This is the accessible text file for GAO report number GAO-10-458 
entitled 'Department of Veterans Affairs: Agency Has Exceeded 
Contracting Goals for Veteran-Owned Small Businesses, but It Faces 
Challenges with Its Verification Program' which was released on May 
28, 2010. 

This text file was formatted by the U.S. Government Accountability 
Office (GAO) to be accessible to users with visual impairments, as 
part of a longer term project to improve GAO products' accessibility. 
Every attempt has been made to maintain the structural and data 
integrity of the original printed product. Accessibility features, 
such as text descriptions of tables, consecutively numbered footnotes 
placed at the end of the file, and the text of agency comment letters, 
are provided but may not exactly duplicate the presentation or format 
of the printed version. The portable document format (PDF) file is an 
exact electronic replica of the printed version. We welcome your 
feedback. Please E-mail your comments regarding the contents or 
accessibility features of this document to Webmaster@gao.gov. 

This is a work of the U.S. government and is not subject to copyright 
protection in the United States. It may be reproduced and distributed 
in its entirety without further permission from GAO. Because this work 
may contain copyrighted images or other material, permission from the 
copyright holder may be necessary if you wish to reproduce this 
material separately. 

Report to Congressional Committees: 

United States Government Accountability Office: 
GAO: 

May 2010: 

Department of Veterans Affairs: 

Agency Has Exceeded Contracting Goals for Veteran-Owned Small 
Businesses, but It Faces Challenges with Its Verification Program: 

GAO-10-458: 

GAO Highlights: 

Highlights of GAO-10-458, a report to congressional committees. 

Why GAO Did This Study: 

The Veterans Benefits, Health Care, and Information Technology Act of 
2006 (the 2006 Act) requires the Department of Veterans Affairs (VA) 
to give priority to veteran-owned and service-disabled veteran-owned 
small businesses (VOSB and SDVOSB) when awarding contracts to small 
businesses. The 2006 Act also requires GAO to conduct a 3-year study 
of VA’s implementation of the act. GAO evaluated (1) the extent to 
which VA met its prime contracting goals for VOSBs and SDVOSBs in 
fiscal years 2007-2009; (2) VA’s progress in implementing procedures 
to verify the ownership, control, and status of VOSBs and SDVOSBs in 
its mandated database; and (3) VA’s progress in establishing a review 
mechanism of prime contractors’ subcontracts with VOSBs and SDVOSBs. 
GAO obtained and analyzed data on VA’s prime and subcontracting 
accomplishments, and reviewed a sample of verified businesses to 
identify any deficiencies in VA’s verification program. 

What GAO Found: 

While VA exceeded its contracting goals with VOSBs and SDVOSBs for the 
past 3 years, it faces challenges in continuing to meet its other 
small business contracting goals and monitoring agreements with other 
agencies that conduct contract activity on VA’s behalf. While VA was 
able to exceed its contracting goals for VOSBs and SDVOSBs, its 
contracting with women-owned small businesses and HUBZone firms fell 
short of its goals during this period. In addition, GAO’s review of 
interagency agreements found that VA lacked an effective process to 
ensure that interagency agreements include required language that the 
other agency comply, to the maximum extent feasible, with VA’s 
contracting goals and preferences for VOSBs and SDVOSBs and to monitor 
the extent to which agencies comply with the requirements. 

VA has made limited progress in implementing an effective verification 
program. While the 2006 Act requires VA to use the veteran preferences 
authorities only to award contracts to verified businesses, VA’s 
regulation does not require that this take place until January 1, 
2012. In fiscal year 2009, 25 percent of the contracts awarded using 
veteran preferences authorities went to verified businesses. To date, 
VA has verified about 2,900 businesses––approximately 14 percent of 
businesses in its mandated database of VOSBs and SDVOSBs. Among the 
weaknesses GAO identified in VA’s verification program were files 
missing required information and explanations of how staff determined 
that control and ownership requirements had been met. In addition, VA’
s procedures call for site visits to further investigate the ownership 
and control of higher-risk businesses, but the agency has a large and 
growing backlog of businesses awaiting site visits. Furthermore, VA 
contracting officers awarded contracts to businesses that had been 
denied verification. Finally, although site visit reports indicate a 
high rate of misrepresentation, VA has not developed guidance for 
referring cases of misrepresentation for investigation and enforcement 
action. Such businesses would be subject to debarment under the 2006 
Act. To ensure a thorough and effective verification program, VA needs 
robust procedures for reviewing businesses, an effective system to 
ensure that contracting officers do not use veteran preferences 
authorities with denied businesses, and clear guidance for referring 
businesses potentially abusing the program. 

VA has developed a mechanism to review prime contractors’ subcontracts 
with VOSBs and SDVOSBs, but the agency has not yet implemented it. For 
the past 3 years, VA fell substantially short of achieving 
subcontracting goals for VOSBs and SDVOSBs. The agency acknowledged 
shortcomings in this area and intends to use a review mechanism to 
confirm all subcontracting activities by prime contractors with 
approved subcontracting plans for a sampling of contracts awarded in 
fiscal year 2010. VA expects increased performance for subcontracting 
goal attainment as a result. It is too soon to assess the 
effectiveness of VA’s subcontracting efforts. 

What GAO Recommends: 

To help address requirements in the 2006 Act, GAO recommends that the 
Secretary of VA develop an effective process to ensure that 
interagency agreements comply with requirements; develop and implement 
a plan that ensures a more thorough and effective verification 
program; monitor contract awards made using veteran preference 
authorities; and develop guidance for staff to make determinations 
about businesses misrepresenting themselves. In commenting on a draft 
of this report, VA agreed with GAO’s recommendations. 

View [hyperlink, http://www.gao.gov/products/GAO-10-458] or key 
components. For more information, contact William Shear at (202) 512-
8678 or shearw@gao.gov. 

Contents: 

Letter: 

Background: 

VA Exceeded Its Veteran Contracting Goals since FY07, but It Faces 
Challenges in Meeting Its Other Small Business Goals and Monitoring 
Interagency Agreements: 

VA Has Made Limited Progress in Implementing Its Verification Program 
and Has Not Developed a Thorough and Effective Program: 

VA Has Not Met Subcontracting Goals for VOSBs and SDVOSBs but Has 
Developed a Review Process to Help Increase Subcontracting 
Achievements: 

Conclusions: 

Recommendations for Executive Action: 

Agency Comments and Our Evaluation: 

Appendix I: Objectives, Scope, and Methodology: 

Appendix II: VetBiz.gov Screenshot and Verified Logo: 

Appendix III: Department of Veterans Affairs' Contracting with Veteran-
Owned Small Businesses: 

Appendix IV: Comments from the Department of Veterans Affairs: 

Appendix V: GAO Contact and Staff Acknowledgments: 

Tables: 

Table 1: Small Business Reauthorization Act's Governmentwide Goals for 
Specific Types of Small Businesses: 

Table 2: VA's Contracting Awards to VOSBs and SDVOSBs, FY07 through 
FY09: 

Table 3: Summary of VA's Interagency Agreements with Federal Agencies, 
Entered on or after January 1, 2009: 

Table 4: VA's VOSB and SDVOSB Subcontracting Goals and 
Accomplishments, FY07 through FY09: 

Figures: 

Figure 1: VA's Percentage of Contracting Dollars to VOSBs, FY07 
through FY09: 

Figure 2: VA's Percentage of Contracting Dollars to SDVOSBs, FY07 
through FY09: 

Figure 3: VA's Use of Veteran Preferences Authorities (VOSB and SDVOSB 
Set-Aside and Sole-Source) Contracting Awards, FY07 through FY09: 

Figure 4: VA's Set-Aside and Sole-Source Awards to VOSBs and SDVOSBs, 
FY07 through FY09: 

Figure 5: VOSB Contracting Dollars and VOSB/SDVOSB Set-aside and Sole- 
source Contracting Dollars by Small Business Category, FY09: 

Figure 6: VA's Level of Contracting with Various Small Business 
Categories, FY06 through FY09: 

Figure 7: VA Contracting with WOSB and HUBZone Businesses, FY07 
through FY09: 

Figure 8: Timeline of Major Events Related to the Verification Program: 

Figure 9: Verification Applications That Were Received and Finalized: 

Figure 10: VA's Two-Step Process for Reviewing Verification 
Applications: 

Figure 11: Screenshot of VetBiz.gov Search for a Business: 

Figure 12: Service-Disabled Veteran-Owned Small Business Verified Logo: 

Abbreviations: 

BIRLS: Beneficiary Identification Records Locator Subsystem: 

CATS: Complaints Automated Tracking System: 

CCR: Central Contractor Registration: 

CVE: Center for Veterans Enterprise: 

DOI: Department of the Interior: 

DSBS: Dynamic Small Business Search: 

EPLS: Excluded Parties List System: 

FAR: Federal Acquisition Regulation: 

FPDS-NG: Federal Procurement Data System-Next Generation: 

FSS: Federal Supply Schedule: 

FY: fiscal year: 

GSA: General Services Administration: 

HUBZone: historically underutilized business zone: 

OAL: Office of Acquisition and Logistics: 

OIG: Office of Inspector General: 

OMB: Office of Management and Budget: 

ORCA: Online Representations and Certifications Application: 

OSDBU: Office of Small and Disadvantaged Business Utilization: 

SBA: Small Business Administration: 

SDVOSB: service-disabled veteran-owned small business: 

SPAWAR: Department of the Navy, Space and Naval Warfare Systems Center: 

VA: Department of Veterans Affairs: 

VAAR: Veterans Affairs Acquisition Regulation: 

VOSB: veteran-owned small business: 

WOSB: women-owned small business: 

[End of section] 

United States Government Accountability Office: 
Washington, DC 20548: 

May 28, 2010: 

The Honorable Daniel K. Akaka: 
Chairman: 
The Honorable Richard Burr: 
Ranking Member: 
Committee on Veterans' Affairs: 
United States Senate: 

The Honorable Stephanie Herseth Sandlin: 
Chairwoman: 
The Honorable John Boozman: 
Ranking Member: 
Subcommittee on Economic Opportunity: 
Committee on Veterans' Affairs: 
House of Representatives: 

The Department of Veterans Affairs (VA) awarded contracts for more 
than $6.1 billion to veteran-owned small businesses (VOSB) and service-
disabled veteran-owned small businesses (SDVOSB) from fiscal years 
(FY) 2007 through 2009. The Veterans Benefits, Health Care, and 
Information Technology Act of 2006 (Pub. L. No. 109-461 or the 2006 
Act) requires that VA give priority to these two categories of small 
businesses when awarding contracts to small businesses and provides 
for the use of limited competition contract awards (sole-source and 
set-aside) to achieve contracting goals that VA is required to 
establish under the 2006 Act.[Footnote 1] Additionally, the law 
requires VA to maintain a database of VOSBs and SDVOSBs and verify the 
ownership, control, and veteran or service-disabled status of 
businesses listed in the database. Businesses must be listed in the 
database to receive contracting preferences for VOSBs and SDVOSBs. 
Finally, the 2006 Act requires VA to establish a subcontracting review 
mechanism to ensure that prime contractors actually awarded 
subcontracts to service-disabled or other veteran-owned businesses. 
Specifically, under this review mechanism, VA must confirm subcontract 
awards that it counts toward its small business subcontracting goal 
achievements. 

As required by the 2006 Act, we conducted a 3-year study on VA's 
efforts to meet its contracting goals for VOSBs and SDVOSBs.[Footnote 
2] As part of the study, we briefed Members of Congress in 2008, 2009, 
and 2010.[Footnote 3] This report discusses (1) the extent to which VA 
met its prime contracting goals for VOSBs and SDVOSBs in FY07, FY08, 
and FY09, and the challenges VA faced in meeting these goals; (2) VA's 
progress in implementing procedures to verify the ownership, control, 
and, if applicable, service-disability status of firms in its mandated 
database of VOSBs and SDVOSBs; and (3) VA's progress in establishing a 
review mechanism for prime contractors' subcontracts with VOSBs and 
SDVOSBs. 

To determine the extent to which VA met contracting goals for FY07 
through FY09, we obtained and analyzed data on contracts from the 
Small Business Administration's (SBA) Goaling Reports and VA 
contracting data from the Federal Procurement Data System-Next 
Generation (FPDS-NG).[Footnote 4] We also used these data to determine 
whether other federal agencies met VA's contracting goals and 
preferences for VOSBs and SDVOSBs pursuant to a statutory requirement 
governing agreements between VA and any governmental entity to acquire 
goods or services.[Footnote 5] We found these data to be sufficiently 
reliable for the purposes of this report. To determine VA's progress 
in implementing procedures to verify the veteran status, control, and 
ownership of business, we reviewed the agency's verification 
guidelines as well as procedures for reviewing applications and 
conducting site visits. Additionally, we conducted a file review of a 
sample of verified businesses to determine the extent to which VA 
followed its procedures and to identify any deficiencies in VA's 
verification process. To determine VA's progress in establishing a 
subcontracting review mechanism, we reviewed data from SBA's Goaling 
Reports and the Electronic Subcontracting Reporting System to 
determine whether goals for subcontracting with VOSBs and SDVOSBs were 
met. Furthermore, we interviewed agency officials to obtain 
information about the subcontracting review mechanism and reviewed the 
agency's associated documents. See appendix I for additional 
information on our scope and methodology. 

We conducted this performance audit from October 2007 through May 
2010, in accordance with generally accepted government auditing 
standards. Those standards require that we plan and perform the audit 
to obtain sufficient, appropriate evidence to provide a reasonable 
basis for our findings and conclusions based on our audit objectives. 
We believe that the evidence obtained provides a reasonable basis for 
our findings and conclusions based on our audit objectives. 

Background: 

The Small Business Reauthorization Act of 1997 sets a governmentwide 
goal for small business participation of not less than 23 percent of 
the total value of all prime contract awards--contracts that are 
awarded directly by an agency--for each fiscal year.[Footnote 6] This 
act also sets goals for participation by specific types of small 
businesses (see table 1). The statutorily mandated, governmentwide 
prime and subcontracting goal for SDVOSBs is 3 percent of all federal 
contract dollars.[Footnote 7] There is no governmentwide numerical 
goal for VOSBs. 

Table 1: Small Business Reauthorization Act's Governmentwide Goals for 
Specific Types of Small Businesses: 

Type of small business: Small disadvantaged businesses, including 8(a) 
businesses; 
Definition: Majority-owned and whose management and daily business is 
controlled by one or more individuals who are socially and 
economically disadvantaged; 
Annual prime contracting goals: 5%. 

