Analysis of Bonneville Power Administration's Estimate To Bury Segments of Transmission Line in Montana

EMD-82-80: Published: May 7, 1982. Publicly Released: Jun 7, 1982.

Additional Materials:

Contact:

Office of Public Affairs
(202) 512-4800
youngc1@gao.gov

GAO was requested to review the Bonneville Power Administration's (BPA) cost estimates to bury segments of high voltage transmission lines in Montana. Specifically, GAO was asked to: (1) evaluate the validity of the BPA cost data for burying portions of a "twin" 500 KV transmission line; and (2) analyze the general engineering reliability and safety considerations of burying such lines.

GAO found that the BPA estimates of $7.1 to $7.4 million per mile to bury the transmission lines are reasonable. However, because this type of installation is not common, uncertainties exist which could make the actual costs higher or lower. For this reason, little is known about the engineering, reliability, and safety considerations of underground installation for lines of this size.

Oct 15, 2020

Jul 24, 2020

Jun 24, 2020

Jun 9, 2020

May 13, 2020

May 12, 2020

Apr 29, 2020

  • energy icon, source: Art Explosion

    Priority Open Recommendations:

    Department of Energy
    GAO-20-285PR: Published: Apr 22, 2020. Publicly Released: Apr 29, 2020.

Apr 17, 2020

Mar 11, 2020

Mar 4, 2020

Looking for more? Browse all our products here