continued progress in the implementation of effective cloud computing SLAs, the Secretaries of Health and Human Services, Homeland Security, Treasury, and Veterans Affairs should direct appropriate officials to develop SLA guidance and ensure key practices are fully incorporated as the contract and associated SLAs expire.

    Agency: Department of Homeland Security
    Status: Open

    Comments: We are following up with DHS on the finalization of its service level agreement (SLA) guidance.
    Recommendation: To help ensure continued progress in the implementation of effective cloud computing SLAs, the Secretaries of Health and Human Services, Homeland Security, Treasury, and Veterans Affairs should direct appropriate officials to develop SLA guidance and ensure key practices are fully incorporated as the contract and associated SLAs expire.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: We are following up with HHS on their service level agreement (SLA) guidance.
    Recommendation: To help ensure continued progress in the implementation of effective cloud computing SLAs, the Secretaries of Health and Human Services, Homeland Security, Treasury, and Veterans Affairs should direct appropriate officials to develop SLA guidance and ensure key practices are fully incorporated as the contract and associated SLAs expire.

    Agency: Department of the Treasury
    Status: Open

    Comments: We are following up with Treasury on their service level agreement (SLA) guidance.
    Recommendation: To help ensure continued progress in the implementation of effective cloud computing SLAs, the Secretaries of Health and Human Services, Homeland Security, Treasury, and Veterans Affairs should direct appropriate officials to develop SLA guidance and ensure key practices are fully incorporated as the contract and associated SLAs expire.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: We are following up with VA on their service level agreement (SLA) guidance.
    Director: Daniel Bertoni
    Phone: (202) 512-7215

    4 open recommendations
    Recommendation: To ensure that it provides all eligible populations access to its services and that its eligibility requirements are consistent with currently accepted practices, the Library of Congress should re-examine and potentially revise its requirement that medical doctors must certify eligibility for the NLS program for those with a reading disability caused by organic dysfunction.

    Agency: Library of Congress
    Status: Open

    Comments: The Library of Congress indicated that the National Library Service for the Blind and Physically Handicapped (NLS) has contracted for a study of how eligibility based on reading disability should be certified. This study will look at medical advances in the diagnosis of reading disabilities, the NLS authorizing statute, and the potential impact of a regulatory change on the program. The expected completion date is December 2017. To close this recommendation, the Library of Congress must demonstrate that this study has been completed and that NLS has determined whether a change in its requirements is warranted.
    Recommendation: To ensure funds are directed to the most cost-effective outreach efforts, NLS should evaluate the effectiveness of its outreach efforts, including the extent to which different outreach efforts have resulted in new users.

    Agency: Library of Congress: National Library Service for the Blind and Physically Handicapped
    Status: Open

    Comments: The Library of Congress indicated that the National Library Service for the Blind and Physically Handicapped (NLS) has begun revising the program application form so that it captures information on how applicants were referred to the program. NLS expects to have all libraries nationwide using this revised application by sometime in 2018. In addition, the Library of Congress indicated that NLS has contracted for a multi-year, multi-media advertising campaign. This effort will assess the effectiveness of different approaches by connecting direct responses to ads with verified program enrollment. The campaign is expected to be fully underway by January 2018. To close this recommendation, the Library of Congress will need to demonstrate that NLS has fully implemented one or more of its planned new approaches for evaluating outreach.
    Recommendation: To help it determine the most cost-effective approach for its next audio player, NLS should comprehensively assess the alternatives of designing its own specialized audio player versus providing commercially available players to its users.

    Agency: Library of Congress: National Library Service for the Blind and Physically Handicapped
    Status: Open

    Comments: The Library of Congress indicated that the National Library Service for the Blind and Physically Handicapped (NLS) has contracted for a study of the different commercially available audio players for their usability, life-cycle costs, maintenance needs, and durability. The study is expected to be completed by December 2017, and will guide NLS in its decision about how to develop its next generation of audio players. To close this recommendation as implemented, the Library of Congress will have to demonstrate that this study has been conducted and that NLS has considered its findings in making a decision about its next generation audio player.
    Recommendation: To help it determine whether to supplement its collection of human-narrated audio materials with text-to-speech materials, NLS should thoroughly assess the text-to-speech option versus continuing to provide only human-narrated materials.

    Agency: Library of Congress: National Library Service for the Blind and Physically Handicapped
    Status: Open

    Comments: The Library of Congress indicated that the National Library Service for the Blind and Physically Handicapped (NLS) has developed a library of 100 text-to-speech (synthetic speech) talking books. In September 2017, NLS will begin a 3-month pilot in which a group of NLS users try out these talking books and provide input to NLS. Also, NLS will require that its next generation of audio players have the capacity to play synthetic speech talking books, and the study it has contracted of commercially available players will consider this requirement among other factors. To close this recommendation as implemented, NLS needs to demonstrate that it has completed its text-to-speech pilot and has decided on an approach going forward with regards to expanding this program.
    Director: Carol R. Cha
    Phone: (202) 512-4456

    6 open recommendations
    Recommendation: To help improve the management of MAIS programs, the Secretary of the Army should direct the Tactical Mission Command program manager to develop a requirements management plan to document and manage its requirements process.

    Agency: Department of Defense: Department of the Army
    Status: Open

    Comments: The Department of Defense concurred with our recommendation. We have requested documentation regarding the status of implementing this recommendation. As of April 2017, we have not received a response from the department to our request. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help improve the management of MAIS programs, the Secretary of the Navy should direct the Common Aviation Command and Control System program manager to identify weaknesses in the requirements traceability process and take corrective actions to manage the traceability of requirements to the respective lower-level requirements, and periodically evaluate work products, including the requirements management plan, and update them in accordance with the requirements guidance.

    Agency: Department of Defense: Department of the Navy
    Status: Open

    Comments: The Department of Defense concurred with our recommendation. We have requested documentation regarding the status of implementing this recommendation. As of April 2017, we have not received a response from the department to our request. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help improve the management of MAIS programs, the Secretary of the Air Force should direct the Defense Enterprise Accounting and Management System program manager to address weaknesses in its controls for ensuring that all software requirements are tested and validated before deployment of new software releases.

    Agency: Department of Defense: Department of the Air Force
    Status: Open

    Comments: The Department of Defense concurred with our recommendation. We have requested documentation regarding the status of implementing this recommendation. As of April 2017, we have not received a response from the department to our request. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help improve the management of MAIS programs, the Director of OMB should instruct the Federal Chief Information Officer (CIO) to add the Under Secretary of Defense for AT&L as a responsible party to DOD's MAIS entries on the Federal IT Dashboard website, alongside the CIO, to publicly disclose the responsible party for the acquisition performance management of MAIS programs.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: The Office of Management and Budget did not agree with the recommendation, but stated it would work with the Department of Defense to address it. In April 2017, the Department of Defense stated that it is reorganizing the office of the Under Secretary of Defense for AT&L and its responsibilities. We will continue to follow up with the department subsequent to the reorganization in an effort to determine the party responsible for the acquisition performance management of MAIS programs and OMB's efforts to disclose the responsible party on the Federal IT Dashboard.
    Recommendation: To help improve the management of MAIS programs, the Secretary of Defense should examine the MAIS critical change reporting process to identify root causes for delays and implement corrective actions for the timely delivery of critical change reports.

    Agency: Department of Defense
    Status: Open

    Comments: The Department of Defense concurred with our recommendation. We have requested documentation regarding the status of implementing this recommendation. As of April 2017, we have not received a response from the department to our request. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help improve the management of MAIS programs, the Secretary of Defense should develop a mechanism for monitoring whether MAIS programs with late reports are restricted from obligating funds and in turn ensuring compliance with the Antideficiency Act.

    Agency: Department of Defense
    Status: Open

    Comments: The Department of Defense concurred with our recommendation. We have requested documentation regarding the status of implementing this recommendation. As of April 2017, we have not received a response from the department to our request. We will continue to monitor the department's progress in implementing this recommendation.
    Director: Marcia Crosse
    Phone: (202) 512-7114

    28 open recommendations
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Agriculture should revise existing department policies for managing hazardous biological agents in high-containment laboratories to contain specific requirements for reporting laboratory incidents to senior department officials, including the types of incidents that should be reported, to whom, and when, or direct the Administrator of the Food Safety and Inspection Service to develop agency policies that contain these requirements.

    Agency: Department of Agriculture
    Status: Open

    Comments: In October 2016 USDA reported that its science and safety councils chartered a joint biorisk management policy committee to oversee the revisions of existing policies to include department-wide incident reporting requirements and time frames. USDA also reported that FSIS will collaborate with the department to ensure that FSIS policies comply with USDA reporting requirements. USDA did not provide an anticipated completion date for revising departmental polices.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Agriculture should review and update outdated department policies for managing hazardous biological agents in high-containment laboratories and direct the Administrators of the Animal and Plant Health Inspection Service (APHIS) and Agricultural Research Service to update their policies and, in the case of APHIS, establish a regular review schedule.

    Agency: Department of Agriculture
    Status: Open

    Comments: In October 2016, USDA reported that the science and safety councils' joint biorisk management policy committee will review and update the existing outdated USDA policies. In addition, USDA reported that APHIS will review agency policies for biological laboratories every 3-5 years or sooner, if necessary, and that this schedule will be reflected in USDA policy. USDA did not provide an anticipated completion date for reviewing and updating departmental polices. USDA reported that ARS has finalized its policies for its institutional biological safety committee in April 2016. Once all USDA and component agency policies have been updated and review schedules established, we will close this recommendation.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Agriculture should routinely analyze results of the department's laboratory inspections and incident reports to identify potential trends that may highlight recurring laboratory safety or security issues and share lessons learned with laboratory personnel.

    Agency: Department of Agriculture
    Status: Open

    Comments: In October 2016, USDA reported that the joint biorisk management policy committee will oversee efforts to collect and analyze laboratory inspection and incident reports and share these reports and critical analyses with USDA senior leadership. USDA did not provide an anticipated start date for analyzing reports and sharing analyses with senior departmental officials. USDA stated that the joint biorisk committee also serves as an information-sharing platform across USDA agencies and, as such, is positioned to share lessons learned from analyses of inspection and incident reports with laboratory personnel as necessary. USDA also provided additional information on APHIS, ARS, and FSIS planned or ongoing inspection and incident report analyses.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Agriculture should require routine reporting of the results of department, agency, and select agent laboratory inspections to senior department officials.

    Agency: Department of Agriculture
    Status: Open

    Comments: In October 2016, USDA reported that the joint biorisk management policy committee will oversee efforts to revise existing departmental regulations to include requirements for routine reporting of inspection results to senior USDA officials. USDA did not provide an anticipated completion date for revising existing departmental regulations. USDA also provided additional information on APHIS, ARS, and FSIS planned or ongoing reporting of inspection results or revisions of agency policies to require such reporting.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Agriculture should require routine reporting of incidents at agency laboratories to senior department officials.

    Agency: Department of Agriculture
    Status: Open

    Comments: In October 2016, USDA reported that the joint biorisk management policy committee will oversee efforts to revise existing departmental regulations to include requirements for routine reporting of laboratory incidents to senior USDA officials. USDA did not provide an anticipated completion date for revising existing departmental regulations. USDA also provided additional information on APHIS, ARS, and FSIS planned or ongoing incident reporting or revisions of agency policies to require such reporting.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Defense should revise existing department policies for managing hazardous biological agents in high-containment laboratories to contain specific requirements for inventory control for all of DOD's high-containment laboratories, not just for its select agent-registered laboratories, or direct the Secretaries of the Air Force, Army, and Navy to revise their existing, respective policies to contain these requirements.

    Agency: Department of Defense
    Status: Open

    Comments: In June 2016, DOD noted that its comments on the final report--in which it agreed with all of our findings and recommendations for the department--had not changed. However, DOD did not provide us with an update on its status in implementing these recommendations.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Defense should direct the Secretaries of the Air Force and Army to review and update their respective outdated policies for managing hazardous biological agents in high-containment laboratories.

    Agency: Department of Defense
    Status: Open

    Comments: In June 2016, DOD noted that its comments on the final report--in which it agreed with all of our findings and recommendations for the department--had not changed. However, DOD did not provide us with an update on its status in implementing these recommendations.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Defense should routinely analyze agencies' inspection results and incident reports to identify potential trends that may highlight recurring laboratory safety or security issues and share lessons learned with laboratory personnel, or direct the Secretaries of the Army and Navy to do so.

    Agency: Department of Defense
    Status: Open

    Comments: In June 2016, DOD noted that its comments on the final report--in which it agreed with all of our findings and recommendations for the department--had not changed. However, DOD did not provide us with an update on its status in implementing these recommendations.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Defense should require routine reporting of the results of Air Force, Army, and Navy inspections of non-select agent registered laboratories to senior department officials.

    Agency: Department of Defense
    Status: Open

    Comments: In June 2016, DOD noted that its comments on the final report--in which it agreed with all of our findings and recommendations for the department--had not changed. However, DOD did not provide us with an update on its status in implementing these recommendations.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Defense should require routine reporting of laboratory incidents at Air Force, Army, and Navy non-select agent registered laboratories to senior department officials.

    Agency: Department of Defense
    Status: Open

    Comments: In June 2016, DOD noted that its comments on the final report--in which it agreed with all of our findings and recommendations for the department--had not changed. However, DOD did not provide us with an update on its status in implementing these recommendations.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Defense should direct the Secretaries of the Army and Navy to require reporting of agency and select agent laboratory inspection results to senior agency officials.

    Agency: Department of Defense
    Status: Open

    Comments: In June 2016, DOD noted that its comments on the final report--in which it agreed with all of our findings and recommendations for the department--had not changed. However, DOD did not provide us with an update on its status in implementing these recommendations.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Defense should develop time frames for the 19 specific recommendations from the July 2015 review, or direct the Secretary of the Army to do so.

    Agency: Department of Defense
    Status: Open

    Comments: In June 2016, DOD noted that its comments on the final report--in which it agreed with all of our findings and recommendations for the department--had not changed. However, DOD did not provide us with an update on its status in implementing these recommendations.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Energy should revise existing department policies for managing hazardous biological agents in high-containment laboratories to contain specific requirements for inspections, or direct the Administrator of the National Nuclear Security Administration and the Director of the Office of Science to develop agency policies that contain this requirement.

    Agency: Department of Energy
    Status: Open

    Comments: In August 2016, DOE reported that it is revising department policy for its select agent and toxin work to highlight oversight of facilities working with these agents and toxins. DOE will solicit input from NNSA, the Office of Science, and its biosurety executive team to determine if specific inspection requirements should be included in the select agent, or other department or agency policies. DOE provided us with information as to other department policies and regulations that allow for inspections. DOE plans to complete its efforts by the end of July 2017. We maintain that DOE should make laboratory inspection requirements explicit and that these requirements apply to all high-containment laboratories, not just those registered with the select agent program.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Energy should review and update its outdated policies for managing hazardous biological agents in high-containment laboratories.

    Agency: Department of Energy
    Status: Open

    Comments: In August 2016, DOE reported that it is updating its outdated select agent policy and plans to complete this update by the end of July 2017.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Administrator of the Environmental Protection Agency (EPA) should revise existing EPA policies for managing hazardous biological agents in high-containment laboratories to contain specific requirements for inventory control, or direct the Director of the Office of Pesticide Programs to incorporate this requirement into its policy.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: EPA agreed with this recommendation in its February 2016 comments on the draft report, but maintains that agency, or senior-level policies, exist that include this requirement. EPA officials cited a Microbiology Laboratory Branch standard operating procedure (SOP) as containing inventory control requirements for the agency's one high-containment laboratory. However, in July 2016, EPA officials told us that it disagreed with our assessment that the SOP, as a laboratory-level document, was insufficient to meet our expectations for senior-level policies. In November 2016, EPA officials reiterated its position stating that the SOP had been approved by senior agency management and, as the requirements in it are universally applied by all laboratory staff, appropriately represents an agency-level policy. EPA further noted that the Office of Pesticide Policy, in which the Microbiology Laboratory Branch is located, is a sub-office within EPA's Office of Chemical Safety and Pollution Prevention (OCSPP), an Assistant Administrator-level office. We continue to believe that senior-level policies--in this case, either those policies issued at the EPA level or at the OCSPP/OPP level--that include all of the policy elements we analyzed reflect critical management commitment to and support for a culture of laboratory safety throughout the organization, regardless of the number of agency laboratories.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Administrator of EPA should review and update EPA's outdated policies for managing hazardous biological agents in high-containment laboratories and establish a regular schedule for reviewing and updating EPA and Office of Pesticide Programs policies.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: In July 2016, EPA reported that the policies and procedures for both the facility that houses its microbiology laboratory and the laboratory itself are reviewed and updated on a bi-yearly or yearly basis consistent with the EPA schedules for biosafety and laboratory plans set in policy. However, EPA did not provide us with the policy that sets the EPA schedules. In addition, our analysis focused on policy documents issued by EPA or its senior-level offices, such as EPA's Safety, Health, and Environmental Management Program manual, dated November 2012. When we analyzed that policy for the report, we were unable to determine whether it was up-to-date because it did not include a review and update schedule or a specific recertification date. As of November, 2016, EPA maintains that this recommendation has been completed, because the office revised the standard operating procedure that provides guidance for establishing the receipt, expiration dates, and disposal of biological inventory used in the laboratory. As of April 2017, we have reached out to EPA for documentation of the actions the agency stated it has taken. Until received, we continue to believe that EPA action on this recommendation is still needed, such as by providing an updated EPA-level safety manual that includes a schedule for reviewing and updating, or providing EPA's schedule set in policy, so long as it also applies to agency- or senior office-level policies.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Administrator of EPA should require routine reporting of the results of department, agency, and select agent laboratory inspections to senior department officials.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: EPA agreed with this recommendation in its February 2016 comments on the draft report. ?In July 2016, EPA reported that its high-containment laboratory will notify senior officials within 3 weeks of any laboratory inspection findings. ?This is a positive step. We are waiting for EPA to provide us with supporting documentation.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Health and Human Services should develop department policies for managing hazardous biological agents in high-containment laboratories that contain specific requirements for reporting laboratory incidents to senior department officials, including the types of incidents that should be reported, to whom, and when, or direct the Director of CDC and the Commissioner of FDA to incorporate these requirements into their respective policies.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In August 2016, HHS reported that both CDC and FDA were working to incorporate incident reporting requirements and time frames into formal agency policies and practices but did not provide an anticipated completion date. In summer 2017, CDC and FDA reported that they were continuing to incorporate incident reporting, which includes all laboratory incidents, accidents, injuries, infections, and near-misses, into formal agency policies. CDC did not provide an anticipated completion date. FDA anticipated completing the policy revisions/updates by summer 2018.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Health and Human Services should develop department policies for managing hazardous biological agents in high-containment laboratories that contain specific requirements for training and inspections for all high-containment component agency laboratories and not just for their select-agent-registered laboratories; or direct the Director of CDC to provide these requirements in agency policies.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In August 2016, HHS reported that CDC plans to revise its policies to include training and inspection requirements for inspections for all high-containment laboratories but did not provide an anticipated completion date. In June 2017, HHS reported that CDC was in the process of revising its formal policies to ensure they included requirements for training and inspections for all of the agency's high-containment laboratories but did not provide an anticipated completion date.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Health and Human Services should require routine reporting of the results of agency and select agent laboratory inspections to senior department officials.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In August 2016, HHS reported that CDC was working with FDA and NIH to establish a process for notifying HHS leadership of inspection results through the department's Biosafety and Biosecurity Coordinating Council. HHS did not provide us with an anticipated time frame for implementing this notification practice or when the agencies plan to begin notifying HHS of inspection results.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Health and Human Services should direct the Director of NIH and the Commissioner of FDA to require routine reporting of the results of agency laboratory inspections--and in the case of FDA, require routine reporting of select agent inspection results--to senior agency officials.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In August 2016, HHS reported that FDA is working to establish a process for notifying senior agency officials of inspection results, and in August 2017, FDA reported that it was in the process of updating its policies to reflect such a notification process. FDA anticipated that the updated policies and processes would be in place by summer 2018. In August 2016, HHS reported that NIH's ongoing practice is to report the results of external inspections to senior agency officials and, in May 2016, developed a standard operating procedure that outlines this reporting process. In March 2017, NIH officials provided assurance that its Division of Occupational Safety and Health provides NIH's intramural governing body with information about NIH's safety performance at least annually; officials further assured that this information includes the overall results of annual inspections (or audits, as NIH calls them) of all NIH laboratories and discussion of the top 10 most report safety infractions for the year. GAO considers NIH to have implemented the recommended action. GAO will close the overall recommendation once FDA has taken equivalent, appropriate action.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Health and Human Services should require routine reporting of incidents at CDC, FDA, and NIH laboratories to senior department officials.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In August 2016, HHS reported that its Biosafety and Biosecurity Council is working to establish incident reporting requirements for CDC, FDA, and NIH but did not provide an anticipated completion date. HHS noted that NIH formally adopted a standard operating procedure that lays out the agency's requirements for reporting incidents to senior officials.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of the Interior should develop department policies, or direct the Directors of Fish and Wildlife Service and U.S. Geological Survey to develop agency policies for managing hazardous biological agents in high-containment laboratories that contain specific requirements for reporting laboratory incidents to senior department officials--including the types of incidents that should be reported, to whom, and when--and specific requirements for roles and responsibilities, training, inventory control, and inspections.

    Agency: Department of the Interior
    Status: Open

    Comments: In July 2016, DOI reported that the Fish and Wildlife Service and U.S. Geological Survey will develop agency-level policies that contain the key elements GAO identified. DOI did not provide us with a time frame for these activities.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of the Interior should routinely analyze the results of the agency's laboratory inspections and incident reports to identify potential trends that may highlight recurring laboratory safety or security issues and share lessons learned with laboratory personnel, or direct the Directors of Fish and Wildlife Service and U.S. Geological Survey to do so.

    Agency: Department of the Interior
    Status: Open

    Comments: In July 2016, DOI reported that its Biosafety Working Group, composed of officials across the department, including Fish and Wildlife Service and U. S. Geological Survey, is developing an automated process for analyzing results of laboratory inspections and incident reports to identify safety and security trends. The working group is also developing a process to share information gleaned from these analyses, including lessons learned, with laboratory personnel in a timely manner. DOI did not provide us with a time frame for these activities.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of the Interior should require routine reporting of the results of agency and select agent inspections to senior department officials.

    Agency: Department of the Interior
    Status: Open

    Comments: In July 2016, DOI reported that in according with the reporting requirements it plans to incorporate into agency-level policies in response to our first recommendation, Fish and Wildlife Service and U. S. Geological survey will be required to submit routine or periodic reports of the results of agency and select agent inspections to the department's designated agency safety and health official.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of the Interior should direct the Director of the U.S. Geological Survey to require routine reporting of the results of agency and select agent laboratory inspections to senior agency officials.

    Agency: Department of the Interior
    Status: Open

    Comments: In July 2016, DOI reported that the U. S. Geological Survey will modify and expand its existing policies to require reporting of agency and select agent inspection results to senior USGS officials.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Veterans Affairs should develop department policies for managing hazardous biological agents in high-containment laboratories that contain specific requirements for reporting laboratory incidents to senior department officials--including the types of incidents that should be reported, to whom, and when--and requirements for inventory control for all of its high-containment laboratories, including its select agent-registered clinical laboratory, or direct the Under Secretary of Health to incorporate these requirements into its policies.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In June 2016, VA reported that while it has policies for reporting laboratory incidents at the local level (VA medical center or laboratory level), VA plans to develop a national level policy for reporting laboratory incidents to senior department officials, including the types of incidents to report, to whom, and when. VA will convene a task force for the purposes of developing such a policy and anticipates that the task force will finalize its policy by March 2018. In June 2017, VA reported that the task force concluded that VA's existing emergency management plan contained all of the necessary requirements for laboratory incident reporting. However, VA has not provided GAO with the emergency management plan. VA further noted that a intradepartmental memorandum was sufficient for making employees aware of such policy requirements in the emergency plan and that such a memorandum was drafted and was being processed for dissemination throughout VA, with an anticipated completion date of August 2017.
    Recommendation: To ensure that federal departments and agencies have comprehensive and up-to-date policies and stronger oversight mechanisms in place for managing hazardous biological agents in high-containment laboratories and are fully addressing weaknesses identified after laboratory safety lapses, the Secretary of Veterans Affairs should direct the Under Secretary of Health to review and update outdated agency policies for managing hazardous biological agents in high-containment laboratories.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: VA updated and finalized its outdated policy for its clinical laboratories in February 2016. In July 2016, VA reported that it has begun updating its policies for its research laboratories and anticipated finalizing them in 6 months. In June 2017, VA reported that its policies for its research laboratories remain under review and revision, with an anticipated completion date of December 2017.
    Director: Debra A. Draper
    Phone: (202) 512-7114

    6 open recommendations
    Recommendation: The Secretaries of Veterans Affairs and Defense should collaborate to perform data-driven strategic workforce planning prior to implementing any future integration efforts.

    Agency: Department of Defense
    Status: Open

    Comments: We will update the status of this recommendation when we determine what steps the agency has taken to implement it.
    Recommendation: The Secretaries of Veterans Affairs and Defense should collaborate to perform data-driven strategic workforce planning prior to implementing any future integration efforts.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: We will update the status of this recommendation when we determine what steps the agency has taken to implement it.
    Recommendation: The Secretaries of Veterans Affairs and Defense should collaborate to determine how best to fill the FHCC's short-term staffing needs, including any additional statutory authorities that might be necessary to implement the desired approach.

    Agency: Department of Defense
    Status: Open

    Comments: We will update the status of this recommendation when we determine what steps the agency has taken to implement it.
    Recommendation: The Secretaries of Veterans Affairs and Defense should collaborate to determine how best to fill the FHCC's short-term staffing needs, including any additional statutory authorities that might be necessary to implement the desired approach.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: We will update the status of this recommendation when we determine what steps the agency has taken to implement it.
    Recommendation: The Secretaries of Veterans Affairs and Defense should collaborate to resolve differences in IT network security standards to the extent possible prior to implementing any future integration efforts.

    Agency: Department of Defense
    Status: Open

    Comments: We will update the status of this recommendation when we determine what steps the agency has taken to implement it.
    Recommendation: The Secretaries of Veterans Affairs and Defense should collaborate to resolve differences in IT network security standards to the extent possible prior to implementing any future integration efforts.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: We will update the status of this recommendation when we determine what steps the agency has taken to implement it.
    Director: Alicia Puente Cackley
    Phone: (202) 512-8678

    2 open recommendations
    Recommendation: To improve the reliability of the annual official U.S. estimate of remittances, the Secretary of Commerce should direct the BEA Director to conduct additional analyses of BEA's estimates using estimation techniques appropriate for dealing with the shortcomings of the data. Analyses should also be conducted to understand the effect of various assumptions behind and limitations of the data on the estimates.

    Agency: Department of Commerce
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the transparency and quality of BEA's international remittances estimate, the Secretary of Commerce should direct the BEA Director to follow established BEA best practices, OMB policies, and NRC guidance for documenting BEA's methods and analyses used to revise its model for estimating remittances and for producing its annual estimates.

    Agency: Department of Commerce
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Steve D. Morris
    Phone: (202) 512-3841

    6 open recommendations
    Recommendation: To improve the effectiveness of federal efforts to monitor wild, native bee populations, the Secretary of Agriculture, as a co-chair of the White House Pollinator Health Task Force, should coordinate with other Task Force agencies that have monitoring responsibilities to develop a mechanism, such as a federal monitoring plan, that would (1) establish roles and responsibilities of lead and support agencies, (2) establish shared outcomes and goals, and (3) obtain input from relevant stakeholders, such as states.

    Agency: Department of Agriculture
    Status: Open

    Comments: As of August 2017, USDA had taken relevant and positive actions but had not yet fully implemented the recommendation related to monitoring wild, native bees. In June 2017, USDA held a stakeholder listening session to gather input to prepare for the development of a monitoring plan. Prior to that, in February 2017, USDA chaired a meeting with representatives from USDA and Interior to discuss how to proceed in replying to the native bee monitoring recommendation. According to a senior USDA official, the meeting participants agreed to form a team to address the recommendation. The participants also planned future relevant activities. These included plans to (1) hold a stakeholder listening session in June 2017 to determine what will be needed to conduct a robust native bee survey, including the identification of any non-Federal entities that might be able to contribute to a native bee monitoring initiative; (2) develop a prospectus in August 2017 that will be shared with all the agencies represented on the Pollinator Health Task Force to ensure minimal duplication of effort and to capitalize on any other activities; (3) hold a December 2017 workshop of stakeholders and scientists to write a white paper on how to combine Federal resources to address the need for a native bee survey; (4) develop the white paper in February 2018 with information on the status of monitoring efforts, current and future needs for effective and comprehensive monitoring, and the status of monitoring partnerships between Federal agencies, State agencies, and nongovernmental organizations; (5) continue bi-weekly conference calls with task teams to address what can be done with current resources; and (6)complete a gaps analysis in May 2018 to determine how to allocate additional resources.
    Recommendation: To increase the accessibility and availability of information about USDA-funded research and outreach on bees, the Secretary of Agriculture should update the categories of bees in the Current Research Information System to reflect the categories of bees identified in the White House Pollinator Health Task Force's research action plan.

    Agency: Department of Agriculture
    Status: Open

    Comments: In March 2017, the agency informed GAO that it planned to complete the recommendation by October 2017.
    Recommendation: To better ensure the effectiveness of USDA's bee habitat conservation efforts, the Secretary of Agriculture should direct the Administrators of FSA and NRCS to, within available resources, increase evaluation of the effectiveness of their efforts to restore and enhance bee habitat plantings across the nation, including identifying gaps in expertise and technical assistance funding available to field offices.

    Agency: Department of Agriculture
    Status: Open

    Comments: As of August 2017, the agency had not acted on our recommendation.
    Recommendation: To better ensure that EPA is reducing the risk of unreasonable harm to important pollinators, the Administrator of EPA should direct the Office of Pesticide Programs to develop a plan for obtaining data from pesticide registrants on the effects of pesticides on nonhoney bee species, including other managed or wild, native bees.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: As of May 2017, the agency had taken actions relevant to the recommendation but had not fully developed a plan to obtain data from pesticide registrants on the effects of pesticides on non-honey bee species. According to EPA, until suitable test methods have been developed, the agency has continued to rely on honey bees as a surrogate for the broader range of bee species that include both solitary and social non-honey bees. The agency continues to track the Organization for Economic Cooperation and Development's (OECD's) efforts to develop suitable test methods to evaluate the effects of pesticides on non-honey bees. EPA provided comments to the OECD on the acute oral and acute contact toxicity test guidelines developed for bumble bees, which are social non-honey bee managed bees; these test methods were recently finalized by OECD as formal test guidelines. Also, EPA staff serve as members of the International Commission on Plant-Pollinator Relationship (ICP-PR), for which a non-honey bee workgroup has been developing acute and chronic toxicity test methods for other managed non-honey bees, including the solitary mason bee. EPA researchers in the National Health and Environmental Effects Research Laboratory (within the Office of Research and Development) are developing methods for measuring effects of pesticides on bumble bee colonies through the use of micro-colonies, and will be participating in field studies over the next two years to determine the effectiveness of these methods in evaluating impacts to bumble bees from the use of pesticides used in horticulture. According to the agency, once sufficient data are available, EPA will be in a better position to determine the extent to which honey bees serve as reasonable surrogates for estimating the sensitivity of non-honey bees to pesticides. According to agency officials, EPA included the recent OECD acute contact and acute oral toxicity tests with bumble bees with the suite of laboratory and semi-field studies in a rulemaking effort that would codify these tests as formal data requirements for registrants. EPA had planned to solicit public comment on the proposed bumble bee testing requirements; however, the rulemaking effort has been delayed until the regulatory burden of the rule can be more thoroughly evaluated. According to agency officials, in January 2017, EPA hosted an international workshop on non-honey bees to evaluate the extent to which the primary routes of exposure for honey bees (i.e., contact and ingestion of residues in pollen/nectar) are protective and serve as suitable surrogates for evaluating exposure of non-honey bees to pesticides. Workshop participants discussed data needed to evaluate exposure for solitary and social non-honey bees. The proceedings of this workshop will be published in a peer-reviewed journal, and will inform EPA's understanding of whether additional routes of exposure need to be considered as part of EPA's risk assessment framework for pollinators. While these are positive developments, they do not constitute full implementation of the recommendation.
    Recommendation: To help comply with the directive in the White House Pollinator Health Task Force's strategy, the Administrator of EPA should direct the Office of Pesticide Programs to identify the pesticide tank mixtures that farmers and pesticide applicators most commonly use on agricultural crops to help determine whether those mixtures pose greater risks than the sum of the risks posed by the individual pesticides.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: As of May 2017, EPA had taken actions relevant to this recommendation but had not fully implemented it. According to EPA, during February and March 2017, the Office of Pesticide Programs continued its efforts to monitor residues in honey bee colonies providing pollination services in almond orchards. In April 2017, EPA requested that the California Department of Pesticide Regulation provide Pesticide Use Reporting data, including specific formulation and quantities applied to specific sites on specific dates during almond bloom. EPA has also reached out to the Almond Board, as well as to beekeepers and almond growers, to request information on the most common tank mixes applied during almond bloom. Although EPA has previously requested Pesticide Use Reporting data from California and the state has provided preliminary data, the information was not sufficiently detailed to extract actual formulations applied on specific dates to specific areas within the almond growing region of California. The combination of information requested from the California Department of Pesticide Regulation and the Almond Board is expected to provide data to evaluate and identify commonly used pesticide tank mixes applied during almond pollination as a case study. According to EPA officials, data from California indicate that the use of tank mixtures in almond orchards decreased by roughly 60 percent from 2014 through 2016, suggesting that best management practices recommended by the Almond Board may be having a positive effect on almond grower practices with respect to tank mixtures. While these are positive developments, they do not yet fully implement the recommendation. It is not yet clear that EPA has used information on the identity of the most common tank mixtures to determine whether they pose greater risks than the sum of the risks posed by the individual pesticides. In addition, it is not yet clear that EPA has identified tank mixtures commonly used on crops other than almonds.
    Recommendation: To measure their contribution to the White House Pollinator Health Task Force strategy's goal to restore and enhance 7 million acres of pollinator habitat, the Secretary of Agriculture should direct the Administrators of the Farm Service Agency (FSA) and the Natural Resources Conservation Service (NRCS) to develop an improved method, within available resources, to track conservation program acres that contribute to the goal.