Type of small business: Women-owned small businesses; 
Definition: Majority-owned and whose management and daily business 
operations are controlled by one or more women; 
Annual prime contracting goals: 5. 

Type of small business: Service-disabled veteran-owned small 
businesses; 
Definition: Majority-owned and whose management and daily business 
operations are controlled by one or more service-disabled veterans; 
Annual prime contracting goals: 3. 

Type of small business: Businesses located in historically 
underutilized business zones (HUBZone); 
Definition: Owned and controlled by individuals operating in qualified 
HUBZones. A principal office must be located within a HUBZone and at 
least 35 percent of the business' employees must reside in a HUBZone; 
Annual prime contracting goals: 3. 

Source: Small Business Act. 

[End of table] 

The 2006 Act provided VA with unique authority to award contracts to 
VOSBs and SDVOSBs on a priority basis to increase contracting 
opportunities for these businesses.[Footnote 8] This authority, 
referred to in this report as the "goals and preferences authority," 
applies only to VA. Among other things, the 2006 Act requires VA to 
establish annual contracting goals for VOSBs and SDVOSBs not less than 
the governmentwide goal and to give preference to these businesses 
when awarding contracts. In FY07, VA set prime contracting goals of 7 
percent for VOSBs and 3 percent for SDVOSBs. VA increased these goals 
for FY08 and FY09, to 10 percent for VOSBs and 7 percent for SDVOSBs. 
The law also requires VA to maintain a database of verified VOSBs and 
SDVOSBs and to confirm subcontract awards that it counts toward its 
small business goals. While the Federal Acquisition Regulation (FAR) 
is the overall governmentwide regulation governing agency 
acquisitions, the Veterans Affairs Acquisition Regulation (VAAR) 
governs acquisitions made under the 2006 Act. Under the VAAR, 
preference for awarding contracts must be made in the following order 
of priority: (1) SDVOSBs, (2) VOSBs, (3) HUBZones or 8(a) businesses, 
and (4) any other small business contracting preference. 

VA's Office of Small and Disadvantaged Business Utilization (OSDBU), 
in conjunction with its Office of Acquisition and Logistics (OAL), is 
responsible for the development of policies and procedures to 
implement and execute the contracting goals and preferences under the 
2006 Act. Additionally, OSDBU serves as VA's advocate for small 
business concerns; provides outreach and liaison support to businesses 
(large and small) and other members of the private sector for 
acquisition-related issues; and is responsible for monitoring VA's 
implementation of socioeconomic procurement programs, such as 
encouraging contracting with women-owned small businesses (WOSB) and 
HUBZone businesses. OSDBU is responsible for the development of VA 
policies and programs related to small business concerns, including 
the following: 

* educating and training VA staff, including advising contracting 
officials on procurement strategies to ensure equitable opportunities 
for small business concerns; 

* negotiating prime and subcontracting goals; and: 

* training, counseling, and assisting small businesses in their 
understanding of federal and agency procurement procedures, including 
advising businesses on marketing their products and services to VA and 
other federal agencies. 

The Center for Veterans Enterprise (CVE), within OSDBU, seeks to help 
veterans interested in forming or expanding their own small 
businesses. CVE also helps VA contracting offices identify veteran-
owned small businesses and works with SBA's Veterans Business 
Development Officers and Small Business Development Centers on 
veterans' business financing, management, and technical assistance 
needs. Additionally, CVE is responsible for implementing VA's 
verification program and maintains the database, known as VetBiz.gov, 
of verified businesses required by the 2006 Act. VetBiz.gov allows 
business owners to register and apply online for verification to CVE 
and also functions as a searchable database for contracting officers 
and the public. Once CVE approves a business, the business name 
appears with a verified logo within the database (see appendix II for 
more information). Once verified, a firm retains that status for 1 
year. 

VA Exceeded Its Veteran Contracting Goals since FY07, but It Faces 
Challenges in Meeting Its Other Small Business Goals and Monitoring 
Interagency Agreements: 

VA exceeded its VOSB and SDVOSB contracting goals since FY07 and made 
significant use of its veteran preferences authorities but faces 
challenges in continuing to meet its other small business contracting 
goals and monitoring interagency agreements. For example, VA's 
continued success in contracting with VOSBs and SDVOSBs has coincided 
with difficulties in meeting other small business goals, such as WOSB 
and HUBZone goals. Beginning January 1, 2009, agreements into which VA 
enters with federal agencies to acquire goods or services on VA's 
behalf must include language requiring the agencies to comply, to the 
maximum extent feasible, with VA's VOSB and SDVOSB contracting goals 
and preferences when acquiring goods or services. We found that one 
interagency agreement into which VA entered after January 1, 2009, did 
not contain the required language. VA does not have an effective 
process in place to ensure that all interagency agreements include the 
required language. Without an effective process to review interagency 
agreements for the required language, VA may not fully comply with the 
requirements of the 2006 Act and cannot be assured that the agencies 
in its interagency agreements are aware of the need to make maximum 
feasible efforts to contract with VOSBs and SDVOSBs. 

VA Exceeded Its VOSB and SDVOSB Prime Contracting Goals since FY07 and 
Increased Its Use of Veteran Preferences Authorities: 

For FY07, VA established a contracting goal for VOSBs at 7 percent-- 
that is, VA's goal was to award 7 percent of its total procurement 
dollars to VOSBs. In FY07, VA exceeded this goal and awarded 10.4 
percent of its contracting dollars to VOSBs (see figure 1). VA 
subsequently increased its VOSB contracting goals to 10 percent for 
FY08 and FY09 and exceeded those goals as well--awarding 14.7 percent 
of contracting dollars to VOSBs in FY08 and 19.7 percent in FY09. 

Figure 1: VA's Percentage of Contracting Dollars to VOSBs, FY07 
through FY09: 

[Refer to PDF for image: horizontal bar graph] 

Fiscal year: 2007; 
Percentage of contracting dollars to VOSB: Goal: 7%; 
Percentage of contracting dollars to VOSB: Actual: 10.4%. 

Fiscal year: 2008; 
Percentage of contracting dollars to VOSB: Goal: 10%; 
Percentage of contracting dollars to VOSB: Actual: 14.7%. 

Fiscal year: 2009; 
Percentage of contracting dollars to VOSB: Goal: 10%; 
Percentage of contracting dollars to VOSB: Actual: 19.7%. 

Source: GAO analysis of FPDS-NG data. 

[End of figure] 

For FY07, VA established a contracting goal for SDVOSBs equivalent to 
the governmentwide goal of 3 percent and exceeded that goal by 
awarding 7.1 percent of its contracting dollars to SDVOSBs (see figure 
2). VA subsequently increased this goal to 7 percent for FY08 and FY09 
and exceeded the goal in those years as well. Specifically, VA awarded 
11.8 and 16.7 percent of its contracting dollars to SDVOSBs in FY08 
and FY09, respectively. 

Figure 2: VA's Percentage of Contracting Dollars to SDVOSBs, FY07 
through FY09: 

[Refer to PDF for image: horizontal bar graph] 

Fiscal year: 2007; 
Percentage of contracting dollars to VOSB: Goal: 3%; 
Percentage of contracting dollars to VOSB: Actual: 7.1%. 

Fiscal year: 2008; 
Percentage of contracting dollars to VOSB: Goal: 7%; 
Percentage of contracting dollars to VOSB: Actual: 11.8%. 

Fiscal year: 2009; 
Percentage of contracting dollars to VOSB: Goal: 7%; 
Percentage of contracting dollars to VOSB: Actual: 16.7%. 

Source: GAO analysis of FPDS-NG data. 

[End of figure] 

In nominal dollar terms, VA's contracting awards to VOSBs increased 
from $1.2 billion in FY07 to $2.8 billion in FY09, while at the same 
time, SDVOSB contracting increased from $832 million to $2.4 billion 
(see table 2). 

Table 2: VA's Contracting Awards to VOSBs and SDVOSBs, FY07 through 
FY09: 

VOSBs[A]: 
FY07: $1.2 billion; 
FY08: $2.1 billion; 
FY09: $2.8 billion. 

SDVOSBs: 
FY07: $832 million; 
FY08: $1.7 billion; 
FY09: $2.4 billion. 

Source: GAO analysis of SBA Goaling Reports and FPDS-NG data. 

[A] Figures for VOSBs include SDVOSBs. 

[End of table] 

The increase of awards to VOSBs and SDVOSBs largely was associated 
with the agency's greater use of the goals and preferences authorities 
established by the 2006 Act. For example, veteran set-aside and sole- 
source awards represented 39 percent of VA's total VOSB contracting 
dollars in FY07. However, in FY09, VA's use of these veteran 
preferences authorities increased to 59 percent of all VOSB 
contracting dollars. In nominal dollar terms, VA's use of these 
veteran preferences authorities increased by $1.2 billion over the 
past 3 years (see figure 3). 

Figure 3: VA's Use of Veteran Preferences Authorities (VOSB and SDVOSB 
Set-Aside and Sole-Source) Contracting Awards, FY07 through FY09: 

[Refer to PDF for image: line graph] 

VOSB and SDVOSB set-aside and sole-source contracting awards: 

Fiscal year: 2007; 
Amount: $473 million. 

Fiscal year: 2008; 
Amount: $1,169 million. 

Fiscal year: 2009; 
Amount: $1,676 million. 

Source: GAO analysis of FPDS-NG data. 

[End of figure] 

VA's use of set-aside and sole-source awards for SDVOSBs contributed 
to an even greater extent to the increase in awards to these 
businesses from FY07 through FY09.[Footnote 9] For each of these 
years, more than 90 percent of contracts to SDVOSBs were awarded 
through set-aside and sole-source mechanisms (see figure 4). 
Additionally, as of February 2010, almost all contracting officers (93 
percent) had received training on the goals and preferences 
authorities. According to VA officials and documents, the training 
includes guidance on VA's final rule implementing the 2006 Act; the 
contracting order of priority; set-aside and sole-source procedures; 
market research procedures for VOSB and SDVOSB businesses; and 
guidelines applying to subcontracting, joint ventures, and interagency 
acquisition agreements. OAL continued training contracting officers in 
March 2010. 

Figure 4: VA's Set-Aside and Sole-Source Awards to VOSBs and SDVOSBs, 
FY07 through FY09: 

[Refer to PDF for image: stacked vertical bar graph] 

Fiscal year: 2007; 
VOSB sole-source: $17 million; 
VOSB set-aside: $7 million; 
SDVOSB sole-source: $174 million; 
SDVOSB set-aside: $275 million. 

Fiscal year: 2008; 
VOSB sole-source: $47 million; 
VOSB set-aside: $22 million; 
SDVOSB sole-source: $486 million; 
SDVOSB set-aside: $614 million. 

Fiscal year: 2009; 
VOSB sole-source: $44 million; 
VOSB set-aside: $56 million; 
SDVOSB sole-source: $555 million; 
SDVOSB set-aside: $1,021 million. 

Source: GAO analysis of FPDS-NG data. 

[End of figure] 

In contrast, VA's use of general contracting authorities--that is, 
governmentwide contract mechanisms to provide a simplified process for 
acquiring goods--for VOSBs (including SDVOSBs) consistently decreased 
from FY07 through FY09. For example, VA's use of its other contracting 
authorities decreased from 52 percent of all VOSB (including SDVOSB) 
contracts in FY07 to 38 percent in FY09. In FY09, VA awarded $1.1 
billion in contracting dollars to VOSBs without the use of any set-
aside or sole-source mechanisms. In these cases, the majority of these 
awards were made using governmentwide contracts, such as the Federal 
Supply Schedule (FSS), and governmentwide agency contracts.[Footnote 
10] See appendix III for more detailed information on the contracting 
dollars and percentages that VA awarded to VOSBs in FY07 through FY09. 

According to SBA's Goaling Program, a small business can qualify for 
one or more small business categories, and an agency may take credit 
for a contract awarded under multiple goaling categories. For example, 
if a small business is owned and controlled by a service-disabled 
woman veteran, the agency may take credit for awarding a contract to 
this business under the VOSB, SDVOSB, and WOSB goaling categories. In 
addition, all awards made to SDVOSBs also count toward VOSBs goal 
achievement. In FY09, of the $2.8 billion awarded to VOSBs, the 
majority (63 percent) applied to both VOSBs and SDVOSBs and no other 
goaling category (see figure 5). Furthermore, of the $1.7 billion 
awarded through the use of veteran preferences authorities (VOSB and 
SDVOSB set-aside and sole-source) in FY09, an even greater majority 
(77 percent) applied solely to the VOSB and SDVOSB goaling categories 
(see figure 5). 

Figure 5: VOSB Contracting Dollars and VOSB/SDVOSB Set-aside and Sole-
source Contracting Dollars by Small Business Category, FY09: 

[Refer to PDF for image: 2 pie-charts] 

VOSB: 
VOSB and SDVOSB: 63%; 
VOSB, SDVOSB, and small disadvantaged business, including 8(a) 
program: 13%; 
VOSB only: 11%; 
Other: 6%; 
VOSB, SDVOSB, and HUBZone: 5%; 
VOSB, SDVOSB, and WOSB: 3%. 

VOSB/SDVOSB set-aside and sole-source: 
VOSB and SDVOSB: 77%; 
VOSB, SDVOSB, and small disadvantaged business, including 8(a) 
program: 7%; 
VOSB, SDVOSB, and HUBZone: 5%; 
Other: 5%; 
VOSB only: 3%; 
VOSB, SDVOSB, and WOSB: 3%. 

Source: GAO analysis of FPDS-NG data. 

[End of figure] 

VA's Continued Success in Contracting with VOSBs and SDVOSBs Coincides 
with Challenges in Meeting Its Other Small Business Goals: 

Although VA exceeded its contracting goals for VOSBs and SDVOSBs in 
FY07 through FY09, it did not meet its goals in other small business 
categories for that period. For example, VA's contracting with WOSBs 
and HUBZone businesses decreased since the implementation of the 2006 
Act (see figure 6). More specifically, VA contracting with WOSBs 
decreased from $584 million in FY07 to $488 million in FY09. 
Additionally, VA contracting with HUBZone businesses decreased from 
$388 million in FY07 to $305 million in FY09. 

Figure 6: VA's Level of Contracting with Various Small Business 
Categories, FY06 through FY09: 

[Refer to PDF for image: multiple line graph] 

Pub. L. No. 109-461 enacted (December 2006). 

