In response to a congressional request, GAO reviewed the status of the Air Force B-1B bomber's maintenance, specifically the: (1) aircraft's test system; (2) delivery of support equipment and repair instructions; (3) contractor engineering support requirements; and (4) effect on aircraft availability.

GAO found that: (1) developmental and operational problems with the on-board test system limited the Air Force's ability to maintain the aircraft as planned; (2) the Air Force determined that the contractors needed to change the specifications to improve the system and to reduce the number of false indications of part failures; (3) replacing the test system's ground processor will cost an estimated $34 million; (4) delays in obtaining support equipment and repair instructions caused the projected Air Force takeover of maintenance operations to slip by about 2 years and increased interim contractor support costs by about $570 million; (5) the Air Force's estimated costs for funding sustaining engineering increased from $101 million to $243 million; (6) the Air Force proposed over 50 reliability and maintainability enhancements totalling more than $586 million; (7) the portion of hours each month that B-1B were not available because of maintenance ranged from 47 to 66 percent, compared to the expected rate of 25 percent; and (8) limited aircraft availability prevented crews from completing mission-ready training, reduced the number of crews receiving training, and delayed the placement of additional aircraft on alert.

Sep 28, 2018

Sep 20, 2018

Sep 17, 2018

Sep 12, 2018

Sep 5, 2018

Aug 30, 2018

Aug 27, 2018

Aug 15, 2018

Jul 30, 2018

Jul 26, 2018

Looking for more? Browse all our products here