Reports & Testimonies

  • GAO’s recommendations database contains report recommendations that still need to be addressed.

    GAO’s recommendations help congressional and agency leaders prepare for appropriations and oversight activities, as well as help improve government operations. Recommendations remain open until they are designated as Closed-implemented or Closed-not implemented. You can explore open recommendations by searching or browsing.

    GAO's priority recommendations are those that we believe warrant priority attention. We sent letters to the heads of key departments and agencies, urging them to continue focusing on these issues. These recommendations are labeled as such. You can find priority recommendations by searching or browsing our open recommendations below, or through our mobile app.

  • Browse Open Recommendations

    Explore priority recommendations by subject terms or browse by federal agency

    Search Open Recommendations

    Search for a specific priority recommendation by word or phrase



  • Governing on the go?

    Our Priorities for Policy Makers app makes it easier for leaders to search our recommendations on the go.

    See the November 10th Press Release


  • Have a Question about a Recommendation?

    • For questions about a specific recommendation, contact the person or office listed with the recommendation.
    • For general information about recommendations, contact GAO's Audit Policy and Quality Assurance office at (202) 512-6100 or apqa@gao.gov.
  • « Back to Results List Sort by   

    Results:

    Subject Term: Engineers

    15 publications with a total of 47 open recommendations including 1 priority recommendation
    Director: Susan Fleming
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: The Assistant Secretary of the Army for Civil Works should direct the Director of Civil Works to determine whether existing tools and capabilities (such as the Corps' analyses and models related to inland harbors' conditions and freight traffic, as well as shoaling effects at coastal ports) can be adapted to help evaluate other factors when allocating funds from the Harbor Maintenance Trust Fund. The Corps should report to Congress on the feasibility, limitations, and potential costs and on an estimate of any additional funds needed to use such an approach to meet the statutory requirements.

    Agency: Department of Defense: Department of the Army: Office of the Assistant Secretary (Civil Works)
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Dave Wise
    Phone: (202) 512-5731

    3 open recommendations
    including 1 priority recommendation
    Recommendation: To improve VA's management of medical-facility construction projects and its accountability and to allow for more informed decision making by Congress and VA, the Secretary of Veterans Affairs should establish a mechanism to monitor the extent that major facilities projects are following guidelines on change orders' time frames and design changes.

    Agency: Department of Veterans Affairs
    Status: Open
    Priority recommendation

    Comments: GAO reviewed VA's 60 day letter and identified that VA did not address the part of GAO?s recommendation that is intended to help VA ensure that information on the reasons for change orders is collected to better inform managers whether guidelines regarding changes are being followed on construction projects. Consequently, in May 2017, GAO requested that VA provide documentation indicating that its current system collects the necessary information on change order processing timeframes for managers to ensure compliance with processing time guidelines. GAO will continue to monitor and update the status of this recommendation.
    Recommendation: To improve VA's management of medical-facility construction projects and its accountability and to allow for more informed decision making by Congress and VA, the Secretary of Veterans Affairs should develop an activation cost estimate for the Denver project that is reliable and conforms with best practices as described in the GAO Cost Estimating and Assessment Guide.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In its 60-day letter to Congress, VA said that it had analyzed its Activation Cost Budget Model (ACBM), which VA uses to estimate activation costs for new medical facilities, and its activation funding process, to improve cost forecasting and management of the activations process. VA said that it has modified ACBM to better support funding estimates and began using it in February 2017. GAO will continue to monitor and update the status of this recommendation.
    Recommendation: To improve VA's management of medical-facility construction projects and its accountability and to allow for more informed decision making by Congress and VA, the Secretary of Veterans Affairs should clarify Office of Construction and Facilities Management (CFM) policies to require that: (1) all projects have an integrated master schedule to ensure that the integrated master schedules include and link all construction and activation activities, and (2) the policies on integrated master schedule for projects managed by CFM and USACE are consistent.