Fiscal year: 2006; 
VOSB: $616 million; 
SDVOSB: $356 million; 
Small disadvantaged business: $819 million; 
WOSB: $480 million; 
HUBZone: $322 million. 

Fiscal year: 2007; 
VOSB: $1,217 million; 
SDVOSB: $832 million; 
Small disadvantaged business: $1,029 million; 
WOSB: $584 million; 
HUBZone: $388 million. 

Fiscal year: 2008; 
VOSB: $2,070 million; 
SDVOSB: $1,654 million; 
Small disadvantaged business: $1,121 million; 
WOSB: $566 million; 
HUBZone: $389 million. 

Fiscal year: 2009; 
VOSB: $2,841 million; 
SDVOSB: $2,405 million; 
Small disadvantaged business: $807 million; 
WOSB: $488 million; 
HUBZone: $305 million. 

Source: GAO analysis of FPDS-NG data. 

[End of figure] 

Furthermore, for the past 2 years VA failed to meet its 5 percent goal 
for WOSBs (see figure 7). In FY08, VA's total contracting dollars with 
WOSBs was 4 percent, and, in FY09, it was 3.4 percent. Additionally, 
VA failed to meet its 3 percent goal for contracting with HUBZone 
businesses for the past 2 years. For example, VA awarded 2.8 percent 
of its contracting dollars to HUBZone businesses in FY08, and awarded 
2.1 percent in FY09. 

Figure 7: VA Contracting with WOSB and HUBZone Businesses, FY07 
through FY09: 

[Refer to PDF for image: 2 horizontal bar graphs] 

WOSB: 
Fiscal year: 2007; 
Percentage of contracting dollars, goal: 5%; 
Percentage of contracting dollars, actual: 5.0%. 

Fiscal year: 2008; 
Percentage of contracting dollars, goal: 5%; 
Percentage of contracting dollars, actual: 4.0%. 

Fiscal year: 2009; 
Percentage of contracting dollars, goal: 5%; 
Percentage of contracting dollars, actual: 3.4%. 

HUBZone: 

Fiscal year: 2007; 
Percentage of contracting dollars, goal: 3%; 
Percentage of contracting dollars, actual: 3.3%. 

Fiscal year: 2008; 
Percentage of contracting dollars, goal: 3%; 
Percentage of contracting dollars, actual: 2.8%. 

Fiscal year: 2009; 
Percentage of contracting dollars, goal: 3%; 
Percentage of contracting dollars, actual: 2.1%. 

Source: GAO analysis of FPDS-NG data. 

[End of figure] 

VA officials acknowledged that the implementation of the contracting 
priority required by the 2006 Act has led to a decrease in awards to 
WOSB and HUBZone businesses.[Footnote 11] As we have previously 
stated, VA's regulations implementing the 2006 Act require contracting 
officers to award contracts according to the following order of 
priority: (1) SDVOSBs, (2) VOSBs, (3) HUBZones or 8(a) businesses, and 
(4) any other small business contracting preference. According to 
OSDBU officials, if contracting officers can easily identify VOSBs 
that also qualify as WOSB or HUBZone businesses (because a business 
can qualify for one or more small business categories), percentages of 
awards in all goal categories may increase. However, women veterans 
currently represent 8 percent of the entire veteran population, 
creating a challenge for VA to achieve the WOSB goal. 

VA has taken some recent steps to increase contracting opportunities 
for WOSB and HUBZone businesses. For example, in 2009, VA and SBA 
formed a working group to develop training sessions, resources, and 
marketing materials targeted to WOSB and HUBZone firms that also may 
be VOSBs and SDVOSBs. The marketing and education materials focus on 
explaining the nature of contracting preferences for VOSBs and SDVOSBs 
and the benefits of registering and applying for verification through 
VetBiz.gov. Additionally, OSDBU will continue to host monthly meetings 
in which VA vendors learn about FSS and how the vendors may be 
integrated into the system. Finally, according to VA, OSDBU has 
updated the agency's Web site to provide assistance for contracting 
officers to help identify small businesses that fall into the various 
small business categories when awarding FSS contracts. Additionally, 
CVE has updated the VetBiz.gov database so that contracting officers 
can more readily locate VOSBs and SDVOSBs that also fall into the 
other small business categories. However, it remains to be seen 
whether VA's recent efforts will be successful in increasing 
contracting opportunities for other small business categories. 

VA Faces Challenges in Monitoring Interagency Agreements for the Use 
of Contracting Preferences: 

The Veterans' Benefits Improvement Act of 2008 (Pub. L. No. 110-389 or 
the 2008 Act) amended the 2006 Act's provisions to require that any 
agreements into which VA enters with other government entities to 
acquire goods or services on VA's behalf on or after January 1, 2009, 
require the agencies to comply, to the maximum extent feasible, with 
VA's contracting goals and preferences for VOSBs and SDVOSBs.[Footnote 
12] Since January 1, 2009, VA has entered into six interagency 
agreements (see table 3). 

Table 3: Summary of VA's Interagency Agreements with Federal Agencies, 
Entered on or after January 1, 2009: 

Agency: General Services Administration (GSA); 
Description of services (number of agreements): Assisted acquisition 
services for information technology equipment, services, and support 
(four agreements); 
Amount: $137.1 million. 

Agency: Department of the Interior (DOI); 
Description of services (number of agreements): Assisted acquisition 
services for information technology services, research and 
development, supplies, renovations and alternations, and financial 
assistance and professional services (one agreement); 
Amount: $2.6 million. 

Agency: Department of the Navy, Space and Naval Warfare Systems Center 
(SPAWAR); 
Description of services (number of agreements): Technical support for 
analysis, planning, program review, and engineering services for 
information management and information technology initiatives (one 
agreement); 
Amount: $154.5 million. 

Source: GAO analysis of VA documents. 

Note: According to our analysis of FPDS-NG data, GSA's contracting 
activities exceeded VA's contracting goals for SDVOSBs (20 percent) 
and VOSBs (31 percent); DOI did not award any contracts to VOSBs or 
SDVOSBs; and SPAWAR data will not be available until the end of FY10. 
The dollars obligated in FPDS-NG do not reflect the total contracting 
dollars for the agreements because some contract actions covered by 
the interagency agreement may not have been awarded by the end of FY09. 

[End of table] 

Additionally, VA has an interagency agreement with the U.S. Army Corps 
of Engineers, but the agreement was signed in September 2007. 
Therefore, the provisions of the 2008 Act are not applicable.[Footnote 
13] According to agency officials, VA has agreements in place with 
additional federal agencies, but all were entered into before January 
1, 2009. Therefore, the provisions of the 2008 Act also are not 
applicable. VA issued guidance to all contracting officers about 
managing interagency acquisitions in March 2009.[Footnote 14] However, 
the agreement with the Department of the Interior (DOI) did not 
include the required language addressing VA's contracting goals and 
preferences until it was amended on March 19, 2010, after we informed 
the agency that the agreement was not in compliance with Pub. L. No. 
110-389. According to VA officials, the agency's acquisition and 
contracting attorneys are responsible for reviewing interagency 
agreements for compliance with these requirements. Additionally, the 
interagency agreement language comes from Office of Management and 
Budget (OMB) templates. However, VA does not have an effective process 
in place to ensure that all interagency agreements include the 2008 
Act's required language and to monitor the extent to which agencies 
comply with the requirements. For example, agency officials could not 
tell us whether contracts awarded under these agreements met the 
SDVOSB and VOSB preferences. Without a plan or oversight activity, 
such as monitoring, VA cannot be assured that agencies have made 
maximum feasible efforts to contract with VOSBs or SDVOSBs. 

VA Has Made Limited Progress in Implementing Its Verification Program 
and Has Not Developed a Thorough and Effective Program: 

VA has made limited progress in implementing a program to verify the 
veteran status, control, and ownership of businesses. As of April 8, 
2010, VA had verified about 2,900 businesses--approximately 14 percent 
of VOSBs and SDVOSBs in the VetBiz.gov database. While VA has adopted 
policies and procedures to review businesses and began to implement a 
risk-based approach to conducting site visits, it has not met the 
requirement in the 2006 Act that it only use its veteran preferences 
authorities with verified businesses when awarding these types of 
contracts. Additionally, our review identified a number of weaknesses 
in the verification program. For example, files supporting verified 
businesses contained missing information and explanations of how staff 
determined that control and ownership requirements had been met has 
made it difficult to know whether verified businesses are truly owned 
and controlled by service-disabled veterans or veterans. VA's 
procedures call for site visits to further investigate the ownership 
and control of higher-risk businesses, but the agency has a large and 
growing backlog of businesses awaiting site visits. VA has denied 
verification to more than 150 businesses but does not have a process 
in place to monitor contracting awards to effectively ensure that 
contracting officers do not use veteran preferences authorities to 
award contracts to denied businesses. Initial site visit findings also 
indicated misrepresentation by some business owners, but VA has not 
developed guidance for staff to follow when misrepresentation may have 
occurred. The weaknesses in VA's verification process reduce 
assurances that verified firms are veteran-owned and -controlled small 
businesses, and VA does not have an effective process to ensure that 
contracting officers do not use veteran preferences authorities with 
denied businesses or to ensure that VA staff take appropriate action 
against businesses that may be misrepresenting their VOSB or SDVOSB 
status. 

VA Has Been Slow to Develop a Thorough Verification Program and Has 
Not Developed a Plan or Established Time Frames for Full 
Implementation: 

In May 2008--approximately 1½ years after Pub. L. No. 109-461 was 
enacted--VA began verifying businesses and published interim final 
rules in the Federal Register, which included eligibility requirements 
and examination procedures, but did not finalize the rules until 
February 2010 (see figure 8).[Footnote 15] According to VA officials, 
CVE initially modeled its verification program on SBA's HUBZone 
program; however, CVE reconsidered verification program procedures 
after we reported on fraud and weaknesses in the HUBZone 
program.[Footnote 16] More recently, in December 2009, the agency (1) 
finalized changes to the VAAR that included an order of priority 
(preferences) for contracting officers to follow when awarding 
contracts and (2) trained contracting officers on the preferences and 
the VetBiz.gov database from January through March, 2010.[Footnote 17] 

Figure 8: Timeline of Major Events Related to the Verification Program: 

[Refer to PDF for image: timeline] 

December 2006: 
Pub. L. No. 109-461 enacted. 

May 2008: 
VA published interim final rule for verification program VA began 
verifying businesses 

July 2009: 
Contractor began study reviewing VA’s verification program. 

October 2009: 
VA began site visits for verification program. 

November 2009: 
Contractor issued report (including recommendations) to VA about 
verification program. 

December 2009: 
VA published final rule to revise the VAAR to implement sections of 
Pub. L. No. 109-461. 

January - March 2010: 
VA contracting officers trained in VAAR final rule. 

February 2010: 
VA published final rule for verification program. 

Source: GAO analysis of various VA documents. 

[End of figure] 

Leadership and staff vacancies plus a limited overall number of 
positions have also contributed to the slow pace of implementation of 
the verification program. For approximately 1 year, leadership in 
OSDBU was lacking because the former Executive Director retired, and 
the position remained vacant from January 2009 until January 2010. 
Furthermore, one of two leadership positions directly below the 
Executive Director has been vacant since October 2008, and the other 
position has been filled temporarily by an Acting Director. The agency 
also faced delays in obtaining contracting support, which slowed 
implementation of the verification program. More than 1 year after the 
agency began verifying businesses, a contractor began conducting site 
visits (which further investigate control and ownership of businesses 
as part of the verification process). As of April 2010, CVE had 6.5 
full-time-equivalent position vacancies, and VA officials told us 
existing staff have increased duties and responsibilities that 
contributed to slowed implementation.[Footnote 18] 

The slowness in implementing the verification program appears to have 
contributed to VA's inability to meet the requirement in the 2006 Act 
that it only use its veteran preferences authorities to contract with 
verified businesses. Currently, contracting officers can use the 
veteran preferences authorities with both self-certified and verified 
businesses listed in the VetBiz.gov database. However, in its December 
2009 rule, VA committed to only awarding contracts using the veteran 
preferences authorities to verified businesses starting on January 1, 
2012.[Footnote 19] According to our analysis of FPDS-NG data, in FY09, 
the majority of contracting awards (75 percent) made under veteran 
preferences went to unverified businesses. In March 2010, the recently 
appointed Executive Director of OSDBU acknowledged in a congressional 
hearing the large undertaking and some challenges with starting a new 
program like the verification program.[Footnote 20] 

As of April 8, 2010, VA had verified about 2,900 businesses--
approximately 14 percent of VOSBs and SDVOSBs in the VetBiz.gov 
database. VA has been processing an additional 4,701 applications, but 
the number of incoming applications continues to grow (see figure 9). 
As of March 2010, CVE estimated that it had received more than 10,000 
applications for verification since it started verifying businesses in 
May 2008. 

Figure 9: Verification Applications That Were Received and Finalized: 

[Refer to PDF for image: multiple line graph] 

Date: May 2008; 
Applications received: 44; 
Applications finalized: 8. 

Date: September 2008; 
Applications received: 865; 
Applications finalized: 123. 

Date: December 2008; 
Applications received: 1,361; 
Applications finalized: 344. 

Date: March 2009; 
Applications received: 2,220; 
Applications finalized: 917. 

Date: June 2009; 
Applications received: 3,750; 
Applications finalized: 1,804. 

Date: September 2009; 
Applications received: 5,946; 
Applications finalized: 2,612. 

Date: December 2009; 
Applications received: 8,081; 
Applications finalized: 3,430. 

Date: March 2010; 
Estimated applications received: 10,098; 
Estimated applications finalized: 4,199. 

Source: GAO analysis of CVE-provided data. 

Note: The "applications finalized" figures include applications 
approved, denied, and finalized for other reasons. 

