B-297078,B-297078.2 Nov 21, 2005
Jump To:
Skip to Highlights

Highlights

Lifecare Management Partners protests the award of a contract to Wright Solutions, Inc. under request for proposals (RFP) No. W91YTZ-05-R-0004, issued by the North Atlantic Regional Contracting Office, Department of the Army, for certified medical record coding services at the Walter Reed Army Medical Center (WRAMC), located in Washington, District of Columbia. Lifecare argues that various agency actions, including the evaluation of Wright's proposal, were unreasonable, and that the resulting award decision was improper.

We deny the protests in part and dismiss them in part.
View Decision

B-297078; B-297078.2, Lifecare Management Partners, November 21, 2005

DOCUMENT FOR PUBLIC RELEASE
The decision issued on the date below was subject to a GAO Protective Order. This redacted version has been approved for public release.

Decision

Matter of: Lifecare Management Partners

File: B-297078; B-297078.2

Date: November 21, 2005

Janine S. Benton, Esq., H. Scott Johnson, Jr., Esq., Seth C. Berenzweig, Esq., Heather A. James, Esq., and Sarah T. Zaffina, Esq., Albo & Oblon, L.L.P., for the protester.

Capt. Joseph V. Fratarcangeli, Department of the Army, for the agency.

Louis A. Chiarella, Esq., and Christine S. Melody, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision.

DIGEST

1. Protest that agency improperly relaxed solicitation's requirement that offerors be able to commence contract performance by the start date by delaying the start date is denied where the agency decision to alter the contract start date was based upon delays in contract award, including an agency-level protest filed by the protester.

2. Protest of agency's technical evaluation is denied where record shows evaluation was reasonable and consistent with evaluation criteria; mere disagreement with agency's evaluation is insufficient to show it was unreasonable.

3. Protest filed with Government Accountability Office is untimely where filed more than 10 days after protester became aware of initial adverse agency action on agency-level protest.

DECISION

Lifecare Management Partners protests the award of a contract to Wright Solutions, Inc. under request for proposals (RFP) No. W91YTZ-05-R-0004, issued by the North Atlantic Regional Contracting Office, Department of the Army, for certified medical record coding services at the Walter Reed Army Medical Center (WRAMC), located in Washington, District of Columbia. Lifecare argues that various agency actions, including the evaluation of Wright's proposal, were unreasonable, and that the resulting award decision was improper.

We deny the protests in part and dismiss them in part.

BACKGROUND

The RFP, issued on May 4, 2005, contemplated the award of a fixed-price, indefinite-delivery/indefinite-quantity contract for a base year with four 1-year options to provide certified medical record coding services. The solicitation established three evaluation factors: technical; past performance; and price.[1] RFP at 26. The RFP also informed offerors that the technical factor was more important than either the past performance or price factors, which were of equal importance. Id. at 27. Award was to be made to the responsible offeror whose proposal was determined to be –most advantageous— to the government, all factors considered. Id. at 26.

Seven offerors, including Wright and the incumbent Lifecare, submitted proposals by the May 20 closing date. Agency Report (AR), Tab 10, Source Selection Decision, at 2. The contracting officer determined that five offerors were within the competitive range. The Army then received individual oral presentations from the offerors in the competitive range.[2] An agency technical evaluation panel (TEP) evaluated offerors' written proposals and oral presentations using an adjectival rating system: excellent, good, satisfactory, marginal, or unsatisfactory for the technical evaluation factor; and good/low risk, satisfactory/medium risk, unsatisfactory/high risk, and neutral/ unknown performance risk for the past performance evaluation factor. Concurrent with the technical evaluation, the agency separately evaluated offerors' prices and calculated an overall evaluated cost to the government for each offeror.

After completion of its evaluation, the TEP provided the contracting officer with its consensus evaluation ratings of offerors' proposals, including those of Lifecare and Wright, which were as follows:


Factor

Lifecare

Wright

Technical (Overall)

Excellent

Excellent

Technical Capability

Excellent

Excellent

Organizational Experience

Excellent

Good

Personnel Qualifications

Excellent

Excellent

Past Performance

Good/Low Risk

Good/Low Risk

Evaluated Price

$24,138,510

$12,869,512

Id. at 4, 11-14.