    Agency: Department of Veterans Affairs
    Status: Open

    Comments: In its 60-day letter to Congress, VA said that it is clarifying its policy and standard operation procedure on developing and maintaining an integrated master schedule. VA will also develop a standard operation procedure specifically for projects that the U.S. Army Corps of Engineers (USACE) is managing for VA. GAO will continue to monitor and update the status of this recommendation.
    Director: Brian Lepore
    Phone: (202) 512-4523

    4 open recommendations
    Recommendation: To improve the information that DOD, military service officials, and installation-level utility system owners and maintainers need to make maintenance or other investment decisions, the Secretary of Defense should direct the Secretary of the Army to take steps to implement existing guidance so that disruption information is consistently available at the installation level.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the information that DOD, military service officials, and installation-level utility system owners and maintainers need to make maintenance or other investment decisions, the Secretary of Defense should direct the Secretary of the Air Force to issue guidance to the installations to require the collection and retention of disruption.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve the information that DOD, military service officials, and installation-level utility system owners and maintainers need to make maintenance or other investment decisions, the Secretary of Defense should direct the Commandant of the Marine Corps to issue guidance to the installations to require the collection and retention of disruption information.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To provide DOD with more consistent information about the condition of DOD-owned utility systems as DOD continues to develop the SMS module for utility systems, the Secretary of Defense should direct the Assistant Secretary of Defense for Energy, Installations, and Environment, in coordination with the military services, to take actions to govern the consistent use of condition standards of utility systems to be assessed using the SMS utilities module, and if applicable, for other facilities assessed using other SMS modules.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Frank Rusco
    Phone: (202) 512-3841

    5 open recommendations
    Recommendation: To help ensure Interior can hire, retain, and train staff it needs to provide effective oversight of oil and gas activities on federal lands and waters, the Secretary of the Interior should direct the Assistant Secretary for Policy, Management and Budget to regularly evaluate the effectiveness of its available incentives, such as special salary rates, the student loan repayment program, and other incentives in hiring and retaining key oil and gas staff.

    Agency: Department of the Interior
    Status: Open

    Comments: In September 2016, Interior's Office of Policy, Management and Budget outlined a plan to assess the effectiveness of special salary rates, as well as recruitment, relocation, and retention incentives by tracking measures such as turnover and acceptance rates. In January 2017 Interior officials reported that the evaluation of these incentives would be conducted on a regular basis. When we confirm that the agency has implemented its evaluation plan, we will provide updated information.
    Recommendation: To help ensure Interior can hire, retain, and train staff it needs to provide effective oversight of oil and gas activities on federal lands and waters, the Secretary of the Interior should direct the Assistant Secretary for Policy, Management and Budget to annually evaluate the bureaus' training programs, including: (1) staff training needs, (2) training effectiveness, and (3) potential opportunities for the bureaus to share training resources.

    Agency: Department of the Interior
    Status: Open

    Comments: In January 2017, Interior officials said the bureaus were developing, or had developed, the means by which they would assess their training needs and review, evaluate, and update their training programs for technical staff. Interior also told GAO that as part of its quarterly review of performance data, the Assistant Secretary for Policy, Management and Budget will ensure that BLM, BSEE and BOEM are coordinating their training needs. Interior officials said that their Office of Strategic Employment and Organizational Development will validate the bureaus' active engagement in this activity and provide support in the fulfillment of this recommendation where needed.
    Recommendation: To help ensure Interior can hire, retain, and train staff it needs to provide effective oversight of oil and gas activities on federal lands and waters, the Secretary of the Interior should direct the Assistant Secretary for Land and Minerals Management to develop technical competencies for all key oil and gas staff.

    Agency: Department of the Interior
    Status: Open

    Comments: In January 2017 Interior officials reported that the Assistant Secretary for Land and Minerals Management will direct BLM, BSEE and BOEM to identify their individual bureau's respective technical competency needs for all key oil and gas staff and develop a plan with milestones for applying these competencies to recruitment, retention, and training strategies designed to address the unique requirements of each bureau.
    Recommendation: To help ensure Interior can hire, retain, and train staff it needs to provide effective oversight of oil and gas activities on federal lands and waters, the Secretary of the Interior should direct the Assistant Secretary for Land and Minerals Management to evaluate the need for and viability of a certification program for BSEE inspectors.