[End of figure] 

According to the 2006 Act, VA must maintain a database of verified 
businesses and, in doing so, must verify the veteran or service- 
disability status, control, and ownership of each business.[Footnote 
21] The rules that VA developed pursuant to this requirement require 
VOSBs and SDVOSBs to register in VetBiz.gov to be eligible to receive 
contracts awarded using veteran preferences authorities.[Footnote 22] 
The small businesses must be owned and controlled by eligible parties, 
and the business must qualify as "small" under federal size standards. 
[Footnote 23] According to VA's rules, an applicant must meet the 
following five eligibility requirements for verification: (1) be owned 
and controlled by a veteran or service-disabled veteran for a VOSB or 
SDVOSB, respectively; (2) demonstrate good character (any small 
business that has been debarred or suspended is ineligible); (3) make 
no false statements (any small business that knowingly submits false 
information is ineligible); (4) have no federal financial obligations 
(any small business that has failed to pay significant financial 
obligations to the federal government is ineligible); and (5) not have 
been found ineligible due to an SBA protest decision.[Footnote 24] 

VA has a two-step process to make the eligibility determinations for 
verification. Under the first step, CVE staff review veteran status 
and, if applicable, service-disability status and publicly available, 
primarily self-reported information about control and ownership for 
all businesses that apply for verification (see figure 10). Business 
owners submit an application (VA Form 0877), which asks for basic 
information regarding the ownership of the company seeking 
verification, through VetBiz.gov and, upon request, must provide 
supporting documents to CVE.[Footnote 25] When applicants submit their 
VA Form 0877, they also must be able to provide, upon request, other 
items for review, such as financial statements, tax returns, articles 
of incorporation or organization, lease and loan agreements, payroll 
records, and bank account signature cards. Typically, these items are 
reviewed at the business during the second step of the review process--
site visits, which can be announced or unannounced--but CVE staff may 
also request that the applicant send copies of other items for review 
during the first step. Apart from site visits, the CVE review is 
centralized--all staff and files are located in Washington, D.C. 

Under the second step, reviews or site visits are conducted to further 
investigate control and ownership for select high-risk businesses. In 
September 2008, VA adopted a risk-based approach to conducting site 
visits by implementing risk guidelines to determine which businesses 
would merit site visits.[Footnote 26] Staff are required to conduct a 
risk assessment for each business and assign a level of risk ranging 
from 1 to 4--with 1 being a high-risk business and 4 being a low-risk 
business. When VA staff conduct a risk assessment, they are to follow 
the agency's risk guidelines, which include criteria such as previous 
government contracting dollars awarded, business license status, 
annual revenue, and percentage of veteran-ownership. For example, if a 
business has previous VA contracts totaling more than $5 million, 
staff must assign that business a risk level of 1 (high). Or, if a 
business is missing an active or business license in good standing, 
staff must assign a risk level of 2 (elevated). VA then uses these 
risk assessments to identify businesses for site visits. According to 
VA, it intends to examine all businesses assigned a high-or elevated-
risk level during a site visit or other means, such as extensive 
document review and telephone interviews with the businesses' key 
personnel. 

Figure 10: VA's Two-Step Process for Reviewing Verification 
Applications: 

[Refer to PDF for image: illustration] 

Step 1: Veteran status and publicly available, primarily self-reported 
information about control and ownership is checked: 

Verification application submitted: 

Veteran business owner: VetBiz.gov (VA Form 0877): CVE staff; 
Request and review of additional information (if needed). 

Risk level assigned after information is recorded and reviewed: 

* Enter business owner's information into CVE's internal database; 

* Check veteran and, if applicable, service-disability status and 
determine whether business owner may receive federal government 
contracts. 

* Check for control and ownership information:Business license, 
Central Contractor Registration, Dynamic Small Business Search, Dun & 
Bradstreet reports, Online Representations and Certifications, 
USAspending.gov, business Web site (if available). 

* Assign risk level according to agency’s risk guidelines. 

Verification application file: CVE$ quality reviewer: Higher risk 
businesses go to step 2. 

Step 2: Site visit: 

Site visit: Applicant’s business: 
Further investigate control and ownership: 
* Interview key personnel; 
* Conduct in-depth document review; 
* Assess day-to-day management; 
* Determine overall assessment. 

Sources: GAO analysis of CVE-provided data; Art Explosion (images). 

[End of figure] 

VA plans to refine its verification processes to address 
recommendations from a contractor's review of the program and best 
practices identified in federal, state, or private-sector programs. In 
July 2009, VA hired an outside contractor to assess the verification 
program's processes, benchmark VA's program to other similar programs, 
and provide recommendations to VA on how to improve the program. VA 
received the contractor's report and recommendations in November 2009. 
[Footnote 27] The contractor recommended that VA require business 
owners to submit key documents as part of the application for 
verification--such as business and professional licenses, copies of 
previous tax records, and lease or operating agreements. (VA currently 
requires businesses to have these documents on file for a possible 
review.) The contractor further recommended that VA upgrade its data 
system to expand its functionality to allow business owners to submit 
the documentation electronically and store electronic copies of the 
information. For example, the contractor recommended that VA adopt 
case-management software to better manage the flow of applications and 
interface with the VetBiz.gov database. According to the contractor's 
analysis of CVE's workforce and the growing application volume, CVE 
would need an additional 13 full-time positions to conduct 
verifications--even after it made necessary improvements to reduce 
processing times for applications.[Footnote 28] VA officials told us 
that they plan to implement the contractor's recommendations to 
require business owners to submit documentation as part of their 
initial application and to upgrade their data systems.[Footnote 29] 
(We further discuss data systems issues later in this report.) 

However, VA did not have a plan or specific time frames for 
implementing a thorough and effective verification program, including 
filling vacant staff positions, providing concrete steps and milestone 
dates for addressing the contractor's recommendations, and hiring 
additional positions to conduct verifications. A plan, including 
specific time frames for completing improvements, would help VA meet 
the requirements in the 2006 Act that it maintain a database of 
verified businesses, and that VA contracting officers only use the 
veteran preferences authorities to award contracts to verified 
businesses. 

Files Supporting Verified Businesses Were Missing Information and 
Limited Procedures Made It Difficult to Know: 

Whether All Eligibility Requirements Were Met: 

Based on our review of a random sample of the files for 112 businesses 
that VA had verified by the end of FY09, an estimated 48 percent of 
the files lacked the required information or documentation that CVE 
staff followed key verification procedures.[Footnote 30] Specifically, 

* 20 percent were missing some type of required information, such as 
evidence that veteran status had been checked or that a quality review 
had taken place; 

* 39 percent lacked information about how staff justified 
determinations that control and ownership requirements were met; and: 

* 14 percent were missing evidence that either a risk assessment had 
taken place or the risk assessment that occurred did not follow the 
agency's risk guidelines.[Footnote 31] 

The overall estimated 20 percent of cases missing some type of 
required information included files missing evidence that veteran 
status was checked, eligibility to receive federal government 
contracts was checked, application forms were complete and signed, or 
a quality review had taken place. According to CVE's verification 
procedures, staff should check the Veteran Benefits Administration's 
Beneficiary Identification Records Locator Subsystem (BIRLS) to 
determine veteran and service-disability status and record that BIRLS 
was checked in their internal database. Although CVE staff must check 
BIRLS for each applicant, we found about 16 percent of files lacked 
information on whether staff had checked the system to determine 
veteran or service-disability eligibility. Additionally, we found 15 
percent of files lacked information on whether CVE staff had checked 
the Excluded Parties List System (EPLS)--which is used to determine 
whether the business owner is eligible to receive federal contracts. 
[Footnote 32] Also, 3 percent of the files lacked a completed or 
signed verification application (VA Form 0877), and 5 percent lacked 
documentation that a quality review had taken place. According to the 
verification procedures, staff must check each VA Form 0877 for 
completeness at the beginning of the process, and each file should 
undergo a quality review at the end of the process. 

Additionally, our file review found that in an estimated 39 percent of 
cases, staff obtained information from a public database but failed to 
record in the file what information they had reviewed to determine 
whether control and ownership requirements had been met. According to 
CVE's verification procedures, staff are to review publicly available, 
primarily self-reported information about control and ownership for 
each business. For example, staff are to check for previous federal 
contracts by reviewing information available on USAspending.gov, check 
for certifications by reviewing the Online Representations and 
Certifications Application (ORCA), and review company history through 
Dun & Bradstreet reports.[Footnote 33] In addition, staff are to 
review information about each business in the following databases: 
VetBiz.gov, Central Contractor Registration (CCR), and Dynamic Small 
Business Search (DSBS)--all of which contain information self-reported 
by business owners.[Footnote 34] According to the verification 
procedures, staff are required to record business status or 
discrepancies about information obtained through each public database 
searched. 

Finally, based on our file review sample, for an estimated 14 percent 
of cases, the files were missing evidence that a risk assessment had 
taken place, or staff incorrectly assigned a risk level lower than 
warranted. For example, 4 percent of cases in this group were missing 
risk levels, and 8 percent of cases incorrectly were assigned a low-or 
moderate-risk level--they had missing business licenses, which 
according to the risk guidelines warranted assigning an elevated-risk 
level. According to VA, staff received on-the-job training about the 
risk guidelines and assigned risk levels are checked for accuracy 
during the quality review, but VA officials also have observed 
incorrectly assigned risk levels. VA officials told us that the staff 
have been learning how to better assign the risk levels, and errors 
have been reduced since the agency hired a full-time staff person as a 
risk manager in February 2009. Incorrectly assigning risk levels 
reduces the chance that the agency is accurately identifying 
businesses for site visits, which, in turn, may lead to some 
businesses not receiving a site visit when it otherwise would be 
warranted. 

We found that data system limitations appear to be contributing 
factors to weaknesses identified in our review of files. For example, 
data entry into CVE's internal database is largely done manually, 
which can result in missing information or data entry errors. 
Furthermore, CVE's internal database does not contain controls to 
ensure that only complete applications that have received a quality 
review move forward. Internal control standards for federal agencies 
require that agencies effectively use information technology in a 
useful, reliable, and continuous way.[Footnote 35] According to agency 
officials, two efforts are under way to enhance CVE's data systems. 
First, CVE plans to enhance its data systems to automatically check 
BIRLS for veteran status and EPLS for good character, and to store the 
information obtained. According to CVE, these changes will require 
outside contractor assistance. On March 18, 2010, VA released a 
solicitation for a contract that closed on April 16, 2010. Once a 
contract is awarded, CVE staff told us that the upgrades will be ready 
to implement in about 12 months. Second, CVE plans to adopt case- 
management software--as recommended in the contractor's report--to 
help manage its verification program files. According to VA officials, 
CVE is considering a software application currently used by another VA 
department.[Footnote 36] The new system will allow CVE to better track 
new and renewal verification applications and manage the corresponding 
case files. Furthermore, the new software will ensure that quality 
reviews take place by not allowing an application to move forward if 
it contains any missing information. However, as we have previously 
discussed, VA does not have specific time frames for putting the case- 
management system in place. 

Furthermore, CVE's verification procedures do not provide guidance for 
staff to follow in the event that they determine information is 
missing or discrepancies exist after reviewing public databases. Staff 
do not have specific guidance to follow about the circumstances under 
which they might need to request additional information directly from 
business owners. Based on our file review, we found in 79 percent of 
cases, staff relied solely on information from the public databases 
but asked for documentation from a business owner in the remaining 
cases. In these examples, we found staff requested copies of active 
business licenses, articles of incorporation, operating agreements, 
stock certificates, or tax documents for further review. The 
verification procedures instruct staff to "request a copy of all 
required documents needed to make a sound decision" but do not provide 
examples of conditions under which staff should request documents as 
evidence to support control or ownership determinations. Furthermore, 
the procedures do not require staff to document their assessments of 
whether eligibility requirements had been met. Internal control 
standards for federal agencies require that agencies collect and 
maintain documentation to confirm information in support of their 
programs.[Footnote 37] According to VA officials, staff verbally 
discuss assessments during a daily meeting but do not document these 
discussions. 

According to our file review, in the 21 percent of cases in which 
staff did request information because they may have found a 
discrepancy in the publicly available information, staff made the 
request directly to the business owners, instead of using third-party 
sources to validate information.[Footnote 38] Publicly available, 
primarily self-reported information may not be reliable to determine 
whether control and ownership requirements have been met. In October 
2009, our investigators reported on the governmentwide SDVOSB 
procurement program (administered by SBA, along with federal procuring 
activities) and found fraud and abuse among some SDVOSBs.[Footnote 39] 
For example, in 10 case studies, we showed that SDVOSBs fraudulently 
received sole-source and set-aside contracts--and that 5 of the 10 
businesses receiving VA contracts were found ineligible because of 
issues with management and control. While CVE's process to review 
publicly available, primarily self-reported information may be 
consistent with SBA's process for the governmentwide SDVOSB program, 
these 5 cases provide evidence that self-reported information may not 
always be reliable for determining control of a business. 

Without timely improvements to CVE's data systems and controls in 
place to ensure the completeness and accuracy of information, the 
verification program remains at higher risk for error, lacks quality 
control, and makes it difficult to know whether eligibility 
requirements were met. Furthermore, the verification procedures do not 
include guidance that would help staff to assess control and 
ownership, particularly in examples of missing information or 
discrepancies among public databases or within self-reported 
information. Without enhancements to its verification procedures that 
include clear guidance for staff to follow when reviewing applications 
and require an assessment of each eligibility requirement, it is 
difficult to know whether eligibility requirements have been met and 
whether verified businesses legitimately qualified as VOSBs or SDVOSBs. 

VA Faces a Growing Backlog for Site Visits, and Early Results Suggest 
a High Rate of Possible Misrepresentations, but VA Has Not Yet Taken 
Actions Based on Findings: 

VA started verifying businesses in May 2008 but did not start 
conducting site visits until October 2009. As of April 8, 2010, VA had 
used contractors to conduct 71 site visits but an additional 654 high-
and elevated-risk businesses awaited visits. Because of this delay, VA 
currently has a large backlog of businesses awaiting site visits and 
some higher-risk businesses have been verified months before their 
site visit occurred or were scheduled to occur. According to VA 
officials, the agency plans to use contractors to conduct an 
additional 200 site visits between May and October, 2010. However, the 
current backlog will grow over future months. 

According to site visit reports, approximately 40 percent of the 
visits resulted in evidence that control or ownership requirements had 
not been met, but, as of April 2010, CVE had not canceled any 
business' verification status. The verification program rules contain 
procedures for cancellation of verified status. Also, according to VA 
officials, CVE will follow the cancellation procedures for any 
business for which the site visit findings contradict the original 
verification determination. Because some businesses are verified 
months before their site visits occurred and findings were developed, 
it is difficult to know whether the businesses actually met control 
and ownership requirements when they were verified. By not 
incorporating site visit findings in a timely manner and canceling 
verification status as necessary, some businesses receive an 
unwarranted verified status and may receive veteran preferences 
contracts, thereby taking contracting opportunities away from 
businesses that, in fact, are owned and controlled by veterans or 
service-disabled veterans. 