On July 21, after having reviewed the evaluation ratings and findings, the contracting officer determined that Wright's proposal, which was lowest-priced among offerors with equivalent technical and past performance ratings, represented the best value to the government.[3] Id. at 16.

The agency provided Wright as well as all unsuccessful offerors with notice of its award determination on August 1.[4] AR, Sept. 21, 2005, at 3; Lifecare Protest, Aug. 19, 2005, at 5-6. On August 5, the Army provided Lifecare with a postaward debriefing. At the debriefing Lifecare questioned, among other things, Wright's ability to successfully perform the contract and comply with the Service Contract Act prevailing wage determination at the awarded contract price. Subsequent to the Lifecare debriefing, the agency issued an amendment to the solicitation. RFP amend. 0002. The amendment stated that the solicitation was being re-opened in order to clarify the pricing unit for various contract line items (i.e., –hours,— and not –records—).[5] The agency informed offerors that the response date for the submission of price clarifications was August 9, at

On August 9, Lifecare did not provide the Army with a price clarification in response to the amended RFP;[6] however, Lifecare did file an agency-level protest challenging the solicitation amendment.[7] AR, Tab 15, Lifecare Agency-Level Protest. Despite Lifecare's protest, the agency proceeded with the procurement and received price clarifications from other offerors as scheduled. On August 17, the contracting officer denied Lifecare's protest. AR, Tab 16, Agency-Level Protest Denial. On August 18, based upon its evaluation of offerors' price clarifications, the agency again selected Wright for award. AR, Tab 17, Source Selection Decision Addendum. On August 22, Lifecare protested to our Office.[8]

ANALYSIS

Lifecare's protests raise numerous issues that can be grouped into three categories. First, Lifecare alleges that the Army improperly relaxed the solicitation requirements in favor of Wright. Second, Lifecare contends that the Army's evaluation of Wright's proposal was flawed. Third, Lifecare alleges that the agency's conduct during the course of the solicitation was in various ways improper. Although we do not here specifically address all of Lifecare's arguments about the evaluation of proposals and other agency actions, we have fully considered all of them and find that they afford no basis to sustain the protest of the selection decision here.

Relaxation of Requirements

Lifecare first protests that the Army improperly relaxed material requirements of the solicitation for Wright. Specifically, Lifecare alleges that although the RFP required offerors to have sufficient accredited personnel to commence contract performance on the August 15 start date, the agency delayed the start date until September 1 for the benefit of Wright. The protester also alleges that its incumbent personnel were solicited by Wright after the August 1 initial award decision as evidence that the awardee did not have adequate personnel to perform the contract. The protester argues that by not requiring Wright to have adequate personnel on hand to commence performance by the contract start date, and by altering the contract start date for Wright's benefit, the agency failed to treat all offerors equally.

It is a fundamental principle of government procurement that competition must be conducted on an equal basis, that is, offerors must be treated equally and be provided with a common basis for the preparation of their proposals. Continental RPVs, B-292768.2, B-292768.3, Dec. 11, 2003, 2004 CPD para. 56 at 8; Systems Mgmt., Inc.; Qualimetrics, Inc., B-287032.3, B-287032.4, Apr. 16, 2001, 2001 CPD para. 85 at 8. Our Office will sustain a protest that an agency improperly relaxed its requirements for the awardee where the protester establishes a reasonable possibility that it was prejudiced by the agency's actions. Datastream Sys., Inc. B-291653, Jan. 24, 2003, 2003 CPD para. 30 at 6. We find that the Army did not improperly relax the solicitation requirements for the benefit of Wright.

The RFP as originally issued established a base period of performance commencing on June 1. RFP at 3. The solicitation also required that, with regard to an offeror's medical record coding personnel, the –Contractor shall provide copies of credentials and a resume to include three years of current coding experience within the last five years for all personnel prior to assignment at WRAMC.— RFP sect. C.1.1.6.

The Army did not complete its award determination here by the June 1 contract start date. As a result, the agency modified its incumbent contract with Lifecare and extended the end date of performance from May 31 until August 31. AR, Tab 9, Contract No. W91YTZ-05-P-0060, Mod. P0005, at 1. Additionally, on August 5, when amending the solicitation here in order to clarify offerors' prices, the Army changed the contract start date to Monday, August 15.[9] RFP amend. 0002, at 2. In denying Lifecare's agency-level protest of the amended solicitation on August 17, the agency stated that the start date for the new contract would be –on or about 1 September.—[10] AR, Tab 16, Agency-Level Protest Denial, at 1. In fact, the contract issued to Wright on Friday, August 19, had a period of performance commencing on Monday, August 22. AR, Tab 18, Contract to Wright, at 1, 15.