    Agency: Department of the Interior
    Status: Open

    Comments: In January 2017 Interior officials reported that the Assistant Secretary for Land and Minerals Management will direct BSEE to evaluate certification programs that are used in other federal agencies and in industry to determine whether these types of formalized verification systems could benefit the inspection program. BSEE will award an Inspector Training Program evaluation contract to independently assess the need and effectiveness of a certification program for BSEE inspectors, including benchmarking with the BLM and other federal enforcement and compliance entities with inspector workforces.
    Recommendation: To help ensure Interior can hire, retain, and train staff it needs to provide effective oversight of oil and gas activities on federal lands and waters, the Secretary of the Interior should direct the Assistant Secretary for Policy, Management and Budget to coordinate with the Assistant Secretary for Land and Minerals Management to create or use an existing mechanism, such as the Deputies Operating Group, Principals Operating Group, or the Interior Training Directors Council, to facilitate collaboration across the three bureaus in addressing their shared hiring, retention, and training challenges.

    Agency: Department of the Interior
    Status: Open

    Comments: As of March 2017, Interior has not identified what mechanism it will use to facilitate collaboration across the three bureaus. In January 2017, Interior officials reported that as part of its quarterly review of performance data, the Assistant Secretary for Policy, Management and Budget will coordinate with the Assistant Secretary for Land and Minerals Management. We will provide updated information when the agency demonstrates that it has created or selected an existing mechanism to use for ongoing collaboration across the three bureaus in addressing their shared hiring, retention, and training challenges.
    Director: Russell, Cary B
    Phone: (202) 512-5431

    6 open recommendations
    Recommendation: To improve DOD's management and oversight of contingency construction in the CENTCOM area of responsibility and in other geographic combatant commands where applicable, and to improve DOD's awareness of how much O&M funding the department uses for construction projects to support contingency operations, the Secretary of Defense should direct the Secretaries of the military departments, in coordination with the Under Secretary of Defense (Comptroller), to track the universe and cost of ongoing and future contingency construction projects that are funded from O&M appropriations under section 2805 of Title 10, U.S. Code (unspecified minor military construction authority).

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve DOD's management and oversight of contingency construction in the CENTCOM area of responsibility and in other geographic combatant commands where applicable, and to improve DOD's ability to quickly fund contingency construction projects that are not ideally suited to the current standard Military Construction and Operation and Maintenance processes and time frames and reduce reliance on funding approaches that pose risks regarding the appropriate use of funding, negative operational impacts, and unnecessary duplication, DOD should evaluate and improve the use of existing processes and authorities to the extent possible; determine whether additional authorities are needed to support urgent construction needs; and revise existing departmental processes or seek additional authorities, as appropriate.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve DOD's management and oversight of contingency construction in the CENTCOM area of responsibility and in other geographic combatant commands where applicable, and to help ensure that DOD limits demands on available resources to those necessary to meet contingency construction project requirements and communicates those requirements effectively, the Secretary of Defense should, in coordination with the Secretary of the Army, direct the Army Corps of Engineers to develop a control activity for documenting level-of-construction determinations before the Army Corps of Engineers designs the projects and estimates their costs.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve DOD's management and oversight of contingency construction in the CENTCOM area of responsibility and in other geographic combatant commands where applicable, and to ensure that DOD avoids constructing facilities that may be unneeded to support U.S. forces and to comprehensively document the results of its reviews of ongoing construction projects when changes in mission requirements occur, the Secretary of Defense should, in coordination with the Chairman of the Joint Chiefs of Staff, direct the Secretaries of the military departments and the Commander of CENTCOM to develop implementing guidance for the review and verification of ongoing contingency construction projects when mission changes occur.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: To improve DOD's management and oversight of contingency construction in the CENTCOM area of responsibility and in other geographic combatant commands where applicable, and to improve the awareness of the combatant and service component commands' responsibilities to record and share lessons learned and to ensure that important contingency-construction-related lessons are recorded, the Secretary of Defense should, in coordination with the Chairman of the Joint Chiefs of Staff, direct the Commander of CENTCOM to revise Central Command Regulation 415-1 or issue other guidance as appropriate to specifically detail the role of the combatant command and service component commands in recording contingency construction lessons learned from the CENTCOM area of responsibility in the Joint Lessons Learned Information System.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Recommendation: In light of potential concerns regarding the appropriate use of funding raised by several of the examples identified in this report, the Secretary of Defense should direct the Secretaries of the Army and the Air Force to review these and, as appropriate, other construction projects in the contingency environment presenting similar circumstances to ensure that funds were properly used.