Contracting Officers Incorrectly Used Veteran Preferences Authorities 
to Award Contracts to Ineligible Businesses: 

We also found that businesses received veteran preferences contracts 
after they had been denied verification. According to VA data, 154 
businesses had been denied verification as of March 4, 2010. According 
to our analysis of these data, the key reasons for denial of 
applications included business owners failed to submit the required 
documentation (44 percent), control requirements were not met (30 
percent), ownership requirements were not met (12 percent), and other 
eligibility requirements were not met (14 percent).[Footnote 40] 

As we have previously stated in this report, the 2006 Act provided VA 
with unique authority to award veteran preferences contracts, and, 
under the VAAR, contracting officers must only use these preferences 
with firms listed in the VetBiz.gov database (from Jan. 1, 2012, only 
with verified businesses). However, according to our analysis of FPDS-
NG data, we found that 11 (of 154) denied businesses had received 
veteran preferences contracts. According to these data, VA contracting 
officers had awarded contracts totaling almost $4 million using the 
veteran preferences authorities--after CVE had denied these businesses 
verification. According to VA officials, denied businesses should be 
removed from the VetBiz.gov database, and contracting officers are 
required to check the database before awarding a contract to ensure 
that the business is listed as either verified or self-certified. 

However, according to VA officials, contracting officers may not be 
diligently checking the VetBiz.gov database before using the veteran 
preferences authorities to award contracts. According to VA officials, 
contracting officers received guidance in June 2007 and received 
training on the 2006 Act's authorities between January and March, 
2010.[Footnote 41] While contracting officers have been trained in the 
veteran preferences authorities and are required to check the 
VetBiz.gov database prior to making an award, they still have 
incorrectly used veteran preferences authorities with denied 
businesses. According to VA, there is no function within the agency's 
electronic contract management system to stop a contracting officer 
from awarding veteran preferences contracts to denied businesses. 
Without a more effective system in place to ensure that contracting 
officers only use veteran preferences authorities with verified or 
self-certified businesses, VA will continue to make awards to 
ineligible businesses (those denied verification), thereby taking 
contracting opportunities away from eligible businesses. 

VA Has Not Developed Guidance That Would Aid Compliance with the 
Enforcement Provision of the 2006 Act Relating to Misrepresentation by 
Businesses: 

As we have previously stated, approximately 40 percent of businesses 
that received site visits did not meet ownership or control 
eligibility requirements and may have misrepresented themselves. 
Contractors that performed the site visits were required to submit 
reports on the results to VA within 7 business days of the site 
visits. According to these reports, evidence of misrepresentation 
dates to October 2009, but VA had not taken actions against these 
businesses as of April 9, 2010. According to VA's Office of Inspector 
General, it has received one referral (on Apr. 5, 2010) as a result of 
the verification program.[Footnote 42] Staff have made no requests for 
debarment as a result of verification program determinations as of 
April 9, 2010.[Footnote 43] 

Under the 2006 Act, any "business concern that is determined by the 
Secretary to have misrepresented the status of that concern as a small 
business concern owned and controlled by veterans or as a small 
business concern owned and controlled by service-disabled veterans … 
shall be debarred from contracting with the Department for a 
reasonable period of time."[Footnote 44] The VAAR states that VA may 
debar businesses that have misrepresented themselves for up to 5 
years.[Footnote 45] Additionally, under the verification program 
rules, whenever CVE determines that a business owner submitted false 
information, the matter will be referred to the Office of Inspector 
General for review, and CVE will request that debarment proceedings be 
initiated.[Footnote 46] However, beyond the directive to staff to make 
a referral and request debarment proceeding, VA does not have detailed 
guidance in place (either in the verification program procedures or 
the site visit protocol) that would instruct staff under which 
circumstances to make a referral or a debarment request.[Footnote 47] 
Such guidance would help to ensure that VA complies with this 
provision of the 2006 Act. Without detailed guidance in place to help 
staff determine whether businesses have misrepresented themselves, 
enforcement actions for misrepresentation will not occur and 
businesses will continue to abuse the program. 

VA Has Not Met Subcontracting Goals for VOSBs and SDVOSBs but Has 
Developed a Review Process to Help Increase Subcontracting 
Achievements: 

VA has developed a mechanism to review prime contractors' subcontracts 
with VOSBs and SDVOSBs, but the agency has not yet implemented it. VA 
currently focuses its oversight of subcontracting activities on prime 
contractors with subcontracting plans, mainly by reviewing their 
electronic reports of subcontracting activity. Large businesses with 
federal contracts of $550,000 or more ($1 million for construction) 
generally must have subcontracting plans that include goals for 
subcontracting with VOSBs, SDVOSBs, and other types of small 
businesses.[Footnote 48] The 2006 Act requires that VA "establish a 
review mechanism to ensure that, in the case of a subcontract of a 
Department contract that is counted for purposes of meeting a goal 
established pursuant to this section, the subcontract was actually 
awarded to a business concern that may be counted for purposes of 
meeting that goal." For FY07, VA set agencywide goals for all 
subcontracts awarded of 7 percent for VOSBs and 3 percent for SDVOSBs; 
for FY08 and FY09, VA set goals of 10 percent for VOSBs and 7 percent 
for SDVOSBs. According to SBA data, VA has not met its own goals for 
subcontracts awarded to VOSBs and SDVOSBs since FY07 (see table 4). 
VOSB and SDVOSB subcontractor participation did not exceed 1 percent 
of all subcontracts awarded in FY08 and FY09.[Footnote 49] In July 
2009, VA's top leadership acknowledged that the agency had fallen far 
short of its subcontracting goals and publicly committed to take more 
aggressive measures to improve its subcontracting record with VOSBs 
and SDVOSBs.[Footnote 50] 

Table 4: VA's VOSB and SDVOSB Subcontracting Goals and 
Accomplishments, FY07 through FY09: 

VA subcontracting goal (percent): [Empty]; 
VA subcontracting goal (percent): [Empty]. 

VA subcontracting goal (percent): 
FY07: VOSB: 7.0%; 
FY07: SDVOSB: 3.0%; 
FY08: VOSB: 10.0%; 
FY08: SDVOSB: 7.0%; 
FY09: VOSB: 10.0%; 
FY09: SDVOSB: 7.0%. 

Accomplishment in dollars[A]: 
FY07: VOSB: $44.0 millions; 
FY07: SDVOSB: $8.0 millions; 
FY08: VOSB: $99.0 millions; 
FY08: SDVOSB: $9.0 millions; 
FY09: VOSB: $45.0 millions; 
FY09: SDVOSB: $13.0 millions. 

Accomplishment as a percentage; 
FY07: VOSB: 0.4%; 
FY07: SDVOSB: 0.1%; 
FY08: VOSB: 1.0%; 
FY08: SDVOSB: 0.1%; 
FY09: VOSB: 0.6%; 
FY09: SDVOSB: 0.2%. 

Sources: SBA's Procurement Subcontracting Report and SBA's analysis of 
Electronic Subcontracting Reporting System data. 

[A] Figures are rounded. 

[End of table] 

VA has created a form--VA Form 0896a--that it plans to use to collect 
subcontracting information from its prime contractors. OMB approved 
the form on January 15, 2010. Initially, VA plans to use a hard-copy 
version of VA Form 0896a and ultimately collect data from prime 
contractors through the Internet. At the close of each fiscal year, VA 
staff will provide the form to prime contractors with approved 
subcontracting plans. Once prime contractors complete and return the 
form, VA staff will then review the form and compare it with the 
information reported by prime contractors in their subcontracting 
plans. VA staff also will contact the subcontractors listed on the 
form to confirm that the subcontracting activity occurred as well as 
confirm the dollar amount expended. VA staff then will determine 
whether discrepancies exist and the reasons for the discrepancies. 
Specifically, VA will attempt to determine instances in which valid 
reasons for a discrepancy exist versus instances in which prime 
contractors may not have made a good-faith effort to comply with their 
subcontracting plans. 

VA plans to centralize the subcontractor review function in its OSDBU. 
Although contractors self-reported information into the SBA-maintained 
Electronic Subcontracting Reporting System prior to development of 
this subcontracting review mechanism, VA had not collected or 
confirmed the accuracy of information on the specific dollar amount or 
percentage of the contract value attributable to individual 
subcontractors. Finally, VA's OSDBU plans to develop standard 
operating procedures by September 2010 for its staff to ensure 
consistent implementation of the review mechanism. According to VA, no 
additional regulatory action is required to implement VA Form 0896a 
and the review process. According to VA, the use of the form will 
improve the subcontractor data that the agency uses to calculate its 
goal accomplishments. VA also expects to see increases in performance 
toward subcontracting goal attainment as a result of improved data 
collection. Additionally, VA will count subcontracting accomplishments 
only with verified businesses starting on January 1, 2012.[Footnote 51] 

As of March 26, 2010, VA planned to use VA Form 0896a on a sampling of 
contracts resulting from solicitations issued after January 7, 2010. 
According to VA, SBA will have to certify FY10 subcontracting data 
before OSDBU performs an analysis of information for contracts 
resulting from these solicitations. In previous years, SBA's data 
certification had taken several months or up to a year to be 
available. VA officials have raised concerns that certain challenges 
may slow implementation of the review mechanism. These challenges 
include the limited staff resources that OSDBU has to implement the 
program. VA estimated that more than 300 prime contractors may be 
required to supply data, which OSDBU must analyze as we have 
previously described. In FY09, VA reported that it had approved 198 
new subcontracting plans. However, VA hired one full-time employee to 
help one existing staff person working on this program. According to 
an agency official, OSDBU will determine after implementation of the 
new form whether additional personnel will be required. Furthermore, 
VA has expressed concerns that prime contractors and subcontractors 
initially may resist providing, or may not realize they have to 
provide, information. According to VA officials, they have not 
pretested the review mechanism with prime contractors but plan 
outreach to prime contractors and subcontractors about the new 
program. VA also plans to motivate prime contractors to complete the 
form and increase subcontracting efforts with VOSBs and SDVOSBs by 
adopting a new evaluation factor in addition to those factors VA 
currently uses to award contracts. For example, VA's procurement staff 
plans to use prime contractors' records in meeting goals detailed in 
subcontracting plans when awarding future VA contracts. Finally, OSDBU 
plans to use the data collected to annually provide findings to VA 
leadership. Because VA has not yet implemented the review mechanism, 
it is too early to assess its effectiveness. 

Conclusions: 

More than 3 years after it was enacted, VA has not fully implemented 
significant requirements of the 2006 Act. The 2006 Act provided VA 
with unique authority to award contracts to VOSBs and SDVOSBs on a 
priority basis to increase contracting opportunities for these 
businesses. In this regard, VA has been highly successful. Since FY07, 
VA has established and exceeded its contracting goals for VOSBs and 
SDVOSBs, primarily by using authorities established under the 2006 
Act. However, the agency faces continuing challenges, and diminished 
achievement, in meeting other small business goals. VA also faces 
challenges in monitoring interagency agreements to ensure that other 
agencies are making efforts to achieve its contracting goals, to the 
maximum extent feasible, as required by an amendment to the 2006 Act's 
provisions. VA does not have an effective process in place to ensure 
that all interagency agreements include the mandated language 
addressing VA's contracting goals and preferences or to monitor the 
extent to which agencies comply with the requirements. By putting such 
a process in place, VA could help ensure that statutory requirements 
are met and that the contracting activities of other agencies also 
meet VA's goals and preferences for VOSBs and SDVOSBs, to the maximum 
extent feasible. 

The agency has been slow to implement a comprehensive program to 
verify the veteran status, ownership, and control of small businesses 
and maintain a database of such businesses, also required by the 2006 
Act. Verification is a vital control to ensure that only eligible 
veteran-owned businesses benefit from the preferential contracting 
authorities. VA has faced several challenges in implementing its 
verification program, including a lack of leadership and a limited 
number of staff positions with which to conduct verifications. VA 
plans to implement recommendations that an outside contractor made to 
improve the program and its data systems. However, we identified 
several weaknesses in the verification program, and the agency has 
been slow to fill staff vacancies and enhance its technology. By 
expeditiously filling its vacant leadership and staff positions within 
OSDBU, VA could better ensure that the verification program will 
operate effectively and planned improvements will be achieved. Many of 
the weaknesses in the files we reviewed appeared to be the result of 
limitations in the software and the associated extensive reliance on 
manual data entry. VA has not yet put software improvements in place. 
Other weaknesses stemmed from gaps in the verification guidance and 
procedures. For example, VA does not have guidance requiring staff to 
document their assessment that each eligibility requirement had been 
met or explaining under what circumstances to request documentation 
from business owners or instances in which third-party data may be 
necessary to validate self-reported information. By developing a plan 
to address leadership and staff vacancies, hire additional staff as 
necessary, achieve timely implementation of enhancements to data 
systems, revise procedures to include additional guidance for staff, 
and provide training to staff on the revised procedures, VA could make 
the verification process more effective. Timely improvements in these 
areas also would likely help the agency reduce backlogs--which have 
continued to grow. 

VA also faces other challenges with respect to ensuring that veteran 
preferences authorities are only used to award contracts to eligible 
businesses (those that have not been denied verification) and taking 
action against businesses that have misrepresented themselves during 
the verification process. According to the 2006 Act, VA must use the 
veteran preferences authorities only with verified businesses. 
However, VA contracting officers used the authorities to award 
contracts--totaling almost $4 million--to 11 businesses that had been 
denied verification. According to VA officials, contracting officers 
received training on the veteran preferences authorities, but the 
agency does not have an effective process in place to ensure that the 
authorities are used correctly. Without such a system, VA lacks 
assurance that it will not continue to make awards to ineligible 
businesses (those denied verification), thereby taking contracting 
opportunities away from eligible businesses. Moreover, findings from 
the initial site visits indicated a high rate of misrepresentation by 
VOSBs and SDVOSBs, coupled with a lack of detailed guidance about how 
to handle such cases (which would be the precursor to any 
investigations and enforcement actions), further suggest that the 
agency will be challenged to conduct effective oversight in a program 
vulnerable to fraud. Specifically, 40 percent of site visits resulted 
in evidence that control and ownership requirements had not been met. 
An effective process to make determinations and referrals that may 
result in enforcement actions against businesses misrepresenting 
themselves is of vital importance for the integrity of the program. 
Thus, to conduct an effective verification program, VA's processes 
would need to include not only robust reviews to ensure that only 
eligible businesses are verified and therefore benefit from 
contracting preferences, but also clear and detailed guidance to 
ensure that ineligible businesses do not benefit from contracting 
preferences by taking the appropriate enforcement actions. 