We find Lifecare's argument that the agency improperly relaxed material solicitation requirements for the awardee to be without merit. First, as the protester itself acknowledges, the solicitation did not require that the successful offeror have all of its employees on hand prior to contract award, Lifecare's Comments, Oct. 3, 2005, at 5; rather, the RFP requirements mandated only that the awardee have sufficient accredited medical coding personnel to begin performance by the contract start date.[11] Second, the record reflects that the agency had a valid reason for altering the August 15 contract start date, namely, delays in the contract award process.

As set forth above, given that it was required to reevaluate offerors' clarified prices and resolve Lifecare's agency-level protest, the Army did not make its final award decision until August 18 and did not issue a contract to Wright until August 19. In light thereof, we fail to see, and the protester fails to explain, how Wright or any other offeror could have begun contract performance on August 15. Moreover, notwithstanding the agency's statement that the start date would be –on or about— September 1, the actual contract start date was August 22, the first business day after the Army issued the contract to Wright--a fact which Lifecare ignores. In sum, we find that there was a reasonable basis for the agency's decision to extend the start date for commencement of contract performance; it was not done to improperly relax the requirements for the awardee. See Military Waste Mgmt., Inc., B-240769.3, Feb. 7, 1991, 91-1 CPD para. 135 at 3. Lifecare, the incumbent contractor, cannot protest the solicitation, delay the agency's ability to award a contract, and then reasonably argue that any alteration of the planned contract start date constitutes a relaxation of the requirements in favor of the new awardee.

Evaluation of Wright's Proposal

Lifecare also protests that the agency's evaluation of Wright's technical proposal was unreasonable. Specifically, Lifecare alleges that the Army overlooked the deficiency in Wright's proposal with regard to the solicitation requirement concerning the designation of a site manager.[12] Lifecare also contends that the agency ignored other significant, material deficiencies in Wright's proposal that were identified by the TEP when performing its evaluation. The protester argues that the agency's flawed evaluation process resulted in the improper selection of Wright for contract award.

In reviewing an agency's evaluation, we will not reevaluate technical proposals; instead, we will examine the agency's evaluation to ensure that it was reasonable and consistent with the solicitation's stated evaluation criteria and procurement statutes and regulations. Urban-Meridian Joint Venture, B-287168, B-287168.2, May 7, 2001, 2001 CPD para. 91 at 2. An offeror's mere disagreement with the agency's evaluation is not sufficient to render the evaluation unreasonable. Ben-Mar Enters., Inc., B-295781, Apr. 7, 2005, 2005 CPD para. 68 at 7. Our review of the record here finds the agency's evaluation of Wright's proposal to be unobjectionable.

The RFP stated, in relevant part:

The Contractor shall designate a Site Manager. The Site Manager shall be responsible for the performance of the work activities of all contracted coding staff. . . . The Contractor shall designate this individual in writing to the Contracting Officer Representative (COR) and the Contracting Officer before the contract start date.

RFP amend. 0001, sect. C.1.1.2.

Wright submitted its written proposal by the original closing date. Wright's proposal set forth the manner in which the offeror planned to perform the required medical coding services. Wright's proposal stated, with regard to its on-site management plan, that the plan would be submitted to the agency within 30 days of contract award. AR, Tab 6, Wright's Technical Proposal, at 15. Wright's written proposal did not identify the proposed site manager. The agency subsequently received individual oral presentations from the offerors. At its oral presentation, Wright's president introduced its proposed on-site project manager, who then proceeded to conduct a substantial portion of the oral presentation, including a lengthy discussion of the site manager's own experience, qualifications, and management philosophy. AR, Tab 6, Wright's Proposal, Audiotape of Oral Presentation. In its evaluation of Wright's entire proposal (i.e., both the written proposal and oral presentation), the TEP determined that the awardee had complied with the RFP requirement regarding designation of a site manager. AR, Tab 8, TEP Consensus Evaluation of Wright, at 12.

