Claim for Alleged Mistake in Offer

B-187273 Jan 19, 1978
Jump To:
Skip to Highlights

Highlights

The contractor presented a claim for an alleged mistake in its offer after award. Relief was denied even though the circumstances called for verification. Verification was not obtained since the contractor had not established that the error was made, and the agency indicated that the items alleged to have been omitted from the offer were discussed with the contractor during the preaward survey.