Short-Range Attack Missiles

NSIAD-92-145R: Published: Feb 24, 1992. Publicly Released: Feb 24, 1992.

Additional Materials:


Office of Public Affairs
(202) 512-4800

Pursuant to a congressional request, GAO summarized an earlier report on the Air Force's: (1) strategic Short-Range Attack Missile (SRAM) II; and (2) its tactical variant, the SRAM T missile. GAO noted that: (1) it concluded that SRAM II range and accuracy capabilities had been degraded due to development problems; (2) despite the changes, the contractor was still unable to meet the range requirements, and proposed reductions to the SRAM II ranges; (3) the Strategic Air Command reduced its required ranges as part of an overall review of strategic requirements, and the contractor's bid would have met the revised requirements; (4) at program termination, the SRAM II schedule had slipped 4 years and its estimated cost had doubled; (5) SRAM T development was contingent on the resolution of SRAM II technical problems; (6) estimated SRAM T program costs had doubled since 1989 and the schedule had slipped about 3 years; and (7) the Air Force and the Department of Energy concluded that there were technical risks in using SRAM A due to its age, but the baseline warhead design for SRAM II could be incorporated into SRAM A.

Mar 13, 2018

Feb 28, 2018

Feb 16, 2018

Feb 15, 2018

Feb 6, 2018

Jan 31, 2018

Jan 18, 2018

Jan 10, 2018

Looking for more? Browse all our products here