Finally, the 2006 Act requires VA to establish subcontracting goals 
for VOSBs and SDVOSBs and to develop a mechanism to review prime 
contractors' subcontracts with these businesses. While the agency has 
developed a mechanism, it has not yet implemented it. VA's 
subcontracting accomplishments also have fallen short of goals for the 
past 3 years. The agency has acknowledged the shortcomings in this 
area and agency leadership has publicly committed to take measures to 
improve VA's subcontracting record. VA intends to start using the 
review mechanism in FY10 and expects to see increases in performance 
toward subcontracting goal attainment as a result. However, it is too 
early to assess the effectiveness of VA's subcontracting efforts. 

Recommendations for Executive Action: 

To facilitate the Department of Veterans Affairs' progress in meeting 
and complying with the requirements of the 2006 Act, we recommend that 
the Secretary of Veterans Affairs take the following four actions: 

* To ensure compliance with the 2006 Act, as its provisions were 
amended by the 2008 Act (Pub. L. No. 110-389), VA should develop an 
effective process to ensure that agreements it enters into with other 
federal agencies for contracting on its behalf to acquire goods or 
services include the required language and monitor other agencies' 
contracting performance under those agreements. 

* To help address the requirement in the 2006 Act to maintain a 
database of verified veteran-owned businesses, VA should develop and 
implement a plan that ensures a more thorough and effective 
verification program. Specifically, the plan should address actions 
and milestone dates for achieving the following: 

- promptly filling vacant positions within OSDBU, including the two 
leadership positions, and hiring additional staff positions as 
necessary; 

- improving its verification processes and procedures to ensure 
greater completeness, accuracy, and consistency in verification 
reviews, including updating data systems to reduce the amount of 
manual data entry by staff and revising the verification procedures to 
include additional guidance for staff on maintaining the appropriate 
documentation, requesting documentation from business owners or third 
parties under specific circumstances, and conducting an assessment 
that addresses each eligibility requirement; and: 

- conducting timely site visits at businesses identified as higher 
risk and taking actions based on site visit findings, including taking 
prompt action to cancel business' verification status as necessary. 

* To better ensure that VA meets the requirement to use veteran 
preferences authorities with verified businesses only, as required by 
the 2006 Act, VA should develop a more effective system to ensure that 
contracting officers do not use veteran preferences authorities to 
award contracts to businesses that have been denied verification, and 
provide additional guidance and training to contracting officers as 
necessary. 

* To ensure that VA takes enforcement actions against businesses that 
have misrepresented themselves, as required by the 2006 Act, VA should 
develop detailed guidance that would instruct staff under which 
circumstances to make a referral or a debarment request as a result of 
the verification program. 

Agency Comments and Our Evaluation: 

We requested the Department of Veterans Affairs' comments on a draft 
of this report, and the Chief of Staff from VA's Office of the 
Secretary provided written comments that are presented in appendix IV. 
VA also provided a technical comment that we incorporated in this 
report where appropriate. VA agreed with the four recommendations and 
provided information about steps that VA has already taken and some 
additional actions that are under way. For example, VA stated that it 
provided training from January through March, 2010, to all of its 
acquisition professionals regarding the language that must be included 
in all interagency agreements entered into on VA's behalf. VA also 
indicated that it has made progress in filling vacant OSDBU positions, 
including filling all leadership positions as of April 12, 2010, and 
that all remaining vacant positions will be filled and staff will be 
on board no later than the end of July 2010. VA stated that its OSDBU 
anticipates requesting a significant number of additional full-time-
equivalent authorizations in the near future to support the 
verification program. Additionally, VA stated that it provided 
training to contracting officers on the use of veteran preferences 
authorities from January through March, 2010, and will periodically 
rebroadcast the training through March 2011. Finally, VA stated that 
it is currently developing the process and procedures to use when 
referring businesses for debarment and plans to have this in place by 
October 31, 2010. 

We are sending copies of this report to the appropriate congressional 
committees, the Secretary of the Department of Veterans Affairs and 
other interested parties. In addition, this report will be available 
at no charge on the GAO Web site at [hyperlink, http://www.gao.gov]. 

If you or your offices have any questions about this report, please 
contact me at (202) 512-8678 or shearw@gao.gov. Contact points for our 
Offices of Congressional Relations and Public Affairs may be found on 
the last page of this report. Key contributors to this report are 
listed in appendix V. 

Signed by: 

William B. Shear: 
Director, Financial Markets and Community Investment: 

[End of section] 

Appendix I: Objectives, Scope, and Methodology: 

Our report objectives were to review (1) the extent to which the 
Department of Veterans Affairs (VA) met its prime contracting goals 
for veteran-owned small businesses (VOSB) and service-disabled veteran-
owned small businesses (SDVOSB) in fiscal years (FY) 2007, 2008, and 
2009, and what, if any, challenges VA faced in meeting these goals; 
(2) VA's progress in implementing procedures to verify the ownership, 
control, and, if applicable, service-disability status of firms in its 
mandated database of VOSBs and SDVOSBs; and (3) VA's progress in 
establishing a review mechanism of prime contractors' subcontracts 
with VOSBs and SDVOSBs. 

To respond to these objectives, we reviewed agency documents related 
to VA's implementation of the Veterans Benefits, Health Care, and 
Information Technology Act of 2006 (Pub. L. No. 109-461, sections 502 
and 503), which requires VA to give priority to VOSBs and SDVOSBs when 
it uses veteran preferences to award contracts.[Footnote 52] 
Additionally, we reviewed regulations implementing the act, including 
the Veterans Affairs Acquisition Regulation, which is the final rule 
implementing the unique contracting preferences, and the final rule 
implementing the verification program.[Footnote 53] We interviewed VA 
officials within the Office of Acquisition and Logistics (OAL); Office 
of Small and Disadvantaged Business Utilization (OSDBU); Center for 
Veterans Enterprise (CVE); and Office of Inspector General (OIG). 
Finally, we obtained information from OSDBU and CVE about authorized 
staffing levels and current allocations for staff working on the 
verification and subcontracting review programs. 

To determine the extent to which VA met its prime contracting goals 
for VOSBs and SDVOSBs and to what extent contracts awarded to VOSBs 
and SDVOSBs were on a set-aside and sole-source basis, we reviewed 
VA's agencywide contracting activity for which small businesses were 
eligible and analyzed SBA's Goaling Reports for FY06 through FY08. 
Because SBA's official Goaling Report was unavailable for FY09, we 
obtained and analyzed Federal Procurement Data Systems-Next Generation 
(FPDS-NG) data for VA contracting activities. Additionally, to assess 
the extent to which VA awarded set-aside and sole-source contracts to 
verified VOSBs and SDVOSBs, we compared those that were self-certified 
in FY09 with a list of businesses verified by the end of FY09 
(provided by CVE). We compared the list provided by CVE with FPDS-NG 
data to determine VA's level of contracting with verified firms. 
Finally, we conducted reasonableness checks on the FPDS-NG data and 
identified any missing, erroneous, or outlying data and had an 
independent analyst review all programming. We also obtained and 
reviewed VA's FY09 FPDS-NG Data Quality Report, as submitted to the 
Office of Management and Budget, which stated that VA's FPDS-NG data 
are 86 percent accurate and 95.8 percent complete. Based on this 
review, we determined the FPDS-NG data to be sufficiently reliable for 
the purposes of this report. 

To determine the extent to which VA agreements with other federal 
agencies has language that referred to VA's contracting goals and 
preferences for VOSBs and SDVOSBs as mandated by Pub. L. No. 109-461, 
and amended by Pub. L. No. 110-389, we interviewed VA officials from 
OAL to obtain information on any policies, procedures, 
responsibilities, and oversight efforts in place to monitor compliance 
with the Pub. L. No. 110-389 requirement. To determine the extent to 
which these agencies awarded contracts to VOSBs and SDVOSBs, we 
evaluated FPDS-NG data to obtain information about contracts awarded 
by federal agencies on VA's behalf and subject to Pub. L. No. 109-461 
provisions. We evaluated the accuracy and completeness of this 
analysis by obtaining data from VA on contracting dollars awarded to 
the Department of the Interior, the General Services Administration, 
the Department of the Navy's Space and Naval Warfare Systems Center, 
and the U.S. Army Corps of Engineers. 

To evaluate the challenges, if any, VA faced in meeting its prime 
contracting goals for VOSBs and SDVOSBs, we reviewed previous 
congressional hearing transcripts that discussed VA's challenges in 
meeting its contracting goals as well as emerging challenges. We also 
conducted several interviews with officials from OSDBU and members of 
veteran service organizations, including representatives from the 
National Veterans Business Development Corporation, Association for 
Service Disabled Veterans, Disabled Veteran Americans, American 
Legion, Veterans of Foreign Wars, Vietnam Veterans of America, and 
National Veteran-Owned Business Association. 

To determine VA's progress in implementing procedures to verify firms 
in its mandated database, we reviewed the agency's verification 
guidelines and risk guidelines as well as procedures for reviewing 
applications and conducting site visits. Additionally, we conducted a 
file review of a sample of verified businesses to determine the extent 
to which VA followed procedures and to identify any deficiencies in 
the verification process. The study population for our review 
consisted of all 1,723 businesses that had been verified between May 
2008 and the end of FY09 (Sept. 30, 2009). We obtained a list of these 
businesses from CVE and selected a probability sample of 112 
businesses, which would allow us to estimate characteristics of all 
applications verified by CVE during this period. This sample contained 
approximately the same proportion of SDVOSBs as did the full study 
population. We conducted the file review at CVE's offices in 
Washington, D.C., during the week of November 16, 2009, and reviewed 
both electronic and paper files. 

Because we followed a probability procedure based on random 
selections, our sample is only one of a large number of samples that 
we might have drawn. Since each sample could have provided different 
estimates, we express our confidence in the precision of our 
particular sample's results as 95 percent confidence internal (plus or 
minus 10 percentage points). This is the interval that would contain 
the actual population value for 95 percent of the samples we could 
have drawn. All percentage estimates from our sample have 95 percent 
confidence intervals within plus or minus 10 percentage points of the 
estimate. 

We created a data collection instrument based on requirements from 
CVE's verification procedures, pretested the instrument on sample 
businesses, and then reviewed each business' file according to the 
finalized instrument. For example, for each business, we reviewed the 
following: the verification application (VA Form 0877), quality 
control form (Control Folder Signature Sheet), the business' entry 
within the agency's internal Microsoft Access database (veteran status 
and eligibility to receive contracts from the federal government), 
notes about public databases checked for control and ownership 
information (Control Folder Review Sheet), screenshots of information 
obtained from public databases searched, and the approval letter. 
[Footnote 54] To determine risk levels assigned to each business, CVE 
provided a comprehensive list of all verified businesses and their 
assigned risk level. We used this list to obtain risk levels for the 
112 businesses in our random sample. Our random sample produced 
estimates with margins of error of 9 percentage points or less at the 
95 percent confidence level. Based on findings from our file review 
sample, we calculated percentage estimates with 95 percent confidence 
intervals within plus or minus 10 percentage points of the estimated 
percentage. The results of our sample are generalizable to the entire 
population of applications verified by the end of FY09. We performed 
the appropriate data reliability procedures for our sample. For 
example, to ensure consistency in how the data collection instrument 
was completed, we randomly selected 30 percent of files (34 out of 
112) for which a second independent analyst peer reviewed the 
information collected. We determined, based on this 30 percent random 
sample, that there were very few discrepancies in how the data 
collection instrument was completed, and that the data were sufficient 
for the purposes of this report. 

To determine why CVE denied applications, we obtained information on 
the number of businesses denied verification and the reasons for 
denial. CVE provided us with information for each application denied 
between May 2008 and March 4, 2010, which we summarized in this 
report. We also compared the denied businesses to FPDS-NG data to 
determine whether any denied business had received a VOSB or SDVOSB 
set-aside in FY09 or in FY10 (through Mar. 23, 2010) from VA after it 
had been denied verification by CVE. We also obtained 10 (of 45) site 
visit reports from CVE that contractors had prepared. We reviewed the 
10 reports to determine whether any businesses failed to meet 
eligibility requirements based on evidence prepared by the contractor 
that conducted the site visit. Finally, we requested information and 
interviewed agency officials from OAL, CVE, and VA's OIG to discuss 
any processes and procedures in place to determine whether businesses 
had misrepresented themselves or to refer businesses for a 
investigation or debarment. 

To determine the extent to which VA met its own subcontracting goals 
for VOSBs and SDVOSBs and the governmentwide statutory goal for 
SDVOSBs, we reviewed data from SBA Goaling Reports and the Electronic 
Subcontracting Reporting System for FY07 through FY09. We reviewed 
Pub. L. No. 109-461, section 502, to identify the statutorily mandated 
requirement that VA set its own goals for VOSB and SDVOSB 
subcontracting activities, and to identify the requirement that VA 
confirm reported subcontracting activity. We conducted interviews with 
OSDBU to assess VA's progress in establishing a review mechanism of 
prime contractors' subcontracts with SDVOSBs and other VOSBs. Finally, 
we obtained and reviewed VA Form 0896a--which is the form that VA 
intends to use to implement its subcontracting review mechanism. 

We conducted this performance audit from October 2007 through May 
2010, in accordance with generally accepted government auditing 
standards. Those standards require that we plan and perform the audit 
to obtain sufficient, appropriate evidence to provide a reasonable 
basis for our findings and conclusions based on our audit objectives. 
We believe that the evidence obtained provides a reasonable basis for 
our findings and conclusions based on our audit objectives. 

[End of section] 

Appendix II: VetBiz.gov Screenshot and Verified Logo: 

The VetBiz.gov database allows business owners to submit applications 
for verification and is also a searchable database for contracting 
officers and the public (see figure 11). Businesses that have been 
verified appear with a verified logo (see figure 12). 

Figure 11: Screenshot of VetBiz.gov Search for a Business: 

[Refer to PDF for image: screen shot] 

Source: GAO obtained screenshot from www.vip.vetbiz.gov (last accessed 
on Mar. 29, 2010). 

[End of figure] 

Figure 12: Service-Disabled Veteran-Owned Small Business Verified Logo: 

[Refer to PDF for image: logo] 

Source: GAO obtained screenshot from www.vip.vetbiz.gov (last accessed 
on Mar. 29, 2010). 