    Agency: Department of Agriculture
    Status: Open

    Comments: As of March 2017, USDA had not acted on this recommendation.
    Director: Chris Currie
    Phone: (404) 679-1875

    1 open recommendations
    Recommendation: To enable FEMA to and more effectively respond to disasters, the Secretary of Homeland Security should direct the FEMA Administrator to develop a workforce strategy to manage and improve retention that includes a process for systematically gathering attrition data and a plan to retain IMAT Cadre-of On-Call Response Employees.

    Agency: Department of Homeland Security
    Status: Open

    Comments: In April 2017, FEMA provided an update on the status of actions taken in response to our report. In the update, FEMA officials said they had issued a new FEMA Human Capital Strategic Plan for fiscal years 2016-2020 that includes an objective to build a scalable and skilled workforce with associated measures including a decrease in attrition rate for permanent full time employees, and an increase in disaster workforce through improvements in the recruitment and retention of incident management employees. FEMA also stated that pay issues and work-life balance have been identified as contributing to retention on National Type I and Regional Type II IMATs. FEMA is actively addressing the pay issues. FEMA provided a brief summary of the actions being taken--which includes development of a policy that provides information on establishing base pay under the new pay system, movement within the pay bands, and merit-based increases is in development. Until completion of the action items, this recommendation will remain open. FEMA officials plan to provide a status update in October 2017.
    Director: Mihm, J Christopher
    Phone: (202) 512-3236

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To help ensure that agencies report consistent and comparable data on federal spending, the Director of OMB, in collaboration with the Secretary of the Treasury, should provide agencies with additional guidance to address potential clarity, consistency, or quality issues with the definitions for specific data elements including Award Description and Primary Place of Performance and that they clearly document and communicate these actions to agencies providing this data as well as to end-users.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open
    Priority recommendation

    Comments: In May 2016, OMB issued guidance for DATA Act Implementation entitled, Implementing Data-Centric Approach for Reporting Federal Spending Information (Management Procedures Memorandum No. 2016-03). This memorandum provided guidance on new federal prime award reporting requirements, agency assurances, and authoritative sources for reporting. In August 2016, OMB released additional draft guidance describing how agencies should report financial information involving intragovernmental transfers and personally identifiable information, as well as how agency Senior Accountable Officials should provide quality assurances for submitted data. Despite these positive steps, we continue to have concerns about the need for additional guidance to facilitate agency implementation of certain data definitions (such as "primary place of performance" and "award description") in order to produce consistent and comparable information, and whether the guidance provides sufficient detail in areas such as the process for providing assurance on data submissions.
    Director: Gregory C. Wilshusen
    Phone: (202) 512-6244

    9 open recommendations
    Recommendation: The Secretary of Homeland Security should direct Network Security Deployment (NSD) to determine the feasibility of enhancing NCPS's current intrusion detection approach to include functionality that would detect deviations from normal network behavior baselines.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 Update: In Feb. 2017, DHS officials stated that they have continued pilot activities that will enable DHS to identify suspicious network activity based on anomalous behavior and reputation and have collected lessons learned that are being tracked by the NCPS Program Management Office. Officials added that DHS had identified a contractor to support the transition of the pilot, including drafting an implementation plan; however, it had yet to award a contract due to lack of resources. As such, the agency did not have an estimated date on the completion of a draft plan for how the transition would be implemented. We requested that DHS provide a copy of the draft implementation plan for our review, when it became available. We will continue to monitor DHS's progress in addressing this recommendation.
    Recommendation: The Secretary of Homeland Security should direct NSD to determine the feasibility of developing enhancements to current intrusion detection capabilities to facilitate the scanning of traffic not currently scanned by NCPS.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 update: In Feb. 2017, DHS officials stated that the NCPS Program Management Office is working with participating Internet Service Providers (ISP) to develop plans to support IPv6 for Traffic Aggregation, DNS redirection, and SMTP quarantining capabilities. Officials stated that an implementation plan that would include all ISP schedules for all planned intrusion prevention services would be available in the third quarter of fiscal year 2017. Additionally, regarding encrypted traffic, officials stated that it is conducting an analysis of Security on Encrypted Traffic (SonET) to better understand options for addressing the challenges, viability of options, and how the issue is being addressed at a broader industry level. The study is scheduled to continue through the fourth quarter of fiscal year 2017. We asked DHS to provide the ISP implementation plans (when finalized) and any findings from the ongoing SCADA and Encrypted traffic studies. We will continue to monitor DHS's progress in addressing this recommendation.
    Recommendation: The Secretary of Homeland Security should direct United States Computer Emergency Readiness Team (US-CERT) to update the tool it uses to manage and deploy intrusion detection signatures to include the ability to more clearly link signatures to publicly available, open-source data repositories.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 update: In Feb. 2017, DHS stated that the NCPS PMO is working with participating Internet Service Providers (ISP) to develop plans to support IPv6 for Traffic Aggregation, DNS redirection, and SMTP quarantining capabilities. Officials stated that an implementation plan that would include all ISP schedules for all planned intrusion prevention services would be available in the third quarter of fiscal year 17. Additionally, officials stated that NSD is conducting an analysis on Security on Encrypted Traffic (SonET) to better understand options for addressing the challenges, viability of options, how the issue is being addressed at a broader industry level. The study will continue through the fourth quarter of fiscal year 2017. We asked DHS to provide the ISP implementation plans (when finalized) and any output/results (findings) from the ongoing studies DHS has related to SCADA and Encrypted traffic. We will continue to monitor DHS's progress in addressing this recommendation.
    Recommendation: The Secretary of Homeland Security should direct US-CERT to consider the viability of using vulnerability information, such as data from the Continuous Diagnostics and Mitigation program as it becomes available, as an input into the development and management of intrusion detection signatures.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 update: In Feb. 2017, DHS officials stated that enhancements were made so that Continuous Diagnostics and Mitigation program (CDM) data can be viewed with the Cyber Indicators Analysis Program (CIAP). Officials stated that the CDM data now may be combined with known vulnerability findings from NCATS and known threats collected from the CIAP system to further prioritize signature development as necessary. We have requested a meeting with DHS to observe the described enhancements. We believe that we will be able to close this recommendation, once we observe the claimed enhancements.
    Recommendation: The Secretary of Homeland Security should direct US-CERT to develop a timetable for finalizing the incident notification process, to ensure that customer agencies are being sent notifications of potential incidents, which clearly solicit feedback on the usefulness and timeliness of the notification.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 Update: In Feb. 2017, DHS stated that US-CERT is in the process of developing a targeted survey of EINSTEIN customers (based off of a prior survey). Additionally, US-CERT has updated the Incident Reporting Guidelines to address previously mentioned process concerns. We have requested a copy of these guidelines and will review the modifications made within. Additionally, DHS stated that modifications to the Remedy ticketing system are underway that would allow for the inclusion of user feedback. These changes are anticipated to be implemented by October 2017. We likely would not be able to close this recommendation until we could review the results of the modifications.
    Recommendation: The Secretary of Homeland Security should direct the Office of Cybersecurity and Communications to develop metrics that clearly measure the effectiveness of NCPS's efforts, including the quality, efficiency, and accuracy of supporting actions related to detecting and preventing intrusions, providing analytic services, and sharing cyber-related information.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 update: In Feb. 2017, DHS officials stated that the Office of Cyber Security and Communications (CS&C) had developed, refined, and were baselining a first set of measures that relate to the Einstein 3A program. Further, they are considering adding one of these measures as an addition to the measures tracked in support of the yearly Government Performance and Results Act (GPRA) required reporting in FY 2018. Additionally, DHS officials stated they are developing information sharing related measures, including exploring how its public and private sector recipients of information measure the value cyber threat indicators and defensive measures. In March 2017, we requested a copy of the developed measures, when they became available. This recommendation will remain open until we are able to review the developed metrics and the subsequent data they are to measure.
    Recommendation: The Secretary of Homeland Security should direct the Office of Cybersecurity and Communications to develop clearly defined requirements for detecting threats on agency internal networks and at cloud service providers to help better ensure effective support of information security activities.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 update: In Feb. 2017, DHS provided memos that gave an overview of the planned enhancements to the Continuous Diagnostics and Mitigation (CDM) program that included references to cloud providers. However, DHS did not provide any specific requirements for us to review. We have requested a follow-up meeting to review the specific requirements developed in support of the planned enhancements described in the provided memos. We will not be able to close this recommendation until we can review the developed requirements and determine that cloud providers are appropriately covered.
    Recommendation: The Secretary of Homeland Security should direct NSD to develop processes and procedures for using vulnerability information, such as data from the Continuous Diagnostics and Mitigation program as it becomes available, to help ensure DHS is using a risk-based approach for the selection/development of future NCPS intrusion prevention capabilities.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 update: In Feb. 2017, DHS stated that the NCPS Program Management Office has made enhancements to the Continuous Diagnostics and Mitigation (CDM) dashboard, but had yet to fully develop the CDM/NCPS data correlation. In March 2017, we asked for update on the status of data correlation, once available. In order to close this recommendation, we would need to review this model and determine how, if at all, the vulnerability information was used as part of a risk-based approach to intrusion prevention.
    Recommendation: The Secretary of Homeland Security should direct NSD to work with their customer agencies and the Internet service providers to document secure routing requirements in order to better ensure the complete, safe, and effective routing of information to NCPS sensors.

    Agency: Department of Homeland Security
    Status: Open

    Comments: April 2017 update: In Feb. 2017, DHS officials stated that the agency worked with the Office of Management and Budget to develop a draft Trusted Internet Connections Reference Architecture. This architecture is to serve as the new guidance for agencies on perimeter security capabilities as well as alternative routing strategies. In March 2017, we requested a copy of the guidance to review the alternative routing guidance. This recommendation will remain open until we have been able to review the information above.
    Director: Valerie Melvin
    Phone: (202) 512-6304

    2 open recommendations
    Recommendation: To help ensure that FDA's IT strategic planning activities are successful in supporting the agency's mission, goals, and objectives, the Commissioner of FDA should require the CIO to establish schedules and milestones for completing a version of an IT strategic plan that incorporates elements to align the plan's strategies with agency-wide priorities; includes results-oriented goals and performance measures that support the agency's mission, along with targets for measuring the extent to which outcomes of IT initiatives support FDA's ability to achieve agency-wide goals and objectives; identifies key IT initiatives that support the agency's goals; and describes interdependencies among the initiatives.

    Agency: Department of Health and Human Services: Food and Drug Administration
    Status: Open

    Comments: FDA concurred with the recommendation and stated that the agency plans to implement it. We contacted the agency in March 2017 and have requested documents regarding FDA's actions to address the recommendation. We are waiting to receive the documents. We will update the status of the agency's actions after we receive and evaluate their response.
    Recommendation: To help ensure that FDA's IT strategic planning activities are successful in supporting the agency's mission, goals, and objectives, the Commissioner of FDA should require the CIO to implement the plan to ensure that expected outcomes of the agency's key IT initiatives are achieved.

    Agency: Department of Health and Human Services: Food and Drug Administration
    Status: Open

    Comments: FDA concurred with the recommendation and stated that the agency plans to implement it. We contacted the agency in March 2017 and have requested documents regarding FDA's actions to address the recommendation. We are waiting to receive the documents. We will update the status of the agency's actions after we receive and evaluate their response.
    Director: Michele Mackin
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: To help ensure that actions taken to improve the test and evaluation process address identified challenges, the Administrator of TSA should finalize all aspects of the third party testing strategy before implementing further third party testing requirements for vendors to enter testing.

    Agency: Department of Homeland Security: Transportation Security Administration
    Status: Open

    Comments: In its response to this recommendation, the Department of Homeland Security concurred and identified initial planned actions to implement the finalize third party strategy. Subsequently, in the Spring of 2016, the TSA Office of Security Capabilities finalized its third party tester application and approval process; established quality conformance standards for potential third party testers; and gathered and considered industry feedback on potential third party test strategy consequences among other actions. Collectively, TSA established and published program requirements and procedures for the third party test strategy. In late 2016, TSA formally delayed its planned implementation of the third-party testing program by a calendar year to now be completed by December 31, 2017. TSA cited a need to conduct additional assessments, coordination challenges, and larger TSA security equipment related initiatives as the reasons for the delay. As part of its regular recommendation status reporting to GAO, TSA in the Spring 2017, noted that it is on track to meet the intent of the recommendation by the later revised date. TSA noted it had recently updated its qualification process by which qualified product lists will be populated and has already incorporated various aspects of third party testing for legacy security equipment qualification.
    Director: Kathleen M. King
    Phone: (202) 512-7114

    1 open recommendations
    Recommendation: To ensure that HHS workforce efforts meet national needs, the Secretary of Health and Human Services should develop a comprehensive and coordinated planning approach to guide HHS's health care workforce development programs--including education, training, and payment programs--that (1) includes performance measures to more clearly determine the extent to which these programs are meeting the department's strategic goal of strengthening health care; (2) identifies and communicates to stakeholders any gaps between existing programs and future health care workforce needs identified in the Health Resources and Services Administration's workforce projection reports; (3) identifies actions needed to address identified gaps; and (4) identifies and communicates to Congress the legislative authority, if any, the Department needs to implement the identified actions.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In December 2016, HHS indicated that the agency had not yet taken steps to implement a comprehensive workforce planning effort. Officials said that for the FY2018 cycle, HHS had planned to expand its group developing legislative proposals to include budget issues and gaps that warrant attention. While it did not do so during that cycle, officials indicated that they would recommend this broader approach to workforce planning for future budget and legislative cycles.
    Director: Anne-Marie Fennell
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: To improve NMFS' ability to capitalize on its efforts to improve fisheries data collection for managing marine recreational fisheries, the Secretary of Commerce should direct the National Oceanic and Atmospheric Administration's Assistant Administrator for Fisheries to develop a comprehensive strategy to guide NMFS' implementation of its marine recreational fisheries data collection program efforts, including a means to measure progress in implementing this strategy and to communicate information to stakeholders. As part of this strategy, NMFS should clearly identify and communicate programmatic goals, determine the program activities and resources needed to accomplish the goals, and establish time frames and performance measures to track progress in implementing the strategy and accomplishing goals.

    Agency: Department of Commerce
    Status: Open

    Comments: In April 2017, a NOAA official stated that the agency expects to develop a strategy in accordance with our recommendation not later than July 2017.
    Director: Melissa Emrey-Arras
    Phone: (617) 788-0534

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To strengthen management of the Direct Loan Program and ensure good customer service for borrowers, the Secretary of Education should direct the Office of Federal Student Aid's Chief Operating Officer to review its methods of providing instructions and guidance to servicers, identifying areas to improve clarity and sufficiency, and ensure consistent delivery of instructions and guidance to ensure program integrity and improve service to borrowers. For example, the Department could consider implementing a detailed, common servicing manual for the Direct Loan program.

    Agency: Department of Education
    Status: Open
    Priority recommendation

    Comments: The Department of Education agreed with this recommendation and has reviewed its guidance to servicers, as of October 2016. It has issued clarifications to servicers in several areas. In addition, the Department had been in the process of an acquisition for a new loan servicing solution but, as of September 2017, is reassessing its acquisition strategy. While the plan for the revised acquisition is not finalized, FSA expects its approach to significantly streamline the process of communicating instructions and guidance to servicers, as well as improve the overall experience for students and borrowers. Upon resolution of its acquisition strategy, Education needs to demonstrate that its final contract for a new loan servicing solution is structured to provide clear and consistent instructions and guidance to servicers to ensure program integrity and improve service to borrowers.
    Director: Timothy M. Persons
    Phone: (202) 512-6412

    2 open recommendations
    Recommendation: To help ensure that biosurveillance-related funding is directed to programs that can demonstrate their intended capabilities, and to help ensure sufficient information is known about the current Gen-2 system to make informed cost-benefit decisions about possible upgrades and enhancements to the system, the Secretary of Homeland Security should direct the Assistant Secretary for Health Affairs and other relevant officials within the Department to not pursue upgrades or enhancements to the current BioWatch system until the Office of Health Affairs (OHA): (1) establishes technical performance requirements, including limits of detection, necessary for a biodetection system to meet a clearly defined operational objective for the BioWatch program by detecting attacks of defined types and sizes with specified probabilities; (2) assesses the Gen-2 system against these performance requirements to reliably establish its capabilities; and (3) produces a full accounting of statistical and other uncertainties and limitations in what is known about the system's capability to meet its operational objectives.

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To help reduce the risk of acquiring immature detection technologies, the Secretary of Homeland Security should direct the Assistant Secretary for Health Affairs, in coordination with the Under Secretary for Science and Technology, to use the best practices outlined in this report to inform test and evaluation actions for any future upgrades or changes to technology for BioWatch.

    Agency: Department of Homeland Security
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Lori Rectanus
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To assist in determining whether to require USPS and PRC to report on delivery performance for rural and non-rural areas, Congress should direct USPS to provide cost estimates related to providing this information.

    Agency: Congress
    Status: Open

    Comments: As of May 2017, Congress has not taken any action to direct USPS to provide cost estimates related to reporting on delivery performance for rural and non-rural areas
    Director: David J. Wise
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To demonstrate the effects of GSA's ongoing efforts to better manage lease holdovers and extensions, the Administrator of GSA should identify performance goals and targets for existing or other measures related to the use of holdovers and extensions for expiring leases within GSA's strategic plan or in another agency planning document. GSA should ensure such goals, targets, and associated measures fully reflect progress, by taking into account the frequency with which holdovers and extensions occur for expiring leases within its portfolio and GSA's expected outcomes for expiring leases.

    Agency: General Services Administration
    Status: Open

    Comments: GSA provided information to GAO in March 2017 to show that this recommendation had been implemented. Specifically, GSA updated its strategic planning process related to lease holdovers and extensions and created an up-front planning measure for expiring leases. GAO had follow up questions seeking more assurance from GSA that these actions would have the intended effect of reducing lease holdovers and extensions. As of June 2017, GAO was awaiting a response from GSA.
    Director: Valerie C. Melvin
    Phone: (202) 512-6304

    2 open recommendations
    Recommendation: To improve the oversight of states' marketplace IT projects, the Secretary of Health and Human Services should direct the Administrator of the Centers for Medicare & Medicaid Services to ensure that all CMS senior executives from IT and business units who are involved in the establishment of state marketplace IT projects review and approve funding decisions for these projects.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In 2015, Department of Health and Human Services (HHS) Centers for Medicare and Medicaid Services (CMS) concurred with the recommendation. The department, in its agency comments, stated that it already included senior executives in its funding decisions for these projects. However, as noted in our report, CMS did not provide evidence that key senior executives from CCIIO, CMCS, and OTS were involved in various funding decisions associated with the states' IT projects. For example, CMS did not demonstrate that senior-level executives from all relevant business and IT units were involved in the initial approval of grant awards or the release of restricted IT funds from marketplace grants as states progressed with their projects. In addition, CMS did not provide evidence of senior executive involvement in the approval of Medicaid funds for marketplace IT projects. Furthermore, as of March 10, 2017, CMS still had not provided evidence that it had taken such actions to support the implementation of this recommendation. By ensuring such executive involvement, CMS would increase accountability for decisions to fund states' IT projects and ensure that these decisions are well informed in order to make efficient use of federal funds.
    Recommendation: To improve the oversight of states' marketplace IT projects, the Secretary of Health and Human Services should direct the Administrator of the Centers for Medicare & Medicaid Services to ensure that states have completed all testing of marketplace system functions prior to releasing them into operation.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In 2015, Department of Health and Human Services (HHS) Centers for Medicare and Medicaid Services (CMS) concurred with the recommendation. The department noted that it would continue to follow its guidelines to determine if state marketplace system functions are ready for release. The department added that it would work closely with state-based marketplaces to improve their systems and verify that system requirements are met and fully tested before approving them for release into production. While CMS drafted guidance to update its process in June 2016, which required states to submit certain testing reports and supporting documentation, as of March 10, 2017, the agency had not provided evidence that it had determined that state systems had been sufficiently tested for release into operations.
    Director: David Powner
    Phone: (202) 512-9286

    17 open recommendations
    Recommendation: To better ensure that agencies' IT savings are being reinvested in the most efficient and effective manner possible, the Director of OMB should direct the Federal CIO to ensure that agencies complete their reinvestment plans, in accordance with established requirements, and maintain those plans on an ongoing basis.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: The Office of Management and Budget (OMB) generally agreed with, and has taken initial steps to implement, our recommendation. In May 2016, OMB released updated guidance for agency's quarterly data submissions that noted the importance of providing savings reinvestment information. Specifically, OMB strongly encouraged agencies to provide reinvestment information where feasible, including a description of the activities that were funded using any savings achieved. OMB further noted that failing to provide such information might result in an agency being unable to accurately track its reinvestments. However, the May 2016 guidance notes that providing this reinvestment information is not required. As of May 2017, OMB had not yet updated its guidance for agencies quarterly data submissions to require reinvestment information. We will continue to evaluate OMB's progress in implementing this recommendation.
    Recommendation: To better ensure that agencies' IT savings are being reinvested in the most efficient and effective manner possible, the Director of OMB should direct the Federal CIO to require agencies to track actual reinvestment performance and define performance targets for agencies' reinvestments, as done previously.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: The Office of Management and Budget (OMB) generally agreed with our recommendation, but has not yet taken steps to implement it. Specifically, as of May 2017, OMB had not issued additional guidance to require agencies to track actual reinvestment performance or defined performance targets for agencies' reinvestments. We will continue to evaluate OMB's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of Agriculture should direct the CIO to ensure that the department's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to reinvest any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Department of Agriculture
    Status: Open

    Comments: The Department of Agriculture agreed with our recommendation, but has not yet taken steps to implement it. Specifically, as of May 2017, the department's integrated data collection submission to the Office of Management and Budget had not been updated to include reinvestment plans for all reported cost savings and avoidance initiatives. For example, the department reported about $25 million in cost savings and avoidances related to its data center consolidation efforts, but did not include plans regarding how these savings would be reinvested. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, as part of any future update to the department's information resource management strategic plan or equivalent document, the Secretary of Commerce should direct the CIO to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources (including data centers) in accordance with OMB's guidance.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation, but has not yet taken steps to implement it. Specifically, as of May 2017, the department had not updated its IT Resource Management Strategic plan to include the approach to reinvesting savings from the consolidation of commodity IT resources. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of Commerce should direct the CIO to ensure that the department's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to reinvest any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce agreed with our recommendation, but has not yet taken steps to implement it. Specifically, as of May 2017, the department's integrated data collection submission to the Office of Management and Budget had not been updated to include reinvestment plans for all reported cost savings and avoidance initiatives. For example, the department reported about $26 million in cost savings and avoidances related to its server virtualization efforts, but did not include plans regarding how these savings would be reinvested. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of Defense should direct the Defense CIO to ensure that the department's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to reinvest any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Department of Defense
    Status: Open

    Comments: The Department of Defense partially agreed with our recommendation and has taken initial steps to implement it. Specifically, as of May 2017, the department reported approximately $331.4 million in data center consolidation cost savings in its quarterly integrated data collection submission to the Office of Management and Budget. Although the department's submission notes that it plans to reinvest these savings in the agency's core mission, it did not provide any further detail regarding these reinvestment plans. In addition, the department did not report any information technology cost savings and avoidance initiatives related to its business system modernization efforts, which it had previously reported to GAO as an area with substantial savings. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: In addition, to improve the U.S. Army Corps of Engineers' IT savings reinvestment plans, the Secretary of Defense should direct the Secretary of the Army, as part of any future update to the U.S. Army Corps of Engineers' IRM strategic plan or equivalent document, to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources (including data centers) in accordance with OMB's guidance.

    Agency: Department of Defense
    Status: Open

    Comments: The U.S. Army Corps of Engineers agreed with our recommendation, but has not yet taken steps to implement it. Specifically, as of May 2017, the agency had not yet updated its Information Resources Management Strategic Plan to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources. We will continue to evaluate the agency's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of Health and Human Services should direct the CIO, as part of any future update to the department's IRM strategic plan or equivalent document, to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources (including data centers) in accordance with OMB's guidance.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: The Department of Health and Human Services (HHS) agreed with, and has taken initial steps to implement, our recommendation. Specifically, in November 2015, the department stated that its Office of the Chief Information Officer will include reinvestment strategies in its next update of the HHS Information Resource Management Strategic Plan. According to the department, the updated strategic plan was expected to be completed by the end of September 2016. However, as of May 2017, the agency had not yet updated its Information Resources Management Strategic Plan to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of Homeland Security should direct the CIO to ensure that the department's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to reinvest any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Department of Homeland Security
    Status: Open

    Comments: The Department of Homeland Security agreed with our recommendation, but has not yet taken steps to implement it. Specifically, as of May 2017, the department's integrated data collection submission to the Office of Management and Budget had not been updated to include reinvestment plans for all reported cost savings and avoidance initiatives. For example, the department did not include reinvestment plans for two cost avoidances strategies related to the Office of Management and Budget's PortfolioStat initiative that have resulted approximately $96 million in cost avoidances. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of Housing and Urban Development should direct the CIO to ensure that the department's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to reinvest any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: The Department of Housing and Urban Development agreed with, and has taken initial steps to implement, our recommendation. Specifically, as of May 2017, the department updated its integrated data collection submission to include reinvestment plans for one of the seven cost savings and avoidance initiatives reported. However, the six remaining initiatives, with savings and avoidances totaling approximately $6 million, did not include reinvestment plans. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's tracking of reinvestments, the Secretary of Labor should direct the CIO to use existing governance mechanisms and any improvements resulting from the implementation of FITARA to improve tracking of how savings have been reinvested.

    Agency: Department of Labor
    Status: Open

    Comments: The Department of Labor has taken initial steps to implement our recommendation. As of November 2015, the department stated that it was planning improvements in the area of information technology (IT) investment management in accordance with the Office of Management and Budget's June 2015 guidance for implementing the December 2014 IT reform law (commonly referred to as the Federal Information Technology Acquisition Reform Act or FITARA). The department added that these improvements would include the tracking of how savings have been reinvested. Subsequently, in May 2016, the department finalized its FITARA Implementation Plan. While the implementation plan discusses planned actions to improve the Chief Information Officer's involvement in agency IT budget requests, acquisition requests, and program management, it did not specifically discuss planned actions to improve the tracking of how information technology savings have been reinvested. In addition, as of May 2017, the department had not documented any FITARA implementation milestones that discussed making improvements in the tracking of how savings are reinvested. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of State should direct the CIO, as part of any future update to the department's IRM strategic plan or equivalent document, to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources (including data centers) in accordance with OMB's guidance.

    Agency: Department of State
    Status: Open

    Comments: The Department of State has not yet taken steps to implement our recommendation. Specifically, as of May 2017, the agency had not yet updated its Information Technology Strategic Plan to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of the Treasury should direct the CIO, as part of any future update to the department's IRM strategic plan or equivalent document, to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources (including data centers) in accordance with OMB's guidance.

    Agency: Department of the Treasury
    Status: Open

    Comments: The Department of the Treasury has not yet taken steps to implement our recommendation. Specifically, as of May 2017, the agency had not yet updated its Information Resources Management Strategic Plan to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of the Treasury should direct the CIO to ensure that the department's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to use any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Department of the Treasury
    Status: Open

    Comments: The Department of the Treasury has not yet taken steps to implement our recommendation. Specifically, as of May 2017, the department's integrated data collection submission did not include reinvestment plans for all reported cost savings and avoidance initiatives. For example, the department reported about $1.07 billion in cost savings and avoidances from its information technology infrastructure efficiency initiatives, but did not provide information regarding how it plans to reinvest these savings and avoidances. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the department's IT savings reinvestment plans, the Secretary of Veterans Affairs should direct the CIO to ensure that the department's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to reinvest any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: The Department of Veterans Affairs agreed with, and has taken initial steps to implement, our recommendation. Specifically, in November 2015, the department's Chief of Staff stated that the Office of Information and Technology was working to establish an office to closely monitor program performance, schedule, return on investment, and total cost of ownership, which will enable reinvestment opportunities. However, as of May 2017, the department's integrated data collection submission did not include reinvestment plans for all of the reported cost savings and avoidance initiatives. For example, the department reported about $177 million in cost savings and avoidances from the renegotiation of an enterprise agreement for software licenses, but did not provide information regarding how it plans to reinvest these savings and avoidances. We will continue to evaluate the department's progress in implementing this recommendation.
    Recommendation: To improve the agency's IT savings reinvestment plans, the Administrator of the Environmental Protection Agency should direct the CIO to ensure that the agency's integrated data collection submission to OMB includes, for all reported initiatives, complete plans to reinvest any resulting cost savings and avoidances from OMB-directed IT reform-related efforts.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: The Environmental Protection Agency agreed with our recommendation, but has not yet taken steps to implement it. Specifically, as of May 2017, the agency's integrated data collection submission did not include reinvestment plans for all of the reported cost savings and avoidance initiatives. For example, the agency reported about $3 million in cost savings and avoidances related to two shared services initiatives, but did not provide information regarding how it plans to reinvest these savings and avoidances. We will continue to evaluate the agency's progress in implementing this recommendation.
    Recommendation: To improve the agency's IT savings reinvestment plans, the Director of the Office of Personnel Management should direct the CIO, as part of any future update to the agency's IRM strategic plan or equivalent document, to include information regarding the approach to reinvesting savings from the consolidation of commodity IT resources (including data centers) in accordance with OMB's guidance.

    Agency: Office of Personnel Management
    Status: Open

    Comments: The Office of Personnel Management (OPM) agreed with our recommendation, but has not yet taken action to implement it. Specifically, in November 2015, OPM's Acting Director stated that information regarding the approach to reinvesting savings from the consolidation of commodity IT resources (including data centers) would be included in future updates to OPM's Strategic IT Plan. However, as of May 2017, the agency had not yet updated its strategic plan to include this information. We will continue to evaluate the OPM's progress in implementing this recommendation.
    Director: Frank Rusco
    Phone: (202) 512-3841

    2 open recommendations
    Recommendation: The Architect of the Capitol, prior to undertaking future major capital projects related to its energy needs, should fully update its long-term energy plan while following key leading capital-planning practices. As part of this effort, the agency should (1) fully assess the complex's long-term needs and identify any performance gaps, while taking into account the effects of possible changes in demand--including the impacts of ongoing and planned energy conservation measures and other factors that could affect the demand for CPP's services; (2) identify and evaluate a range of alternatives for how to best meet the agency's needs, including non-capital options and energy conservation measures that could reduce the demand for CPP's services; and (3) identify key assumptions and risks of the alternatives considered and perform valid sensitivity and uncertainty analyses to determine which alternatives could prove the most cost-effective under a range of potential future conditions.

    Agency: Architect of the Capitol
    Status: Open

    Comments: In December 2016, AOC said that it was updating its long-term strategic energy plan in accordance with the best practices we identified. AOC was not certain when they would complete the plan.
    Recommendation: As AOC updates its long-term energy plan, the Architect should seek a review of the plan by an independent panel of experts to ensure it follows key leading practices and provide the results of the review to Congress.

    Agency: Architect of the Capitol
    Status: Open

    Comments: In December 2016, AOC said that it was updating its long-term strategic energy plan in accordance with the best practices we identified. AOC was not certain when they would complete the plan.
    Director: Michael J. Sullivan
    Phone: (202) 512-4841

    2 open recommendations
    Recommendation: To improve DOD's use of portfolio management for its weapon system investments and ensure that its investment plans are affordable, strategy-driven, balance near- and long-term needs, and leverage efforts across the military services, as well as to provide a solid foundation for future portfolio management efforts at the enterprise-level, the Secretary of Defense should revise DOD Directive 7045.2 on Capability Portfolio Management in accordance with best practices and promote the development of better tools to enable more integrated portfolio reviews and analyses of weapon system investments. Key elements of this recommendation would include (1) designating the Deputy Secretary of Defense or some appropriate delegate responsibility for implementing the policy and overseeing portfolio management in DOD; (2) requiring annual enterprise-level portfolio reviews that incorporate key portfolio review elements, including information from the requirements, acquisition, and budget processes; (3) directing the Joint Staff, AT&L, and CAPE to collaborate on their data needs and develop a formal implementation plan for meeting those needs either by building on the database the Joint Staff is developing for its analysis or investing in new analytical tools; and (4) incorporating lessons learned from military service portfolio reviews and portfolio management activities, such as using multiple risk and funding scenarios to assess needs and re-evaluate priorities.

    Agency: Department of Defense
    Status: Open

    Comments: In providing comments on this report, the Department of Defense partially concurred with this recommendation and has taken steps to implement one part of it. In October 2016, the Joint Staff informed GAO that it was updating two of its databases on military capabilities and capability requirements to provide DOD with better analytical tools to support portfolio management. The Department of Defense has not taken any other actions to implement this recommendation.
    Recommendation: To improve DOD's use of portfolio management for its weapon system investments and ensure that its investment plans are affordable, strategy-driven, balance near- and long-term needs, and leverage efforts across the military services, and to help ensure the military services' portfolio reviews are conducted regularly and effectively integrate information from the requirements, acquisition, and budget communities, the Secretary of Defense should direct the Secretaries of the Army, Navy, and Air Force to update or develop policies that require them to conduct annual portfolio reviews that incorporate key portfolio review elements, including information from the requirements, acquisition, and budget processes.

    Agency: Department of Defense
    Status: Open

    Comments: In providing comments on this report, DOD partially concurred with this recommendation but has not yet taken any actions necessary to implement it.
    Director: J. Alfredo Gómez
    Phone: (202) 512-3841

    3 open recommendations
    Recommendation: The EPA Administrator should direct OGD to develop a timetable with milestones and identify and allocate resources for adopting electronic records management for all 10 regional offices.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: According to EPA officials, the Office of Grants and Debarment (OGD) established an agency-wide electronic grants record workgroup in fiscal year 2016. The workgroup identified the contents of the electronic grant file, technical options, and evaluation criteria. OGD completed its alternatives analysis for scope, general approach, and requirements in fiscal year 2017. As of May 2017, the next phase of work is on hold, subject to available funds and prioritization of work.
    Recommendation: The EPA Administrator should direct OGD to implement plans for adopting an up-to-date and comprehensive IT system by 2017 that will provide accurate and timely data on agencywide compliance with grants management directives.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: Implementation efforts are ongoing. According to EPA officials, OGD is conducting a multi-modular project to upgrade the agency's grants management IT system. As of May 2017, the final module is on schedule for deployment in fiscal year 2018. OGD will incorporate performance tracking of priority directives in accordance with the policy framework of the new grants management plan.
    Recommendation: Until the new IT system is implemented, the EPA Administrator should direct OGD to develop ways to more effectively use existing web-based tools to better monitor agencywide compliance with grants management directives.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: Implementation efforts are ongoing. According to EPA officials, OGD has developed the capability to provide managers cumulative annual baseline monitoring data. Further capabilities of web-based tools, namely the replacement of OGD's primary tool Quik Reports, was scheduled for deployment in fiscal year 2017. This effort, combined with updates to the Grants Datamart, will provide long-term enhancements for EPA's grant reporting needs. As of May 2017, the modernization of supported tools and web applications continues. EPA officials also said that extending centralized grant data to other internal systems is improving the continuity of data.
    Director: Charles Michael Johnson, Jr.,
    Phone: (202) 512-7331

    2 open recommendations
    Recommendation: Given that countering violent extremism is a priority for the U.S. government in general and State's Bureau of Counterterrorism (CT Bureau), the Secretary of State should take steps to ensure that CVE program efforts abroad are evaluated.

    Agency: Department of State
    Status: Open

    Comments: In June 2017, the CT Bureau indicated that a third-party evaluation of the CVE program has been completed. The evaluation focused on process and programming, including all CVE projects funded between fiscal years 2012 and 2016 and resulted in two related but disparate sets of recommendations and findings. The CT Bureau indicated that it has begun incorporating the recommendations made in the evaluation into its overall CVE efforts.
    Recommendation: To improve State's CT Bureau's program management efforts, the Secretary of State should take steps to ensure the Bureau of Counterterrorism establishes specific time frames for addressing recommendations from program evaluations.

    Agency: Department of State
    Status: Open

    Comments: In June 2017, the CT Bureau indicated it is in the process of reviewing recommendations from the CVE evaluation, and will soon be assigning timelines to those recommendations that the bureau deems relevant and achievable. For other evaluations, the CT Bureau indicated that it has already acknowledged the need to assign specific timelines to evaluation recommendations and has adjusted accordingly.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    2 open recommendations
    Recommendation: In order to improve DOD's procurement of SATCOM, to address DOD's fragmented procurement of commercial SATCOM, to better position DOD to identify needs, manage and acquire commercial SATCOM, and to address the incomplete data on commercial SATCOM spending and demand, the Secretary of Defense, in coordination with the Joint Chiefs, U.S. Strategic Command, combatant commands, military services, and DISA, should enforce current policy requiring DISA to acquire all commercial SATCOM for DOD.

    Agency: Department of Defense
    Status: Open

    Comments: DOD has reiterated, but not yet enforced, its policy requiring the Defense Information Systems Agency (DISA) to procure all commercial satellite communications (SATCOM). DOD published Instruction 8420.02, titled DOD Satellite Communications (SATCOM), in September 2016. This instruction prescribes the actions DOD component heads should follow in requesting commercial SATCOM capability through DISA, as required by the 2013 Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 6250.01E, "Satellite Communications". It also outlines methods by which DISA can obtain and the DOD Chief Information Officer can analyze data that could inform commercial SATCOM resource usage, allocation, and requirements. While establishing a new policy to emphasize and assign SATCOM procurement responsibilities is a step in the right direction, policy requiring that DISA acquire all commercial SATCOM for DOD already existed at the time of GAO's report. Further, DOD Commercial Satellite Communications (COMSATCOM) users may still be out of compliance with the CJCSI, according to an October 2016 U.S. Strategic Command report on COMSATCOM usage which states that "DoD COMSATCOM users should compete their services through DISA, as outlined in CJCSI 6250.01E, as soon as practicable."
    Recommendation: In order to improve DOD's procurement of SATCOM, to better leverage DOD's buying power and help DOD understand its military and commercial SATCOM spending, and enable DOD to reform its commercial SATCOM acquisition and management processes, the Secretary of Defense, in conjunction with the Air Force and DISA, should complement the pathfinder efforts by conducting an assessment of whether further centralization of military and commercial SATCOM procurement, such as the identification of a single focal point within DOD to decide how to meet the overall demand or a central procurement knowledge focal point, could further save money and improve performance.

    Agency: Department of Defense
    Status: Open

    Comments: Although we reported in 2016 that the Joint Requirements Oversight Council approved a commercial satellite communications "Centralized Management Concept of Operations, which intends to implement a three-phased approach to centralize management of military and commercial wideband SATCOM," we have yet to obtain a copy of the Concept of Operations and assess the extent to which DOD conducted an assessment of whether further centralization of commercial and military procurement of satellite communications would save money and improve performance.
    Director: Joseph W. Kirschbaum
    Phone: (202) 512-9971

    2 open recommendations
    Recommendation: To assist U.S. installations in protecting against insider threats, the Secretary of Defense should direct the military services to share information about actions U.S. installations have taken to address insider threats by consistently using existing mechanisms--such as working groups, lessons-learned information systems, and antiterrorism web portals.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To assist DOD leadership in their oversight and decision-making process, the Secretary of Defense should direct the DOD leaders on the Mission Assurance Coordination Boards and the military services to take steps to improve the consistency of reporting and monitoring of the implementation of recommendations from the independent review of the 2009 Fort Hood shooting. Such steps could include DOD and the military services developing criteria for consistent reporting on the progress of recommendations and the military services providing periodic reports to the Mission Assurance Coordination Boards on the status of Fort Hood recommendations at the service level and installation level.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    3 open recommendations
    including 1 priority recommendation
    Recommendation: To ensure that the SLS cost and schedule estimates better conform with best practices and are useful to support management decisions, the NASA Administrator should direct SLS officials to update the SLS cost and schedule estimates, at least annually, to reflect actual costs and schedule and record any reasons for variances before preparing their budget requests for the ensuing fiscal year. To the extent practicable, these updates should also incorporate additional best practices including thoroughly documenting how data were adjusted for use in the update and cross-checking results to ensure they are credible.

    Agency: National Aeronautics and Space Administration
    Status: Open
    Priority recommendation

    Comments: NASA agreed with this recommendation and reported taking steps to address it through its annual assessment of the SLS's current cost and schedule estimates against its Agency Baseline Commitment. The agency provided the results of this assessment but did not address the deficiencies we identified in NASA's original estimate, including thoroughly documenting how data were adjusted for the update and cross-checking the results to ensure credibility. In order to close this recommendation, NASA's estimate of its current costs would ideally include documentation of how data were adjusted for use in the updated estimate as well as an explanation of any estimating methodology crosschecks. At a minimum, the estimate documentation should include an explanation of variances between the original estimate and the current estimate.
    Recommendation: To provide more comprehensive information on program performance, the NASA administrator should direct the SLS program to expedite implementation of the program-level EVM system.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: The SLS program concurred with our recommendation and has taken steps to implement a program-level earned value management (EVM) system. In May 2016, NASA and Boeing finalized its contract with Boeing for the SLS core stage, the largest development effort in the program. According to NASA officials, the SLS program began receiving contractor earned value management data derived from the new core stage performance measurement baseline in fall 2016. At that time the program implemented a program-level EVM system tracking both in-house and contractor effort.
    Recommendation: To ensure that decisionmakers are able to track progress toward the agency's committed launch readiness date, the NASA administrator should direct the SLS program to include as part of the program's quarterly reports to NASA headquarters a reporting mechanism that tracks and reports program progress relative to the agency's external committed cost and schedule baselines.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: The SLS program concurred with our recommendation. According to NASA officials, the program has taken steps to track and report progress relative to the agency's external committed cost and schedule baselines within the program's quarterly reports to NASA headquarters. The program, however, has not yet provided documentation of these actions to GAO.
    Director: Andrew Sherrill
    Phone: (202) 512-7215

    1 open recommendations
    Recommendation: To inform decisions on any potential future iterations of the veterans' employment workshop, the Secretary of Labor should assess and report to Congress the extent to which further delivery of employment workshops to veterans and their spouses could fill a niche not fully served by existing federal programs. Such an assessment could involve collaboration with VA and other stakeholder organizations.

    Agency: Department of Labor
    Status: Open

    Comments: In May 2017, DOL repeated its assertion that the employment needs of veterans and spouses are best met through the services offered by their local American Job Centers. Additionally, DOL's Veterans' Employment and Training Service (VETS) has published its employment workshop TAP curriculum in eBook form, making it accessible to all veterans and spouses. VETS planned to report to Congress in 2017 on whether a need exists to provide an employment workshop to veterans and spouses. DOL has not provided an update to GAO on that assessment. Further, VETS is conducting a pilot to identify additional options to connect veterans and spouses to employment services available at American Job Centers, and plans to report its initial findings to Congress in 2018.
    Director: J. Christopher Mihm
    Phone: (202) 512-6806

    5 open recommendations
    Recommendation: To help ensure that agency review processes provide frequent, regular opportunities to assess progress on agency priority goals (APG), and are conducted in a manner consistent with GPRA Modernization Act of 2010 (GPRAMA) requirements, OMB guidance, and leading practices, the Secretary of Defense should work with the COO and PIO to modify the Department's review processes to ensure that review meetings are led by the agency head or COO.

    Agency: Department of Defense
    Status: Open

    Comments: In July 2017, Department of Defense (DOD) staff informed us that the department's quarterly performance reviews, which had been reinstituted in late 2016, have been put on hold while the department's new strategic plan is under development. According to DOD staff, the quarterly reviews will not resume until after the department's new strategic plan is approved and released. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: To help ensure that agency review processes provide frequent, regular opportunities to assess progress on agency priority goals (APG), and are conducted in a manner consistent with GPRA Modernization Act of 2010 (GPRAMA) requirements, OMB guidance, and leading practices, the Secretary of Defense should work with the COO and PIO to modify the Department's review processes to ensure that review meetings are used to review progress on all APGs at least once a quarter, discuss at-risk goals and improvement strategies, and assess whether specific program activities, policies, or other activities are contributing to goals as planned.

    Agency: Department of Defense
    Status: Open

    Comments: In July 2017, Department of Defense (DOD) staff informed us that the department's quarterly performance reviews, which had been reinstituted in late 2016, have been put on hold while the department's new strategic plan is under development. According to DOD staff, the quarterly reviews will not resume until after the department's new strategic plan is approved and released. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: To help ensure that agency review processes provide frequent, regular opportunities to assess progress on agency priority goals (APG), and are conducted in a manner consistent with GPRA Modernization Act of 2010 (GPRAMA) requirements, OMB guidance, and leading practices, the Secretary of Defense should work with the COO and PIO to modify the Department's review processes to ensure that review meetings are used by participants to identify, agree upon, document and track follow-up actions.

    Agency: Department of Defense
    Status: Open

    Comments: In July 2017, Department of Defense (DOD) staff informed us that the department's quarterly performance reviews, which had been reinstituted in late 2016, have been put on hold while the department's new strategic plan is under development. According to DOD staff, the quarterly reviews will not resume until after the department's new strategic plan is approved and released. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: To help ensure that agency review processes provide frequent, regular opportunities to assess progress on agency priority goals (APG), and are conducted in a manner consistent with GPRA Modernization Act of 2010 (GPRAMA) requirements, OMB guidance, and leading practices, the Secretary of State should work with the COO and PIO to modify the Department's review processes to ensure that progress on each APG is reviewed in an in-person review meeting at least quarterly.

    Agency: Department of State
    Status: Open

    Comments: According to information provided by State Department staff in June 2017, efforts to address this recommendation are currently on hold until a new Chief Operating Officer (COO) for the department has been appointed. Once a new COO is in place the department plans to move forward with in-person quarterly reviews based on the COO's guidance. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: To help ensure that agency review processes provide frequent, regular opportunities to assess progress on agency priority goals (APG), and are conducted in a manner consistent with GPRA Modernization Act of 2010 (GPRAMA) requirements, OMB guidance, and leading practices, the Secretary of State should work with the COO and PIO to modify the Department's review processes to ensure that the reviews are led by the agency head or COO.

    Agency: Department of State
    Status: Open

    Comments: According to information provided by State Department staff in June 2017, efforts to address this recommendation are currently on hold until a new Chief Operating Officer (COO) for the department has been appointed. Once a new COO is in place the department plans to move forward with in-person quarterly reviews based on the COO's guidance. We will continue to monitor the status of actions to address this recommendation.
    Director: Mark L. Goldstein
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: The Chairman of FCC should evaluate the effectiveness of FCC's accessibility-related public outreach efforts and ensure those efforts incorporate key practices identified in this report, such as defining objectives and establishing process and outcome metrics.

    Agency: Federal Communications Commission
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Lawrance Evans
    Phone: (202) 512-8678

    1 open recommendations
    Recommendation: To enhance and sustain future U.S. participation in the development of international capital standards for insurers, the Secretary of the Treasury should direct the Director of FIO, in consultation with the Federal Reserve and NAIC, to enhance future collaborative interagency efforts by following additional leading practices for collaboration, such as taking steps to sustain leadership over the long term and publicly reporting on their efforts, for example in annual reports.

    Agency: Department of the Treasury
    Status: Open

    Comments: Although Treasury publicly reported on collaboration efforts between the Federal Insurance Office, the Board of Governors of the Federal Reserve System, and state insurance regulators in its most recent annual report, it has not taken other steps to ensure that leadership will be sustained over the long term.
    Director: Maurer, Diana C
    Phone: (202) 512-9627

    2 open recommendations
    including 2 priority recommendations
    Recommendation: To ensure that the Department of Justice effectively measures its efforts to address incarceration challenges, the Attorney General should explore additional data collection opportunities and modify its Smart on Crime indicators to incorporate key elements of successful performance measurement systems.

    Agency: Department of Justice
    Status: Open
    Priority recommendation

    Comments: In August 2015, DOJ reported that it has taken steps to obtain new, more granular data elements that it hoped to incorporate into its indicators. However, DOJ also stated that it did not believe that measureable targets were appropriate for its Smart on Crime indicators because prosecutors need to make case by case decisions without regard to targets or concerns for any other incentive. As of October 2016, DOJ had not provided any updates on its progress addressing this recommendation to enhance performance measurement. Until DOJ provides this information, we cannot determine whether its efforts resulted in indicators that incorporate key elements of successful performance measurement systems. In March, 2017, DOJ noted that, due to a change in administration, the consequences of the Smart on Crime initiative are uncertain, and did not provide any further updates on its progress addressing our recommendation.
    Recommendation: To ensure that the Department of Justice effectively measures its efforts to address incarceration challenges, the Attorney General should direct the Office of the Pardon Attorney, in conjunction with the Office of the Deputy Attorney General, to (1) track how long it takes, on average, for commutation of sentence petitions to clear each step in the review process under DOJ's control, and (2) identify and address, to the extent possible, any processes that may contribute to unnecessary delays.

    Agency: Department of Justice
    Status: Open
    Priority recommendation

    Comments: In August 2015, DOJ reported that tracking the steps of its review would not provide meaningful data because the Department prioritizes those cases for review that appear likely to meet the Clemency Initiative factors announced in April 2014. Nevertheless, DOJ stated that it agreed that identifying and addressing unnecessary delays in the review process is important, and that it has been regularly working to identify and address such delays. As of October 2016, DOJ had not provided any updates on its progress addressing this recommendation to better track and address any unnecessary delays. Until it does so, we cannot determine whether it is meeting the key goal of the new Clemency Initiative--to expeditiously identify and review especially meritorious petitions. In March 2017, DOJ noted that due to the accelerated clemency review process implemented in 2015, it currently has no standard process to evaluate, and did not provide any further updates on its progress in addressing our recommendation.
    Director: David Powner
    Phone: (202) 512-9286

    5 open recommendations
    Recommendation: In order to institutionalize sound IT management practices and build FSA's IT management capacity while improving service to the Nation's farmers and ranchers, the Secretary of Agriculture should direct the FSA Administrator to establish and implement an improvement plan to guide the agency in adopting recognized best practices and following agency policy.

    Agency: Department of Agriculture
    Status: Open

    Comments: FSA developed a Strategic IT Roadmap to assist the agency's business and IT leadership in prioritizing IT investments. In addition, FSA stated that it will develop and document a comprehensive improvement plan that is to delineate tactical steps, timelines, and performance metrics to track incremental progress in adopting recognized best practices and program management capabilities. We will continue to monitor the agency's progress in documenting and implementing its improvement plan.
    Recommendation: In order to institutionalize sound IT management practices and build FSA's IT management capacity while improving service to the Nation's farmers and ranchers, the Secretary of Agriculture should direct the FSA Administrator to adhere to recognized best practices and agency policy in developing and managing system requirements before proceeding with any further system development to deliver previously envisioned MIDAS functionality. Specifically, the Administrator should ensure that requirements are complete, unambiguous, and prioritized; commitment to requirements is obtained through a formal requirements baseline; differences (or gaps) between the requirements and capabilities of the intended solution (including commercial off-the-shelf solutions) are analyzed; strategies to address any gaps are developed; and requirements are traced forward and backward among development products.

    Agency: Department of Agriculture
    Status: Open

    Comments: FSA reported that it will improve the rigor and adherence to requirements management processes for all IT projects, utilizing processes and tools that will support the integrity of the requirements throughout the lifecycle, to ensure that requirements are complete, formally baselined, gaps are analyzed, and fully traceable forward and backward. FSA also noted that it is pursuing an enhanced, more comprehensive governance structure that will further support its commitment to increasing rigor and adherence to defined requirements management processes. We will continue to monitor the agency's implementation of these efforts.
    Recommendation: In order to institutionalize sound IT management practices and build FSA's IT management capacity while improving service to the Nation's farmers and ranchers, the Secretary of Agriculture should direct the FSA Administrator to adhere to recognized best practices and agency policy in planning and monitoring projects. Specifically, the Administrator should ensure that project plans include predefined expectations for cost, schedule, and deliverables before proceeding with any further system development; updates to the project plan are made through change control processes; and progress against the project plan, including work performed by contractors, is monitored.

    Agency: Department of Agriculture
    Status: Open

    Comments: FSA noted that it began an initiative to improve the agency's use of capital planning guidance from the Office of Management and Budget and would prepare corrective action plans to address identified weaknesses in fiscal year 2016. FSA also noted that it was conducting a series of training classes on capital planning and IT project management across the agency, developing a risk management program, and strengthening the use of earned value management. We will continue to monitor the agency's progress on its project planning efforts.
    Recommendation: In order to institutionalize sound IT management practices and build FSA's IT management capacity while improving service to the Nation's farmers and ranchers, the Secretary of Agriculture should direct the FSA Administrator to adhere to recognized best practices and agency policy in system testing. Specifically, the Administrator should establish well-defined test plans before proceeding with any further system development, and ensure that testing of (a) individual system components, (b) the integration of system components, and (c) the end-to-end system are conducted.

    Agency: Department of Agriculture
    Status: Open

    Comments: FSA stated that going forward the agency will adhere to recognized best practices and agency policy in pursuing consistent or increased rigor around system testing. The agency noted that it plans to demonstrate that its testing capabilities are consistent and repeatable across all FSA IT projects. We will continue to monitor the agency's implementation of these efforts.
    Recommendation: In order to institutionalize sound IT management practices and build FSA's IT management capacity while improving service to the Nation's farmers and ranchers, the Secretary of Agriculture should direct the FSA Administrator to adhere to recognized best practices and agency policy in executive-level IT governance before proceeding with any further system development. Specifically, an executive-level governance board should (1) review and approve a comprehensive business case that includes a life cycle cost estimate, a cost-benefit analysis, and an analysis of alternatives for proposed solutions that are to provide former MIDAS requirements prior to their implementation; (2) ensure that any programs that are to accommodate former MIDAS requirements are fully implementing the IT program management disciplines and practices identified in this report; (3) conduct a post-implementation review and document lessons learned for the MIDAS investment; and (4) reassess the viability of the MIDAS technical solution before investing in further modernization technologies.

    Agency: Department of Agriculture
    Status: Open

    Comments: FSA stated that, as part of its organizational transformation efforts, the CIO is evaluating its governance structure and updating the charter for the agency-wide IT investment review board with the support of the agency's Executive Leadership Council. FSA also noted that it will adhere to the department's governance framework and processes. We will continue to monitor the agency's implementation of these efforts and how they address our recommendation.
    Director: Michael J. Sullivan
    Phone: (202) 512-4841

    2 open recommendations
    Recommendation: To help ensure that requirements are well defined and well understood before a program is approved to start system development, the Secretary of Defense should direct the military service chiefs and service acquisition executives to work together to assess whether sufficient systems engineering expertise is available during the requirements development process.

    Agency: Department of Defense
    Status: Open

    Comments: DOD has not yet taken action in response to this recommendation. GAO will continue to monitor.
    Recommendation: To help ensure that requirements are well defined and well understood before a program is approved to start system development, the Secretary of Defense should direct the military service chiefs and service acquisition executives to work together to develop a better way to make sure sufficient systems engineering is conducted and opportunities exist to better define requirements and assess resource trade-offs before a program starts.

    Agency: Department of Defense
    Status: Open

    Comments: DOD has not yet taken action in response to this recommendation. GAO will continue to monitor.
    Director: Joseph W. Kirschbaum
    Phone: (202) 512-9971

    4 open recommendations
    Recommendation: To further enhance the department's efforts to protect its classified information and systems from insider threats, the Secretary of Defense should direct the Under Secretary of Defense for Intelligence to, in planned supplemental planning guidance to be developed, identify actions beyond the minimum standards that components should take to enhance their insider-threat programs.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To further enhance the department's efforts to protect its classified information and systems from insider threats, the Secretary of Defense should direct the Under Secretary of Defense for Intelligence to evaluate and document the extent to which current assessments provide a continuing analysis of gaps for all DOD components; report to Congress on the results of this evaluation; and direct that the overall results of these self- and independent assessments be reviewed by the Office of the Under Secretary of Defense for Intelligence.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To further enhance the department's efforts to protect its classified information and systems from insider threats, the Secretary of Defense should direct the Under Secretary of Defense for Intelligence to provide DOD components supplemental guidance that directs them to incorporate risk assessments into their insider-threat programs.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To further enhance the department's efforts to protect its classified information and systems from insider threats, the Secretary of Defense should identify an insider-threat program office to support the Under Secretary of Defense for Intelligence's responsibilities in managing and overseeing DOD and components' insider-threat programs.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Carol R. Cha
    Phone: (202) 512-4456

    27 open recommendations
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Commerce should ensure an inventory of mobile devices and services is established department-wide (i.e., all components' devices and associated services are accounted for).

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce has not yet implemented this recommendation. In response to our report, the department said it planned to address the recommendation by the second quarter of fiscal year 2016. However, as of August 2017, it had not demonstrated that it had done so. We will continue to monitor the department's progress.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Commerce should ensure a reliable department-wide inventory of mobile service contracts is developed and maintained.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce has not yet implemented this recommendation. In response to our report, the department said it planned to address the recommendation by the second quarter of fiscal year 2016. However, as of August 2017, it had not demonstrated that it had done so. We will continue to monitor the department's progress.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Commerce should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of Commerce
    Status: Open

    Comments: The Department of Commerce has not yet implemented this recommendation. In response to our report, the department said it planned to address the recommendation by the second quarter of fiscal year 2016. However, as of August 2017, it had not demonstrated that it had done so. We will continue to monitor the department's progress.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Defense should ensure an inventory of mobile devices and services is established department-wide (i.e., all components' devices and associated services are accounted for).

    Agency: Department of Defense
    Status: Open

    Comments: As of August 2017, the Department of Defense had not implemented this recommendation. In July 2016, the department reported that it does not maintain a single, centralized device-level inventory and, instead, the military departments track and manage their own devices and contracted wireless services as separate enterprises. However, as we stated in our report, the inventory need not be generated centrally at the headquarters level; the department can compile a comprehensive inventory using its components' complete inventories. We will continue to monitor the department's efforts to address this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Defense should ensure a reliable department-wide inventory of mobile service contracts is developed and maintained.

    Agency: Department of Defense
    Status: Open

    Comments: As of August 2017, the Department of Defense had not implemented this recommendation. The department updated its mobile services contract inventory in August 2015; however, as of August 2017, the department had not demonstrated that it has maintained the inventory. We will continue to monitor the department's efforts to implement the recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Health and Human Services should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: The Department of Health and Human Services has not implemented this recommendation. In April 2016, an audit liaison in the Office of the Chief Information Officer reported that each component maintains processes and procedures for device management. However, as of August 2017, the department had not provided evidence that components have established procedures that address the elements of our recommendation. We will continue to monitor the department's implementation of this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Homeland Security should ensure an inventory of mobile devices and services is established department-wide (i.e., all components' devices and associated services are accounted for).

    Agency: Department of Homeland Security
    Status: Open

    Comments: The Department of Homeland Security has taken steps to implement this recommendation. Specifically, it developed inventories for the two components we reviewed. The department also reported that it had identified all components' devices. However, as of August 2017, it had not provided evidence that all the components had an inventory of unique devices and associated services. We will continue to monitor the department's efforts to implement the recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Homeland Security should ensure a reliable department-wide inventory of mobile service contracts is developed and maintained.

    Agency: Department of Homeland Security
    Status: Open

    Comments: The Department of Homeland Security has taken steps to implement the recommendation, but more needs to be done. Specifically, in May 2017, the department developed an enterprise-wide inventory of mobile service contracts; however, the department has not demonstrated that it has maintained the inventory quarterly. We will continue to monitor the department's efforts to fully implement the recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Homeland Security should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of Homeland Security
    Status: Open

    Comments: The Department of Homeland Security has not implemented the recommendation. In August 2017, a Program Management Specialist in the Office of the Chief Information Office described steps the department was taking as it considers a follow-on to its department-wide blanket purchase agreement for wireless expense management services. We will continue to monitor the department's efforts to implement the recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of the Interior should ensure an inventory of mobile devices and services is established department-wide (i.e., all components' devices and associated services are accounted for).

    Agency: Department of the Interior
    Status: Open

    Comments: The Department of the Interior has not implemented this recommendation. As of May 2017, the department was in the process of migrating its cellular service contracts to the General Services Administration's federal wireless strategic sourcing initiative blanket purchase agreement as its agency-wide solution for mobile devices and services. According to the department, the initiative requires awardee(s) and orderers to conduct a complete inventory of devices and legacy service contracts as they transition to the blanket purchase agreement. According to the department's transition plan, the transition is to be complete by February 2018. We will continue to monitor the department's efforts to implement the recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of the Interior should ensure a reliable department-wide inventory of mobile service contracts is developed and maintained.

    Agency: Department of the Interior
    Status: Open

    Comments: The Department of the Interior has not implemented this recommendation. As of May 2017, the department was in the process of migrating its cellular service contracts to the General Services Administration's federal wireless strategic sourcing initiative blanket purchase agreement as its agency-wide solution for mobile devices and services. According to the department, the initiative requires awardee(s) and orderers to conduct a complete inventory of devices and legacy service contracts as they transition to the blanket purchase agreement. According to the department's transition plan, the transition is to be complete by February 2018. We will continue to monitor the department's efforts to implement the recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Attorney General should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of Justice
    Status: Open

    Comments: The Department of Justice has taken steps to implement this recommendation. Specifically, in response to our findings, the department's Chief Information Officer issued a memo that required components to establish procedures for regular reviews of invoices for wireless services to identify unused and underused devices or services, as well as any over-usage charges to service plans. However, as of August 2017, the department had not demonstrated that its components had implemented the requirements. We will continue to monitor the department's progress.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of State should ensure an inventory of mobile devices and services is established department-wide (i.e., all components' devices and associated services are accounted for).

    Agency: Department of State
    Status: Open

    Comments: The Department of State has not yet implemented this recommendation. In July 2017, the department stated that it planned to transition its mobile devices and services to the General Services Administration's Federal Strategic Sourcing Initiative. However, the department has not addressed developing an inventory of mobile devices and services. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of State should ensure a reliable department-wide inventory of mobile service contracts is maintained.

    Agency: Department of State
    Status: Open

    Comments: The Department of State has not implemented this recommendation. In July 2017, the department stated that it plans to transition its mobile devices and services to the General Services Administration's Federal Strategic Sourcing Initiative. However, the department has not addressed developing an inventory of mobile service contracts. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of State should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of State
    Status: Open

    Comments: The Department of State has not yet implemented this recommendation. In July 2017, the department stated that it was in the process of implementing a Telecommunications Expense Management System to provide visibility into mobile spending, asset management, usage, and tracking. However, the department has not provided evidence that it has established procedures that address the elements of our recommendation . We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Transportation should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of Transportation
    Status: Open

    Comments: The Department of Transportation has not yet demonstrated that it has implemented our recommendation. Specifically, as of August 2017, neither of the two components we reviewed in May 2015 had addressed the weaknesses we identified in their procedures. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of the Treasury should ensure an inventory of mobile devices and services is established department-wide (i.e., all components' devices and associated services are accounted for).

    Agency: Department of the Treasury
    Status: Open

    Comments: The Department of the Treasury has not yet implemented this recommendation. In May 2016, the Department of the Treasury stated that it had performed data calls to collect data on mobile device inventories across the department. However, as of August 2017, the department had not demonstrated that it had established a department-wide inventory of mobile devices and services. We will monitor the department's progress in implementing this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of Veterans Affairs should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: The Department of Veterans Affairs has not yet implemented this recommendation. The department stated that its Office of Information and Technology drafted documentation for the development and implementation of a system to manage spending on mobile devices and services. However, the solution had not been funded. The department stated that a target date for addressing the recommendation is December 2017, conditional upon available funds.
    Recommendation: To help the agency effectively manage spending on mobile devices and services, the Administrator of the Environmental Protection Agency should ensure a complete inventory of mobile devices and associated services is established.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: The Environmental Protection Agency had taken steps to implement this recommendation. Specifically, it reported that it had conducted a management review and identified improvements to ensure that the agency has a complete inventory of mobile devices and services. However, as of August 2017, it had not demonstrated that it had established a complete inventory. We will continue to monitor the agency's progress.
    Recommendation: To help the agency effectively manage spending on mobile devices and services, the Administrator of the Environmental Protection Agency should ensure procedures to monitor and control spending are established agency-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: The Environmental Protection Agency has not yet implemented this recommendation. The agency stated that program offices receive quarterly mobile device usage reports and are requested to review them. However, as of August 2017, the agency had not provided documented procedures that address the elements of our recommendation.
    Recommendation: To help the agency effectively manage spending on mobile devices and services, the Administrator of the National Aeronautics and Space Administration should ensure a complete inventory of mobile devices and associated services is established.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: The National Aeronautics and Space Administration (NASA) has not yet implemented the recommendation. In August 2017, officials from NASA's Office of the Chief Information Officer stated that the agency plans to address the recommendation through a strategic sourcing approach the agency is developing and estimates implementing in fiscal year 2018. The officials stated that the agency expects to fully address the recommendation by December 2018.
    Recommendation: To help the agency effectively manage spending on mobile devices and services, the Administrator of the National Aeronautics and Space Administration should ensure a reliable inventory of mobile service contracts is developed and maintained.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: The National Aeronautics Administration (NASA) has not yet implemented the recommendation. In August 2017, officials from NASA's Office of the Chief Information Officer stated that the agency plans to address the recommendation through a strategic sourcing approach the agency is developing and estimates implementing in fiscal year 2018. The officials stated that the agency expects to fully address the recommendation by March 2019.
    Recommendation: To help the agency effectively manage spending on mobile devices and services, the Administrator of the National Aeronautics and Space Administration should ensure procedures to monitor and control spending are established agency-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: The National Aeronautics and Space Administration (NASA) has not implemented the recommendation. In August 2017, officials from NASA's Office of the Chief Information Officer stated that the agency plans to address the recommendation through an Enterprise Mobility Service Contract that it plans to fully transition to by July 2019. The officials stated that the contract will allow the agency to monitor and optimize usage.
    Recommendation: To help the agency effectively manage spending on mobile devices and services, the Commissioner of the Social Security Administration should ensure a complete inventory of mobile devices and associated services is established.

    Agency: Social Security Administration
    Status: Open

    Comments: The Social Security Administration (SSA) described steps it was taking to address our recommendation. Specifically, the agency stated that it had deployed and is operating a Mobile Expense Management System that will be used to maintain an enterprise-wide inventory of mobile devices and associated services once all the agency's mobile service contracts/accounts have been successfully consolidated onto one of the agency's blanket purchasing agreements. SSA expected to complete this consolidation in the September to October 2016 timeframe. However, as of August 2017, the agency had not demonstrated that it had implemented the recommendation. We will continue to monitor its progress in implementing this recommendation.
    Recommendation: To help the agency effectively manage spending on mobile devices and services, the Commissioner of the Social Security Administration should ensure procedures to monitor and control spending are established agency-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Social Security Administration
    Status: Open

    Comments: The Social Security Administration (SSA) described steps it was taking to address this recommendation. Specifically, the agency stated that representatives from various agency components were working to develop and document the policies, guidelines, processes, and procedures to effectively implement an enterprise model for mobile provisioning and management. SSA expects to complete this effort in fiscal year 2017. As of August 2017, the agency had not demonstrated that it had addressed the recommendation. We will continue to monitor its progress in implementing this recommendation.
    Recommendation: To help the department effectively manage spending on mobile devices and services, the Secretary of the Treasury should ensure procedures to monitor and control spending are established department-wide. Specifically, ensure that (1) procedures include assessing devices for zero, under, and over usage; (2) personnel with authority and responsibility for performing the procedures are identified; and (3) the specific steps to be taken to perform the process are documented.

    Agency: Department of the Treasury
    Status: Open

    Comments: The Department of the Treasury has not yet implemented this recommendation. In May 2016, the department stated that it had awarded two contracts to facilitate mobile device management, and had advised its bureaus to track, analyze, and manage mobile device use and cost in accordance with GAO guidance at their level until migration to the department-wide contracts has been completed. However, as of August 2017, the department had not demonstrated that it had established department-wide procedures to monitor and control spending on mobile devices and services. We will continue to monitor the department's progress in implementing this recommendation.
    Recommendation: To better enable OMB to oversee agency efforts to consolidate mobile telecommunications contracts, the Director should measure and report progress in achieving its goal of cost savings through consolidation, as described in the 2012 Digital Government Strategy.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of August 2017, the Office of Management and Budget (OMB) had made progress in implementing this recommendation by requiring agencies to track savings; however, it had not yet reported progress in achieving its goal of cost savings. Specifically, in August 2016, OMB issued a policy requiring covered agencies to appoint, by November 2016, a dedicated lead for mobile devices and services. The official is expected to work closely with senior agency officials to establish and maintain an agency-wide inventory of mobile contracts, identify opportunities for contract consolidation, and track savings, among other things. In addition, according to an official in OMB's Office of Federal Procurement, a team led by OMB, the General Services Administration, and the departments of Defense and Homeland Security, is to develop an approach for measuring savings related to mobile devices and services.
    Director: Joseph Kirschbaum
    Phone: (202) 512-9971

    4 open recommendations
    Recommendation: To enhance collaboration between DOD and NNSA, the Secretaries of Defense and Energy should update the 1997 memorandum of agreement for the Council, and, as part of this update, describe the roles, responsibilities, structure, and functions of the Council's two support committees, how the Council and these groups are to work together, and the general processes and time frames the Council and its support committees should follow to carry out statutory responsibilities.