As a preliminary matter, it is not clear that the solicitation required that offerors designate their proposed site managers in their proposals. As noted above, the relevant RFP provision states only that the –contractor— is to designate a site manager to the agency –before the contract start date.— Rather than clearly establishing a proposal requirement, this language suggests that the requirement was only to designate the site manager before the start of performance. SeeCitrus College; KEI Pearson, Inc., B-293543 et al., Apr. 9, 2004, 2004 CPD para. 104 at 3. In any event, we find Lifecare's assertion that Wright failed to designate a site manager in its proposal to be factually inaccurate. The record clearly establishes that Wright's oral presentation included the designation of its site manager. The RFP also informed offerors that the agency would consider an offeror's oral presentation to be part of its proposal. Such treatment is entirely consistent with the relevant FAR provision, which provides that –oral presentations by offerors as requested by the government may substitute for, or augment, written information.— FAR sect. 15.102. The fact that Wright's initial written proposal did not include the designation of a site manager is simply not determinative of whether Wright in fact designated a site manager in its proposal.

Lifecare also alleges that the agency ignored significant deficiencies in Wright's technical proposal that were actually identified by the TEP when performing its evaluation. Lifecare contends that all TEP members who reviewed Wright's proposal identified deficiencies in the areas of project management plan quality, allocation of personnel and resources, and organizational experience. Lifecare argues that notwithstanding these noted deficiencies, the TEP improperly rated Wright's proposal as excellent overall under the technical evaluation factor.

As set forth above, the RFP informed offerors that the technical evaluation factor was comprised of three, equally-important subfactors: technical capability; organizational experience; and personnel qualifications. In turn, the technical capability subfactor consisted of five, second-tier criteria all of equal importance, one of which was quality of the project management plan and allocation of personnel and resources. RFP at 26. When performing its evaluation, the TEP rated offerors' technical proposals by having each member individually review and assign an adjectival rating to each subfactor and criterion, as well as an overall evaluation rating. The TEP then developed consensus ratings based upon discussions among the members of the strengths and weaknesses of each proposal.

The TEP members each individually rated Wright's proposal as good under the project management plan criterion. AR, Tab 8, TEP Evaluation of Wright. The agency evaluators each found Wright to have strengths here (e.g., on-site management was extremely involved in all projects), but also believed that concerns regarding the immediately availability of Wright's on-site management and/or the timely allocation of personnel constituted weaknesses.[13] The TEP consensus evaluation also rated Wright as good under the project management plan criterion. Based upon its ratings of Wright's technical proposal under each stated evaluation criterion, the TEP rated Wright's proposal as excellent as to technical capability, good as to organizational experience, excellent as to personnel qualifications, and excellent overall. Id.

We find Lifecare's assertion that the agency ignored the deficiencies which the TEP identified in its review of Wright's proposal to be without merit. The record indicates that when assigning an evaluation rating to the technical merits of Wright's proposal, the TEP properly considered all aspects of the awardee's proposal--both those aspects identified as weaknesses to which Lifecare refers, as well as the many aspects identified as strengths which Lifecare does not mention. Based upon a consideration of relative strengths and weaknesses, the TEP reasonably rated Wright's proposal as either good or excellent under each technical factor and criterion. The existence of isolated weaknesses in an otherwise favorable assessment does not preclude or make unreasonable an overall favorable evaluation rating. See Metro Mach. Corp., B-295744, B-295744.2, Apr. 21, 2005, 2005 CPD para. 112 at 25. Under the circumstances here, we have no basis to find the agency's evaluation unreasonable.[14]

Untimely Issues


Lifecare also protests that the Army actively attempted to hinder its participation in the solicitation by –tortiously interfering— with Lifecare's employee contracts and trying to recruit Lifecare personnel for the follow-on contract. Lifecare states that it maintains non-competition agreements with its employees who have worked at WRAMC. The protester contends that various Army procurement officials talked to Lifecare employees, both before and after the agency's initial award decision, and questioned whether Lifecare's non-competition agreements were enforceable. Lifecare argues that the agency efforts to undermine the contractual relationship between Lifecare and its employees had the effect of hindering Lifecare's participation in the competition. The Army contends that agency officials did not interfere with the Lifecare employment agreements, or try to persuade Lifecare's employees to leave their positions with the firm.