[End of figure] 

[End of section] 

Appendix III: Department of Veterans Affairs' Contracting with Veteran-
Owned Small Businesses: 

Dollars in millions: 

SDVOSB set-aside: 
FY07: Dollars: $275; 
FY07: Percentage: 23%; 
FY08: Dollars: $614; 
FY08: Percentage: 29%; 
FY09: Dollars: $1,100; 
FY09: Percentage: 36%. 

SDVOSB sole-source: 
FY07: Dollars: 174; 
FY07: Percentage: 14; 
FY08: Dollars: 486; 
FY08: Percentage: 23; 
FY09: Dollars: 555; 
FY09: Percentage: 20. 

Veteran set-aside[A]: 
FY07: Dollars: 7; 
FY07: Percentage: 1; 
FY08: Dollars: 22; 
FY08: Percentage: 1; 
FY09: Dollars: 56; 
FY09: Percentage: 2. 

Veteran sole-source[A]: 
FY07: Dollars: 17; 
FY07: Percentage: 1; 
FY08: Dollars: 47; 
FY08: Percentage: 2; 
FY09: Dollars: 44; 
FY09: Percentage: 2. 

Subtotal - Pub. L. No. 109-461 authorities: 
FY07: Dollars: $473; 
FY07: Percentage: 39%; 
FY08: Dollars: $1,200; 
FY08: Percentage: 56%; 
FY09: Dollars: $1,700; 
FY09: Percentage: 59%. 

Other set-aside or sole-source[B]: 
FY07: Dollars: $109; 
FY07: Percentage: 9%; 
FY08: Dollars: $85; 
FY08: Percentage: 4%; 
FY09: Dollars: $75; 
FY09: Percentage: 3%. 

No set-aside: 
FY07: Dollars: 624; 
FY07: Percentage: 52; 
FY08: Dollars: 848; 
FY08: Percentage: 40; 
FY09: Dollars: 1,100; 
FY09: Percentage: 38. 

Subtotal - Other authorities: 
FY07: Dollars: $733; 
FY07: Percentage: 61%; 
FY08: Dollars: $933; 
FY08: Percentage: 44%; 
FY09: Dollars: $1,175; 
FY09: Percentage: 41%. 

Total contracting for VOSBs[C]: 
FY07: Dollars: $1,200; 
FY07: Percentage: 100%; 
FY08: Dollars: $2,100; 
FY08: Percentage: 100%; 
FY09: Dollars: $2,800; 
FY09: Percentage: 100%. 

Source: GAO analysis of SBA's Goaling Reports and FPDS-NG data. 

Note: Due to rounding, figures do not sum exactly to subtotals or 
totals. 

[A] Veteran set-aside and sole-source figures do not include SDVOSBs. 

[B] Includes small business, HUBZone, 8(a), and emerging small 
business set-asides or sole-source. 

[C] The total contracting for VOSBs includes SDVOSBs. 

[End of table] 

[End of section] 

Appendix IV: Comments from the Department of Veterans Affairs: 

Department of Veterans Affairs: 
Office of the Secretary: 

May 12, 2010: 

Mr. William B. Shear: 
Director, Financial Markets and Community Investment: 
U.S. Government Accountability Office: 
441 G Street, NW: 
Washington, DC 20548: 

Dear Mr. Shear: 

The Department of Veterans Affairs (VA) has reviewed the Government 
Accountability Office's (GAO) draft report, Department Of Veterans 
Affairs: Agency Has Exceeded Contracting Goals for Veteran-Owned Small 
Businesses, but Faces Challenges with Its Verification Program (GA0-10-
458) and generally agrees with GAO's conclusions and concurs with 
GAO's recommendations to the Department. The enclosure specifically 
addresses each of GAO's recommendations. 

VA appreciates the opportunity to comment on your draft report. 

Sincerely, 

Signed by: 

John R. Gingrich: 
Chief of Staff: 

Enclosure: 

[End of letter] 

Enclosure: 

Department of Veterans Affairs (VA) Comments to Government 
Accountability Office (GAO) Draft Report: Department of Veterans 
Affairs: Agency Has Exceeded Contracting Goals for Veteran-Owned Small 
Businesses, but Faces Challenges with Its Verification Program (GA0-10-
458): 

GAO Recommendation: To facilitate the Veterans Affairs' progress in 
meeting and complying with the requirements of the 2006 Act, we 
recommend that the Secretary of Veterans Affairs take the following 
four actions: 

Recommendation 1: To ensure compliance with the 2006 Act, as its 
provisions were amended by the 2008 Act (P.L. 110-389), VA should 
develop an effective process to ensure that agreements it enters with 
other federal agencies for contracting on its behalf to acquire goods 
or services include the required language and monitor other agencies' 
contracting performance under those agreements. 

VA Comment: Concur. The, Office of Acquisition and Logistics 
Information Letter (IL) 001AL-09-04 issued March 23, 2009 (attached) 
states that: 

"Consistent with VA's Veterans First Contracting Program, all 
Interagency Acquisitions (IA) shall include a provision requiring that 
servicing agencies, to the maximum extent feasible, comply with the 
priorities for contracting with service-disabled Veteran-owned small 
businesses (SDVOSB) and Veteran-owned small businesses (VOSBs) over 
other socio-economic classes of small businesses. The provision should 
also state that sole source and set-aside acquisition authorities for 
such small businesses are set forth in 38 U.S.C. § 8127. This 
provision does not supersede or otherwise affect the authorities 
provided under the Small Business Act." 

Additionally, VA provided training from January — March 2010, to all 
acquisition professionals regarding the language which must be 
included in all interagency agreements entered into on behalf of VA. 

Recommendation 2: To help address the requirement in the 2006 Act to 
maintain a database of verified veteran-owned businesses, VA should 
develop and implement a plan that ensures a more thorough and 
effective verification program. Specifically, the plan should address 
actions and milestone dates for achieving the following: 

* Promptly filling vacancies within OSDBU, including the two 
leadership positions and hiring additional staff positions as 
necessary; 

* Improving its verification process and procedures to ensure greater 
completeness, accuracy, and consistency in verification reviews 
including updating data systems to reduce the amount of manual data 
entry by staff and revising the verification procedures to include 
additional guidance for staff on maintaining appropriate 
documentation, requesting documentation from business owned or third-
parties under specific circumstances, and conducting an assessment 
that addresses each eligibility requirement; and; 

* Conducting timely site visits at businesses identified as higher-
risk and taking actions based upon site visit findings, including 
taking prompt action to cancel business' verification status as 
necessary. 

VA comment: Concur. Office of Small and Disadvantaged Business 
Utilization (OSDBU) has made progress filling vacant positions. As of 
April 12, 2010, all three leadership positions were staffed: an SES-
level Executive Director and two GS-15-level program directors. OSDBU 
is authorized 40 full-time employee (FTE) positions, and as of May 5, 
2010, OSDBU had 29.5 FTE onboard. Of the remaining 10.5 FTE, OSDBU is 
awaiting final Human Resources approval to hire a GS-13 Small Business 
Specialist and a GS-7/8 Program Support Assistant. Presently, 
interviews are being held for GS-5/6 Program Support Clerks 
representing 2.5 FTE. OSDBU is awaiting issuance of certificates for 
six other positions including a GS-9/11 Program Specialist, five GS-14 
Team Leaders, and is anticipating that two vacancies will be filled by 
the end of May 2010. The remaining 8.5 FTE will be onboard no later 
than the end of July 2010. OSDBU anticipates requesting a significant 
number of additional authorizations for FTE within the next three 
months to support the unique elements of its mission. The uniqueness 
of other programs in OSDBU will require additional staffing, 
especially with regard to outreach and partnership programs. OSDBU 
estimates that a mix of permanent and temporary (or contractor) FTE 
will be necessary to optimize OSDBU program performance and meet 
internal goals for the January 1, 2012, rollout of new Vendor 
Information Pages (VIP) where only verified vendors will be visible to 
users. 

For the Center for Veterans Enterprise (CVE) to fulfill its unique 
mission and meet the verification requirements and standards to 
facilitate a smooth transition to an automated verification system, a 
number of new positions will need to be created and hired; most of 
these would be program specialists to support the verification 
process. CVE initially had only three full-time staff for the 
verification function. The backlog of applications in process has 
grown steadily, to over 5,000 as of May 1, 2010. Approximately 3,000 
applicants had been verified as of May 1, 2010, but note that a 
substantial number of companies that indicate that a Veteran has 51 
percent ownership may be questionable. OSDBU is shifting workload to 
allow its CVE staff to focus more directly on the verification and 
automation issues while new staff are authorized and brought onboard. 
The current goal is to examine at least 6,000 applications by December 
31, 2011. Additionally, we will identify at least 95 percent of the 
applications received from companies that are not, in fact, owned and 
controlled by a Veteran or a Service-Disabled Veteran. This will 
reduce the processing time to less than 60 days from the time the 
Veteran's status has been verified in VA's Beneficiary Identification 
and Records Locator System. 

Action Plan Tasks And Milestone Schedule: 

Action: Award Contract for VIP5/Contact Management System; 
Target Date: 5/30/2010. 

Action: Complete the Transfer of the EVIC Call Center operations to 
the Small Business Office; 
Target Date: 6/1/2010. 

Action: Award Sole Source Contract for Level 2 Examinations; 
Target Date: 6/15/2010. 

Action: OSDBU/CVE submits actionable contracting requirements to the 
Office of Acquisition, Logistics and Construction for the following:	
* Verification Level 2 Examinations; 
* Onsite Examinations; 
* Legal Assistance Services; 
* Temporary clerical staff to handle backlog; 
* Additional requirements to be determined; 
Target Date: 6/30/2010. 

Action: Solicitation for Onsite Examinations released; 
Target Date: 7/2/2010. 

Action: Other solicitations; 
Target Date: TBD. 

Action: VIP 5 Ready to Launch; 
Target Date: 3/1/2011. 

Action: VIP database presentation modified by regulation; 
Target Date: 1/1/2012. 

To date, the CVE retained contractors for the onsite examinations have 
conducted 102 site visits and provided 89 completed site visit 
reports. VA has exercised the contract option for 200 additional 
onsite examinations. The reengineered onsite examinations protocol has 
been implemented so that the contractors are now conducting site 
visits in advance of the final decision to approve or deny a business 
for verification. Site visit reports are reviewed and approved for 
internal concurrence prior to verification summary determinations. 
Processing includes not only the actual site visit and CVE's review of 
the completed Site Visit report, but also preparation of the denial 
letter or Notice of Proposed Cancellation, and dispatch of the letter. 
Per 38 CFR Part 74.22, the business owner will have 30 days from 
receipt of the letter to respond. Once the business owner's response 
is received, the Director, CVE will make a decision whether to reverse 
the denial/cancellation decision. CVE currently plans to conduct 
approximately 15 site visits per month, starting June 1, 2010. 

Recommendation 3: To better ensure that VA meets the requirement to 
use veterans preferences authorities with verified businesses only, as 
required by the 2006 Act, VA should develop a more effective system to 
ensure that contracting officers do not use veteran preference 
authorities to award contracts to businesses that have been denied 
verification, and provide additional guidance and training to 
contracting officers as necessary. 

VA Comment: Concur. Since implementation of the Veterans First 
Contracting Program's Final Rule January 7, 2010, VA provided training 
to all acquisition professionals on the use of Veterans' preferences. 
This training was conducted from January - March 2010. A live 
broadcast of the training was held in March 2010, and is being 
periodically rebroadcast through March 2011 on the VA Knowledge 
Network. As a part of their market research, contracting officers are 
required to view the VIP database to locate SDVOSBs and VOSBs. Vendors 
currently must be listed in the VIP database to be eligible for an 
award under the Veterans First Contracting Program. Businesses that 
have applied for verification through OSDBU and are deemed eligible 
are noted in the database with a "Verified" identifier. When a 
business is denied verification, OSDBU removes that business profile 
from public view in the VIP database. When checking the VIP for 
registered/verified SDVOSBs and VOSBs, contracting officers will not 
see businesses which have been denied verification; those profiles are 
viewable by OSDBU administrators only. 

Recommendation 4: To ensure that VA takes enforcement actions against 
businesses that have misrepresented themselves, as required by the 
2006 Act, VA should develop detailed guidance that would instruct 
staff under which circumstances to make a referral or a debarment 
request as a result of the verification program. 

VA Comment: Concur. VA is currently developing the process and 
procedures to use when referring a vendor for debarment under 38 
U.S.C. 8127. The completion date for this action is October 31, 2010. 

[End of section] 

Appendix V: GAO Contact and Staff Acknowledgments: 

GAO Contact: 

William B. Shear, (202) 512-8678 or shearw@gao.gov: 

Staff Acknowledgments: 

In addition to the individual named above, Harry Medina, Assistant 
Director; Paola Bobadilla; Julianne Dieterich; Beth Ann Faraguna; 
Julia Kennon; John Ledford; Jonathan Meyer; Amanda Miller; Marc 
Molino; Mark Ramage; Barbara Roesmann; Kathryn Supinski; Paul 
Thompson; Julie Trinder; and William Woods made significant 
contributions to this report. 

[End of section] 

Footnotes: 

[1] Pub. L. No. 109-461 § 502 (Dec. 22, 2006), codified at 38 U.S.C. § 
8127, as amended. As discussed later in this report, under a 
subsequently enacted law, VA agreements with other agencies for 
acquiring goods and services must contain a provision calling for the 
agencies to achieve those goals to the maximum extent feasible. See 
Pub. L. No. 110-389 § 806 (Oct. 10, 2008). 

[2] Pub. L. No. 109-461 § 502(c). 

[3] For our 2009 briefing, see GAO, Department of Veterans Affairs 
Contracting with Veteran-Owned Small Businesses, GAO-09-391R 
(Washington, D.C.: Mar. 19, 2009). However, we did not publish reports 
discussing our 2008 and 2010 congressional briefings. 

[4] The Federal Acquisition Regulation requires executive-branch 
departments and agencies to collect and report procurement data to 
FPDS-NG. 

[5] Under a 2008 amendment to 38 U.S.C. § 8127, VA must include in 
agreements or arrangements between VA and any governmental entity to 
acquire goods or services a requirement that the entity will, to the 
maximum extent feasible, comply with the requirements for VA 
contracting contained in the section when the entity acquires such 
goods or services. The provision applies to agreements entered into 
after December 31, 2008. Pub. L. No. 110-389, § 806 (Oct. 10, 2008). 

[6] Small Business Reauthorization Act of 1997, Pub. L. No. 105-135 § 
603 (1997), codified at 15 U.S.C. § 644(g), as amended. 