    Agency: Department of Defense
    Status: Open

    Comments: In commenting on this report, DOD agreed with our recommendation to update the 1997 memorandum of agreement and proposed that, once this action was completed, the Council Chairman would issue a letter to the Council members documenting the roles and responsibilities, structure, and functions of the Council's support committees. The Secretaries of Defense and Energy approved an updated memorandum of agreement for the Council in January 2017, but as of August 2017, the NRC Chairman had not issued a letter to Council members documenting the roles and responsibilities, structure, and functions of the Council's support committees. Council staff told us they expected to develop that letter after the Nuclear Posture Review was complete and its impact on the Council's process was clear. Officials anticipated the Nuclear Posture Review would be complete by the end of December 2017.
    Recommendation: To enhance collaboration between DOD and NNSA, the Secretaries of Defense and Energy should update the 1997 memorandum of agreement for the Council, and, as part of this update, describe the roles, responsibilities, structure, and functions of the Council's two support committees, how the Council and these groups are to work together, and the general processes and time frames the Council and its support committees should follow to carry out statutory responsibilities.

    Agency: Department of Energy
    Status: Open

    Comments: In commenting on this report, NNSA agreed with this recommendation and said it would work collaboratively with the Council and DOD to update the memorandum of agreement and ensure appropriate guidance is issued to document requirements for the Council's two support committees. The Secretaries of Defense and Energy approved an updated memorandum of agreement for the Council in January 2017, but as of August 2017, the NRC Chairman had not issued a letter to Council members documenting the roles and responsibilities, structure, and functions of the Council's support committees. Council staff told us they expected to develop that letter after the Nuclear Posture Review was complete and its impact on the Council's process was clear. Officials anticipated the Nuclear Posture Review would be complete by the end of December 2017.
    Recommendation: To enhance collaboration between DOD and NNSA, the Secretaries of Defense and Energy should update the 1997 memorandum of agreement for the Council, and, as part of this update, include a requirement that budget and program evaluation officials from both DOD and NNSA will consistently and routinely attend all meetings of the Council's two support committees.

    Agency: Department of Defense
    Status: Open

    Comments: In commenting on this report, DOD generally agreed with this recommendation and stated that the letter from the Council Chairman that would be developed to address our first recommendation would require that budget and program evaluation officials from both DOD and NNSA consistently and routinely attend meetings of the Council and its support committees. As of August 2017, the Nuclear Weapons Council's Standing and Safety Committee had reviewed and updated its membership and chairmanship structure and approved changes in preparation for the Council Chairman issuing a letter documenting the roles, responsibilities, structure, and functions of the Council's support committees. Council staff told us they expected to develop that letter after the Nuclear Posture Review was complete and its impact on the Council's process was clear. Officials anticipated the Nuclear Posture Review would be complete by the end of December 2017.
    Recommendation: To enhance collaboration between DOD and NNSA, the Secretaries of Defense and Energy should update the 1997 memorandum of agreement for the Council, and, as part of this update, include a requirement that budget and program evaluation officials from both DOD and NNSA will consistently and routinely attend all meetings of the Council's two support committees.

    Agency: Department of Energy
    Status: Open

    Comments: In commenting on this report, NNSA agreed with this recommendation and stated that it would work collaboratively with the Council and DOD to ensure appropriate guidance is issued to document requirements for the participation of budget and evaluation officials in support committee meetings. As of August 2017, the Nuclear Weapons Council's Standing and Safety Committee had reviewed and updated its membership and chairmanship structure and approved changes in preparation for the Council Chairman issuing a letter documenting the roles, responsibilities, structure, and functions of the Council's support committees. Council staff told us they expected to develop that letter after the Nuclear Posture Review was complete and its impact on the Council's process was clear. Officials anticipated the Nuclear Posture Review would be complete by the end of December 2017.
    Director: David C. Trimble
    Phone: (202) 512-3841

    5 open recommendations
    including 2 priority recommendations
    Recommendation: To improve DOE's management and oversight of the WTP project, the Secretary of Energy should, in assessing the alternatives, revise cost and schedule estimates for the Low Activity Waste Pretreatment System and the Tank Waste Characterization and Staging facility in accordance with industry best practices.

    Agency: Department of Energy
    Status: Open

    Comments: We will monitor the status of this proposed requirement.
    Recommendation: To improve DOE's management and oversight of the WTP project, the Secretary of Energy should revise the statements of mission need for the two proposed projects to allow DOE to consider a variety of alternatives without limiting potential solutions, consistent with the DOE requirement that mission need statements should not identify particular solution such as equipment, facility, or technology.

    Agency: Department of Energy
    Status: Open

    Comments: According to DOE DARTS report on 5/19/16, revision of the statement of mission for the Low Activity Waste Pretreatment System "has become overcome by events". We will continue to follow up on this recommendation.
    Recommendation: To improve DOE's management and oversight of the WTP project, the Secretary of Energy should, in accordance with DOE's Office of River Protection quality assurance policy, conduct an extent-of-condition review for WTP's High Level Waste and Low Activity Waste facilities' systems that have not been reviewed by DOE.

    Agency: Department of Energy
    Status: Open
    Priority recommendation

    Comments: DOE agreed with the recommendations and in its written responses to our report stated that it had implemented them. However, we believe additional actions are needed, as indicated in the priority recommendations letter we sent to DOE in 2017. To fully address the recommendations, DOE should conduct an extent-of-condition review for WTP's High Level Waste and Low Activity Waste facilities' systems.
    Recommendation: To improve DOE's management and oversight of the WTP project, the Secretary of Energy should consider whether or to what extent construction activities for the High Level Waste and Low Activity Waste facilities should be further limited until aggressive risk mitigation strategies are developed and employed to address technical challenges that DOE, the contractor, and others have identified but not yet resolved.

    Agency: Department of Energy
    Status: Open
    Priority recommendation

    Comments: DOE has noted that these activities were already limited and stated that a specific set of criteria has been established for resuming construction on the High Level Waste facility. However, as we noted in our report, an extent-of-condition review has not been performed on the remainder of the facility's systems, and recommendations from the facility's design and operability review have not been implemented. DOE also stated that construction on the Low Activity Waste facility is nearly complete, that the WTP Federal Project Director has a detailed risk register, and that each remaining risk is being proactively mitigated. This statement, however, does not fully reflect the extent or potential seriousness of the technical risks that remain. An extent-of-condition review may mean limiting the production of new design documents until this review is complete in order to avoid potential costly rework. We believe additional actions are needed. To fully address the recommendation, DOE should consider whether or to what extent construction activities for those facilities should be further limited until this review is completed and aggressive risk mitigation strategies are developed and employed.
    Recommendation: To improve DOE's management and oversight of the WTP project, the Secretary of Energy should enlist the services of another agency or external entity to serve as an owner's agent to assist the Office of River Protection in reviewing and evaluating the WTP contractor's design and approach to mitigating design challenges.

    Agency: Department of Energy
    Status: Open

    Comments: Congress required DOE to meet this requirement in the 2016 NDAA, and DOE reports that they issued a contract to Parsons Government Services on September 29, 2015. We have requested a copy of this contract for review to ensure that the recommendation has been addressed.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    2 open recommendations
    Recommendation: To strengthen MDA's acquisition efforts and help support oversight and to ensure MDA makes sound investment decisions on improving homeland ballistic missile defense, the Secretary of Defense should direct MDA to make the department's analysis of alternatives an integral part of its planning effort and delay any decisions to begin development of the new GMD Redesigned Kill Vehicle until: a) the department's analysis of alternatives is completed and identifies the best solution to pursue; and b) Congressional and DOD decision makers have been provided the results of that analysis.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with our recommendation. As of July 2017, MDA has yet to finalize the analysis of alternatives (AOA) report. MDA officials stated the results of the analysis from the AOA were reached in early fiscal year 2015 and informed the decision to pursue the RKV. The AOA results were summarized and briefed to staff members from the congressional defense committees and senior DOD leadership. MDA subsequently submitted the report to DOD's Office of Cost Assessment and Program Evaluation (CAPE) for a sufficiency review but an official from the Office of the Secretary of Defense stated in July 2017 that CAPE has yet to perform the review. We await the final AOA report to make a determination of whether the recommendation was implemented.
    Recommendation: To strengthen MDA's acquisition efforts and help support oversight, drawing from information it already has, the Secretary of Defense should direct MDA to report annually to Congress its plans for, and achieved progress in developing and delivering integrated Ballistic Missile Defense System (BMDS)-level capabilities. This reporting should include: a) planned integrated BMDS-level capabilities, including dates for when capability is planned for delivery; and b) element-level upgrades needed for delivery of the integrated BMDS capability, including dates that these upgrades need to be available for integration into the BMDS capability.

    Agency: Department of Defense
    Status: Open

    Comments: In providing comments on this report, the Department of Defense concurred with our recommendation to annually report to Congress its plans and progress made in delivering integrated BMDS-level capabilities, including delivery dates for the capabilities and element upgrades needed to support these capacities. Previously, MDA planned to provide Congress a table summarizing the development and delivery of integrated BMDS capabilities annually, beginning in the 2016 BMDS Accountability Report (BAR). We reviewed the 2016 BAR and determined the report did not include the full extent of information regarding plans and progress made in delivery integrating BMDS-level capabilities described in our recommendation. To remain consistent with the methodology for our annual missile defense review, we will assess the 2017 BAR in next year's review to determine if it includes this information.
    Director: Mak, Marie A
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: In order for NASA to fully implement the NASA Authorization Act of 2008 and for CASIS to fulfill its responsibility as outlined in the cooperative agreement, the NASA Administrator should direct the Associate Administrator for the Human Exploration and Operations Mission Directorate to fully staff the ISS National Laboratory Advisory Committee.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: NASA does not plan to staff the International Space Station National Laboratory Advisory Committee (INLAC) at this time. Officials stated that they continue to believe that the Center for the Advancement of Science in Space (CASIS) Board of Directors meets the intent of the INLAC charter by providing oversight of CASIS implementation of utilization of the ISS as a national laboratory. NASA remains concerned about staffing another oversight group that may create conflicts with the existing CASIS Board of Directors. NASA is also exploring with CASIS opportunities to open portions of board meetings to the general public and interested parties in order to foster additional transparency and a broad and free exchange of ideas. In response to this recommendation, the Associate Administrator for the Human Exploration and Operations Mission Directorate indicated that NASA was seeking relief from the statutory requirement to staff the INLAC.
    Director: Zina Merritt
    Phone: (202) 512-5257

    2 open recommendations
    Recommendation: To help ensure that the Air Force is properly retaining items and accurately reporting its amount of retention stock and excess inventory in accordance with DOD guidance, and not spending resources to store unneeded inventory, the Secretary of the Air Force should direct the Commander, Air Force Materiel Command, to begin performing contingency retention reviews for those items, valued at about $2.6 billion, that it already knows should not be retained as economic retention stock so that it can identify and promptly dispose of inventory that is not needed.

    Agency: Department of Defense: Department of the Air Force
    Status: Open

    Comments: As of August 2017, the Air Force has not completed the review of all of the necessary items to address the recommendation. We will continue to monitor the Air Force's actions to fully address this implementation.
    Recommendation: To help ensure that the Navy has adequate oversight of on-order excess inventory termination decisions and necessary performance measures consistent with DOD guidance, the Secretary of the Navy should direct the Commander, Naval Supply Systems Command, to incorporate the graduated management reviews and the ability to track and review the reasons for not canceling and modifying on-order excess items into its automated termination module that is under development.

    Agency: Department of Defense: Department of the Navy
    Status: Open

    Comments: As of September 2017, Naval Supply Systems Command plans to incorporate graduated management reviews and the ability to track and review the reason for not canceling and modifying on-order excess items into its automated termination module that is under development and being implemented. However, fiscal year 2019 is the best estimate for full implementation of such capabilities into the automated termination module, according to Naval Supply Systems Command officials.
    Director: Michelle Sager
    Phone: (202) 512-6806

    3 open recommendations
    Recommendation: To better ensure the adherence to requirements for approval and public access to and feedback on significant guidance in accordance with OMB's Final Bulletin for Agency Good Guidance Practices (M-07-07), the Secretary of HHS should develop written procedures for the approval of significant guidance documents.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In comments printed in the April 2015 final report, HHS concurred with the recommendation and stated that it would explore the best mechanism for distributing written procedures for approval of significant guidance. As of August 2017, GAO is working with HHS officials to obtain additional updates and documentation regarding the department's implementation of this recommendation.
    Recommendation: To improve agencies' guidance development, review, evaluation, and dissemination processes for non-significant guidance, we recommend that the Secretaries of USDA, HHS, DOL, and Education should strengthen their selected components' application of internal controls to guidance processes by adopting, as appropriate, practices developed by other departments and components, such as assessment of risk; written procedures and tools to promote the consistent implementation and communication of management directives; and ongoing monitoring efforts to ensure that guidance is being issued appropriately and has the intended effect. Examples of practices that could be adopted more widely include (1) written procedures for guidance production to, among other things, clearly define management roles; (2) improved communication tools, such as routing slips to document management review; and (3) consistent and ongoing monitoring to determine if guidance is being accessed and having the intended effect.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In comments printed in the April 2015 final report, HHS concurred with the recommendation and stated that it would continue to work with its agencies to share best practices and ensure that agency practices are alighted with departmental standards. As of August 2017, GAO is working with HHS officials to obtain additional updates and documentation regarding the department's implementation of this recommendation.
    Recommendation: To improve agencies' guidance development, review, evaluation, and dissemination processes for non-significant guidance, we recommend that the Secretaries of USDA, HHS, DOL, and Education should improve the usability of selected component websites to ensure that the public can easily find, access, and comment on online guidance. These improvements could be informed by the web and customer satisfaction metrics that components have collected on their websites. Some examples of changes that could facilitate public access to online guidance include (1) improving website usability by clarifying which links contain guidance; (2) highlighting new or important guidance; and (3) ensuring that posted guidance is current.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In comments printed in the April 2015 final report, HHS concurred with the recommendation and stated that it would review current links to guidance documents and explore ways to enhance their visibility and usability. As of August 2017, GAO is working with HHS officials to obtain additional updates and documentation regarding the department's implementation of this recommendation.
    Director: Cristina T. Chaplain
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: To improve technology planning and ensure planning efforts are clearly aligned with the SBIRS follow-on, the Secretary of the Air Force should establish a technology insertion plan as part of the SBIRS follow-on acquisition strategy that identifies obsolescence needs as well as specific potential technologies and insertion points.

    Agency: Department of Defense: Department of the Air Force
    Status: Open

    Comments: In providing comments on this report, the agency concurred with this recommendation. DOD's planned action on the scope and focus of technology insertion will be based on the direction provided in the Space Based Infrared System (SBIRS) Follow-on Analysis of Alternatives (AoA) and will be executed through the SBIRS Space Modernization Initiative (SMI). The SBIRS AoA was completed in March 2016; however, as of June 2017, the SMI schedule has yet to show how technology will be inserted into the follow-on system.
    Director: Mark L. Goldstein
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: The Secretary of the Department of Homeland Security should direct FPS to develop and implement a strategy for using covert-testing data and data on prohibited items to improve FPS's security-screening efforts. The strategy should, at a minimum, aim to ensure that: (1) covert-testing data are used to systematically monitor, review, and improve performance nationwide; (2) covert-testing data are used to determine which testing scenarios will be implemented or reinstated; and (3) data on prohibited items are analyzed to determine the reasons for wide variations in the number of reported prohibited-items detected across buildings and to assist with managing the screening process and informing policy.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of June 2016, implementation of this recommendation was in process, according to the Federal Protective Service (FPS). FPS provided no additional information, but plans to update GAO in the coming weeks on the status of this and other open recommendations.
    Director: David C. Trimble
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: To enhance the usefulness of NNSA's future reports to Congress describing the costs and benefits of its competition of M&O contracts under the requirements contained in Section 3121 of the National Defense Authorization Act for fiscal year 2013, as amended, the NNSA Administrator should take steps to ensure that future reports reflect DOE's information quality guidelines, federal cost accounting standards, and GAO's best practices guidance relevant to the clear and complete presentation of information on each of the required topics. In particular, future reports should clearly and completely describe costs and benefits, including the agency's expectations, as well as the associated analysis, assumptions, information sources, and key limitations and uncertainties about costs and benefits described. The description of uncertainties should include key excluded or unspecified costs and benefits, such as those that are anticipated but not fully known at the time of report writing.

    Agency: Department of Energy: National Nuclear Security Administration
    Status: Open

    Comments: NNSA recently awarded an M&O contract for Sandia NL. NNSA will have to produce a report on the costs and benefits of its competition, which will need to be delivered in early spring, 2017. Upon delivery to Congress, GAO will be able to assess whether NNSA fulfilled this recommendation.
    Director: J. Christopher Mihm
    Phone: (202) 512-6806

    1 open recommendations
    Recommendation: The Director of the Office of Management and Budget should direct, as appropriate, federal agencies involved with the White House Working Group on Detroit, to collect good practices and lessons learned from their efforts to assist Detroit during its fiscal crisis and share them with other federal agencies and local governments. Toward this end, OMB may want to consider making use of existing knowledge and capacity associated with the Strong Cities, Strong Communities Initiative and its National Resource Network.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: In commenting on a draft of GAO's March 2015 report, OMB neither agreed nor disagreed with this recommendation. In April 2017, OMB staff stated that they believed steps had been taken to preserve some of the lessons coming out of the administration's efforts to assist the City of Detroit during its fiscal crisis. However, they were unable to provide specifics. GAO has requested additional information and supporting documentation regarding this effort.
    Director: Brenda S. Farrell
    Phone: (202) 512-3604

    6 open recommendations
    Recommendation: To improve DOD's ability to prevent sexual assaults of male servicemembers, to increase its responsiveness to male servicemembers who are sexually assaulted, and to help DOD's sexual assault prevention and response program realize the full benefit of the data it collects on sexual assault incidents, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in collaboration with the Secretaries of the military services, to develop a plan for data-driven decision making to prioritize program efforts.

    Agency: Department of Defense
    Status: Open

    Comments: DOD was contacted on July 26, 2016 for an update on efforts to address this recommendation and responded that they are working on the report required by the NDAA on male victims of sexual assault and they believe that the report will, at a minimum, take some steps to address this recommendation. DOD also noted that the report required by the NDAA is due in the first quarter of FY 17 and that they will provide us with a copy once it has been approved. We will provide updated information when we confirm any actions the agency has taken in response to this recommendation.
    Recommendation: To improve DOD's ability to prevent sexual assaults of male servicemembers, to increase its responsiveness to male servicemembers who are sexually assaulted, and to address challenges faced by male servicemembers as DOD continues to seek to transform its culture to address sexual assault, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in collaboration with the Secretaries of the military services, to develop clear goals with associated metrics to drive the changes needed to address sexual assaults of males and articulate these goals, for example in the department's next sexual assault prevention strategy.

    Agency: Department of Defense
    Status: Open

    Comments: DOD was contacted on July 26, 2016 for an update on efforts to address this recommendation and responded that they are working on the report required by the NDAA on male victims of sexual assault and they believe that the report will, at a minimum, take some steps to address this recommendation. DOD also noted that the report required by the NDAA is due in the first quarter of FY 17 and that they will provide us with a copy once it has been approved. We will provide updated information when we confirm any actions the agency has taken in response to this recommendation.
    Recommendation: To improve DOD's ability to prevent sexual assaults of male servicemembers, to increase its responsiveness to male servicemembers who are sexually assaulted, and to address challenges faced by male servicemembers as DOD continues to seek to transform its culture to address sexual assault, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in collaboration with the Secretaries of the military services, to include information about the sexual victimization of males in communications to servicemembers that are used to raise awareness of sexual assault and the department's efforts to prevent and respond to it.

    Agency: Department of Defense
    Status: Open

    Comments: DOD was contacted on July 26, 2016 for an update on efforts to address this recommendation and responded that they are working on the report required by the NDAA on male victims of sexual assault and they believe that the report will, at a minimum, take some steps to address this recommendation. DOD also noted that the report required by the NDAA is due in the first quarter of FY 17 and that they will provide us with a copy once it has been approved. We will provide updated information when we confirm any actions the agency has taken in response to this recommendation.
    Recommendation: To improve DOD's ability to prevent sexual assaults of male servicemembers, to increase its responsiveness to male servicemembers who are sexually assaulted, and to address challenges faced by male servicemembers as DOD continues to seek to transform its culture to address sexual assault, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in collaboration with the Secretaries of the military services, to revise sexual assault prevention and response training to more comprehensively and directly address the incidence of male servicemembers being sexually assaulted and how certain behavior and activities--like hazing--can constitute a sexual assault.

    Agency: Department of Defense
    Status: Open

    Comments: DOD was contacted on July 26, 2016 for an update on efforts to address this recommendation and responded that they are working on the report required by the NDAA on male victims of sexual assault and they believe that the report will, at a minimum, take some steps to address this recommendation. DOD also noted that the report required by the NDAA is due in the first quarter of FY 17 and that they will provide us with a copy once it has been approved. We will provide updated information when we confirm any actions the agency has taken in response to this recommendation.
    Recommendation: To improve DOD's ability to prevent sexual assaults of male servicemembers, to increase its responsiveness to male servicemembers who are sexually assaulted, and to help ensure that all of DOD's medical and mental health providers are generally aware of any gender-specific needs of sexual assault victims, and that victims are provided the care that most effectively meets those needs, the Assistant Secretary of Defense for Health Affairs should, in collaboration with the services' Surgeons General, systematically evaluate the extent to which differences exist in the medical and mental health-care needs of male and female sexual assault victims, and the care regimen, if any, that will best meet those needs.

    Agency: Department of Defense: Office of the Assistant Secretary of Defense (Health Affairs)
    Status: Open

    Comments: DOD was contacted on July 26, 2016 for an update on efforts to address this recommendation and responded that they are working on the report required by the NDAA on male victims of sexual assault and they believe that the report will, at a minimum, take some steps to address this recommendation. DOD also noted that the report required by the NDAA is due in the first quarter of FY 17 and that they will provide us with a copy once it has been approved. We will provide updated information when we confirm any actions the agency has taken in response to this recommendation.
    Recommendation: To improve DOD's ability to prevent sexual assaults of male servicemembers, to increase its responsiveness to male servicemembers who are sexually assaulted, and to help ensure that all of DOD's medical and mental health providers are generally aware of any gender-specific needs of sexual assault victims, and that victims are provided the care that most effectively meets those needs, the Assistant Secretary of Defense for Health Affairs should, in collaboration with the services' Surgeons General, develop and issue guidance for the department's medical and mental health providers--and other personnel, as appropriate--based on the results of this evaluation that delineates these gender-specific distinctions and the care regimen that is recommended to most effectively meet those needs.

    Agency: Department of Defense: Office of the Assistant Secretary of Defense (Health Affairs)
    Status: Open

    Comments: DOD was contacted on July 26, 2016 for an update on efforts to address this recommendation and responded that they are working on the report required by the NDAA on male victims of sexual assault and they believe that the report will, at a minimum, take some steps to address this recommendation. DOD also noted that the report required by the NDAA is due in the first quarter of FY 17 and that they will provide us with a copy once it has been approved. We will provide updated information when we confirm any actions the agency has taken in response to this recommendation.
    Director: Susan Fleming
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To improve stewardship over the nation's highways and bridges, the Secretary of Transportation should direct the FHWA Administrator to conduct a study on state oversize- and overweight-permitting practices, including automated vehicle routing and escort driver certification, to identify areas of best practice and share the results with states.

    Agency: Department of Transportation
    Status: Open

    Comments: The Federal Highway Administration (FHWA) concurred with this recommendation. According to an FHWA letter, they will conduct a review of permitting practices, which will include findings from several recent and ongoing research projects related to oversize and overweight permitting. FHWA plans to complete this review by September 30, 2017, and share the results with states through peer exchanges and forums.
    Director: Carol R.Cha
    Phone: (202) 512-4456

    2 open recommendations
    Recommendation: The Secretary of Defense should direct the Under Secretary of Defense for Acquisition, Technology, and Logistics to require MAIS programs to establish their first acquisition program baseline within 2 years of beginning work on the programs.

    Agency: Department of Defense
    Status: Open

    Comments: The Department developed a draft process document that states that business system (e.g. financial management, logistics management) programs should start development on at least one release within 24 months after programs have identified the needed capabilities and received approval to conduct further analysis into the potential delivery of the capabilities. We will follow-up with the Department for the final process document and guidance, when available.
    Recommendation: The Secretary of Defense should direct the Secretary of the Army to direct the Army (Financial Management and Comptroller) to complete a plan for conducting auditability testing of LMP Increment 2 functionality to ensure that such testing occurs prior to the LMP program management office deploying future functionality.

    Agency: Department of Defense
    Status: Open

    Comments: According to DOD officials, in response to our recommendation, the department developed a plan to conduct system testing on LMP Increment 2 in accordance with the Federal Information System Controls Audit Manual. The officials stated that the department's plan was to conduct this testing both prior to and after the deployment of new functionality to users. We have requested additional information and documentation from DOD regarding these LMP Increment 2 test plans in order to determine whether the testing associated with auditability of the system was to be conducted before deployment to users.
    Director: David C. Trimble
    Phone: (202) 512-3841

    2 open recommendations
    Recommendation: To develop reliable cost estimates for the TRU waste removal project and for the TWF construction project at LANL, the Secretary of Energy should direct NNSA and the Office of Environmental Management to revise the cost estimate for the TRU waste removal project to ensure that it uses updated assumptions based on the current understanding of project conditions, such as the status of WIPP.

    Agency: Department of Energy
    Status: Open

    Comments: As of April 2017, Department of Energy (DOE) officials indicated that a revised life-cycle baseline cost estimate was prepared for all Office of Environmental Management mission work at Los Alamos National Laboratory, including transuranic waste removal work. DOE approved the revised cost estimate in July 2016. After we review documentation of the estimate, we will evaluate whether it is sufficient to close the recommendation.
    Recommendation: To develop reliable cost estimates for the TRU waste removal project and for the TWF construction project at LANL, the Secretary of Energy should direct NNSA to revise and update the TWF project's cost estimate by following all best practices for developing a reliable cost estimate that covers all life-cycle costs for better managing the project going forward.

    Agency: Department of Energy
    Status: Open

    Comments: The Department of Energy (DOE) agreed with the recommendation. As of March 2017, DOE indicated that Los Alamos National Laboratory prepared a cost estimate for the operations and maintenance of the Transuranic Waste Facility (TWF) facility in December 2015, which was reviewed and accepted by the responsible program offices. DOE indicated that the revised estimate reflected operational costs for a seven-year window and incorporated applicable best practices, including documentation of any significant deviations and uncertainties impacting the estimate, among other things. After we obtain documentation of the estimate, we will evaluate the action to determine whether it is sufficient to close the recommendation as implemented.
    Director: Zina D. Merritt
    Phone: (202) 512-5257

    3 open recommendations
    Recommendation: To help DOD increase the efficiency and effectiveness of its management of its business operations, and to enhance DOD's ability to achieve its business transformation efforts, the Secretary of Defense should direct the Deputy Secretary of Defense, in his capacity as the CMO, to ensure that the DCMO document business transformation priorities and communicate these priorities to officials responsible for DOD's business functions.

    Agency: Department of Defense
    Status: Open

    Comments: DOD concurred with this recommendation. As of September 2017, DOD is developing a draft of its Agency Strategic Plan for Fiscal Years 2018-2022, which officials stated is intended to communicate the department's strategic goals and objectives for its business operations, among other things. DOD intends to submit the plan to the Office of Management and Budget in February 2018. After the department approves the plan, we will assess the extent to which it documents business transformation priorities and communicates these priorities to officials responsible for DOD's business functions.
    Recommendation: To help DOD increase the efficiency and effectiveness of its management of its business operations, and to enhance DOD's ability to achieve its business transformation efforts, the Secretary of Defense should direct the Deputy Secretary of Defense, in his capacity as the CMO, to ensure that the DCMO oversee the development of a corrective action plan, in coordination with officials responsible for DOD business functions, that outlines the root causes for business transformation weaknesses and the solutions needed to address those weaknesses.

    Agency: Department of Defense
    Status: Open

    Comments: DOD concurred with this recommendation. DOD has developed corrective action plans to address recommendations from some of our prior work. For example, in August 2017, DOD developed a corrective action plan to address recommendations from our December 2016 report on the military departments' business transformation efforts. The corrective action plan identifies the deficiencies highlighted in the report, as well as key corrective actions, estimated and actual completion dates, and measures capturing demonstrated results. DOD officials stated that the department is working towards adopting a process to require similar corrective action plans for all of our open recommendations. We will continue monitor whether DOD adopts this process and creates similar corrective action plans that address business transformation weaknesses identified in our prior work.
    Recommendation: To help DOD increase the efficiency and effectiveness of its management of its business operations, and to enhance DOD's ability to monitor the progress of its business transformation efforts, the Secretary of Defense should direct the Office of the DCMO to, in coordination with officials responsible for DOD's business functions, develop performance measures that reflect key attributes of successful performance measures, such as clarity, comprehensiveness, and linkage.

    Agency: Department of Defense
    Status: Open

    Comments: DOD concurred with this recommendation. In May 2017, the Acting DCMO issued a memorandum outlining a DOD strategic planning framework. The DOD strategic planning framework is intended to align DOD core business functions with the Office of Management and Budget's reform categories. As part of this framework, DOD components are tasked with conducting thorough reviews of their business operations, identifying reform initiatives, and developing performance goals and measures to monitor and assess implementation of reform activities. DOD plans to include the reform initiatives and specific performance goals and measures in its Agency Strategic Plan for Fiscal Years 2018-2022. As of September 2017, DOD is developing a draft of its plan and expects to submit the plan to the Office of Management and Budget in February 2018. After the department approves the plan, we will assess the extent to which the performance measures included in the plan reflect key attributes of successful performance measures, such as clarity, comprehensiveness, and linkage.
    Director: Carol R. Cha
    Phone: (202) 512-4456

    2 open recommendations
    including 2 priority recommendations
    Recommendation: To ensure that the Bureau is better positioned to deliver an Internet response option for the 2020 Decennial Census, the Secretary of Commerce should direct the Under Secretary for Economic Affairs to direct the Director of the Census Bureau to ensure that the estimated costs associated with the Internet response option are updated to reflect significant changes in the program and to fully meet the characteristics of a reliable cost estimate.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The Department of Commerce neither agreed nor disagreed with this recommendation. To fully implement this recommendation, the Census Bureau's updated cost estimate needs to reflect significant changes in the program as they relate to the Internet response option and fully meet the characteristics of a reliable cost estimate. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Recommendation: To ensure that the Bureau is better positioned to deliver an Internet response option for the 2020 Decennial Census, the Secretary of Commerce should direct the Under Secretary for Economic Affairs to direct the Director of the Census Bureau to ensure that the methodologies for answering the Internet response rate and IT infrastructure research questions are determined and documented in existing or future project plans in time to inform key design decisions.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The Department of Commerce neither agreed nor disagreed with this recommendation. The Census Bureau has developed the methodologies for answering IT infrastructure research questions in its 2020 Census Enterprise Architecture and Infrastructure Transition Plan, which describes the Bureau's multi-year plan for evolving the IT infrastructure to support all 2020 Census operations. However, to fully implement this recommendation the Bureau needs to provide documentation that describes the methodology for determining the Internet response rate for the 2020 Census. We will continue to monitor and evaluate the Bureau's progress in implementing this recommendation.
    Director: Robert Goldenkoff
    Phone: (202) 512-2757

    3 open recommendations
    including 3 priority recommendations
    Recommendation: To assist the interagency working group, known as the Federal Agency Skills Team (FAST), to better identify government-wide skills gaps having programmatic impacts and measure its progress towards closing them, the Director of OPM--in conjunction with the CHCO Council--should strengthen its approach and methodology by (1) assisting FAST in developing goals for closing skills gaps with targets that are both clear and measurable; (2) working with FAST to design outcome-oriented performance metrics that align with overall targets for closing skills gaps and link to the activities for addressing kills gaps; (3) incorporating greater input from subject matter experts, as planned; and (4) ensuring FAST consistently follows key practices for project planning.

    Agency: Office of Personnel Management
    Status: Open
    Priority recommendation

    Comments: As of October 2016, OPM has sought to strengthen the methodology for closing skills gaps by offering skills gap closure training to 1) agency officials with respect to agency-specific skills gaps, and 2) interagency working groups with respect to government-wide skills gaps. Held during the spring of 2016, this OPM-led training sought to provide agency officials with methodologies for identifying the root causes for skills gaps, as well as provide assistance in developing action plans for implementing and monitoring their strategies to address these skills gaps. OPM officials stated that these interagency teams will report on a quarterly basis to the OPM Director on their progress to implement these strategies, beginning in January 2017. OPM, in conjunction with OMB, agencies, and the CHCO Council, needs to ensure that this infrastructure is implemented as developed.
    Recommendation: To ensure that OPM builds the predictive capacity to identify emerging skills gaps across the government--including the ability to collect and use reliable information on the competencies of the federal workforce for government-wide workforce analysis--the Director of OPM should (1) establish a schedule specifying when OPM will modify its Enterprise Human Resources Integration database to capture staffing data that it currently collects from agencies through its annual workforce data reporting process; and (2) work with agency CHCOs to bolster the ability of agencies to assess workforce competencies by sharing competency surveys, lessons learned, and other tools and resources.

    Agency: Office of Personnel Management
    Status: Open
    Priority recommendation

    Comments: As of October 2016, officials reported that OPM has partnered with the Chief Learning Officers Council to leverage resources to develop a framework to support agencies efforts to develop competency assessments. Additionally, OPM reported that it has created an internal working group to determine whether its Enterprise Human Resources Integration (EHRI) personnel database can support having a predictive capacity for identifying emerging skills gaps across the government, including the ability to collect and use information on the competencies of the federal workforce. OPM needs to work with agencies to improve competency assessment across the government and to pursue modifying EHRI to support the collection of staffing and competency data.
    Recommendation: To help agencies and OPM better monitor progress toward closing skills gaps within agencies and government-wide, the Director of OPM should (1) work with the CHCO Council to develop a core set of metrics that all agencies should use as part of their HRstat data-driven reviews; and (2) coordinate with FAST personnel and explore the feasibility of collecting information needed by FAST as part of agencies' HRstat reviews.

    Agency: Office of Personnel Management
    Status: Open
    Priority recommendation

    Comments: As of October 2016, officials reported that OPM has partnered with the CHCO Council to implement a government-wide set of metrics for use as part of a government-wide benchmarking effort. However, it has no plans to coordinate the data collection efforts of agencies' HRstat reviews with the collection efforts of OPM's and agencies' working groups to identify and address skills gaps. OPM stated that coordinating the data collection was not possible because agencies' HRstat reviews have different goals and collect different types of data than the working groups. We maintain that action on our recommendation is important because it is likely that the core metrics collected under HRstat could help inform the efforts of the working groups and thus reduce duplicative efforts. Moreover, the use of a core set of metrics from agencies' HRstat reviews could aid in monitoring actual progress in closing skills gaps government-wide.
    Director: Gerald L. Dillingham, Ph.D.
    Phone: (202) 512-2834

    2 open recommendations
    Recommendation: If, in the next authorization for FAA, Congress chooses to mandate that FAA take actions to streamline and reform the agency, Congress may wish to consider requiring FAA to (1) track measures of and (2) report to Congress on the actual results of such efforts.

    Agency: Congress
    Status: Open

    Comments: FAA's authorization expired at the end of Fiscal Year 2015. As of May 2017, Congress has passed several FAA authorization extensions that did not include any actions related to this matter. We will continue to monitor legislation, and when we determine what steps the Congress has taken regarding this matter, we will provide updated information.
    Recommendation: To better enable FAA to track, aggregate, and report on the results of its streamlining and reform initiatives, the Secretary of Transportation should direct FAA to develop a mechanism to capture the results of its efficiency initiatives in its planned database for process improvements. Measures of results might include, for example, cost savings, timeliness, or customer service metrics, which may be common to several types of process improvement efforts and therefore facilitate aggregation across improvements.

    Agency: Department of Transportation
    Status: Open

    Comments: As of May 2017, FAA expanded its existing data repository to include results of the efficiency initiatives, but no realized results or benefits have yet been entered into the data repository. GAO will continue to monitor the status of this recommendation.
    Director: Mctigue Jr, James R
    Phone: (202) 512-7968

    2 open recommendations
    Recommendation: To improve the reliability of Taxonomy estimates for future filing seasons, the Commissioner of Internal Revenue should follow relevant best practices outlined in the GAO Cost Guide by documenting the underlying analysis justifying cost-influencing assumptions.

    Agency: Department of the Treasury: Internal Revenue Service
    Status: Open

    Comments: As of April 2017, IRS has taken steps to update its methodology for calculating and reporting its Taxonomy estimates. IRS provided GAO with updated Taxonomy estimates for 2015; GAO is reviewing these estimates to determine the extent to which IRS has implemented GAO's recommendation.
    Recommendation: To improve the reliability of Taxonomy estimates for future filing seasons, the Commissioner of Internal Revenue should follow relevant best practices outlined in the GAO Cost Guide by reporting the inherent imprecision and uncertainty of the estimates. For example, IRS could provide a range of values for its Taxonomy estimates.

    Agency: Department of the Treasury: Internal Revenue Service
    Status: Open

    Comments: As of April 2017, IRS has taken steps to update its methodology for calculating and reporting its Taxonomy estimates. IRS provided GAO with updated Taxonomy estimates for 2015; GAO is reviewing these estimates to determine the extent to which IRS has implemented GAO's recommendation.
    Director: Michael Courts
    Phone: (202) 512-8980

    1 open recommendations
    Recommendation: The Secretary of State should direct State's Office of the Procurement Executive to incorporate leading practices into any future single insurer solicitations by determining whether existing guidance could be used, or by developing guidance based on leading practices in federal and State Department acquisition regulations and State internal control standards.

    Agency: Department of State
    Status: Open

    Comments: The Department of State concurred with the recommendation and said it would incorporate leading practices into any future single insurer solicitation if a determination is made to pursue a single insurer program. However, as of September 2017 State had not made a determination to pursue a single insurer program. GAO will continue to monitor State's effort to implement the recommendation.
    Director: Dave Powner
    Phone: (202) 512-9286

    1 open recommendations
    Recommendation: To address risks in the GOES-R program development and to help ensure that the satellite is launched on time, the Secretary of Commerce should direct the NOAA Administrator to address shortfalls in defect management identified in this report, including the lack of clear guidance on defect definitions, what defect metrics should be collected and reported, and how to establish a defect's priority or severity.

    Agency: Department of Commerce
    Status: Open

    Comments: NOAA agreed with this recommendation. The agency subsequently reported that contractors are required to report defects and that the agency can place a hold or put liens against contractors if defects are not addressed. NOAA also provided documentation to support its recurring meetings at which defects are addressed. Additionally, NOAA provided documentation on its defect reporting requirements and definitions. However, NOAA did not provide documentation showing what defect metrics should be collected and reported, and how to establish a defect's priority or severity. We will continue to monitor the agency's actions on this recommendation.
    Director: Brian Lepore
    Phone: (202) 512-4523

    2 open recommendations
    Recommendation: To improve the ability of the Department of Defense and the military departments to manage the potential for foreign encroachment near their test and training ranges, the Secretary of Defense, in consultation with the military departments, should develop and implement guidance for assessing risks to test and training ranges from foreign encroachment in particular, to include: (1) determining the criticality and vulnerability of DOD's ranges and the level of the threat; and (2) a time frame for completion of risk assessments.

    Agency: Department of Defense
    Status: Open

    Comments: In October 2017, DOD stated that it has conducted a data call to the services to identify the locations that the services consider to be at risk from foreign encroachment. DOD has received this information from the services and is using it to inform the development of guidance. That effort is in process, so this recommendation is still open.
    Recommendation: To identify potential foreign encroachment concerns on federally-owned land near test and training ranges, the Secretary of Defense should collaborate with the secretaries of relevant federal agencies, including at a minimum the Secretaries of the Interior and Transportation, to obtain additional information needed from federal agencies managing land and transactions adjacent to DOD's test and training ranges. If appropriate, legislative relief should be sought to facilitate this collaborative effort.

    Agency: Department of Defense
    Status: Open

    Comments: In October 2017, DOD stated that it continues to engage with land management agencies on this issue and has met with about eight agencies in the past several years, including the Forest Service in September 2017. The agencies that DOD has met with fit into two main categories: (1) land management agencies such as Department of the Interior and Department of Transportation and (2) trade and foreign relation focused agencies such as Department of State and the Department of Treasury. In addition, DOD continues to explore the possibility of legislative relief to assist in this area. This effort is in process, so this recommendation is still open.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: In order to provide additional information and analyses to effectively manage the program and account for new risks identified after the 2011 replan, the NASA Administrator should direct JWST project officials to follow best practices while conducting a cost risk analysis on the prime contract for the work remaining and ensure the analysis is updated as significant risks emerge.

    Agency: National Aeronautics and Space Administration
    Status: Open

    Comments: JWST did conduct a cost risk analysis and provided the results to GAO. We reported in GAO-16-112 that it substantially met best practices. However, the project stated they did not plan to update the analysis as significant risks emerged, which is a key element of the recommendation.
    Director: Frank Rusco
    Phone: (202) 512-3841

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To improve the reliability of its cost estimates, as NRC revises its cost estimating procedures, the NRC Chairman should ensure that the agency aligns the procedures with relevant cost estimating best practices identified in the GAO Cost Estimating and Assessment Guide and ensure that future cost estimates are prepared in accordance with relevant cost estimating best practices.

    Agency: Nuclear Regulatory Commission
    Status: Open
    Priority recommendation

    Comments: In February 2017, the NRC staff released draft updated cost-benefit guidance, with a public comment period beginning in March 2017. In January 2018, NRC staff plan to provide a draft of the final guidance to the Commission. The final updated cost-benefit guidance is expected to be issued for use in March 2018.
    Director: David C. Trimble
    Phone: (202) 512-3841

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To minimize the risk of developing unreliable AOAs and incurring major cost increases and schedule delays on projects, the Secretary of Energy should direct DOE's Office of Acquisition and Project Management to update its project management order requirements to incorporate best practices for conducting an AOA.

    Agency: Department of Energy
    Status: Open
    Priority recommendation

    Comments: In May 2016, DOE updated its project management order (Order 413.3B) to require that AOAs for capital asset acquisition projects be consistent with published GAO best practices. DOE also planned to issue an AOA guide that will be critical to ensuring implementation of the new AOA requirement by providing DOE procedures for conducting reliable AOAs. According to a DOE official, development of the guide was on hold indefinitely along with all other actions to publish new, or update existing departmental directives in response to the two Presidential Executive Orders issued in January and February 2017 that directed federal agencies to, among other things, reduce and reform agency regulations. In the interim, DOE issued an AOA handbook in April 2017 but will not have fully addressed the recommendation until it completes the guide.
    Director: Valerie C. Melvin
    Phone: (202) 512-6304

    5 open recommendations
    including 1 priority recommendation
    Recommendation: To ensure that HUD fully implements and sustains effective IT governance practices, the Secretary of Housing and Urban Development should direct the Deputy Secretary and the department's Chief Information Officer to place a high priority and ensure that the executive-level investment review board meets as outlined in its charter, documents criteria for use by the other boards, and distributes its decisions to appropriate stakeholders.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: As of April 2017, HUD had not provided information demonstrating that the department has addressed this recommendation. HUD reported that it established a new executive-level investment review board (i.e. the Executive Operations Committee) that replaced the board discussed in our report. However, as of April 2017, the department had not yet documented criteria the Committee had established for use by other boards or provided evidence of how this new committee would distribute decisions made to appropriate stakeholders.
    Recommendation: To ensure that HUD fully implements and sustains effective IT governance practices, the Secretary of Housing and Urban Development should direct the Deputy Secretary and the department's Chief Information Officer to place a high priority and fully establish and maintain a complete set of governance policies, establish time frames for establishing policies planned but not yet developed, and update key governance documents to reflect changes made to established practices.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: As of April 2017, the department had taken steps to address this recommendation. In 2015, HUD updated its Project Planning and Management policy and confirmed that the remaining policies to be developed were the IT Risk Policy and the IT Performance Management Policy. HUD also reported that the department planned to revise additional existing policies, including the IT Management Framework Policy, IT Capital Management Policy, IT Project Planning & Management Policy, IT Governance Policy, and IT Strategic Planning Policy. As of April 2017, the department had finalized a Risk Policy but reported it was still working on additional policy updates anticipated to be finalized during 2017.
    Recommendation: To ensure that HUD fully implements and sustains effective IT governance practices, the Secretary of Housing and Urban Development should direct the Deputy Secretary and the department's Chief Information Officer to place a high priority and fully establish an IT investment selection process that includes (1) articulating how reviews of project proposals are to be conducted; (2) planning how data (including cost estimates) are to be developed and verified and validated; (3) establishing criteria for how cost, schedule, and project risk are to be analyzed; (4) developing procedures for how proposed projects are to be compared to one another in terms of investment size (cost), project longevity (schedule), technical difficulty, project risk, and cost-benefit analysis; and (5) ensuring that final selection decisions made by senior decision makers and governance boards are supported by analysis, consider predefined quantitative measures, and are consistently documented.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: As of April 2017, HUD had not provided information demonstrating that the department has addressed this recommendation. In 2015, HUD reported that it had begun using a new tool to support its IT selection process. As of April 2017, the department had reported on improvements to its investment process but had not yet provided evidence of specific actions or plans aimed at ensuring the five IT selection processes highlighted in this recommendation would be addressed.
    Recommendation: To ensure that HUD fully implements and sustains effective IT governance practices, the Secretary of Housing and Urban Development should direct the Deputy Secretary and the department's Chief Information Officer to place a high priority and fully establish a well-defined process that incorporates key practices for overseeing investments, including (1) monitoring actual project performance against expected outcomes for project cost, schedule, benefit, and risk; (2) establishing and documenting cost-, schedule-, and performance-based thresholds for triggering remedial actions or elevating project review to higher-level investment boards; and (3) conducting post-implementation reviews to evaluate results of projects after they are completed.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: As of April 2017, the department had taken steps to address this recommendation. Specifically, in April 2016, HUD provided evidence of actions taken toward developing new processes for investment oversight practices. Specifically, the department created processes for conducting project health assessments and weekly project management meetings intended to monitor, among other things, actual performance against expected outcomes, and to establish thresholds for triggering remedial actions or elevating projects for additional review. As of April 2017, the department had not provided evidence that these new processes were fully established and institutionalized.
    Recommendation: To establish an enterprise-wide view of cost savings and operational efficiencies generated by investments and governance processes, the Secretary of Housing and Urban Development should direct the Deputy Secretary and Chief Information Officer to place a higher priority on identifying governance-related cost savings and efficiencies and establish and institutionalize a process for identifying and tracking comprehensive, high-quality data on savings and efficiencies resulting from IT investments and the IT governance process.

    Agency: Department of Housing and Urban Development
    Status: Open
    Priority recommendation

    Comments: As of April 2017, the department had taken steps to address this recommendation. Specifically, in April 2016, HUD provided examples of cost savings that the department had identified by "scrubbing" existing contracts during the fiscal year 2015 budget formulation process, along with copies of a template that it designed and used to help identify such savings. As of April 2017, the department had not yet provided evidence that it had formally established policies and procedures or taken other actions to institutionalize a process for identifying and providing an enterprise-wide view of IT-related cost savings and operational efficiencies.
    Director: Daniel Bertoni
    Phone: (202) 512-7215

    2 open recommendations
    Recommendation: As part of initiatives currently under way to improve agency information on claims with appointed representatives and detect potential fraud associated with representatives, the Commissioner of the Social Security Administration should consider actions to provide more timely access to data on representatives and enhance mechanisms for identifying and monitoring trends and patterns related to representation, particularly trends that may present risks to program integrity. Specifically, SSA could (1) Identify additional data elements, or amendments to current data collection efforts, to improve information on all appointed representatives, including those under contract with states and other third parties; (2) Implement necessary policy changes to ensure these data are collected. This could include enhancing technical systems needed to finalize SSA's 2008 proposed rules that would recognize organizations as representatives; and (3) Establish mechanisms for routine data extracts and reports on claims with representatives.

    Agency: Social Security Administration
    Status: Open

    Comments: In July 2017, SSA reported that it is approaching the conclusion of the first phase of a new initiative, called Registration, Appointment and Services for Representatives (RASR). This initiative aims to register all appointed representatives and improve relevant business processes and data collection. SSA reported that it had to postpone the first release of RASR, originally targeted for December 2016, due to some systems issues. SSA stated that it has not yet set a new target date for the first release. SSA stated that this new application will enhance data collection and management of representatives' information and that it will help make strides toward better oversight and improved data analysis and reporting. We will consider closing this recommendation when these efforts are completed.
    Recommendation: To address risks associated with potential overpayments to representatives and protect claimant benefits, the Commissioner of the Social Security Administration should take steps to enhance coordination with states, counties, and other third parties with the goal of improving oversight and preventing and identifying potential overpayments. This coordination could be conducted in a cost-effective manner, such as issuing guidance to states and other third parties on vulnerabilities for overpayment; sharing best practices on how to prevent overpayments; or considering the costs and benefits, including any privacy and security concerns, of providing third parties controlled access to portions of the eFolder to facilitate the detection of potential overpayments.

    Agency: Social Security Administration
    Status: Open

    Comments: In July 2017, SSA stated that it added a section to a new form--Form SSA-1698, Fee Agreement for Representation before the Social Security Administration--that claimants and representatives can use to enter into fee agreements. According to SSA, this form requires the disclosure of fees that the representative will receive from a third party and the amount of those fees. SSA expects this form to be in use upon OMB approval. Similar language already exists in another form--Form SSA-1560-U4, Petition to Obtain Approval of a Fee for Representing a Claimant before the Social Security Administration--that claimants and representatives can use for fee petitions. SSA stated that these forms are (and will be) included in the folder of evidence that adjudicators may review before determining whether and how much to authorize in fees. According to SSA, disclosure and approval of any third party fees, with potential adjustment of the fee, by both the claimant and SSA should help prevent excessive fees. While the proposed change to the form may help improve transparency of fee arrangements, the potential for a representative to receive a payment from SSA and also receive a payment from a state or other third party still exists. Unless SSA and the state or other third party share information on their payments or have policies and procedures in place to prevent such cases, representatives could still receive both SSA and state payments that total more than the SSA-authorized fee. In order to address this vulnerability, we continue to believe that SSA should enhance coordination or issue guidance to states and other third parties about this vulnerability, which could include SSA sharing best practices for preventing these types of overpayments. For example, one state requires contracted organizations to submit copies of their signed form 1696 (Appointment of Representative) so the state could verify the representative checked the appropriate box for payment.
    Director: David Trimble
    Phone: (202) 512-3841

    2 open recommendations
    including 2 priority recommendations
    Recommendation: To enhance NNSA's ability to develop reliable cost estimates for its projects and for its programs that have project-like characteristics, the Secretary of Energy should revise DOE directives that apply to programs to require that DOE and NNSA and its contractors develop cost estimates in accordance with the 12 cost estimating best practices, including developing life-cycle cost estimates for programs.

    Agency: Department of Energy
    Status: Open
    Priority recommendation

    Comments: In its written comments, DOE stated that it is in the process of substantially revising the existing DOE Order 130.1, and that as part of this effort, DOE will assess the requirement for program cost estimates and will revise the order to provide more specificity on the cost estimating requirements. Further, DOE stated that the revised order will (1) define which DOE and NNSA program budget requests require cost estimates and (2) clarify that cost estimates for program budget submissions shall be conducted in accordance with the DOE cost estimating guide (or its successor policy). As of October 2016, DOE stated that it is working to implement a new funding execution system that has delayed revision of DOE Order 130.1. The new system will impact the budget practices, planning, policies and processes that will be outlined in the revised DOE 130.1. The department is in the final testing phases of the system and can now begin to initiate internal approval to update DOE Order 130.1. DOE stated that it anticipated issuance of a fully approved DOE Order 130.1 by August 30, 2017
    Recommendation: To enhance NNSA's ability to develop reliable cost estimates for its projects and for its programs that have project-like characteristics, the Secretary of Energy should revise DOE requirements and guidance that apply to programs to ensure that program reviews are conducted periodically, including reviews of the life-cycle cost estimates for programs.

    Agency: Department of Energy
    Status: Open
    Priority recommendation

    Comments: In written comments, DOE stated that it is in the process of substantially revising the existing DOE Order 130.1, and that as part of this effort the department will assess requirements for program reviews and the linkage between program reviews and the budget formulation process. As of October 2016, DOE stated that it is working to implement a new funding execution system that has delayed revision of DOE Order 130.1. The new system will impact the budget practices, planning, policies and processes that will be outlined in the revised DOE Order 130.1. DOE is in the final testing phases of the system and can now begin to initiate internal approval to update the order. The department anticipated issuance of a fully approved DOE Order 130.1 by August 30, 2017.
    Director: Michele Mackin
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: The legislated cost cap for Ford-class aircraft carrier construction provides a limit on procurement funds. However, the legislation also provides for adjustments to the cost cap. To understand the true cost of each Ford-class ship, Congress should consider revising the cost cap legislation to ensure that all work included in the initial ship cost estimate that is deferred to post-delivery and outfitting account is counted against the cost cap. If warranted, the Navy would be required to seek statutory authority to increase the cap.

    Agency: Congress
    Status: Open

    Comments: This recommendation remains open to allow Congress time to consider legislation amending the cost cap for the Ford class of aircraft carriers. The current version of the fiscal year 2018 National Defense Authorization Act (H.R. 2810) does not amend the current cost cap legislation.
    Director: Daniel Bertoni
    Phone: (202) 512-7215

    2 open recommendations
    Recommendation: To help improve the quality of VBA's disability compensation claim decisions, the Secretary of Veterans Affairs should direct the Under Secretary for Benefits to take steps to ensure that any future upgrades to local data systems allow QRTs to pause the claims process when errors are detected and enable QRTs to better track error trends.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: As of November 2017, VA had no further updates on this recommendation. VA previously reported that VBA had submitted business requirements to add new functionality in VA's electronic claims processing system, the Veterans Benefit Management System (VBMS), that would allow the agency to identify deficiencies during the claims process. If an error is detected, the claim would be paused to allow an in-process review (IPR), conducted by quality review teams, to occur. However, VA reported in August 2017 that these new business requirements would not be implemented due to limited VA Office of Information Technology (OIT) funding available for OIT updates in fiscal year 2018 and beyond. This recommendation will remain open until November 2018, in case circumstances or funding change.
    Recommendation: To help improve the quality of VBA's disability compensation claim decisions, the Secretary of Veterans Affairs should direct the Under Secretary for Benefits to take additional steps to evaluate the effectiveness of quality assurance activities to identify opportunities to improve or better target these activities.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: As of November 2017, VA reported that VBA's Compensation Service is beginning to gather and analyze quality assurance data to identify areas for improvements in VA processes, guidance, and training. This database, called Quality Management System (QMS), captures data from all types of quality reviews at various stages of the claims process, to include local regional office individual quality reviews, in-process reviews, national STAR reviews and consistency studies. According to VA, QMS has been functional since July 2017 and has captured over 130,000 quality reviews. VBA's Compensation Service is analyzing the first 90 days of data from QMS and once the data analysis is complete, it plans to implement the first set of changes or actions to improve accuracy. VA expects to implement these actions by January 2018. To close this recommendation, the agency will need to provide documentation of the comprehensive quality assurance data being captured, and how it is being used to either evaluate QA activities or make specific improvements with potential for improving accuracy.
    Director: David Wise
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To enhance the transparency of the FRPP data and help GSA make more informed decisions regarding the planning, effective and efficient management, and disposal of civilian warehouse assets, in GSA's landlord role, which is performed by the Public Buildings Service, and as part of its efforts to address our 2012 recommendation to develop and publish a comprehensive 5-year capital plan, GSA should develop and implement a strategy specific to warehouses. This strategy should apply capital-planning leading practices, involving prioritization and long-term planning, to the warehouse portion of GSA's portfolio.

    Agency: General Services Administration
    Status: Open

    Comments: The General Services Administration (GSA) analyzed warehouse data and determined that the existing tools and processes are the most appropriate way to treat warehouses because these tools and processes consider warehouses within the context of local markets, client agencies, and GSA's short and long-term investment plans. However, GSA continues to lack a strategic approach to prioritize warehouses and make long-term, informed decisions about government warehouse space. Further, in light of GSA's aging warehouse inventory and agencies' modern-day storage needs, there is potentially a growing gap between what GSA can provide from the government's owned portfolio and what the tenant agencies require. Because the agency lacks a strategy focused on its warehouse portfolio, GSA may have limited ability to address this potentially growing gap as well as the unique challenges facing GSA's warehouse portfolio. Such a strategy would enable GSA and tenant agencies to prioritize their needs and take a long-term view of the warehouse inventory to support better informed decisions. We will follow-up with GSA regarding this recommendation, which is intended to enhance GSA's existing tools and processes, as they relate to warehouses.
    Director: Daniel Bertoni
    Phone: (202) 512-7215

    3 open recommendations
    including 1 priority recommendation
    Recommendation: To improve the ability of the agency to detect and prevent potential physician-assisted fraud, and to address potential disincentives for staff to detect and prevent physician-assisted fraud, SSA should review the standards used to assess DDS performance; and develop and distribute promising practices to incentivize staff to better balance the goal of processing claims promptly with the equally important goal of identifying and reporting evidence of potential fraud.

    Agency: Social Security Administration
    Status: Open

    Comments: SSA partially agreed with this recommendation, citing that their employees take their stewardship responsibilities seriously and that field office and disability determination services (DDS) employees are the agency's first and best line of defense against fraud. In 2016, the agency reported that it was working with experts in its OIG and Office of Anti-Fraud Programs to develop and disseminate promising practices on identifying and reporting fraud. We will close this recommendation once SSA takes steps to review its standards for assessing DDS performance and disseminates the best practices it is developing.
    Recommendation: To improve the ability of the agency to detect and prevent potential physician-assisted fraud, and to address the potential risks associated with medical evidence submitted by sanctioned physicians, SSA should evaluate the threat posed by this information and, if warranted, consider changes to its policies and procedures.

    Agency: Social Security Administration
    Status: Open

    Comments: As of 2016, SSA reported that it was pursuing several options to address the potential risks of medical evidence submitted by sanctioned physicians. This included determining how it could use licensure information from the List of Excluded Individuals and Entities. SSA stated that it believes the best opportunity to further evaluate the possible review of the license statuses of medical evidence providers is in conjunction with the implementation of the National Vendor File, part of the national Disability Case Processing System, which is under development. In addition, SSA reported it had drafted two Social Security Rulings to define fraud and to provide processes for disregarding evidence and making redeterminations in disability claims when there is reason to believe that fraudulent evidence was provided. We will close this recommendation once SSA articulates a strategy for using license status information in the vendor file and it finalizes its rulings.
    Recommendation: To improve the ability of the agency to detect and prevent potential physician-assisted fraud, and to help ensure new initiatives that use analytics to identify potential fraud schemes are successful, SSA should develop an implementation plan that identifies both short- and long-term actions, including: (1) timeframes for implementation; (2) resources and staffing needs; (3) data requirements, e.g., the collection of unique medical provider information; (4) how technology improvement will be integrated into existing technology improvements such as the Disability Case Processing System and National Vendor File; and (5) how different initiatives will interact and support each other.

    Agency: Social Security Administration
    Status: Open
    Priority recommendation

    Comments: Since fiscal year 2015, SSA has taken several steps that will help the agency to combat fraud, waste, and abuse. SSA established the Office of Anti-Fraud Programs to provide centralized oversight and accountability for the agency's initiatives, which, in consultation with the Office of the Inspector General and other SSA components, will lead the development of SSA's anti-fraud initiatives and activities. This includes efforts to mitigate fraud through data analytics that utilize SSA's existing data systems. SSA developed a strategic plan for fiscal years 2016-2018 to guide its anti-fraud efforts that includes the use of data analytics. However, this plan does not specifically address actions to combat potential physician-assisted fraud. As of April 2017, SSA stated that it continued to develop a fraud management strategy that is consistent with the leading practices identified in GAO's report. Once the strategy is complete, SSA plans to conduct a fraud risk assessment on its major lines of business, beginning with the disability program in fiscal year 2017. We will continue to monitor SSA's progress to identify and prevent fraud schemes that include physicians.
    Director: J. Christopher Mihm
    Phone: (202) 512-6806

    8 open recommendations
    including 2 priority recommendations
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to better present a more coherent picture of all federal programs, revise relevant guidance to direct agencies to collaborate with each other in defining and identifying programs that contribute to common outcomes.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of July 2017, Office of Management and Budget (OMB) staff stated that they had not taken any actions in response to our recommendations related to the federal program inventory, as they continued to determine how best to implement inventory requirements in coordination with those of the Digital Accountability and Transparency Act of 2014 (DATA Act) and the Program Management Improvement Accountability Act (PMIAA). OMB staff told us they will issue guidance to implement PMIAA by the end of 2017. They noted that a program inventory would help agencies meet PMIAA requirements such as conducting program portfolio reviews. Staff told us they cannot commit to an implementation date for the inventory updates because of methodological and timing challenges, but they anticipate making significant progress within a year of issuing the PMIAA guidance. We will continue to monitor progress.
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to better present a more coherent picture of all federal programs, revise relevant guidance to provide a time frame for what constitutes "persistent over time" that agencies can use as a decision rule for whether to include short-term efforts as programs.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of July 2017, Office of Management and Budget (OMB) staff stated that they had not taken any actions in response to our recommendations related to the federal program inventory, as they continued to determine how best to implement inventory requirements in coordination with those of the Digital Accountability and Transparency Act of 2014 (DATA Act) and the Program Management Improvement Accountability Act (PMIAA). OMB staff told us they will issue guidance to implement PMIAA by the end of 2017. They noted that a program inventory would help agencies meet PMIAA requirements such as conducting program portfolio reviews. Staff told us they cannot commit to an implementation date for the inventory updates because of methodological and timing challenges, but they anticipate making significant progress within a year of issuing the PMIAA guidance. We will continue to monitor progress.
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to better present a more coherent picture of all federal programs, define plans for when additional agencies will be required to develop program inventories.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of July 2017, Office of Management and Budget (OMB) staff stated that they had not taken any actions in response to our recommendations related to the federal program inventory, as they continued to determine how best to implement inventory requirements in coordination with those of the Digital Accountability and Transparency Act of 2014 (DATA Act) and the Program Management Improvement Accountability Act (PMIAA). OMB staff told us they will issue guidance to implement PMIAA by the end of 2017. They noted that a program inventory would help agencies meet PMIAA requirements such as conducting program portfolio reviews. Staff told us they cannot commit to an implementation date for the inventory updates because of methodological and timing challenges, but they anticipate making significant progress within a year of issuing the PMIAA guidance. We will continue to monitor progress.
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to better present a more coherent picture of all federal programs, include tax expenditures in the federal program inventory effort by designating tax expenditure as a program type in relevant guidance.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open
    Priority recommendation

    Comments: As of July 2017, OMB had not taken action to include tax expenditures in the federal program inventory, as GAO recommended in October 2014. The GPRA Modernization Act of 2010 (GPRAMA) requires OMB to publish a list of all federal programs on a central, government-wide website. The federal program inventory is the primary tool for agencies to identify programs that contribute to their goals, according to OMB's guidance. By including tax expenditures in the inventory, OMB could help ensure that agencies are properly identifying the contributions of tax expenditures to the achievement of their goals. Although OMB published an initial inventory covering the programs of 24 federal agencies in May 2013, OMB decided to postpone further development of the inventory in order to coordinate with the implementation of the Digital Accountability and Transparency Act of 2014 (DATA Act). In July 2015, GAO recommended that OMB accelerate efforts to merge DATA Act purposes with the production of a federal program inventory. In July 2017, OMB guidance and staff stated they are determining how best to implement the program inventory requirements in coordination with those of the DATA Act and the Program Management Improvement Accountability Act. Without including tax expenditures in the inventory, OMB is missing an important opportunity to increase the transparency of tax expenditures and the outcomes to which they contribute.
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to better present a more coherent picture of all federal programs, include tax expenditures in the federal program inventory effort by developing, in coordination with the Secretary of the Treasury, a tax expenditure inventory that identifies each tax expenditure and provides a description of how the tax expenditure is defined, its purpose, and related performance and budget information.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open
    Priority recommendation

    Comments: As of July 2017, OMB had not taken action to include tax expenditures in the federal program inventory, as GAO recommended in October 2014. The GPRA Modernization Act of 2010 (GPRAMA) requires OMB to publish a list of all federal programs on a central, government-wide website. The federal program inventory is the primary tool for agencies to identify programs that contribute to their goals, according to OMB's guidance. By including tax expenditures in the inventory, OMB could help ensure that agencies are properly identifying the contributions of tax expenditures to the achievement of their goals. Although OMB published an initial inventory covering the programs of 24 federal agencies in May 2013, OMB decided to postpone further development of the inventory in order to coordinate with the implementation of the Digital Accountability and Transparency Act of 2014 (DATA Act). In July 2015, GAO recommended that OMB accelerate efforts to merge DATA Act purposes with the production of a federal program inventory. In July 2017, OMB guidance and staff stated they are determining how best to implement the program inventory requirements in coordination with those of the DATA Act and the Program Management Improvement Accountability Act. Without including tax expenditures in the inventory, OMB is missing an important opportunity to increase the transparency of tax expenditures and the outcomes to which they contribute.
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to help ensure that the information agencies provide in their inventories is useful to federal decision makers and key stakeholders, and to provide greater transparency and ensure consistency in federal program funding and performance information, revise relevant guidance to direct agencies to consult with relevant congressional committees and stakeholders on their program definition approach and identified programs when developing or updating their inventories.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of July 2017, Office of Management and Budget (OMB) staff stated that they had not taken any actions in response to our recommendations related to the federal program inventory, as they continued to determine how best to implement inventory requirements in coordination with those of the Digital Accountability and Transparency Act of 2014 (DATA Act) and the Program Management Improvement Accountability Act (PMIAA). OMB staff told us they will issue guidance to implement PMIAA by the end of 2017. They noted that a program inventory would help agencies meet PMIAA requirements such as conducting program portfolio reviews. Staff told us they cannot commit to an implementation date for the inventory updates because of methodological and timing challenges, but they anticipate making significant progress within a year of issuing the PMIAA guidance. We will continue to monitor progress.
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to help ensure that the information agencies provide in their inventories is useful to federal decision makers and key stakeholders, and to provide greater transparency and ensure consistency in federal program funding and performance information, revise relevant guidance to direct agencies to identify in their inventories the performance goal(s) to which each program contributes.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of July 2017, Office of Management and Budget (OMB) staff stated that they had not taken any actions in response to our recommendations related to the federal program inventory, as they continued to determine how best to implement inventory requirements in coordination with those of the Digital Accountability and Transparency Act of 2014 (DATA Act) and the Program Management Improvement Accountability Act (PMIAA). OMB staff told us they will issue guidance to implement PMIAA by the end of 2017. They noted that a program inventory would help agencies meet PMIAA requirements such as conducting program portfolio reviews. Staff told us they cannot commit to an implementation date for the inventory updates because of methodological and timing challenges, but they anticipate making significant progress within a year of issuing the PMIAA guidance. We will continue to monitor progress.
    Recommendation: To ensure the effective implementation of federal program inventory requirements and to make the inventories more useful, the Director of OMB should, to help ensure that the information agencies provide in their inventories is useful to federal decision makers and key stakeholders, and to provide greater transparency and ensure consistency in federal program funding and performance information, ensure, during OMB reviews of inventories, that agencies consistently identify, as applicable, the strategic goals, strategic objectives, agency priority goals, and cross-agency priority goals each program supports.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of July 2017, Office of Management and Budget (OMB) staff stated that they had not taken any actions in response to our recommendations related to the federal program inventory, as they continued to determine how best to implement inventory requirements in coordination with those of the Digital Accountability and Transparency Act of 2014 (DATA Act) and the Program Management Improvement Accountability Act (PMIAA). OMB staff told us they will issue guidance to implement PMIAA by the end of 2017. They noted that a program inventory would help agencies meet PMIAA requirements such as conducting program portfolio reviews. Staff told us they cannot commit to an implementation date for the inventory updates because of methodological and timing challenges, but they anticipate making significant progress within a year of issuing the PMIAA guidance. We will continue to monitor progress.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    3 open recommendations
    Recommendation: Before making decisions on whether to disaggregate DOD's protected satellite communications, SBIRS, or environmental monitoring satellite systems, the Secretary of Defense should direct the Under Secretary of Defense for Acquisition, Technology and Logistics to develop common measures for resilience.

    Agency: Department of Defense
    Status: Open

    Comments: DOD has not yet developed common measures for resilience, but has stated standard metrics are under development. Results from a recent study by the National Security Space Enterprise Vision Tiger Team are expected to develop resilience requirements and options for attaining resiliency. DOD plans to use the Space Based Infrared System Follow-on as a test case for describing resilience as a system requirement. The Air Force approved a draft capability development document in February 2017, and a full capability development document is under development. In addition, DOD has identified mission assurance and resiliency as priorities for the next Space Strategic Portfolio Review. GAO's ongoing review of hosted payloads, to be conducted over the next year, will likely review issues related to this area.
    Recommendation: Before making decisions on whether to disaggregate DOD's protected satellite communications, SBIRS, or environmental monitoring satellite systems, the Secretary of Defense should direct the Under Secretary of Defense for Acquisition, Technology and Logistics to expand demonstration efforts to examine the operational feasibility of disaggregation by empirically quantifying its benefits and limitations as well as addressing longstanding barriers that could hinder its implementation.

    Agency: Department of Defense
    Status: Open

    Comments: DOD has not yet empirically quantified the benefits and limitations of disaggregation, or addressed longstanding barriers that could hinder its implementation, through a demonstration of operational feasibility. However, DOD stated it has considered the disaggregation of certain capabilities in previous war games, and lessons learned will be carried forward into future war games. For example, the most recent war games focused on ways to increase space system resilience by expanding and integrating international and private sector capabilities, and increasing the number of sensors and associated coverage.
    Recommendation: Before making decisions on whether to disaggregate DOD's protected satellite communications, Space Based Infrared System (SBIRS), or environmental monitoring satellite systems, the Secretary of Defense should direct the Under Secretary of Defense for Acquisition, Technology and Logistics to comprehensively examine--either through the Analysis of Alternatives studies or through other assessments--the full range of disaggregation issues, including those that go beyond the satellite systems themselves.

    Agency: Department of Defense
    Status: Open

    Comments: DOD has made progress toward assessing disaggregation through its analysis of alternatives (AOA) efforts for individual satellite programs within three areas: protected satellite communications services (PSCS), space-based environmental monitoring (SBEM), and the Space Based Infrared System (SBIRS). However, DOD has not yet completed a comprehensive examination of the full range of disaggregation issues. DOD completed the SBEM AOA in October 2013, the SBIRS Follow-on AOA in December 2015, and the PSCS AOA in February 2016. These AOAs each included cost, capability, and risk analyses for aggregated and disaggregated alternatives, though each did not assess the full range of disaggregation issues for the subject area. For example, the SBEM AOA evaluated options including placing sensors on host satellites, placing satellites in different orbits, and relying on international and U.S. civil partners to provide some capabilities, but it focused on the space segment and did not analyze alternative ground segment components. The AOA team determined impacts to the ground segment would need to be assessed more thoroughly once DOD decided on a solution. In October 2016, the Air Force approved an acquisition strategy for the planned solution, called the Weather System Follow-on - Microwave. The program has not yet assessed ground segment impacts, but the Air Force stated it will be assessed further once a contract is awarded. For the PSCS and SBIRS areas, the Air Force conducted subsequent studies on resiliency in 2016, which evaluated the benefits of resiliency in future architectures for satellite communications missions and informed resilience requirements for the SBIRS Follow-on. GAO has ongoing work in these areas and plans to complete reviews of the AOAs in the fall of 2017 and a hosted payload review in the next year.
    Director: John Neumann
    Phone: (202) 512-3841

    9 open recommendations
    Recommendation: To better inform users of the annual monitoring report about the frequency and scope of pesticide tolerance violations, the Secretary of Health and Human Services should direct the Commissioner of FDA to disclose in the agency's annual pesticide monitoring program report which pesticides with EPA-established tolerances the agency did not test for in its pesticide monitoring program and the potential effect of not testing for those pesticides.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In February 2015, FDA posted a report summarizing the results of its Fiscal Year 2012 Pesticide Monitoring Program. The report identified which pesticides the agency tested for in FY 2012. However, the report did not identify which pesticides with EPA-established tolerances were not tested for, nor did it discuss the potential effect of not testing for those pesticides. As of December 2016, FDA had not provided an updated status for this recommendation. It plans to provide a status update in early calendar year 2017.
    Recommendation: To gather and report reliable, nationally representative data on pesticide residue violations, the Secretary of Health and Human Services should direct the Commissioner of FDA to design and implement a statistically valid sampling methodology that would enable the agency, within existing resources, to gather nationally representative pesticide residue incidence and level data for both domestically produced and imported foods, or justify statistically the use of a nonprobability method that can measure the estimation error. In designing either approach, FDA should consider the extent to which the benefits exceed the costs.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: In February 2015, FDA issued a report summarizing the results of its pesticide monitoring program for Fiscal Year 2012. This report followed by about 4 months the issuance of our report, GAO-15-38, in October 2014. The FDA report stated that the sampling methodology used in FY 2012 was not statistically based. However, in light of our recommendation that FDA design and implement a statistically valid sampling methodology, the agency could have used its February 2015 report to announce its plan to develop such a methodology for use in the future, but it did not do so. As of December 2016, FDA had not provided an updated status for this recommendation. It plans to provide a status update in early calendar year 2017.
    Recommendation: To gather and report reliable, nationally representative data on pesticide residue violations, the Secretary of Health and Human Services should direct the Commissioner of FDA to report the nationally representative incidence and level data in its annual pesticide monitoring reports, including disclosing the limits of its chosen sampling methodology.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: As of December 2016, FDA had not provided an updated status for this recommendation. It plans to provide a status update in early calendar year 2017.
    Recommendation: To evaluate and refine its targeted pesticide compliance and enforcement monitoring program, the Secretary of Health and Human Services should direct the Commissioner of FDA to use the incidence and level data to assess the effectiveness of FDA's targeted pesticide compliance and enforcement monitoring program, including its use of the Predictive Risk-based Evaluation for Dynamic Import Compliance Targeting targeting tool for imported foods, by comparing the rate of violations detected through the program to the overall rate of pesticide residue violations within the domestic and imported food supplies.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: As of December 2016, FDA had not provided an updated status for this recommendation. It plans to provide a status update in early calendar year 2017.
    Recommendation: To evaluate and refine its targeted pesticide compliance and enforcement monitoring program, the Secretary of Health and Human Services should direct the Commissioner of FDA to identify any types of domestic and imported foods that are at high risk for pesticide residue tolerance violations to improve the ability of its targeted pesticide compliance and enforcement monitoring program to consistently identify food likely to have violations.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: As of December 2016, FDA had not provided an updated status for this recommendation. It plans to provide a status update in early calendar year 2017.
    Recommendation: To better inform the public about the frequency and scope of pesticide tolerance violations, the Secretary of Agriculture should direct the FSIS Administrator to disclose in the agency's annual pesticide monitoring program report which pesticides with EPA-established tolerances the agency did not test for in its National Residue Program and the potential effect of not testing for those pesticides.

    Agency: Department of Agriculture
    Status: Open

    Comments: In March 2015, FSIS issued its Fiscal Year 2015 Residue Sampling Plan for the National Residue Program for Meat, Poultry, and Egg Products. The sampling plan contained information on the pesticides that FSIS would include in its residue testing program. However, the sampling plan did not identify pesticides with EPA-established tolerances that FSIS did not plan to include in its testing program. In December 2015, FSIS issued its Fiscal Year 2014 Residue Sample Results for its national residue program. The agency's report on its results did not identify pesticides with EPA-established tolerances that were not included in its testing program, nor did it report on the potential effect of not testing for those pesticides. In June 2016, FSIS issued its sampling plan for Fiscal Year 2016. The sampling plan contained information on the pesticides that FSIS would include in its residue testing program. However, the sampling plan did not identify pesticides with EPA-established tolerances that FSIS did not plan to include in its testing program. The FSIS sampling results for Fiscal Year 2015 were not available as of December 2016.
    Recommendation: To better meet federal standards and best practices for statistical surveys, the Secretary of Agriculture should direct the AMS Administrator to provide better documentation of the survey methods used in its Pesticide Data Program in the program's annual reports by providing more complete information on the sampling methodology the agency uses, such as how it identifies and selects states, food distribution centers, and commodities for pesticide residue testing, and include measures of sampling error for reported estimates.

    Agency: Department of Agriculture
    Status: Open

    Comments: The Agricultural Marketing Service published its 2015 Pesticide Data Program annual report in November 2016. As with earlier reports, this report does not provide sufficient documentation of the survey methods used in the program. In particular, the report does not provide complete information on the sampling methodology the agency used, such as how it identified and selected states, food distribution centers, and commodities for pesticide residue testing. Further, it does not include measures of sampling error for reported estimates.
    Recommendation: To better meet federal standards and best practices for statistical surveys, the Secretary of Agriculture should direct the AMS Administrator to provide better documentation of the survey methods used in its Pesticide Data Program in the program's annual reports by reporting on the extent to which its survey covers commodities in the U.S. food supply and any limitations associated with its survey methodology.

    Agency: Department of Agriculture
    Status: Open

    Comments: The Agricultural Marketing Service published its 2015 Pesticide Data Program annual report in November 2016. This report has a new section titled Sampling Limitations. In that section, the agency acknowledges that the total number of distribution centers and terminal markets within the participating states is difficult to establish because existing sites may go out of business or merge and new sites may open during the course of the year. Despite this limitation, the agency concludes that the sites selected in the program are representative of all sites in these states. However, the agency has not provided sufficient documentation in the report to support the claim that its data are representative of conditions across the country for commodities in the U.S. food supply.
    Recommendation: To better meet federal standards and best practices for statistical surveys, the Secretary of Agriculture should direct the AMS Administrator to provide better documentation of the survey methods used in its Pesticide Data Program in the program's annual reports by describing methods users should employ to analyze the data, including obtaining margins of error for making generalizeable estimates of pesticide residues in commodities.

    Agency: Department of Agriculture
    Status: Open

    Comments: The Agricultural Marketing Service published its 2015 Pesticide Data Program annual report in November 2016. This report does not describe methods users should employ to analyze the data, including obtaining margins of error for making generalizeable estimates of pesticide residues in commodities.
    Director: John Neumann
    Phone: (202) 512-3841

    4 open recommendations
    Recommendation: To more effectively fulfill its expanded role in providing a clearinghouse of information on available federal technology transfer opportunities, the Chair of FLC, in coordination with the other members of the Executive Board, should work collaboratively with agency and lab members to take steps to better communicate with potential customers during the design and implementation of FLC's clearinghouse initiatives, including conducting customer needs assessments, conducting customer testing of current and future web-based initiatives, and collecting customer feedback on all FLC initiatives to make the initiatives more useful.

    Agency: Federal Laboratory Consortium for Technology Transfer
    Status: Open

    Comments: FLC has provided GAO with information on steps they are taking to address the recommendations in GAO-15-127. A number of these actions should be completed towards the end of 2016 after which we plan to request additional information from FLC.
    Recommendation: To more effectively fulfill its expanded role in providing a clearinghouse of information on available federal technology transfer opportunities, the Chair of FLC, in coordination with the other members of the Executive Board, once feedback is collected from potential customers, should work collaboratively with agency and lab members to use this feedback to improve FLC's initiatives to make them more useful to potential customers, including asking FLC members for additional or different information, as appropriate.

    Agency: Federal Laboratory Consortium for Technology Transfer
    Status: Open

    Comments: FLC has provided GAO with information on steps they are taking to address the recommendations in GAO-15-127. A number of these actions should be completed towards the end of 2016 after which we plan to request additional information from FLC.
    Recommendation: To more effectively fulfill its expanded role in providing a clearinghouse of information on available federal technology transfer opportunities, the Chair of FLC, in coordination with the other members of the Executive Board, should work collaboratively with agency and lab members to develop performance goals and measures for FLC's clearinghouse initiatives and use the results to evaluate progress toward meeting FLC's goals on outreach and networking.

    Agency: Federal Laboratory Consortium for Technology Transfer
    Status: Open

    Comments: FLC has provided GAO with information on steps they are taking to address the recommendations in GAO-15-127. A number of these actions should be completed towards the end of 2016 after which we plan to request additional information from FLC.
    Recommendation: To more effectively fulfill its expanded role in providing a clearinghouse of information on available federal technology transfer opportunities, the Chair of FLC, in coordination with the other members of the Executive Board, should report on FLC's progress in these efforts in its annual report to the President and Congress.

    Agency: Federal Laboratory Consortium for Technology Transfer
    Status: Open

    Comments: FLC has provided GAO with information on steps they are taking to address the recommendations in GAO-15-127. A number of these actions should be completed towards the end of 2016 after which we plan to request additional information from FLC.
    Director: Asif A. Khan
    Phone: (202) 512-9869

    2 open recommendations
    Recommendation: To help improve the implementation of GCSS-Army, the Secretary of the Army should ensure that the Under Secretary of the Army, in his capacity as the Chief Management Officer, directs the GCSS-Army Program Management Office to develop an updated schedule that fully incorporates best practices, including (1) assigning resources to all activities, (2) establishing durations of all activities, (3) confirming that the critical path is valid, and (4) ensuring reasonable total float.

    Agency: Department of Defense: Department of the Army
    Status: Open

    Comments: We are in the process of obtaining an updated integrated master schedule from DOD to determine if Army fully incorporated best practices. As of June 2017,Army officials told us that the integrated master schedule and revised cost estimate will not be available until December 2017. This recommendation remains open.
    Recommendation: To help improve the implementation of GCSS-Army, the Secretary of the Army should ensure that the Under Secretary of the Army, in his capacity as the Chief Management Officer, directs the GCSS-Army Program Management Office to update the cost estimate to fully incorporate best practices by documenting the results of (1) a risk and uncertainty analysis, (2) the cross-checking of major cost elements to see if results are similar, and (3) a sensitivity analysis.

    Agency: Department of Defense: Department of the Army
    Status: Open

    Comments: We are in the process of obtaining an updated cost estimate from DOD to determine if Army fully incorporated best practices. As of June 2017, Army officials told us that the integrated master schedule and revised cost estimate will not be available until December 2017. This recommendation remains open.
    Director: Maurer, Diana C
    Phone: (202) 512-9627

    6 open recommendations
    including 5 priority recommendations
    Recommendation: The Secretary of Homeland Security should designate the headquarters consolidation program a major acquisition, consistent with DHS acquisition policy, and apply DHS acquisition policy requirements.

    Agency: Department of Homeland Security
    Status: Open
    Priority recommendation

    Comments: In alignment with GAO's recommendation, on September 16, 2014, DHS issued an Acquisition Decision Memorandum designating the DHS-funded portions of the headquarters consolidation program as a Major Acquisition Program to be overseen by the departmental Acquisition Review Board (ARB). DHS made further progress implementing this recommendation by conducting and documenting an ARB of the program on November 15, 2016. The ARB process provided DHS greater oversight of headquarters consolidation, and provided a forum for officials to consider a wide range of issues affecting consolidation efforts, such as funding and project scope. However, DHS and General Services Administration (GSA) were required to revise their cost and schedule estimates subsequent to the ARB's review. In addition, as of March 2017, DHS, in coordination with GSA, had not submitted the report to Congress on DHS Headquarters Consolidation mandated by Pub. L. No. 114-150. GAO will reassess the status of this recommendation after cost and schedule estimates are finalized and DHS and GSA submit the required report to Congress, i.e., when there is more certainty about the future direction of the project overall and DHS's funded portion in particular.
    Recommendation: In order to improve transparency and allow for more informed decision making by congressional leaders and DHS and GSA decision-makers, before requesting additional funding for the DHS headquarters consolidation project, the Secretary of Homeland Security and the Administrator of the General Services Administration should work jointly to conduct the following assessments and use the results to inform updated DHS headquarters consolidation plans: (1) a comprehensive needs assessment and gap analysis of current and needed capabilities that take into consideration changing conditions, and (2) an alternatives analysis that identifies the costs and benefits of leasing and construction alternatives for the remainder of the project and prioritizes options to account for funding instability.

    Agency: Department of Homeland Security
    Status: Open
    Priority recommendation

    Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of March 2017, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Officials stated that the information would be submitted as soon as possible, but exact timeframes were uncertain given ongoing project deliberations and internal reviews. Required information includes a comprehensive assessment of property and facilities utilized by DHS in the National Capital Region, and an analysis that identifies the costs and benefits of leasing and construction alternatives for the remainder of the consolidation project. DHS and GSA have made significant progress in developing a revised plan for headquarters consolidation since 2014, including the completion of a business case analysis to support the new plan. GAO will review the latest information on DHS headquarters consolidation efforts when it is provided to Congress, and will assess the materials in the context of this recommendation at that time. Continued DHS and GSA attention to following leading capital planning practices is critical given the project's multi-billion dollar cost and impact on future departmental operations.
    Recommendation: In order to improve transparency and allow for more informed decision making by congressional leaders and DHS and GSA decision-makers, before requesting additional funding for the DHS headquarters consolidation project, the Secretary of Homeland Security and the Administrator of the General Services Administration should work jointly to conduct the following assessments and use the results to inform updated DHS headquarters consolidation plans: (1) a comprehensive needs assessment and gap analysis of current and needed capabilities that take into consideration changing conditions, and (2) an alternatives analysis that identifies the costs and benefits of leasing and construction alternatives for the remainder of the project and prioritizes options to account for funding instability.

    Agency: General Services Administration
    Status: Open
    Priority recommendation

    Comments: GSA agreed with both recommendations to conduct a comprehensive needs assessment and gap analysis and to update cost and schedule estimates. The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150), enacted on April 29, 2016, mirrors GAO recommendations in this area. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS's headquarters consolidation efforts not later than 120 days of enactment. As of March 2017, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Officials stated that the information would be submitted as soon as possible, but exact timeframes were uncertain given ongoing project deliberations and internal reviews. Required information includes a comprehensive needs assessment, a costs and benefits analysis, and updated cost and schedule estimates. Furthermore, the act requires the Comptroller General to evaluate the cost and schedule estimates not later than 90 days after their submittal to Congress. DHS and GSA have made significant progress in developing an Enhanced Plan for headquarters consolidation since 2014, including the completion of a business case analysis to support the new plan. In addition, GSA is leading efforts to revise the project's cost and schedule estimates, and according to GSA officials, the revised figures will take into account GAO's leading cost-estimation practices. We will review the latest information on DHS's headquarters consolidation efforts when it is provided to Congress, and will assess the materials in the context of these recommendations at that time. Continued DHS and GSA attention to following leading practices for capital planning and cost and schedule estimation is critical given the project's multi-billion dollar cost and impact on future departmental operations.
    Recommendation: In order to improve transparency and allow for more informed decision making by congressional leaders and DHS and GSA decision-makers, before requesting additional funding for the DHS headquarters consolidation project, after revising the DHS headquarters consolidation plans, the Secretary of Homeland Security and the Administrator of the General Services Administration should work jointly to develop revised cost and schedule estimates for the remaining portions of the consolidation project that conform to GSA guidance and leading practices for cost and schedule estimation, including an independent evaluation of the estimates.

    Agency: Department of Homeland Security
    Status: Open
    Priority recommendation

    Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of March 2017, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Officials stated that the information would be submitted as soon as possible, but exact timeframes were uncertain given ongoing project deliberations and internal reviews. Required information includes updated cost and schedule estimates for the consolidation project that are consistent with GAO's recommendations in GAO-14-648. Furthermore, the act requires the Comptroller General to evaluate the cost and schedule estimates not later than 90 days after their submittal to Congress. GSA is leading efforts to revise project cost and schedule estimates, and according to GSA officials, the revised figures will take into account GAO's leading estimation practices. GAO will review the latest DHS headquarters consolidation cost and schedule estimates when they are provided to Congress, and will assess the materials in the context of this recommendation at that time. Continued DHS and GSA attention to following leading cost and schedule estimation practices is critical given the project's multi-billion dollar cost and impact on future departmental operations.
    Recommendation: In order to improve transparency and allow for more informed decision making by congressional leaders and DHS and GSA decision-makers, before requesting additional funding for the DHS headquarters consolidation project, after revising the DHS headquarters consolidation plans, the Secretary of Homeland Security and the Administrator of the General Services Administration should work jointly to develop revised cost and schedule estimates for the remaining portions of the consolidation project that conform to GSA guidance and leading practices for cost and schedule estimation, including an independent evaluation of the estimates.

    Agency: General Services Administration
    Status: Open
    Priority recommendation

    Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of March 2017, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Officials stated that the information would be submitted as soon as possible, but exact timeframes were uncertain given ongoing project deliberations and internal reviews. Required information includes updated cost and schedule estimates for the consolidation project that are consistent with GAO's recommendations in GAO-14-648. Furthermore, the act requires the Comptroller General to evaluate the cost and schedule estimates not later than 90 days after their submittal to Congress. GSA is leading efforts to revise project cost and schedule estimates, and according to GSA officials, the revised figures will take into account GAO's leading estimation practices. GAO will review the latest DHS headquarters consolidation cost and schedule estimates when they are provided to Congress, and will assess the materials in the context of this recommendation at that time. Continued DHS and GSA attention to following leading cost and schedule estimation practices is critical given the project's multi-billion dollar cost and impact on future departmental operations.
    Recommendation: Congress should consider making future funding for the St. Elizabeths project contingent upon DHS and GSA developing a revised headquarters consolidation plan, for the remainder of the project, that conforms with leading practices and that (1) recognizes changes in workplace standards, (2) identifies which components are to be colocated at St. Elizabeths and in leased and owned space throughout the National Capital Region, and (3) develops and provides reliable cost and schedule estimates.

    Agency: Congress
    Status: Open

    Comments: The Department of Homeland Security Headquarters Consolidation Accountability Act of 2015 (Pub. L. No. 114-150) was enacted on April 29, 2016. Among other things, the act requires DHS, in coordination with GSA, to submit information to Congress about DHS headquarters consolidation efforts not later than 120 days of enactment. As of March 2017, DHS and GSA had not submitted the information to Congress required by Pub. L. No. 114-150. Officials stated that the information would be submitted as soon as possible, but exact timeframes were uncertain given ongoing project deliberations and internal reviews. Required information includes: a comprehensive assessment of property and facilities utilized by DHS in the National Capital Region; an analysis that identifies the costs and benefits of leasing and construction alternatives for the remainder of the consolidation project; and updated cost and schedule estimates for the project that are consistent with GAO's recommendations in GAO-14-648. Furthermore, the act requires the Comptroller General to evaluate the cost and schedule estimates not later than 90 days after their submittal to Congress. A comprehensive report to Congress on DHS headquarters consolidation, along with reliable project cost and schedule estimates, could inform Congress's funding decisions.
    Director: Brenda S. Farrell
    Phone: (202) 512-3604

    1 open recommendations
    Recommendation: In order for the military services to obtain more comprehensive and detailed information regarding sexual assault prevention and response during basic and subsequent career-specific training to help oversee their programs, the Secretary of Defense should direct each military service, in collaboration with the Director of DOD's Sexual Assault Prevention and Response Office, to develop and implement a tool, such as a survey, or leverage existing military training surveys--such as those used by the Air Force or the Navy--that will provide more comprehensive and detailed information to decision makers about sexual assault and other sexual misconduct that occur during initial military training, including basic and subsequent career-specific military training.

    Agency: Department of Defense
    Status: Open

    Comments: DOD partially concurred with the recommendation to develop and implement a survey, or leverage existing military training surveys, which will provide more comprehensive and detailed information to decision makers about sexual assault and other sexual misconduct that occurs during initial military training, including basic and subsequent career-specific military training. In its written comments, DOD stated that the department values the intent of this recommendation; but stated that more analysis needs to be conducted to determine the best tool or methodology to meet the intent of this recommendation and reduce the negative impact of possible survey fatigue. As of August 2017, DOD requires each service to respond about actions taken in response to this recommendation in its enclosure to the department's annual report on sexual assault. While the Navy and Air Force continue to survey recruits and technical training students, the Marine Corps and Army have not implemented surveys. As such, this recommendation will remain open and we will monitor the response of the Army and Marine Corps in next year's annual report.
    Director: Jacqueline M. Nowicki
    Phone: (617) 788-0580

    2 open recommendations
    Recommendation: Based on GAO's review, the Secretary of Education should direct the Office of Special Education Programs to increase transparency regarding the timeliness of due process hearing decisions for Congress and better target its monitoring and technical assistance to states, revise its performance measure to collect information from states on the amount of time that extensions add to due process hearing decisions.

    Agency: Department of Education
    Status: Open

    Comments: : In April 2017, Education reported that it had developed and implemented a plan to monitor states with 10 or more fully adjudicated hearings in a given year where at least 75 percent of the decisions are issued with extended timelines. Specifically, the agency reported it was actively monitoring 6 states meeting these criteria. It would also provide technical assistance to states, as appropriate, to facilitate more timely resolution of due process disputes. Education also reported that it would gather information on the burden and cost of revising its performance measure, however, as of June 2017, it had not provided documentation that it had done so. While these are positive steps, we will consider closing this recommendation when Education's revises its performance measure on the timeliness of due process hearing decisions.
    Recommendation: Based on GAO's review, the Secretary of Education should direct the Office of Special Education Programs to assist its oversight of dispute resolution, take steps to improve the comparability of parental involvement data while minimizing the burden to states, and use the data for better management decision making. Steps to consider could include establishing and requiring that states follow standard data collection and analysis procedures.

    Agency: Department of Education
    Status: Open

    Comments: In FY15, Education reported that the IDEA Data Center, in relation to the parent involvement portion of the audit, has continued review of APR [need to spell out] indicator B8 to collect information related to data collection methods, results, and improvement activities for the indicator summary for OSEP. It also began reviewing existing sources for information on how parent data are collected and best practices/ exemplars that are publicly available. In April 2017, Education reported it would direct Parent Technical Assistance Centers and other Education-funded centers to work together to develop and disseminate materials to assist states in analyzing and using parental involvement data to improve the provision of special education services. We believe this effort could help individual states improve methods for analyzing and using parental involvement data. However, we await documentation that such materials were developed and distributed. Also, it is unclear how it would improve the comparability of parental involvement data across states and allow Education to accurately assess states' performance on this IDEA indicator.
    Director: Maurer, Diana C
    Phone: (202) 512-9627

    1 open recommendations
    Recommendation: To better address obstacles that occur during the activation process and to help ensure that institutions are activated within estimated timeframes, including those institutions that do not currently have inmates, such as Administrative USP Thomson and USP Yazoo City, the Director of the Bureau of Prisons should develop and implement an activation schedule that incorporates the four characteristics of scheduling best practices.

    Agency: Department of Justice: Bureau of Prisons
    Status: Open

    Comments: On November 25, 2014, DOJ provided a written response to GAO-14-709 that stated that BOP was in the process of developing a new activation handbook and comprehensive schedule and that BOP would establish a multi-disciplinary working group of BOP subject-matter experts to work on this project. On June 3, 2015, BOP reported that it had assembled a multidisciplinary workgroup as planned, and based on BOP's March 16, 2016 status update, the workgroup's efforts were ongoing at the time. On September 20, 2016, BOP provided the schedule to us, as part of its newly developed activation handbook. While the Activation Handbook's schedule addresses in detail what needs to be done and who should do the work, it is not fully inclusive of the best practices related to scheduling that we outlined in our report. To fully address this recommendation, BOP would need to fully incorporate best practices. This includes creating a baseline schedule that incorporates all of the tasks identified in the responsibility matrix, determining the duration for each effort, and incorporating the appropriate predecessor and successor logic. Per scheduling best practices, BOP would also need to determine which activities make up the critical path and develop procedures for conducting a schedule risk analysis, ensuring that the schedule can be traced both horizontally and vertically, and that mechanisms are in place for maintaining the baseline schedule and an updated schedule as projects progress.
    Director: Brenda S. Farrell
    Phone: (202) 512-3604

    2 open recommendations
    Recommendation: To help ensure that DOD has the necessary information to determine the extent to which cost savings result from any future consolidation of training within METC or the Education and Training Directorate, the Assistant Secretary of Defense for Health Affairs should direct the Director of the DHA to develop baseline cost information as part of its metrics to assess achievement of cost savings.

    Agency: Department of Defense: Office of the Assistant Secretary of Defense (Health Affairs)
    Status: Open

    Comments: The House Report Accompanying the National Defense Authorization Act for Fiscal Year 2015, citing our work on this subject, required DOD to submit a report by January 31, 2015 detailing, among other things, an explanation of the purpose and goals of the medical education and training shared service with regard to its role in improving the cost efficiency of delivering training, including the challenges it will address, the practices it will put in place to address these challenges, and the resulting cost savings. However, as of September 2015, DOD has not submitted this report. Until DOD develops baseline cost information as part of its metrics to assess achievement of cost savings, this recommendation should remain open.
    Recommendation: To help realize the reform effort's goal of achieving cost savings, the Assistant Secretary of Defense for Health Affairs should direct the Director of the DHA to conduct a fully developed business case analysis for the Education and Training Directorate's reform effort. In this analysis the Director should (1) identify the cost-related problem that it seeks to address by establishing the Education and Training Directorate, (2) explain how the processes it has identified will address the costrelated problem, and (3) conduct and document an analysis of benefits, costs, and risks.

    Agency: Department of Defense: Office of the Assistant Secretary of Defense (Health Affairs)
    Status: Open

    Comments: The House Report Accompanying the National Defense Authorization Act for Fiscal Year 2015, citing our work on this subject, required DOD to submit a report by January 31, 2015 detailing, among other things, an explanation of the purpose and goals of the medical education and training shared service with regard to its role in improving the cost efficiency of delivering training, including the challenges it will address, the practices it will put in place to address these challenges, and the resulting cost savings. However, as of September 2015, DOD has not submitted this report. We reported in September 2015 that DOD has not yet presented a fully developed business case for its Medical Education and Training shared service. Until DOD addresses these concerns, this recommendation should remain open.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    3 open recommendations
    including 3 priority recommendations
    Recommendation: To provide the Congress with the necessary insight into program planning and affordability, and to decrease the risk of cost and schedule overruns, NASA's Administrator should direct the Human Exploration and Operations Mission Directorate to take the following action: To promote affordability, before finalizing acquisition plans for future capability variants, NASA should assess the full range of competition opportunities and provide to the Congress the agency's assessment of the extent to which development and production of future elements of the SLS could be competitively procured.

    Agency: National Aeronautics and Space Administration
    Status: Open
    Priority recommendation

    Comments: NASA agreed with this recommendation. NASA competitively awarded a contract to develop and build a universal stage adapter and provided justifications for other than full and open competition for the Exploration Upper Stage and Exploration Upper Stage engines as well as for the acquisition of six additional RS-25 engines. NASA, however, did not provide support that in advance of awarding these sole source contracts that it provided to Congress the agency's assessment of the extent to which development and production of future elements of the SLS could be competitively procured. To fully implement this recommendation, NASA should conduct such an analysis and provide this assessment to Congress for the new advanced boosters that it plans to acquire.
    Recommendation: To provide the Congress with the necessary insight into program planning and affordability, and to decrease the risk of cost and schedule overruns, NASA's Administrator should direct the Human Exploration and Operations Mission Directorate to take the following action: To allow for a continued assessment of progress and affordability, NASA should structure each future increment of SLS capability with a total cost exceeding the $250 million threshold for designation as a major project as a separate development effort within the SLS program. In doing so, NASA should require each increment to complete both the technical and programmatic reviews required of other major development projects, per the agency's acquisition and system engineering policies.

    Agency: National Aeronautics and Space Administration
    Status: Open
    Priority recommendation

    Comments: NASA agreed with this recommendation. In May 2017, NASA officials stated that efforts to address this recommendation are in progress.
    Recommendation: To provide the Congress with the necessary insight into program planning and affordability, and to decrease the risk of cost and schedule overruns, NASA's Administrator should direct the Human Exploration and Operations Mission Directorate to take the following action: Provide decision makers with an informed basis for making investment decisions regarding the SLS program, NASA should identify a range of possible missions for each future SLS variant that includes cost and schedule estimates and plans for how those possible missions would fit within NASA's funding profile.

    Agency: National Aeronautics and Space Administration
    Status: Open
    Priority recommendation

    Comments: NASA agreed with this recommendation. NASA officials stated they have taken steps to address it through issuing its September 2016 Human Exploration and Operations Exploration Objectives document. This document is a positive step in providing additional details about NASA?s vision as it includes more details on the objectives that NASA plans to accomplish in its phases of exploration. To fully address this recommendation, however, NASA still needs to identify cost and schedule estimates for any possible SLS missions beyond its first exploration mission, EM-1, and how its planned missions would fit within NASA's funding profile.
    Director: Anne-Marie Fennell
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: To ensure that NOAA has sufficient information and analysis to guide long-term decisions regarding its aircraft, the Secretary of Commerce should direct the NOAA Administrator to ensure that the agency links and integrates its multiple planning efforts as it finalizes a capital asset plan for aircraft.

    Agency: Department of Commerce
    Status: Open

    Comments: As of December 2016, NOAA's Office of Marine and Aviation Operations is working to complete its various planning efforts activities and integrate the key components with a comprehensive aircraft modernization plan that it expects to finalize in fall 2017.
    Director: David C. Trimble
    Phone: (202) 512-3841

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To ensure that the security of radiological sources at industrial facilities is reasonably assured, the Chairman of the Nuclear Regulatory Commission should conduct an assessment of the T&R process--by which licensees approve employees for unescorted access--to determine if it provides reasonable assurance against insider threats, including (1) determining why criminal history information concerning convictions for terroristic threats was not provided to a licensee during the T&R process to establish if this represents an isolated case or a systemic weakness in the T&R process; and (2) revising, to the extent permitted by law, the T&R process to provide specific guidance to licensees on how to review a employee's background. NRC should also consider whether certain criminal convictions or other indicators should disqualify an employee from T&R or trigger a greater role for NRC.

    Agency: Nuclear Regulatory Commission
    Status: Open
    Priority recommendation

    Comments: On December 14, 2016, the NRC provided Congress with a report detailing its review of the effectiveness of the requirements in 10 CFR Part 37 to determine whether any additional security measures, guidance updates, rulemaking changes, or licensee outreach efforts are appropriate. The completion of the 10 CFR Part 37 program review included insights into the effectiveness of the T&R process. Specifically, the review generated recommendations for enhancements in the area of T&R, including, among other things, increased controls for protection of information related to individuals having access to Category 1 and 2 quantities of radioactive materials; improved guidance related to information individuals must disclose when applying for unescorted access; development of sample forms or templates for use in T&R evaluations; and improved coordination efforts with the FBI to share potential terrorist threat information involving individuals seeking approval for new or continued unescorted access to Category 1 and 2 quantities of radioactive materials. However, certain aspects of the NRC staff's assessment of the T&R process remain ongoing. Specifically, on November 25, 2016, the staff closed Temporary Instruction (TI) 2800/042, "Evaluation of Trustworthiness and Reliability Determinations," and is using the information gained from the TI to consider additional enhancements to the T&R process. As part of this continuing effort, the NRC will evaluate the potential use of disqualifying criteria in making T&R determinations and the incorporation of additional insider mitigation program features, such as requiring the self-reporting of legal actions, into the T&R process to which the individual has been subject. The NRC expects this evaluation to be completed in December 2017.
    Director: Kimberly Gianopoulos
    Phone: (202) 512-8612

    2 open recommendations
    including 2 priority recommendations
    Recommendation: To improve federal-state collaboration in providing export promotion services in accordance with the National Export Initiative, and the Export Enhancement Act of 1992, the Secretary of Commerce, as Chair of the TPCC, should take steps consistent with key practices to enhance, where possible, federal information sharing with state trade offices on Commerce's export promotion activities. This could include more formal guidance to Commerce staff regarding the circumstances, in light of legal restrictions, in which information can be shared with state trade offices and other nonfederal entities, and exploring ways for clients to give permission to release information useful to such nonfederal entities.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The Department of Commerce (Commerce) notified GAO that it did not fully concur with GAO's May 2014 recommendation, preferring instead to maintain a case-by-case approach rather than issuing more formal guidance on federal information sharing with state trade offices. According to Commerce, as of March 2016, the agency was in the process of implementing a new client relationship management system. Commerce officials said that as future iterations of this system and public websites come online, they would seek to identify ways for clients to give permission to release information useful to other federal agencies, state trade offices, and other local service providers. In February 2016, Congress passed The Trade Facilitation and Trade Enforcement Act of 2015, Public Law 114-125, which requires that within a year of the act's passing, Commerce must develop a federal-state export promotion coordination plan that addresses, among other things, information sharing between federal and state trade offices. The act also requires Commerce and state trade promotion agencies to develop a framework to share information on export successes, and report to Congress on this framework within a year of the law's enactment. Later in 2016, Commerce officials began holding monthly calls with SIDO and state trade offices to share information on topics such as client intake, performance measures, and new federal export promotion activities. In March 2017, Commerce officials informed GAO that after further review of information-sharing limitations under the Trade Secrets Act, Commerce has determined that Written Impact Narratives (WINs) that have been approved for public use by the clients can be shared with State trade agencies. Commerce is currently developing a policy to ensure they are shared in a timely manner. In addition, the newly formed Trade Promotion Coordinating Committee (TPCC) state and federal export promotion working group is expected to create a framework for information sharing. Without greater information sharing in the provision of similar services, Commerce will likely be limited in its ability to help ensure that export promotion services are efficiently managed across federal and state efforts, and that resources are appropriately leveraged.
    Recommendation: To improve federal-state collaboration in providing export promotion services in accordance with the National Export Initiative, and the Export Enhancement Act of 1992, the Secretary of Commerce, as Chair of the TPCC, should take steps consistent with key practices for collaboration to enhance TPCC agencies' partnering on export promotion with nonfederal entities, such as State International Development Organizations and Global Cities. This could include reassessing and strengthening the TPCC's intergovernmental partnerships by clarifying expected outcomes, defining roles and responsibilities, monitoring results, and planning resource needs.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The Department of Commerce (Commerce) and the Trade Promotion Coordinating Committee (TPCC), which is responsible for providing a unified national framework for export promotion, have taken some steps to enhance federal-state collaboration in export promotion, as GAO recommended in May 2014 and as called for in a subsequent law. In February 2016, Congress passed The Trade Facilitation and Trade Enforcement Act of 2015, Public Law 114-125, which according to the State International Development Organizations (SIDO), contained provisions intended to enhance federal-state collaboration in export promotion. First, the act directs the President to establish a state and federal export promotion coordination working group as a subcommittee of the TPCC and appoint at least one representative from a state trade promotion agency to the TPCC. Second, beginning in February 2017, the act requires Commerce to annually submit to the TPCC a federal-state export strategy for each state that submits its export strategy to Commerce for that year that, among other things, addresses efforts to reduce duplication. Third, the act requires Commerce and state trade promotion agencies to develop a coordinated set of performance metrics, and report to Congress on these metrics within a year of the law's enactment. Fourth, the act mandates an annual survey and analysis, in coordination with state trade promotion agencies, of the overall effectiveness of federal-state coordination in export promotion. In April 2016 Commerce and SIDO signed a memorandum of intent to develop joint strategies and implement activities to enhance federal and state agency coordination and cooperation . In September 2016 Commerce issued a Federal Register Notice announcing the establishment of a state and federal export promotion coordination working group under the TPCC. The Secretary of Commerce appointed 14 members to this new working group in January 2017, which has met several times according to Commerce officials. The working group is developing a federal-state export coordination strategy that is expected to define roles and responsibilities, among other things. Successfully completing these activities is important, because without joint federal-state planning, programs at different levels of government will likely continue to be duplicative, and effective resource planning will likely be hampered.
    Director: John Neumann
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: To improve the OECA GLP inspection process, the EPA Administrator should assess the authority and need for a fee-based inspection system, and if such a system is warranted, establish a user fee system, seeking additional legislative authority, if necessary, to make the laboratory inspection program self-sustaining.

    Agency: Environmental Protection Agency
    Status: Open

    Comments: In June 2016, EPA officials told GAO that OECA was working with OPP and its Office of General Counsel to figure out the best mechanism for potentially accomplishing this. As of July 2017, EPA had not provided any additional information on the status of this recommendation.
    Director: Joseph Kirschbaum
    Phone: (202) 512-9971

    1 open recommendations
    Recommendation: To help ensure that DOD's investments are being applied toward developing medical countermeasures to respond to the most serious and likely biological threat agents, the Secretary of Defense should direct the appropriate DOD officials to develop and implement a process to update and validate DOD's list of biological threats, as required by DOD Directives 5160.05E and 6205.3, or implement a process that aligns with the department's current policies, practices, and priorities as reflected in the 2001 and 2010 Quadrennial Defense Reviews .

    Agency: Department of Defense
    Status: Open

    Comments: DOD concurred with the recommendation. DOD has been reviewing directives addressing biological warfare threats and is in the process of revising DOD Directive 5160.05E to ensure that the directive appropriately captures and institutionalizes the use of risk assessments to support research, development, and acquisition of chemical and biological defense capabilities. The Chemical and Biological Defense Program (CBDP) piloted the risk assessment process in 2014 and will continue to conduct annual risk assessments to support portfolio planning and guidance. In addition to this revision, the CBDP continues to improve stakeholder awareness and discussions on threats through the utilization of an annual threat day review and on-going Joint Service discussions on chemical and biological threats and capabilities to address those threats. Alignment of the threat information and medical countermeasure capabilities are discussed through the CBDP Medical Prime/Non-Prime Working Group, which was established in February 2015 to ensure the CBDP medical portfolio is addressing the highest priority threats considering available candidates and resources. The group meets quarterly to address key programmatic changes, discuss program strategic guidance, and to address information presented and discussed at the annual threat review sessions. In total, these efforts have improved the Department's ability to ensure biological threats are aligned and considered through holistic, threat-informed, risk-based assessments. DOD is also taking actions to improve the development of medical countermeasures against priority threats through a number of actions such as developing a process guide, holding threat days, and performing in-depth analyses on medical science and technology solutions. Once DOD completes and issues Directive 5160.05E, we will assess the extent to which DOD's combined actions address the recommendation.
    Director: Cristina Chaplain
    Phone: (202) 512-4841

    2 open recommendations
    including 2 priority recommendations
    Recommendation: To provide the Congress with the necessary insight into program affordability, ensure its ability to effectively monitor total program costs and execution, and to facilitate investment decisions, the NASA's Administrator should direct the Human Exploration and Operations Mission Directorate to establish a separate cost and schedule baseline for work required to support the SLS Block I Exploration Mission-2 (EM-2) and report this information to the Congress through NASA's annual budget submission. If NASA decides to fly the SLS Block I beyond EM-2, establish separate life cycle cost and schedule baseline estimates for those efforts, to include funding for operations and sustainment, and report this information annually to Congress via the agency's budget submission.

    Agency: National Aeronautics and Space Administration
    Status: Open
    Priority recommendation

    Comments: NASA partially agreed with this recommendation, stating that it defined and documented life cycle costs for SLS to a first demonstrated capability, consistent with cost estimating best practices and NASA project and program management policy and that it would report costs associated with the second exploration mission via its annual budget submission. Best practices for cost estimating recognize that NASA's evolutionary development approach for SLS helps reduce risk and provide capabilities more quickly, but reporting costs via the budget alone will not provide information about potential costs over the long-term and progress cannot be assessed without a baseline that serves as a means to compare current costs against expected costs. To address this recommendation, NASA needs to establish separate cost and schedule baselines for work required to support SLS for EM-2.
    Recommendation: To provide the Congress with the necessary insight into program affordability, ensure its ability to effectively monitor total program costs and execution, and to facilitate investment decisions, because NASA intends to use the increased capabilities of the SLS, Orion, and Ground Systems Development and Operations efforts well into the future and has chosen to estimate costs associated with achieving the capabilities, the NASA's Administrator should direct the Human Exploration and Operations Mission Directorate to establish separate cost and schedule baselines for each additional capability that encompass all life cycle costs, to include operations and sustainment. When NASA cannot fully specify costs due to lack of well-defined missions or flight manifests, forecast a cost estimate range -- including life cycle costs -- having minimum and maximum boundaries. These baselines or ranges should be reported to Congress annually via the agency's budget submission.

    Agency: National Aeronautics and Space Administration
    Status: Open
    Priority recommendation

    Comments: NASA partially agreed with this recommendation, stating that it had established separate programs for Space Launch System, Orion, and the ground systems and adopted a block upgrade approach for SLS. While NASA's prior establishment of SLS, Orion, and the ground systems as separate programs lends some insight into expected costs and schedule at the broader program level, it does not meet the intent of the recommendation because cost and schedule identified at that level is unlikely to provide the detail necessary to monitor the progress of each block against a baseline. To address this recommendation, NASA needs to establish separate cost and schedule baselines for each additional SLS, Orion, and Ground Systems Development and Operations capability blocks that encompass all life-cycle costs, to include operations and sustainment.
    Director: Robert Goldenkoff
    Phone: (202) 512-2757

    4 open recommendations
    including 2 priority recommendations
    Recommendation: To create a more effective human capital system that is more responsive to managing priorities and future workforce needs, the Director of OPM, in conjunction with the CHCO Council, should strengthen OPM's coordination and leadership of government-wide human capital issues to ensure government-wide initiatives are coordinated, decision makers have all relevant information, and there is greater continuity in the human capital community for key reforms. Such actions could include: (1) developing a government-wide human capital strategic plan that, among other things, would establish strategic priorities, time frames, responsibilities, and metrics to better align the efforts of members of the federal human capital community with government-wide human capital goals and issues; and (2) coordinating communication on government-wide human capital issues with other members of the human capital community so that there is greater consistency, transparency, and completeness in exchanging and using information by stakeholders and decision makers.

    Agency: Office of Personnel Management
    Status: Open
    Priority recommendation

    Comments: In April 2017, OPM issued a final regulation requiring OPM and agencies take significant steps in identifying, prioritizing, and coordinating efforts to address critical human capital issues. The regulation will require OPM to complete the Federal Workforce Priorities Report (FWPR). According to OPM, the FWSPR will serve as tool for all stakeholders and agencies to: (1) be informed about current and emerging workforce challenges, (2) develop strategies to address the impending risks, and (3) monitor progress. The FWSPR will also serve as a tool for the Administration to develop their Human Capital President's Management Agenda, as well as Cross Agency Priority Goals. the regulation also requires agencies to develop a Human Capital Operating Plan, which will reflect the priorities identified in the FWSPR. We believe this final regulation represents an important step forward in addressing the current fragmentation of the federal human capital community and will continue to monitor its status.
    Recommendation: To create a more effective human capital system that is more responsive to managing priorities and future workforce needs, the Director of OPM, in conjunction with the CHCO Council, should explore the feasibility of expanded use of enterprise solutions to more efficiently and effectively address shared or government-wide human capital challenges. Such actions could include: (1) seeking cost savings and improved functionality through coordinated government-wide Human Resources Information Technology planning and acquisition, (2) seeking agency input to ensure OPM's workforce planning tools provide effective guidance for agencies, and (3) sharing workforce planning lessons learned and successful models across the government.

    Agency: Office of Personnel Management
    Status: Open
    Priority recommendation

    Comments: In April 2017, OPM officials said it had developed some enterprise solutions to address shared or government-wide human capital challenges. For example, OPM officials said it created a multi-factor model workforce planning tool to assess the risk of agency-specific mission critical occupations. Officials said this tool is the foundation for any good workforce planning process to better understand which MCOs require the greatest attention. Officials said the model was drafted from input from an intra-agency workgroup, was beta tested with a workforce planning workgroup consisting of the majority of CFO Act agencies and finally approved by the full Chief Human capital Officer's Council. This tool was then used by agencies to identify their agency-specific high risk MCOs. OPM officials said they plan to use this model to develop other tools. We believe this tool represents an important step forward in identifying enterprise tools and will continue to monitor OPM's continued efforts.
    Recommendation: To create a more effective human capital system that is more responsive to managing priorities and future workforce needs, the Director of OPM, in conjunction with the CHCO Council, should review the extent to which new capabilities are needed to promote agile talent management. Such actions could include developing or sharing: (1) tools, resources, and methods to help identify skills gaps and surpluses that can inform agency recruitment, retention, and training needs; and (2) mechanisms for increasing staff mobility within an agency and government-wide to assist agencies in aligning their workforces with evolving needs.

    Agency: Office of Personnel Management
    Status: Open

    Comments: As of October 2016, OPM has been exploring the use of agile talent management approaches. OPM established the pilot project, Gov Connect, that tests how employees can move within and across agencies to work on self-initiated and/or manager-initiated projects. Currently, OPM is working to design Phase II of the effort, which is to develop a model for the government wide implementation of the initiative. Over 10 agencies were involved with Phase I for the single agency pilot process and more contact OPM each day as they learn about Gov Connect. OPM briefed the CHCOC and the President's Management Council (PMC) two years ago about the initiative and since then, Gov Connect has become a part of the President's Management Agenda (PMA). To further the familiarity of Gov Connect, OPM established a Starter Kit, which was designed to communicate a suggested approach for how to implement one or several of the Gov Connect models within a respective agency. The Starter Kit is a reflection of agency lessons learned through their experience with Phase I, and OPM continues to refresh the content as additional information is learned. With regards to skill identification, OPM has begun working to address this through the work with the government wide skills gap initiative. A key aspect of the initiative includes the identification of a root cause. Through this process, it is expected that needed skills will become evident. Subsequently, strategies will be established to address the root cause. In addition, OPM is revising its data collection process. OPM, because of statute and regulation, has the ability to require a set of workforce metrics, such as agency projections. We are currently exploring how to establish the capability to capture information regarding the current workforce. Work will continue through FY 17 until a solution has been identified. In June 2015, OPM reported that its Center for Strategic Workforce Planning (SWP) is developing tools to better visualize results of the CHCO manager satisfaction survey and the CHCO applicant satisfaction survey for distribution to agencies. OPM is also developing a model to assist agencies in selecting mission critical occupations for government-wide skills gap closure based on multiple factors, including separation rates, retention percentages, and applicant to job ratios. SWP is currently co-leading the GovConnect initiative, which explores models for workforce agility that include micro-detailing, cloud-based skill deployment across organizational components, and employee-initiated innovation initiatives. OPM is collaborating with the Chief Learning Officers Council to develop standards for agency use of data to prioritize investment in workforce development. Through these standards, agencies will apply data including skills gap analysis (e.g., retirement projections, competency gaps, etc.) to prioritize needs. We will continue to monitor OPM's efforts.
    Recommendation: To create a more effective human capital system that is more responsive to managing priorities and future workforce needs, the Director of OPM, in conjunction with the CHCO Council, should ensure agencies are getting the guidance and tools that they need by evaluating the communication strategy for and effectiveness of relevant tools, guidance, or leading practices created by OPM or the agencies to address crosscutting human capital management challenges.

    Agency: Office of Personnel Management
    Status: Open

    Comments: As of August 2016, OPM reported that its office of Employee Services is developing for deployment a comprehensive Strategic Human Capital Management (SHCM) needs survey that will be distributed to the CHCO Council. The survey is designed to directly solicit information about relevant tools, guidance and resources from agency human capital professionals that they feel will benefit their SHCM processes. This annual survey and the information OPM gathers from the survey results will assist OPM with developing/providing suggested tools through the HCF. We will continue to monitor OPM's efforts.
    Director: J. Alfredo Gómez
    Phone: (202) 512-3841

    3 open recommendations
    Recommendation: To develop an estimate of the scope of work remaining to address uranium contamination on or near the Navajo reservation, Congress should consider requiring that the Environmental Protection Agency take the lead and work with the other federal agencies to develop an overall estimate of the remaining scope of the work, time frames, and costs.

    Agency: Congress
    Status: Open

    Comments: As of December 2016, we are not aware of any legislation being enacted to address this matter for congressional consideration.
    Recommendation: In light of the problems BIA has encountered in managing the cleanup at the Tuba City Dump site, the Secretary of the Interior should direct the Assistant Secretary for Indian Affairs to employ best practices in creating the schedule and cost estimates for the remedial action cleanup phase.

    Agency: Department of the Interior
    Status: Open

    Comments: As of December 2016, GAO is awaiting action by the agency to implement this recommendation.
    Recommendation: In light of the problems BIA has encountered in managing the cleanup at the Tuba City Dump site, the Secretary of the Interior should direct the Assistant Secretary for Indian Affairs to identify and examine any lessons learned from managing the remedial investigation and feasibility study contract and consider these lessons as part of the acquisition planning process for the remedial action contract.

    Agency: Department of the Interior
    Status: Open

    Comments: As of December 2016, GAO is awaiting action by the agency to implement this recommendation.
    Director: Jacqueline M. Nowicki
    Phone: (617) 788-0580

    3 open recommendations
    Recommendation: In order to improve grantees' planning and implementation efforts, increase the effectiveness of grantee efforts to integrate and manage resources, and learn more about the program's impact, the Secretary of Education should clarify program guidance about planning and implementation grants to provide reasonable assurance that planning grantees are better prepared to continue their efforts in the absence of implementation funding. Additional guidance could include encouraging grantees to set aside a small amount of the grant to identify and deliver early, tangible benefits to their neighborhoods.

    Agency: Department of Education
    Status: Open

    Comments: Education stated that it would communicate to planning grant applicants that implementation funding is contingent on the availability of funds and that it would clarify to grantees that planning grant funds could be used to achieve early, tangible benefits. However, Education has not awarded any new planning grants since 2012. In FY17, ED reported that if new funding becomes available for the Promise Neighborhoods' planning and implementation awards, the Department will emphasize to all interested applicants that grant awards are contingent on the availability of funds and the results of the competitive award process. Education also stated that it would provide more targeted technical assistance to planning grant recipients regarding strategies for continuing grantees' efforts absent implementation funding. In 2015, its technical assistance provider published information on planning for growth and sustainability of Promise Neighborhoods.
    Recommendation: In order to improve grantees' planning and implementation efforts, increase the effectiveness of grantee efforts to integrate and manage resources, and learn more about the program's impact, the Secretary of Education should develop and disseminate to grantees on an ongoing basis an inventory of federal programs and resources that can contribute to the Promise Neighborhoods program's goal to better support coordination across agency lines.

    Agency: Department of Education
    Status: Open

    Comments: Education stated that it would work with its technical assistance providers to create a mechanism to distribute a comprehensive list of external funding opportunities, programs and resources on a regular basis to better support the grantees' implementation efforts. In FY15, ED reported that the program office held a grantee meeting in July 2015 featuring at least three workshops on sustainability and leveraging additional funding sources. The program office also had a website (promiseneighborhoods.ed.gov) with a number of resources under the "toolbox" tab that can assist interested programs in financing their ongoing needs. While the workshops and web resources were good first steps that can assist grantees, GAO maintains that Education, rather than individual grantees, is best positioned to develop and share such an inventory of federal programs that relate to the goals of the Promise Neighborhoods program. Without such an inventory, Education may be missing opportunities to better support grantees; find other federal program for future coordination efforts; and identify potential fragmentation, overlap and duplication at the federal level. In FY17, Education did not provide any updates on this recommendation, nor has it provided such an inventory.
    Recommendation: In order to improve grantees' planning and implementation efforts, increase the effectiveness of grantee efforts to integrate and manage resources, and learn more about the program's impact, the Secretary of Education should develop a plan to use the data collected from grantees to conduct a national evaluation of the program.

    Agency: Department of Education
    Status: Open

    Comments: Education stated that it would consider options for how and whether it can use the data collected from grantees to conduct a national evaluation. As a first step, Education said it would conduct a systematic evaluation of the reliability and validity of the data. In its 2016 Notice of Funding Availability for Implementation Grants, Education acknowledged that grantees have struggled to collect the full range of data necessary to conduct meaningful evaluation activities and emphasized the importance of helping grantees develop robust data systems. In addition, in its agency comments, Education had stated that it had not received sufficient funding to support a national evaluation. In FY2017, ED provided documentation of its request for funding for conducting an evaluation and the response to the request. However, the entity within ED that is responsible for impact evaluations maintains that it has no plans to conduct an impact evaluation, given that grantees were not randomly selected. GAO agrees that the program was not designed for impact evaluation, however, as we reported, there are other options for evaluating such programs that can provide meaningful information about how well grantees are addressing the problem of poor student outcomes in impoverished neighborhoods. Not evaluating the program limits Education and other agencies from learning about the extent to which model is effective and should be replicated. Developing an evaluation plan would provide critical information about the resources required to conduct an evaluation, and could better inform future funding requests for such an evaluation.
    Director: Mackin, Michele
    Phone: (202) 512-4841

    1 open recommendations
    Recommendation: To better communicate acquisition funding needs to Congress, the Secretary of Homeland Security should enhance the content of future Future Years Homeland Security Program (FYHSP) reports--for fiscal years 2016-20 and beyond--by presenting acquisition programs' annual cost estimates and any anticipated funding gaps.

    Agency: Department of Homeland Security
    Status: Open

    Comments: In providing comments on this report, the Department of Homeland Security (DHS) concurred with this recommendation, and stated that it provides Congress Comprehensive Acquisition Status Reports (CASR) on a quarterly basis that include cost estimates for all major acquisition programs. However, the CASRs do not disaggregate the cost estimates to identify how much the programs are expected to cost each year, and therefore the proposed approach would not allow Congress to identify funding gaps on an annual basis. In April 2016, DHS presented an alternative approach that would incorporate annual funding gaps into future FYHSP reports. DHS stated it plans to initially include these annual funding gaps in the fiscal years 2018-22 FYHSP report, which was expected to be released shortly after the President's fiscal year 2018 budget request in May 2017. However, the transition to a new administration delayed the release of the FYHSP report. Once available, GAO will evaluate the FYHSP report to determine whether DHS has met the intent of this recommendation.
    Director: Dillingham, Gerald L
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To improve the applicants' understanding of the medical standards and the information required to complete FAA's medical certification process, the Secretary of Transportation should direct the Administrator of FAA to enhance the online medical-application system by clarifying instructions and questions on the medical application form and providing useful information to applicants.

    Agency: Department of Transportation
    Status: Open

    Comments: When we confirm what actions FAA has taken in response to this recommendation, we will provide updated information.
    Director: Anne-Marie Fennell
    Phone: (202) 512-3841

    5 open recommendations
    Recommendation: To ensure appropriate levels of employees' supervision and guidance for the workforces of USDA's service center agencies, consistent with OPM guidance, the Secretary of Agriculture, through the Chief Human Capital Officer, should revise departmental policy targeting a uniform supervisory ratio so that the service center agencies can identify appropriate supervisory ratios based on a documented analysis of their specific customer needs and workload distribution.

    Agency: Department of Agriculture
    Status: Open

    Comments: As of December 15, 2016, USDA has not taken action on this recommendation. We will continue to monitor USDA's efforts.
    Recommendation: To ensure appropriate levels of employees' supervision and guidance for the workforces of USDA's service center agencies, consistent with federal internal control standards, the Secretary of Agriculture, through the Chief Human Capital Officer, should communicate to the service center agencies the departmental guidance for calculating supervisory ratios and ensure its use.

    Agency: Department of Agriculture
    Status: Open

    Comments: As of December 15, 2016, USDA has not taken action on this recommendation. We will continue to monitor USDA's efforts.
    Recommendation: To help USDA's service center agencies effectively implement office closures and meet internal control standards, the Secretary should take action to amend USDA's policy on organizational changes to include such leading practices as presenting a business-case or cost-benefit analysis and using the change management practice of measuring progress toward stated goals.

    Agency: Department of Agriculture
    Status: Open

    Comments: According to USDA the Department is in the process of revising its policy on organizational changes, but as of December 15, 2016, this revision is not yet finalized. We will continue to monitor USDA's efforts.
    Recommendation: To improve the use of buyout or early retirement incentives, the Secretary of Agriculture should direct its service center agencies, FSA and RD, to document clear links between their buyout and early retirement incentives and their reshaping or overall strategic goals.

    Agency: Department of Agriculture
    Status: Open

    Comments: As of December 15, 2016, USDA has not taken action on this recommendation. We will continue to monitor USDA's efforts.
    Recommendation: To improve the use of buyout or early retirement incentives, the Secretary of Agriculture should direct its service center agencies, FSA, NRCS, and RD, to establish a system for identifying and evaluating relevant data on buyout and early retirement incentive recipients.

    Agency: Department of Agriculture
    Status: Open

    Comments: As of December 15, 2016, USDA has not taken action on this recommendation. We will continue to monitor USDA's efforts.
    Director: Carol R. Cha
    Phone: (202) 512-4456

    1 open recommendations
    Recommendation: To better ensure that the Defense Agencies Initiative (DAI) implements effective risk management and information technology (IT) acquisition best practices, the Secretary of Defense should direct the Director of the Defense Logistics Agency to direct the DAI program office to establish a comprehensive risk log that includes all up-to-date risks with evaluations and categorizations that comply with DLA's defined parameters; and associated mitigation plans.

    Agency: Department of Defense
    Status: Open

    Comments: The Defense Logistics Agency established a risk log for DAI that includes risk evaluations and categorizations, and associated mitigation plans. We will continue monitoring the program's implementation of this recommendation to ensure that the agency is periodically reviewing the status of each risk and updating DAI's risk log and mitigation plans, as intended by the recommendation.
    Director: Rebecca Gambler
    Phone: (202) 512-8777

    5 open recommendations
    including 3 priority recommendations
    Recommendation: To improve the acquisition management of the Plan and the reliability of its cost estimates and schedules, assess the effectiveness of deployed technologies, and better inform CBP's deployment decisions, when updating the schedules for the IFT, Remote Video Surveillance System (RVSS), and Mobile Surveillance Capability programs, the Commissioner of CBP should ensure that scheduling best practices, as outlined in our schedule assessment guide, are applied to the three programs' schedules.

    Agency: Department of Homeland Security: United States Customs and Border Protection
    Status: Open
    Priority recommendation

    Comments: In March 2014, CBP concurred with our recommendation and in response, stated it planned to ensure that scheduling best practices are applied as far as practical when updating the three program schedules. In May 2016 CBP provided us with complete schedules for the IFT and RVSS programs. In December 2016, we provided CBP our assessment of the updated schedules for the IFT and RVSS programs. In January 2017 CBP provided us with a complete schedule for the MSC program and in March 2017, we provided CBP with our assessment of the MSC schedule. In April 2017, CBP provided additional clarifying information in regards to the MSC schedule. As of May 2017, based on our assessment of the updated schedules for the IFT, RVSS, and MSC programs, CBP has made improvements in the quality of the schedules since our last report, but the program schedules have not met all characteristics of a reliable schedule.
    Recommendation: To improve the acquisition management of the Plan and the reliability of its cost estimates and schedules, assess the effectiveness of deployed technologies, and better inform CBP's deployment decisions, the Commissioner of CBP should develop and maintain an Integrated Master Schedule for the Plan that is consistent with scheduling best practices.

    Agency: Department of Homeland Security: United States Customs and Border Protection
    Status: Open

    Comments: In March 2014, CBP did not concur with this recommendation and maintained that an integrated master schedule for the Plan in one file undermines the DHS-approved implementation strategy for the individual programs making up the Plan, and that the implementation of this recommendation would essentially create a large, aggregated program, and effectively create an aggregated "system of systems". DHS further stated that a key element of the Plan has been the disaggregation of technology procurements. As of December 2016, CBP continues to non-concur with this recommendation and plans no further action. However, as we noted in the report, collectively these programs are intended to provide CBP with a combination of surveillance capabilities to be used along the Arizona border with Mexico. Moreover, while the programs themselves may be independent of one another, the Plan's resources are being shared among the programs. As such, we continue to believe that developing an integrated master schedule for the Plan is needed. Developing and maintaining an integrated master schedule for the Plan could allow CBP insight into current or programmed allocation of resources for all programs as opposed to attempting to resolve any resource constraints for each program individually.
    Recommendation: To improve the acquisition management of the Plan and the reliability of its cost estimates and schedules, assess the effectiveness of deployed technologies, and better inform CBP's deployment decisions, when updating Life-cycle Cost Estimates for the IFT and RVSS programs, the Commissioner of CBP should verify the Life-cycle Cost Estimates with independent cost estimates and reconcile any differences.

    Agency: Department of Homeland Security: United States Customs and Border Protection
    Status: Open

    Comments: In March 2014, DHS concurred with this recommendation. In May 2016 CBP provided us with updated life-cycle cost estimates for two of its highest-cost programs under the Plan--the Integrated Fixed Tower (IFT) and the Remote Video Surveillance (RVSS). Further, CBP officials stated that in fiscal year 2016, DHS's Cost Analysis Division started piloting DHS's independent cost estimate capability on the RVSS program. According to CBP officials, the pilot is an opportunity to assist DHS in developing its independent cost estimate capability and that CBP selected the RVSS program for the pilot because the program is at a point in its planning and execution process where it can benefit most from having an independent cost estimate performed as these technologies are being deployed along the southwest border, beyond Arizona. In August 2016, CBP officials provided an update stating that details for an estimated independent cost estimate schedule and analysis plan for the RVSS program had not yet been finalized. As of November 2016, CBP officials stated that the results of the independent cost estimate for the RVSS program are expected to be completed by January 31, 2017. Further, CBP officials have not detailed similar plans for the IFT. We continue to believe that independently verifying the life-cycle cost estimates for the IFT and RVSS programs and reconciling any differences, consistent with best practices, could help CBP better ensure the reliability of the estimates.
    Recommendation: To improve the acquisition management of the Plan and the reliability of its cost estimates and schedules, assess the effectiveness of deployed technologies, and better inform CBP's deployment decisions, the Commissioner of CBP should revise the IFT Test and Evaluation Master Plan to more fully test the IFT program, before beginning full production, in the various environmental conditions in which IFTs will be used to determine operational effectiveness and suitability, in accordance with DHS acquisition guidance.

    Agency: Department of Homeland Security: United States Customs and Border Protection
    Status: Open
    Priority recommendation

    Comments: In March 2014, DHS did not concur with this recommendation and stated that the Test and Evaluation Master Plan includes tailored testing and user assessments that will provide much, if not all, of the insight contemplated by the intent of the recommendation. According to CBP officials, acceptance testing was performed on the system in July 2015 and a limited user testing for the IFT system was conducted during October and November 2015. In May 2016, CBP reported that it had conditionally accepted seven out of 53 IFT systems in one area of responsibility. CBP also reported that it is working to deploy and test the remaining IFT unit systems to other areas of responsibility. In November 2016, CBP stated that they continue to non-concur with this recommendation and planned no further action. However, as we reported in March 2014, we continue to believe that revising the Test and Evaluation Master Plan to include more robust testing to determine operational effectiveness and suitability could better position CBP to (1) evaluate IFT capabilities before moving forward to full production for the system, (2) provide CBP with information on the extent to which the towers satisfy Border Patrol's user requirements, and (3) reduce potential program risks. Without conducting operational testing in accordance with DHS guidance, the IFT program may be at increased risk of not meeting Border Patrol operational needs.
    Recommendation: To improve the acquisition management of the Plan and the reliability of its cost estimates and schedules, assess the effectiveness of deployed technologies, and better inform CBP's deployment decisions, once data on asset assists are required to be recorded and tracked, the Commissioner of CBP should analyze available data on apprehensions and seizures and technological assists, in combination with other relevant performance metrics or indicators, as appropriate, to determine the contribution of surveillance technologies to CBP's border security efforts.

    Agency: Department of Homeland Security: United States Customs and Border Protection
    Status: Open
    Priority recommendation

    Comments: In February 2015, Border Patrol officials provided documentation stating that the agency has yet to analyze data on asset assists, in combination with other relevant performance metrics and indicators to determine the contributions of surveillance technologies to its mission. However, the Border Patrol plans to address this recommendation using the Capability Gap Analysis Process (CGAP) developed by Johns Hopkins University Applied Physics Lab specifically for the Border Patrol. According to Border Patrol officials, the CGAP will enable the agency to examine the effects of technology and other Border Patrol assets such as agents, infrastructure, in the context of everyday border patrol operations. The data generated by the CGAP along with e3 apprehension and seizure data will better inform the nature of the contributions and impacts of surveillance technology on enforcement efforts. Border Patrol officials explained that capturing data on asset assists within the in e3 Processing database was the first step to determine the contribution of technology to detect, identify, and classify activity along the border. Further, the Border Patrol identified individual types of technology such as Integrated Fixed Towers, Mobile Video Surveillance System, Underground Sensors, etc. and grouped them into classes such as Fixed, Mobile and Relocatable to better distinguish the contribution of each class of technology. As the Border Patrol gains a better understanding through analysis, the agency plans to continue to refine the measures and the collection of the metrics. In November 2014, the Border Patrol proposed a timeline highlighting the agency's future efforts to capture and document the contributions of the different classes of technology to the Border Patrol's mission. In our March 2016 update on the progress made by agencies to address our findings on duplication and cost savings across the federal government, we reported that CBP had modified its time frame for developing baselines for each performance measure and that additional time would be needed to implement and apply key attributes for metrics. In March 2016, according to CBP officials, the actual completion was being adjusted pending test and evaluation results for recently deployed technologies on the southwest border. In addition, Border Patrol officials told us that they planned to have various qualitative and quantitative performance measures of technology completed by the end of fiscal year 2016. These measures would help profile different levels of situational awareness in different areas of the border. In September 2016, Border Patrol provided a case study that assessed CGAP data with technology assist data and other measures to determine contributions of surveillance technologies to its mission. While this is a start to developing performance measures, the case study is limited to one location along the border and the analysis limited to select technologies. As of April 2017, CBP had not conducted assessments of the deployments to determine the contribution of surveillance technologies to the border security mission. Until CBP completes its efforts to fully develop and apply key attributes for performance metrics for all technologies to be deployed under the Plan, it will not be well positioned to fully assess its progress in implementing and determining the Plan and determine when mission benefits have been fully realized.
    Director: Zina Merritt
    Phone: (202) 512-5257

    1 open recommendations
    Recommendation: To provide greater assurance of the accuracy of manpower requirements reports produced by AWPS for use at Army industrial sites, the Secretary of the Army should direct AMC--with assistance as needed from USAMAA--to submit AWPS to USAMAA for review and validation as a manpower requirements determination tool, in accordance with Army regulations.

    Agency: Department of Defense: Department of the Army
    Status: Open

    Comments: In commenting on the final report, the Army concurred and stated that AWPS was developed to address deficiencies in the Army's manpower requirements determination process by capturing and using the actual hours of the work performed in previous periods to project future requirements. The Army also stated that an integrated AWPS/LMP solution may result in a different manpower predictive tool that must be validated through USAMAA, and that it is important the Army focus on developing a business case analysis to include AWPS functionality into the Army's enterprise resource planning systems. In December 2014, the Under Secretary of the Army directed the Commanding General, AMC, to complete the overlap assessment between AWPS and LMP and to submit the approved manpower requirements determination approach to USAMAA for validation. In November 2015, the Army reported that AMC will not submit AWPS to USAMAA for review and validation because additional funding would be needed to modify AWPS to meet USAMAA requirements for a manpower requirements determination tool, and AMC decided not to make those modifications. Furthermore, the Army also reported that, based on its overlap assessment of AWPS and LMP, it plans to integrate AWPS functionality into LMP. Specifically, the Army plans to migrate all AWPS functions related to the collection and reporting of manpower resources executed in support of approved work at the AMC industrial base sites. As of March 2017, Army officials confirmed that the Army will not submit AWPS to USAMAA for review and validation, and that preparations for integrating AWPS functionality into LMP are ongoing.
    Director: David C. Trimble
    Phone: (202) 512-3841

    3 open recommendations
    Recommendation: To identify lessons learned from and provide assurance of preventing recurrence of cost increases for the MOX facility and WSB, and to develop reliable cost estimates for the Plutonium Disposition program, the Secretary of Energy should direct the DOE and NNSA Offices of Acquisition and Project Management and the NNSA office responsible for managing the Plutonium Disposition program, as appropriate, to revise and update the program's life-cycle cost estimate following the 12 key steps described in the GAO Cost Estimating and Assessment Guide for developing high-quality cost estimates, such as conducting an independent cost estimate to provide an objective and unbiased assessment of whether the estimate can be achieved.

    Agency: Department of Energy
    Status: Open

    Comments: DOE is currently evaluating dilute and dispose as a potential alternative approach to the MOX approach. As a result, DOE does not plan to update the Plutonium Disposition Program life-cycle estimate until a decision is made on which approach to pursue. We will continue to monitor this situation and update the status of this recommendation once DOE has made a decision on the approach taken by this program.
    Recommendation: To identify lessons learned from and provide assurance of preventing recurrence of cost increases for the MOX facility and WSB, and to develop reliable cost estimates for the Plutonium Disposition program, the Secretary of Energy should direct the DOE and NNSA Offices of Acquisition and Project Management and the NNSA office responsible for managing the Plutonium Disposition program, as appropriate, to ensure that the MOX contractor revises its proposal for increasing the cost of the MOX facility to meet all best practices for a high-quality, reliable cost estimate--for example, by cross-checking major cost elements to determine whether alternative estimating methods produce similar results.

    Agency: Department of Energy
    Status: Open

    Comments: DOE is currently evaluating dilute and dispose as a potential alternative approach to the MOX approach. As a result, DOE does not plan to update the proposal for increasing the cost of the MOX facility until a decision is made on which approach to pursue. We will continue to monitor this situation and update the status of this recommendation once DOE has made a decision on the approach taken by this program.
    Recommendation: To ensure that future DOE projects benefit from lessons learned that reflect the underlying causes of cost increases or schedule delays experienced by other projects, and that Congress and DOE have life-cycle cost estimates for DOE programs that include individual construction projects, the Secretary of Energy should revise DOE's project management order or otherwise implement a departmentwide requirement by requiring life-cycle cost estimates covering the full cost of programs that include both construction projects and other efforts and activities not related to construction.

    Agency: Department of Energy
    Status: Open

    Comments: DOE revised its project management order in May 2016 but did not make any changes in regards to this recommendation. We will continue to monitor DOE activities, if any, related to this recommendation.
    Director: Wise, David J
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To provide increased transparency about the funding amounts agencies are spending to maintain their assets and manage their backlogs, the Director of OMB should require the OMB Deputy Director for Management, as chair of the FRPC, in collaboration and consultation with FRPC member agencies, to collect information--through FRPP or other mechanisms--on funding agencies annually spent to address existing deferred maintenance and repair deficiencies and report summary level information in the FRPC's fiscal year report.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of December 2015, OMB had worked with the FRPC to develop a method to collect annual recurring maintenance and repair data in the FRPP. This effort includes (1) developing separate definitions for "operations" and "maintenance" costs, which are currently reported in the FRPP as a combined cost number, and (2) defining a methodology that agencies can use to consistently collect and report annual deferred maintenance and repair expenditures. OMB expects these actions to be completed by the fiscal year 2018 FRPP reporting cycle. As of March 28, 2017, OMB had not provided GAO with any additional updates regarding the status of this recommendation..
    Director: St James, Lorelei
    Phone: (202) 512-2834

    3 open recommendations
    Recommendation: To strengthen USPS's capital investment process related to USPS policy and consistent application of leading practices, the Postmaster General and executive leaders should establish a time frame for developing a clear, detailed, single-source, standard set of policies and procedures that reflect the capital investment selection phase.

    Agency: United States Postal Service: Office of the Postmaster General
    Status: Open

    Comments: In June 2017, the U.S. Postal Service (USPS) informed GAO that its Handbook F-66 General Investment Policies and Procedures is undergoing revisions that will make the capital investment selection process more clear, detailed, and standardized. The revised draft of the F-66 handbook is currently in the review and clearance process and may be finalized in 2017. USPS added that it will inform GAO of further updates as they develop.
    Recommendation: To strengthen USPS's capital investment process related to USPS policy and consistent application of leading practices, the Postmaster General and executive leaders should modify capital investment policies to more closely align with the following leading practices, including: (1) for planning capital investments, consider whether an external entity could better support all or part of a desired function when evaluating alternative capital investment options; (2) for selecting capital investments, use a portfolio approach for developing business cases and finalizing and allocating resources; and (3) for evaluating capital investments, seek and leverage external oversight and review, from a consultant or peer reviewer, and require that best practices and lessons learned be incorporated into the review process.

    Agency: United States Postal Service: Office of the Postmaster General
    Status: Open

    Comments: In June 2017, USPS informed GAO and provided documentation that its Handbook F-66 General Investment Policies and Procedures is to incorporate all leading practices. The F-66, however, is not yet finalized. In particular, the draft F-66 states that for planning investments, USPS is to conduct an analysis to identify the most economically beneficial resolution to a problem--the alternative that will result in the highest net present value, lowest costs, or greatest savings. For selecting investments, USPS is to use a portfolio approach organized by agency goals, sub-goals, indicators, and targets. For evaluating investments, USPS is to evaluate the need to hire consultants when applicable to assess the investment. The revised F-66 indicates that USPS will also is require project managers to submit an analysis of investment performance and lessons learned as part of its post-deployment steps.
    Recommendation: To strengthen USPS's capital investment process related to USPS policy and consistent application of leading practices, the Postmaster General and executive leaders should regularly examine the extent to which executives and program managers consistently follow all leading practices, particularly for: (1) identifying problems and reassessing risk while managing a project; and (2) evaluating the cost, schedule, and performance results of completed projects.

    Agency: United States Postal Service: Office of the Postmaster General
    Status: Open

    Comments: In June 2017, USPS informed GAO and provided documentation that its revised Handbook F-66 General Investment Policies and Procedures is to include a management step to regularly review the progress and benefits of its capital investments, as well as its affordability and achievability, and make adjustments as necessary to meet the investment's goals. In addition, once a project is completed, USPS will require capital investment managers to present on the investment's performance, return-on-investment, and lessons learned.
    Director: Mackin, Michele
    Phone: (202) 512-4841

    1 open recommendations
    including 1 priority recommendation
    Recommendation: To help mitigate confusion about the use of reverse auctions in federal acquisitions, the Director of the Office of Management and Budget should take steps to amend the FAR to address agencies' use of reverse auctions.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open
    Priority recommendation

    Comments: In providing comments on this report, OMB generally concurred with this recommendation but, as of July 2017, had not yet publicly released a draft of any related proposed FAR rule(s). In July 2017, OMB staff stated that a FAR team had drafted proposed regulatory changes to address the use of reverse auctions in response to GAO's recommendation. OMB staff said that the draft changes were undergoing review and they expected they would be published for public comment before the end of the calendar year.
    Director: Wilshusen, Gregory C
    Phone: (202) 512-6244

    8 open recommendations
    Recommendation: To improve their response to data breaches involving PII, the Secretary of Defense should direct the Secretary of the Army to require documentation of the reasoning behind risk determinations for breaches involving PII.

    Agency: Department of Defense
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the department stating that it has taken action, we plan to verify whether implementation has occurred.
    Recommendation: To improve their response to data breaches involving PII, the Secretary of Defense should direct the Secretary of the Army to require an evaluation of the agency's response to data breaches involving PII to identify lessons learned that could be incorporated into agency security and privacy policies and practices.

    Agency: Department of Defense
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the department stating that it has taken action, we plan to verify whether implementation has occurred.
    Recommendation: To improve their response to data breaches involving PII, the Secretary of Health and Human Services should direct the Administrator for the Centers for Medicare & Medicaid Services to require documentation of the risk assessment performed for breaches involving PII, including the reasoning behind risk determinations.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the department stating that it has taken action, we plan to verify whether implementation has occurred.
    Recommendation: To improve their response to data breaches involving PII, the Secretary of Health and Human Services should direct the Administrator for the Centers for Medicare & Medicaid Services to document the number of affected individuals associated with each incident involving PII.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the department stating that it has taken action, we plan to verify whether implementation has occurred.
    Recommendation: To improve their response to data breaches involving PII, the Secretary of Health and Human Services should direct the Administrator for the Centers for Medicare & Medicaid Services to require an evaluation of the agency's response to data breaches involving PII to identify lessons learned that could be incorporated into agency security and privacy policies and practices.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the department stating that it has taken action, we plan to verify whether implementation has occurred.
    Recommendation: To improve their response to data breaches involving PII, the Chairman of the Federal Reserve Board should require documentation of the risk assessment performed for breaches involving PII, including the reasoning behind risk determinations.

    Agency: Federal Reserve System
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the agency stating that it has taken action, we plan to verify whether implementation has occurred.
    Recommendation: To improve their response to data breaches involving PII, the Chairman of the Federal Reserve Board should document the number of affected individuals associated with each incident involving PII.

    Agency: Federal Reserve System
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the agency stating that it has taken action, we plan to verify whether implementation has occurred.
    Recommendation: To improve their response to data breaches involving PII, the Chairman of the Federal Reserve Board should require an evaluation of the agency's response to data breaches involving PII to identify lessons learned that could be incorporated into agency security and privacy policies and practices.

    Agency: Federal Reserve System
    Status: Open

    Comments: We have not yet validated agency actions on this recommendation. Subsequent to the agency stating that it has taken action, we plan to verify whether implementation has occurred.
    Director: Cha, Carol R
    Phone: (202) 512-4456

    2 open recommendations
    Recommendation: To improve planning and execution of the next telecommunications transition, the Administrator of General Services, in coordination with the Office of Personnel Management, should examine potential government-wide telecommunications expertise shortfalls and use the study to shape the NS2020 strategic approach.

    Agency: General Services Administration
    Status: Open

    Comments: The General Services Administration (GSA) has not addressed this recommendation. In June 2014, the agency reported that it had coordinated with OPM to incorporate key objectives in its NS2020 strategy to address and mitigate challenges with regards to government-wide expertise needed to execute the NS2020 program. However, as of May 2017, GSA had not demonstrated that it had studied potential government-wide telecommunications expertise shortfalls or used the study to shape the NS2020 strategic approach.
    Recommendation: To improve planning and execution of the next telecommunications transition, the Administrator of General Services should ensure that the lessons are applied, based on priority and available resources, to the next transition strategy.

    Agency: General Services Administration
    Status: Open

    Comments: The General Services Administration has not implemented this recommendation but has taken steps to address it. In April 2014, the agency developed a strategy for transitioning to the next telecommunications contract vehicle. The strategy described the lessons learned that contributed to the delay in the prior transition and identified approaches the agency planned to take to apply the lessons learned. For example, it identified high level plans for addressing the need for improved management of the complex acquisition process and the need for technical and contracting telecommunications expertise across the government. As of August 2016, GSA had prioritized the lessons learned and considered the resources needed to apply them. However, as of May 2017, the agency had not demonstrated that it had ensured that the lessons were applied, based on priority and available resources, to the next transition strategy. We will continue to monitor GSA's efforts to implement the recommendation.
    Director: Crosse, Marcia G
    Phone: (202) 512-7114

    2 open recommendations
    Recommendation: In order to reduce the administrative costs associated with a fragmented MAI grant structure that diminishes the effective use of HHS's limited HIV/AIDS funding, and to enhance services to minority populations, HHS should consolidate disparate MAI funding streams into core HIV/AIDS funding during its budget request and allocation process.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: HHS stated that it does not support the consolidation of Minority AIDS Initiative (MAI)funds into core funding. As of September, 2016, we are still awaiting an update from HHS on the status of any efforts to implement this recommendation. We will update the status of this recommendation when we receive additional information.
    Recommendation: In order to reduce the administrative costs associated with a fragmented MAI grant structure that diminishes the effective use of HHS's limited HIV/AIDS funding, and to enhance services to minority populations, HHS should seek legislation to amend the Ryan White Comprehensive AIDS Resources Emergency Act of 1990 or other provisions of law, as necessary, to achieve a consolidated approach.

    Agency: Department of Health and Human Services
    Status: Open

    Comments: HHS stated that it does not support the consolidation of Minority AIDS Initiative (MAI) funds into core funding. As of September, 2016, we are still awaiting an update from HHS on the status of any efforts to implement this recommendation. We will update the status of this recommendation when we receive additional information.
    Director: Goldenkoff, Robert N
    Phone: (202) 512-2757

    4 open recommendations
    including 3 priority recommendations
    Recommendation: To help maintain a more thorough and insightful 2020 Census development schedule in order to better manage risks to a successful 2020 Census, the Secretary of Commerce and Undersecretary of Economic Affairs should direct the U.S. Census Bureau to improve the comprehensiveness of schedules, including ensuring that all relevant activities are included in the schedule.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The Bureau agreed with this recommendation and stated that it is reviewing and refining project schedules to ensure that they include the full scope of work needed to reach operational decision points for the 2020 Census. The 2020 Research and Planning Office currently has 55 decennial project schedules, consisting of more than 3,700 activities. Several project schedules were re-baselined and pushed into production in January 2014. Focused integration sessions occurred in late January and February 2014, resulting in revised schedules. The Bureau released its operational plan and other documentation in November 2015, and announced in June 2016 that it would finalize and release its 2020 Census schedule in July 2016. To fully implement this recommendation, the Bureau needs to include within its integrated master activity schedule at lower levels the activities and milestones it has already identified as needed throughout the 2020 Census lifecycle. We are beginning an audit of the Bureau's scheduling practices this summer and will review actions the Bureau may have taken to address this recommendation.
    Recommendation: To help maintain a more thorough and insightful 2020 Census development schedule in order to better manage risks to a successful 2020 Census, the Secretary of Commerce and Undersecretary of Economic Affairs should direct the U.S. Census Bureau to improve the construction of schedules, including ensuring complete logic is in place to identify the preceding and subsequent activities as well as a critical path that can be used to make decisions.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The Bureau agreed with this recommendation and stated that it has already begun maturing project schedules to ensure that the logical relationships between discrete schedules are put into place. Schedule integration sessions across projects and programs were held in late January 2014 and into February 2014 and periodically since then, where work is deconstructed into detailed schedules. As the Bureau continues to mature its schedule and scheduling process for the 2020 Census and related tests, its officials say they are taking care to ensure that logical linkages are in place within the schedule and that they are adding additional activities on a rolling basis. Bureau officials believe this ongoing work with the 2020 schedule will ensure they have a robust tool to help manage the 2020 program and make key decisions. The Bureau released its operational plan and other documentation in November 2015 and announced in June 2016 that it would finalize and release its 2020 Census schedule in July 2016. To fully implement this recommendation, the Bureau needs to ensure linkage between activities and the estimated resources needed to complete them. We are beginning an audit of the Bureau's scheduling practices this summer and will review actions the Bureau may have taken to address this recommendation.
    Recommendation: To help maintain a more thorough and insightful 2020 Census development schedule in order to better manage risks to a successful 2020 Census, the Secretary of Commerce and Undersecretary of Economic Affairs should direct the U.S. Census Bureau to improve the credibility of schedules, including conducting a quantitative risk assessment.

    Agency: Department of Commerce
    Status: Open
    Priority recommendation

    Comments: The Bureau agreed with this recommendation and stated that it has already begun maturing project schedules to ensure that the logical relationships between discrete schedules are put into place. Schedule integration sessions across projects and programs were held in late January 2014 and into February 2014 and periodically since then, where work is deconstructed into detailed schedules. As the Bureau continues to mature its schedule and scheduling process for the 2020 Census and related tests, its officials say they are taking care to ensure that logical linkages are in place within the schedule and that they are adding additional activities on a rolling basis. Bureau officials believe this ongoing work with the 2020 schedule will ensure they have a robust tool to help manage the 2020 program and make key decisions. The Bureau released its operational plan and other documentation in November 2015 and announced in June 2016 that it would finalize and release its 2020 Census schedule in July 2016. As part of the maturation process, the Bureau expects to conduct a quantitative risk assessment of decennial project schedules. In 2015, the Bureau provided us with a preliminary output from its risk analysis software as a demonstration of the type of analysis it is committed to, but more recently its officials said that they may not be able to take all the steps needed to satisfy this recommendation. To fully implement this recommendation, the Bureau needs to conduct quantitative schedule risk analyses with the resulting schedule. We are beginning an audit of the Bureau's scheduling practices this summer and will review actions the Bureau may have taken to address this recommendation.
    Recommendation: The Director of the U.S. Census Bureau should initiate a robust workforce planning process for those working on schedules related to the Master Address File, including actions such as an analysis of skills needed, to identify and address gaps in scheduling skills.

    Agency: Department of Commerce: Bureau of the Census
    Status: Open

    Comments: The Census Bureau agreed with this recommendation and states it is taking steps to improve its scheduling practices and to initiate a comprehensive workforce planning process for those working on decennial project schedules. Bureau officials state they are currently evaluating the skills needed for scheduling support of the 2020 Census and will take the appropriate steps to acquire and develop the appropriate mix of skill sets, including but not limited to developing certified scheduling staff, hiring expert contractors to assist with periodic training, and scheduling standards implementation. They also state that the Bureau is committed to continuing to strengthen the schedule management plan, practices, and methods in place for the 2020 Census. The Bureau has experienced turnover in the leadership of the team responsible for 2020 scheduling, and, as of July 2017, Bureau officials have said they are working to collect artifacts that may demonstrate how this recommendation was addressed.
    Director: St James, Lorelei
    Phone: (202) 512-2834

    3 open recommendations
    Recommendation: To ensure efficient management of the circulating coin inventory, the Board of Governors should direct Cash Product Office (CPO) to develop a process to assess the factors that have influenced increasing coin operations costs and differences in costs across Reserve Banks and a process to use this information to identify practices that could lead to cost-savings.

    Agency: Federal Reserve System: Board of Governors
    Status: Open

    Comments: As of August 2017, GAO is reviewing the recommendation update information the Federal Reserve. The Federal Reserve has indicated that they have developed and approved a methodology to determine the differences in coin costs among different Reserve Banks and thhave begun to identify cost differences among Reserve Banks and also begun to decrease overall coin costs.
    Recommendation: To ensure efficient management of the circulating coin inventory, the Board of Governors should direct CPO to establish, document, and annually report to the Board performance goals and metrics for managing the circulating coin inventory, (e.g., Reserve Bank coin management costs) and measure performance towards those goals and metrics.

    Agency: Federal Reserve System: Board of Governors
    Status: Open

    Comments: As of August 2017, GAO is reviewing information provided by the Federal Reserve. The Federal Reserve has indicated that the Cash Advisory Group has endorsed CPO's coin metric methodology. In addition, the CPO is working with the Board of Governors to understand variances in unit costs and working to reduce those costs.
    Recommendation: To ensure efficient management of the circulating coin inventory, the Board of Governors should direct CPO to establish and implement a process to assess the accuracy of forecasts for new coin orders and revise the forecasts as needed.

    Agency: Federal Reserve System: Board of Governors
    Status: Open

    Comments: As of August 2017, GAO is reviewing information provided by the Federal Reserve. The Federal Reserve has indicated that they have begun work to implement a more formal assessment program for forecasting new coin orders. In addition, the Cash Product Office has begun work to refine the accuracy of these forecasts.
    Director: Farrell, Brenda S
    Phone: (202) 512-3604

    2 open recommendations
    Recommendation: To guide the implementation of actions DOD identified in its study on JPME, the Chairman of the Joint Chiefs of Staff should direct the Director for Joint Force Development to establish well-defined timeframes for conducting follow-on actions, coordinate with all stakeholders, and identify key officials responsible for implementing the study's recommendations to help ensure the usefulness, timeliness, and implementation of any actions DOD takes in response to the findings and recommendations contained in its study.

    Agency: Department of Defense: Joint Chiefs of Staff
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To guide the implementation of actions DOD identified in its study on JPME, the Chairman of the Joint Chiefs of Staff should direct the Director for Joint Force Development to assess the costs of implementing recommendations made and efficiencies to be derived from the recommendations in order to implement DOD's recommendations in a cost-effective manner.

    Agency: Department of Defense: Joint Chiefs of Staff
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Farrell, Brenda S
    Phone: (202) 512-3604

    4 open recommendations
    Recommendation: To improve DOD's estimates and comparisons of the full cost of its military, civilian, and contractor workforces and to improve DOD's methodology for estimating and comparing the full cost of its various workforces, the Secretary of Defense should direct the Office of Cost Assessment and Program Evaluation to further develop guidance for cost elements that users have identified as challenging to calculate, such as general and administrative, overhead, advertising and recruiting, and training.

    Agency: Department of Defense
    Status: Open

    Comments: According to DOD's April 2017 report on Comparing the Cost of Civilians and Contractors, DOD's Cost Assessment and Program Evaluation (CAPE) office is updating fiscal year 2017 estimates in its Full Cost of Manpower (FCoM) system to reflect separate officer and enlisted training costs. If more specific cost estimates are required, users of FCoM are directed to cost estimating tools operated by the military departments.
    Recommendation: To improve DOD's estimates and comparisons of the full cost of its military, civilian, and contractor workforces and to improve DOD's methodology for estimating and comparing the full cost of its various workforces, the Secretary of Defense should direct the Office of Cost Assessment and Program Evaluation to develop business rules for estimating the full cost of National Guard and Reserve personnel.

    Agency: Department of Defense
    Status: Open

    Comments: According to DOD's April 2017 report in Comparing the Cost of Civilians and Contractors, a cost estimating function for Reserve Component personnel far exceeds the combination of variables for developing active component and DOD civilian cost estimates. Due to the scope of the Full Cost of Manpower (FCoM) contract, OSD(CAPE) has not adopted this recommendation in terms of a web-based application. However, OSD(CAPE) intends to address general business rules for Reserve Component cost estimates in the next DoDI revision.
    Recommendation: To improve DOD's estimates and comparisons of the full cost of its military, civilian, and contractor workforces and to improve DOD's methodology for estimating and comparing the full cost of its various workforces, the Secretary of Defense should direct the Office of Cost Assessment and Program Evaluation, in coordination with the department's Office of the Actuary and appropriate federal actuarial offices, to reevaluate the inclusion and quantification of pension, retiree health care costs, and other relevant costs of an actuarial nature and make revisions as appropriate.

    Agency: Department of Defense
    Status: Open

    Comments: According to DOD's April 2017 report on Comparing the Cost of Civilians and Contractors, OSD(CAPE) has reviewed the inclusion of payments that the government makes to retirement and health benefits. All identified costs that are attributable to current retirees and past service of active civilian and military personnel, such as unfunded liabilities, are being revised in the cost estimating guidelines. OSD(CAPE) intends to incorporate these changes in the next DoDI revision and coordinate a review with the Office of the DoD Actuaty.
    Recommendation: To improve DOD's estimates and comparisons of the full cost of its military, civilian, and contractor workforces and to improve DOD's ability to estimate contractor support costs, the Secretary of Defense should direct the Office of Cost Assessment and Program Evaluation, consistent with established practices for developing credible cost estimates, to research the data sources it is currently using and reassess its contractor support data sources for use when determining contractor support costs.

    Agency: Department of Defense
    Status: Open

    Comments: According to DOD's April 2017 report on Comparing the Cost of Civilian and Contractors, the department's efforts to improve data sources are ongoing.
    Director: Wise, David J
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To enhance transparency and allow for more informed decision making related to the appropriate role of leasing in GSA's real property portfolio, the Administrator of GSA should include in the lease prospectus a description of the length of time that an agency estimates it will need the space, an historical account of how long the agency has been in the particular building it is occupying at the time of the prospectus, and any major investments the agency will have to make to the leased space to meet its mission. For those spaces for which the agency has a long-term projected need, also include an appropriate form of cost-to-lease versus cost-to-own analysis.

    Agency: General Services Administration
    Status: Open

    Comments: As of March 2017, GSA had not incorporated the recommended information into its fiscal year 2016 lease prospectuses and did not plan to do so in future prospectuses. GSA officials stated that GSA may not know how long an agency will need the space or the amount of investment that will be needed, so this information would be difficult to incorporate. However, in its 2013 review, GAO found that 9 of the 12 case study leases included space for long-term or mission critical space needs for tenant agencies. Some of the tenant agencies in these leases had been housed in multiple successive leases far longer than the statutory term limit of 20 years for a single GSA lease-situations that would lend themselves to analyzing the extent to which it would be more cost-effective for the government to own rather than lease. Moreover, GSA and the agency are likely to have general information on the complexity and likely investment needed to meet an agency's mission-related needs in leased space that could be included in the prospectus. Including the recommended information would increase transparency and facilitate more informed decision making by Congress.
    Director: Fennell, Anne-marie Lasowski
    Phone: (202) 512-3841

    2 open recommendations
    Recommendation: To help the agencies enhance their abilities to identify their firefighting aircraft needs and better ensure they obtain aircraft that meet those needs, the Secretaries of Agriculture and the Interior should direct the Chief of the Forest Service and the Deputy Assistant Secretary for Public Safety, Resource Protection, and Emergency Services, respectively, to, subsequent to the completion of the first two recommendations, update the agencies' strategy documents for providing a national firefighting aircraft fleet to include analysis based on information on aircraft performance and effectiveness and to reflect input from stakeholders throughout the fire aviation community.

    Agency: Department of Agriculture
    Status: Open

    Comments: According to Forest Service and Interior officials, the National Interagency Aviation Committee, which includes members from both agencies, has drafted an Aviation Strategy and has solicited feedback from interagency stakeholders. The committee plans to present the strategy for senior level review in October 2017. The Forest Service additionally reports that it has begun developing its own aviation strategy for 2019-2023, and expects to certify it by September, 2018. The Forest Service strategy will be linked to the Interagency Aviation Strategy.
    Recommendation: To help the agencies enhance their abilities to identify their firefighting aircraft needs and better ensure they obtain aircraft that meet those needs, the Secretaries of Agriculture and the Interior should direct the Chief of the Forest Service and the Deputy Assistant Secretary for Public Safety, Resource Protection, and Emergency Services, respectively, to, subsequent to the completion of the first two recommendations, update the agencies' strategy documents for providing a national firefighting aircraft fleet to include analysis based on information on aircraft performance and effectiveness and to reflect input from stakeholders throughout the fire aviation community.

    Agency: Department of the Interior
    Status: Open

    Comments: According to Forest Service and Interior officials, the National Interagency Aviation Committee, which includes members from both agencies, has drafted an Aviation Strategy and has solicited feedback from interagency stakeholders. The committee plans to present the strategy for senior level review in October 2017.
    Director: Mihm, J Christopher
    Phone: (202) 512-6806

    1 open recommendations
    Recommendation: To improve implementation of GPRAMA and help address pressing governance issues, given the common, long-standing difficulties agencies continue to face in measuring the performance of various types of federal programs and activities--contracts, direct services, grants, regulations, research and development, and tax expenditures--the Director of OMB should work with the PIC to develop a detailed approach to examine these difficulties across agencies, including identifying and sharing any promising practices from agencies that have overcome difficulties in measuring the performance of these program types. This approach should include goals, planned actions, and deliverables along with specific time frames for their completion, as well as the identification of the parties responsible for each action and deliverable.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: As of August 2017, OMB and the PIC have taken some limited actions to address this recommendation. According to information provided by staff from OMB and the PIC in June 2015, they had taken some initial steps to address this recommendation in a few areas, such as acquisition management (contracts). In addition, the PIC formed a working group on performance measurement that, in part, is focusing on how to develop appropriate performance measures. However, OMB and the PIC have not yet developed a comprehensive and detailed approach to address these issues as recommended in our report. OMB staff told us in August 2017 that efforts related to the future implementation of the Program Management Improvement Accountability Act could help address this recommendation. We will continue to monitor progress.
    Director: Powner, David A
    Phone: (202)512-9286

    1 open recommendations
    Recommendation: The Secretaries of Agriculture and Commerce should address the weaknesses in agency- and bureau-led TechStat processes and management outlined in this report.

    Agency: Department of Agriculture
    Status: Open

    Comments: The agency partially agreed with our assessment of the agency's TechStat process, but has not yet implemented our recommendation. At the time of our review, we identified several weaknesses in the agency's TechStat processes and management, including holding bureau-led TechStats, incorporating TechStats in its capital planning and governance structure, providing training on TechStats, and consistently capturing action steps, deadlines, and responsibilities in its TechStat memorandums. In an April 2017 update, the agency stated that it had not held any TechStats in 2016, but had identified several candidates for TechStats within the next 6 months. In addition, the agency plans to update its capital planning documents to include the TechStat program in late summer 2017. In addition, it has not finalized its TechStat training documentation, but plans to complete the documentation in late summer 2017. We will continue to monitor the implementation of this recommendation.
    Director: Melvin, Valerie C
    Phone: (202)512-6304

    2 open recommendations
    including 1 priority recommendation
    Recommendation: To ensure that HUD effectively and efficiently manages its modernization efforts aimed at improving its IT environment to support mission needs, the Secretary of Housing and Urban Development should direct the Deputy Secretary to establish a plan of action that identifies specific time frames for correcting the deficiencies highlighted in this report for both its ongoing projects, as applicable, and its planned projects, to include (1) developing charters that define what constitutes project success and establish accountability, (2) finalizing deliverable-oriented work breakdown structures and associated dictionaries that define the detailed work needed to accomplish project objectives, (3) completing comprehensive project management plans that reflect cost and schedule baselines and fully incorporate subsidiary management plans, (4) establishing requirements management plans that include prioritization methods to be applied and metrics for determining how products address requirements, (5) completing matrixes to include requirements traceability from mission needs through implementation, and (6) establishing strategies to guide how acquisitions are managed in accordance with other processes and that performance metrics are established.

    Agency: Department of Housing and Urban Development
    Status: Open
    Priority recommendation

    Comments: HUD did not agree or disagree with, but stated it had planned actions intended to address, our recommendation. As of April 2017, HUD provided evidence of its updated project planning and management process, including requirements for improvements to project charters and management plans, but we have not yet seen evidence that HUD's actions have fully addressed deficiencies in other project management documentation.
    Recommendation: To improve development and use of the department's project management framework, the Secretary should direct the Customer Care Committee to review the role and responsibilities of the Technical Review Subcommittee and ensure that the department's governance structure operates as intended and adequately oversees the management of all of its modernization efforts.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: HUD agreed with our recommendation and reported plans for the Customer Care Committee to review the roles and responsibilities of the Technical Review Subcommittee. As of March 2017, HUD had finalized an updated Subcommittee charter. We are reviewing changes made to the charter and plan to observe the Subcommittee's operation under the revised guidance.
    Director: Mihm, J Christopher
    Phone: (202)512-3236

    3 open recommendations
    Recommendation: To enhance the value of Performance.gov for intended audiences and improve the ability to identify and prioritize potential improvements, the Director of the Office of Management and Budget--working with the Performance Improvement Council and the General Services Administration--should clarify the ways that intended audiences could use the information on the Performance.gov website to accomplish specific tasks and specify the design changes that would be required to facilitate that use.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: In July 2017, Office of Management and Budget (OMB) staff informed us that they will be partnering with a vendor to redesign Performance.gov to improve its usability and the accessibility of information on the website. They plan to launch the new site in February 2018, concurrent with the President's Budget for fiscal year 2019. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: To enhance the value of Performance.gov for intended audiences and improve the ability to identify and prioritize potential improvements, the Director of the Office of Management and Budget--working with the Performance Improvement Council and the General Services Administration--should seek to more systematically collect information on the needs of a broader audience, including through the use of customer satisfaction surveys and other approaches recommended by HowTo.gov.

    Agency: Executive Office of the President: Office of Management and Budget
    Status: Open

    Comments: In July 2017, Office of Management and Budget (OMB) staff informed us that they will be partnering with a vendor to redesign Performance.gov, and that they plan to launch the new site in February 2018, concurrent with the President's Budget for fiscal year 2019. To inform this redesign, OMB staff said that they plan to engage a wide range of stakeholders, including Congress, federal agency managers and staff, and interested members of the public and outside organizations. We will continue to monitor the status of actions to address this recommendation.
    Recommendation: To enhance the value of Performance.gov for intended audiences and improve the ability to identify and prioritize potential improvements, the Director of the Office of Management and Budget--working with the Performance Improvement Council and the General Servic