We find this issue to be untimely. As set forth above, offerors were given until August 9 to clarify their prices in response to RFP Amendment 0002. Lifecare chose not to submit a price clarification by the revised closing date; instead, it filed a protest with the agency contending that the solicitation was defective in that it failed to remedy, among other things, the agency's interference with Lifecare's employee contracts. As noted above, despite Lifecare's protest, the Army proceeded with the procurement and received offerors' price clarifications as scheduled. On August 17, the contracting officer denied Lifecare's protest and, on August 18, the Army made a new award determination. On August 22, Lifecare protested this issue to our Office.

Where a protest initially has been filed with a contracting activity, any subsequent protest to our Office, to be considered timely under our Bid Protest Regulations, must be filed within 10 days of actual or constructive knowledge of initial adverse agency action. 4 C.F.R. sect. 21.2(a)(3). The term –adverse agency action— is defined in our Bid Protest Regulations to include the agency's proceeding with the receipt of proposals in the face of the protest. 4 C.F.R. sect. 21.0(f); Carlisle Tire & Rubber Co., B-235413, May 12, 1989, 89-1 CPD para. 457 at 2.[15] Thus, it is our general view that once the contracting activity proceeds with accepting offers, the protester is on notice that the contracting activity will not undertake the requested corrective action; consequently, timeliness is measured from this point rather than from the receipt of a subsequent formal denial of the agency-level protest. Scopus Optical Indus., B-238541, Feb. 23, 1990, 90-1 CPD para. 221 at 2.

Since Lifecare learned of the initial adverse agency action on August 9, but did not file its protest with our Office until August 22, more than 10 days later, its protest is untimely under our Bid Protest Regulations.[16] 4 C.F.R. sect. 21.2(a)(3). These timeliness rules reflect the dual requirements of giving parties a fair opportunity to present their cases and of resolving protests expeditiously without unduly disrupting or delaying the procurement process.[17] Air Inc.--Recon., B-238220.2, Jan. 29, 1990, 90-1 CPD para. 129 at 2.

The protests are denied in part and dismissed in part.

Anthony H. Gamboa
General Counsel



[1] The solicitation also set forth various evaluation subfactors of equal importance to each other within each prime evaluation factor. RFP at 26-27. The technical evaluation subfactors were: technical capability; organizational experience; and personnel qualifications. Id. at 26.

[2] The RFP established that the oral presentations, including copies of slides used to support the oral presentations, would be considered part of the offeror's proposal. RFP at 24. The agency also prepared audiotape recordings of each offeror's oral presentation.

[3] The Army determined that another offeror's proposal, whose price was lower than that of Wright with equivalent technical and past performance ratings, was ineligible for award because it had failed to provide prices for all contract line items. Id. at 14.

[4] The record indicates that the Army did not actually issue a contract to Wright at the time of the August 1 award determination.

[5] Based upon the Lifecare debriefing, the Army concluded that offerors did not have a common understanding of the solicitation's intended pricing unit, and that seeking price clarifications was necessary in order to put all offerors on an equal plane for price evaluation purposes. AR, Sept. 21, 2005, at 3; Tab 16, Agency-Level Protest Denial, at 1.

[6] The record reflects that Lifecare's original price proposal had been based upon the intended pricing unit (i.e., hours). AR, Tab 15, Lifecare Agency-Level Protest, at 3-4; Tab 17, Source Selection Decision Addendum, at 1.

[7] Lifecare argued that Amendment 0002 was defective insofar as it failed to correct the following alleged improprieties: (1) the agency's tortious interference with Lifecare's employee contracts; and (2) Wright's defective prices and the agency's defective price evaluation. AR, Tab 15, Lifecare Agency-Level Protest, at 3-6.

[8] Lifecare's protest to our Office was delivered by e-mail on August 19 after , and thus is considered filed on August 22, the next business day. See 4 C.F.R. sect. 21.0(g) (2005).

[9] It is unclear when Wright was to commence performance as a result of the August 1 initial award determination, as no contract was actually issued to the awardee at this time, and the RFP's original start date of June 1 had passed.

[10] The agency also noted that it was relying upon incumbent Lifecare to fulfill the terms of its modified contract, which had an end date of August 31. Id.

[11] Whether Wright may have solicited Lifecare's incumbent personnel after the initial award decision and prior to the contract start date, as Lifecare alleges, is therefore irrelevant to our determination here. Moreover, we note that it is neither unusual nor inherently improper for an awardee to recruit and hire personnel previously employed by an incumbent contractor.