[7] The 3 percent requirement for SDVOSBs was included in the Veterans 
Entrepreneurship and Small Business Development Act of 1999, Pub. L. 
No. 106-50 (1999). In 2003, Congress passed the Veterans Benefit Act, 
which established the Service-disabled Veteran-owned Small Business 
Procurement Program that SBA administers along with federal procuring 
agencies. The governmentwide program is intended to provide federal 
contracting opportunities to qualified businesses and permits 
contracting officers to award set-aside and sole-source contracts to 
any small business concern owned and controlled by service-disabled 
veterans to help reach the 3 percent governmentwide goal. Pub. L. No. 
108-183, § 308, 117 Stat, 2651, 2662 (2003). 

[8] Pub. L. No. 109-461, §§ 502, 503 (2006), codified at 38 U.S.C. §§ 
8127, 8128, as amended. 

[9] On June 19, 2007, VA issued Information Letter 049-07-08 (Veterans 
First Contracting Program) notifying all contracting officers about 
the Pub. L. No. 109-461 authorities. 

[10] The FSS and other governmentwide contract mechanisms provide a 
simplified process for obtaining goods and services by identifying 
approved contractors with which federal agencies may place orders. 
According to SBA guidelines, agencies may claim credit for purchases 
made with small businesses through FSS. However, VA may not use its 
unique VOSB and SDVOSB contracting authorities in making purchases 
through FSS. 

[11] In pertinent part, section 503, codified at 38 U.S.C. § 8128(a) 
provides as follows: "In procuring goods and services pursuant to a 
contracting preference under this title or any other provision of law, 
the Secretary shall give priority to a small business concern owned 
and controlled by veterans, if such business concern also meets the 
requirements of that contracting preference." 

[12] Pub. L. No. 110-389 § 806 (Oct. 10, 2008). The amendment also 
provides that nothing in this requirement "shall be construed to 
supersede or otherwise affect the authorities provided under the Small 
Business Act (15 U.S.C. § 631)." 

[13] This agreement was amended in August of 2008, but Pub. L. No. 110-
389 applies only to agreements entered into on or after January 1, 
2009. According to VA, its agreement with the U.S. Army Corps of 
Engineers (Corps) for FY09 totaled $338 million and was for planning, 
design, and construction management goods and services. According to 
our analysis of FPDS-NG data, the Corps appeared to be exceeding VA's 
goals by awarding approximately 47 percent of contracting dollars to 
both VOSBs and SDVOSBs. However, the dollars obligated in FPDS-NG do 
not reflect the total contracting dollars because some contract 
actions covered by the interagency agreement may not have been awarded 
by the end of FY09. 

[14] Department of Veterans Affairs, Information Letter 001-AL-09-04, 
Managing Interagency Acquisitions (Mar. 23, 2009). 

[15] Pub. L. No. 109-461 established a transition rule that was in 
effect for a 1-year period, which began when section 502 became 
effective. The effective date, defined in the act as 180 days after 
the date on which the law was enacted, was June 20, 2007. Pub. L. No. 
109-461 § 502(b). For the 1-year period, the transition rule 
established a presumption of eligibility for inclusion in the VA 
database of VOSBs and SDVOSBs covered by the act for businesses that 
were listed in any small business database maintained by VA. The final 
rule for the verification program, with changes, became effective 
February 8, 2010. 75 Fed. Reg. 6098 (Feb. 8, 2010). 

[16] GAO, Small Business Administration: Additional Actions Are Needed 
to Certify and Monitor HUBZone Businesses and Assess Program Results, 
[hyperlink, http://www.gao.gov/products/GAO-08-975T] (Washington, 
D.C.: July 17, 2008); HUBZone Program: SBA's Control Weaknesses 
Exposed the Government to Fraud and Abuse, [hyperlink, 
http://www.gao.gov/products/GAO-08-964T] (Washington, D.C.: July 17, 
2008); and Small Business Administration: Additional Actions Are 
Needed to Certify and Monitor HUBZone Businesses and Assess Program 
Results, [hyperlink, http://www.gao.gov/products/GAO-08-643] 
(Washington, D.C.: June 17, 2008). 

[17] 74 Fed. Reg. 64619, 64620 (Dec. 8, 2009), effective January 7, 
2010. 

[18] In FY09, CVE was authorized 23 full-time-equivalent positions, an 
increase from the 17 full-time positions authorized in FY08. 

[19] 74 Fed. Reg. 64619, 64620 (Dec. 8, 2009). 

[20] During the congressional hearing, representatives from veteran 
service organizations also highlighted concerns with VA's verification 
program, including an apparent lack of resources and delays in 
obtaining contractor support to effectively carry out mandated 
requirements, and complaints from business owners about delays in 
obtaining verification. House Subcommittee on Economic Opportunity, 
Committee on Veterans' Affairs, U.S. Department of Veterans Affairs' 
Center for Veteran Enterprise, Statement of Tim J. Foreman, Department 
of Veterans Affairs, Executive Director of the Office of Small 
Disadvantaged Business Utilization, 111th Congress, 2nd session, March 
11, 2010. 

[21] 38 U.S.C. § 8127(f). 

[22] According to VA, under full-and-open competition, VOSBs or 
SDVOSBs do not need to be listed in the VetBiz.gov database to be 
awarded a contract. 

[23] Eligible parties include veterans, service-disabled veterans, and 
some surviving spouses who own businesses. 

[24] Ownership is defined as a firm being at least 51 percent 
unconditionally and directly owned by one or more veterans or service- 
disabled veterans. Control is defined as both the day-to-day 
management and the long-term decision-making authority. For example, 
an applicant's management and daily business operations must be 
conducted by one or more veterans or service-disabled veterans to be 
verified. Debarred or suspended business concerns are determined by 
checking the General Services Administration-maintained database, 
known as the Excluded Parties List System. See 75 Fed. Reg. at 6103-
6104. 

[25] VA Form 0877 asks for information such as business name, owner 
name(s), veteran or service-disabled status, Social Security 
Number(s), and percentage of ownership in the business. 

[26] Department of Veterans Affairs, Verification Program Risk 
Guidelines (September 2008). 

[27] Addx Corporation and Mahan Consulting Group, Reengineered 
Verification Processes, Verification Advisory, and Assistance Services 
(Nov. 16, 2009). 

[28] Of CVE's 23 authorized staff positions, 9 are dedicated toward 
conducting verifications. According to the contractor's 
recommendation, CVE needs 22 staff positions to conduct verifications. 
This results in an additional 13 staff positions over CVE's FY09 
authorized level. 

[29] According to a CVE memorandum, staff will identify businesses 
with current VA contracts that have not submitted VA Form 0877 and 
invite them to apply for verification. CVE will require these 
applicants to provide documentation, such as business licenses, 
articles or incorporation, corporate bylaws, and operating agreements. 
"Verification Change Sheet - Priority Processing" (Mar. 11, 2010). 

[30] We conducted a review of a random sample of 112 files on 
businesses that VA had verified by September 30, 2009, to determine 
the agency's compliance with its own application procedures. In this 
report, all percentage estimates based on this sample have 95 percent 
confidence intervals within plus or minus 10 percentage points of the 
estimate. 

[31] The percentages in the three bulleted text do not sum to 48 
percent because individual files may have demonstrated one or more of 
the deficiencies we noted in the bullets. For example, one file may 
have been missing some type of required information, and the business 
also may have been assigned an incorrect risk level. 

[32] EPLS is a General Services Administration-maintained database and 
contains information about entities that have been debarred, 
suspended, proposed for debarment, excluded or otherwise disqualified 
under the nonprocurement common rule, or otherwise declared ineligible 
to receive federal contracts and other federal financial assistance. 

[33] USAspending.gov, provides this information (these data are 
largely from FPDS-NG) to the public, as collected from federal 
agencies, in an easy-to-use Web site. ORCA is a Web-based system that 
centralizes and standardizes the collection, storage, and viewing of 
many FAR-required representations and certifications. 

[34] CCR collects, validates, stores, and disseminates data in support 
of agency acquisition missions, including federal agency contract and 
assistance awards. DSBS is an SBA-maintained database that includes 
information on certifications relating to 8(a) business development, 
HUBZone, and small disadvantaged business status. 

[35] GAO, Standards for Internal Control in the Federal Government, 
[hyperlink, http://www.gao.gov/products/GAO/AIMD-00-21.3.1] 
(Washington, D.C.: November 1999). 

[36] The Complaints Automated Tracking System (CATS) application is 
used by VA's Office of Resolution Management to track workplace 
discrimination cases and to manage file documents. CATS is an 
application that creates case files, retains them in a central secure 
network setting, and archives the files for future use. The CATS 
application is an SQL-based data depository, has specially designed 
interface and code logic for tracking cases, and can produce reports. 

[37] [hyperlink, http://www.gao.gov/products/GAO/AIMD-00-21.3.1]. 

[38] Examples of using third-party sources include directly obtaining 
tax records from the Internal Revenue Service (after requesting 
consent from business owners) or utilizing private-sector products 
that may help with screening, identifying, and detecting fraud in 
businesses and individuals. For example, LexisNexis offers a product 
that helps to quickly, safely, and accurately authenticate the 
identities of both businesses and individuals. 

[39] GAO, Service-Disabled Veteran-Owned Small Business Program: Case 
Studies Show Fraud and Abuse Allowed Ineligible Firms to Obtain 
Millions of Dollars in Contracts, [hyperlink, 
http://www.gao.gov/products/GAO-10-108] (Washington, D.C.: Oct. 23, 
2009). 

[40] The 14 percent included reasons such as business owners not 
meeting the character of service requirements, businesses that had 
lost an SBA bid protest, applications with multiple reporting 
discrepancies, or businesses with invalid joint-venture agreements. 

[41] Information Letter 049-07-08. 

[42] VA's Office of Inspector General has received referrals about the 
businesses identified in our October 2009 report (GAO-10-108), on the 
governmentwide SDVOSB program, but these referrals were made as a 
result of our work, not VA's verification program. 

[43] One business was referred to VA's committee for FAR debarment. 
The committee requested additional information, and the case remains 
active. This business was identified in our October 2009 report (GAO-
10-108) on the governmentwide SDVOSB program and was found ineligible 
because of issues with performance (i.e., not adhering to 
subcontracting limitations), which is not a verification issue. 

[44] 38 U.S.C. § 8127(g). 

[45] 48 CFR 809.406-2. See 74 Fed. Reg. at 64630. 

[46] 38 CFR Part 74.2. See 75 Fed. Reg. at 6103-6104. 

[47] While VA contracting officers can use protests to determine 
whether a business misrepresented its status, CVE staff conduct 
verifications on businesses that want to be listed in the VetBiz.gov 
database. These businesses may not have procurements with VA, and, 
therefore, CVE staff cannot always use status protests as a means to 
determine misrepresentation. 

[48] FAR part 19.702. 

[49] VA's accomplishments also did not meet the governmentwide 
statutory goal for SDVOSB subcontract participation of 3 percent. Each 
federal agency with procurement authority is responsible for meeting 
this goal. Subcontracting achievements for SDVOSBs have been much less 
for all federal agencies. According to SBA's FY08 subcontracting 
report, only one agency achieved the SDVOSB subcontracting goal of 3 
percent. 

[50] Eric K. Shinseki, Secretary of Veterans Affairs, 5th Annual 
National Small Business Veteran Conference (Las Vegas, Nev.: July 21, 
2009). 

[51] 48 CFR 819.7 (Dec. 8, 2009). 

[52] Pub. L. No. 109-461, section 502 (Dec. 22, 2006), 38 U.S.C. § 
8127. 

[53] 48 CFR Part 819, final rule (Dec. 8, 2009) and 38 CFR Part 74, 
final rule (Feb. 8, 2010). 

[54] CVE had adopted its first verification application procedures in 
May 2008 and revised these procedures in November 2008 and again in 
August 2009. According to VA, it made no significant changes between 
the November 2008 and August 2009 application procedures. However, VA 
made changes between the May and November, 2008, procedures and some 
applications that had been verified in this time period did not have 
the same requirements--mainly the Control Folder Review and Signature 
Sheets. For the purposes of our analysis, if a business' file did not 
contain these items--but was reviewed and verified between May 12 and 
November 17, 2008 (n=12)--we excluded the result from our data 
analysis and did not consider it a missing piece of information. 

[End of section] 

GAO's Mission: 

The Government Accountability Office, the audit, evaluation and 
investigative arm of Congress, exists to support Congress in meeting 
its constitutional responsibilities and to help improve the performance 
and accountability of the federal government for the American people. 
GAO examines the use of public funds; evaluates federal programs and 
policies; and provides analyses, recommendations, and other assistance 
to help Congress make informed oversight, policy, and funding 
decisions. GAO's commitment to good government is reflected in its core 
values of accountability, integrity, and reliability. 

Obtaining Copies of GAO Reports and Testimony: 

The fastest and easiest way to obtain copies of GAO documents at no 
cost is through GAO's Web site [hyperlink, http://www.gao.gov]. Each 
weekday, GAO posts newly released reports, testimony, and 
correspondence on its Web site. To have GAO e-mail you a list of newly 
posted products every afternoon, go to [hyperlink, http://www.gao.gov] 
and select "E-mail Updates." 

Order by Phone: 

The price of each GAO publication reflects GAO’s actual cost of
production and distribution and depends on the number of pages in the
publication and whether the publication is printed in color or black and
white. Pricing and ordering information is posted on GAO’s Web site, 
[hyperlink, http://www.gao.gov/ordering.htm]. 

Place orders by calling (202) 512-6000, toll free (866) 801-7077, or
TDD (202) 512-2537. 

Orders may be paid for using American Express, Discover Card,
MasterCard, Visa, check, or money order. Call for additional 
information. 

To Report Fraud, Waste, and Abuse in Federal Programs: 

Contact: 

Web site: [hyperlink, http://www.gao.gov/fraudnet/fraudnet.htm]: 
E-mail: fraudnet@gao.gov: 
Automated answering system: (800) 424-5454 or (202) 512-7470: 

Congressional Relations: 

Ralph Dawn, Managing Director, dawnr@gao.gov: 
(202) 512-4400: 
U.S. Government Accountability Office: 
441 G Street NW, Room 7125: 
Washington, D.C. 20548: 

Public Affairs: 

Chuck Young, Managing Director, youngc1@gao.gov: 
(202) 512-4800: 
U.S. Government Accountability Office: 
441 G Street NW, Room 7149: 
Washington, D.C. 20548: