Skip to Highlights
Highlights

The protester objected to the determination that its proposal was technically unacceptable. The determination of the technical acceptability of the proposal was within the discretion of the procuring agency and was not disturbed since there was no clear showing that the determination was unreasonable. Rebuttal to the agency's technical determination did not establish that the evaluation was without a reasonable basis.

Downloads

GAO Contacts