[12] As a preliminary matter, we note that the protester alleges that the agency should have rejected Wright's proposal as –nonresponsive.— The record is clear, however, that the solicitation here employed negotiated procedures pursuant to Federal Acquisition Regulation (FAR) Part 15. Accordingly, the protester's references to –nonresponsiveness— are inappropriate (and its reliance upon FAR Part 14 and our decisions in sealed bidding procurements is misplaced), since this concept is not applicable to negotiated procurements. See Marshall-Putnam Soil & Water Conservation Dist., B-289949, B-289949.2, May 29, 2002, 2002 CPD para. 90 at 4-5. We interpret Lifecare's protest as contending that Wright's proposal should have been rejected as technically unacceptable because the firm's offer allegedly did not comply with the RFP requirements. Accordingly, we analyze the protester's contention by the standards applicable to negotiated procurements.

[13] While the RFP did not require the submission of an on-site management plan before the contract start date, Wright's proposal to provide the agency with a management plan within 30 days of contract award was seen by the TEP as a weakness. Likewise, the TEP identified other weaknesses in Wright's proposal under the organizational experience subfactor.

[14]In its initial protest Lifecare also asserted that the agency failed to perform an adequate price realism determination of Wright's proposal as required by the solicitation. Protest, Aug. 19, 2005, at 10-12. The Army specifically addressed this protest issue in its report, discussing the agency's price realism evaluation of both Wright's initial and clarified price proposals, and the protester's comments offered no substantive rebuttal of the agency's position. (Lifecare argued only that the Army had not canceled its initial contract award at the time it evaluated offerors' price clarifications, a fact wholly irrelevant to whether the agency's price realism evaluation was proper.) Where, as here, an agency provides a detailed response to a protester's assertions and the protester either does not respond to the agency's position or provides a response that fails to substantively rebut the agency's position, we deem the initially-raised arguments abandoned. L-3 Communications Westwood Corp., B-295126, Jan. 19, 2005, 2005 CPD para. 30 at 4; Citrus College; KEI Pearson, Inc., supra, at 8 n.4. In any event, our review of the record indicates that the agency's price realism evaluation of Wright's proposal was reasonable and consistent with the stated evaluation criteria.

[15] In addition, the written guide describing our Office's bid protest process, which is posted on GAO's website, explicitly warns potential protesters that they –should keep in mind, however, that GAO views as adverse agency action any action that makes clear that the agency is denying the agency-level protest. Examples of adverse agency action include the agency's proceeding with . . . the receipt of proposals . . . despite the agency-level protest.— Bid Protests at GAO: A Descriptive Guide (7th ed. 2003) at 12. See http://www.gao.gov/decisions/bidpro/bid/bibreg.html.

[16] Similarly, Lifecare's protest that the Army improperly considered its agency-level protest of the amended solicitation to be a confirmation of the offeror's original price, rather than suspending the procurement pending the protest's outcome as the agency should have done, is also untimely. Lifecare was aware as of August 9 that the Army had decided not to postpone the receipt of offerors' price clarifications, notwithstanding its agency-level protest. However, it was not until October 3--almost 2 months after this adverse agency action--that Lifecare first raised this protest issue with our Office. Moreover, contrary to the protester's assertion, although an agency generally may not award a contract while a preaward protest is pending, an agency is not also required to suspend the closing date for the receipt of proposals or its evaluation of offerors' proposals. See FAR sect. 33.103(f)(1); Ann Riley & Assocs., Ltd., B-237365, Nov. 15, 1989, 89-2 CPD para. 463 at 2; see also 31 U.S.C. sect. 3553(c) (2000); FAR sect. 33.104(b)(1); 4 C.F.R. sect. 21.6; Northwest Express Ltd., B-246431, Feb. 28, 1992, 92-1 CPD para. 244 at 2 n.1.

[17] In any event, our bid protest jurisdiction is limited to review of whether agencies' procurement actions complied with procurement statutes and regulations, 31 U.S.C. sect. 3551-3552 (2000); determining whether the agency improperly interfered with Lifecare's employee contracts is not a matter within the scope of our bid protest jurisdiction. Further, the protester has failed to show how it was prejudiced in any manner by the alleged agency action.