    Agency: Department of Defense
    Status: Open

    Comments: When we confirm what actions the agency has taken in response to this recommendation, we will provide updated information.
    Director: Fennell, Anne-marie Lasowski
    Phone: (202) 512-3841

    2 open recommendations
    Recommendation: To help ensure that the Corps and FEMA carry out the national leveesafety- related activities required in the Water Resources Reform and Development Act of 2014, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers and that the Secretary of Homeland Security direct the FEMA Administrator to develop a plan, with milestones, for implementing these activities, using existing resources or requesting additional resources as needed. This plan could be posted on the Corps' website and monitored for progress.

    Agency: Department of Homeland Security
    Status: Open

    Comments: As of December 2016, GAO is awaiting action by the agency to implement this recommendation.
    Recommendation: To help ensure that the Corps and FEMA carry out the national leveesafety- related activities required in the Water Resources Reform and Development Act of 2014, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers and that the Secretary of Homeland Security direct the FEMA Administrator to develop a plan, with milestones, for implementing these activities, using existing resources or requesting additional resources as needed. This plan could be posted on the Corps' website and monitored for progress.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, GAO is awaiting action by the agency to implement this recommendation.
    Director: Anne-Marie Fennell
    Phone: (202) 512-3841

    2 open recommendations
    Recommendation: To help improve the efficiency of Corps operations at reservoir projects and to assist the Corps in meeting the requirement of the Water Resources Reform and Development Act of 2014 to update the Corps' 1992 reservoir report, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to develop guidance on what activities constitute a review of a water control manual and how to document that review.

    Agency: Department of Defense
    Status: Open

    Comments: The agency agreed with our recommendation. We will provide updates when the agency takes action.
    Recommendation: To help improve the efficiency of Corps operations at reservoir projects and to assist the Corps in meeting the requirement of the Water Resources Reform and Development Act of 2014 to update the Corps' 1992 reservoir report, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to track consistent information on the status of water control manuals, including whether they need revisions, and prioritize revisions as needed.

    Agency: Department of Defense
    Status: Open

    Comments: The agency agreed with our recommendation. We will provide updates when the agency takes action.
    Director: Michele Mackin
    Phone: (202) 512-4841

    3 open recommendations
    Recommendation: To improve the use of warranties and guarantees in Navy shipbuilding, the Secretary of the Defense should direct the Secretary of the Navy, in arrangements where the shipbuilder is paid to correct defects, to structure contract terms such that shipbuilders do not earn profit for correcting construction deficiencies following delivery that are determined to be their responsibility.

    Agency: Department of Defense
    Status: Open

    Comments: In providing comments on this report, the Department of Defense partially concurred with this recommendation, and has completed a study reviewing our findings. The study, conducted by the CNA Analysis and Solutions, found that our recommendations were well founded and appropriate. In response to our report and the study, the Navy states it will provide written guidance by the end of 2017 to prevent shipbuilders from earning profit for correcting shipbuilder-responsible defects.
    Recommendation: To improve the use of warranties and guarantees in Navy shipbuilding, the Secretary of the Defense should direct the Secretary of the Navy to establish and document a clear objective for using a guaranty, and then create guidance for contracting officers that illustrates how to implement a guaranty that meets this objective. This guidance should describe how contracting officers should use aspects of the guaranty, including determining an appropriate limitation of liability, to achieve the objective and include considerations as to when a guaranty should be a separate contract line item.

    Agency: Department of Defense
    Status: Open

    Comments: In providing comments on this report, the Department of Defense partially concurred with this recommendation, and agreed to conduct a study to determine what policy and guidance changes are necessary to provide guidance on the many factors that should be considered to effectively implement warranty and guaranty provisions. As of April 2017, this study is complete and the Navy states that it now concurs with our recommendation. In doing so, the Navy is drafting an instruction, including a decision template, laying out the considerations underlying the decision to use warranties, guarantees or other mechanisms. This instruction will help contracting officers choose an appropriate tool and document the decision in a business clearance memorandum. The Navy plans to implement the instruction by the end of 2017.
    Recommendation: To improve the use of warranties and guarantees in Navy shipbuilding, the Secretary of the Defense should direct the Secretary of the Navy, for future ship construction contracts, to determine whether or not a warranty as provided in the FAR, provides value and document the costs, benefits, and other factors used to make this decision. To inform this determination, the Navy should begin differentiating the government's and shipbuilder's responsibility for defects and track the costs to correct all defects after ship delivery.

    Agency: Department of Defense
    Status: Open

    Comments: In providing comments on this report, the Department of Defense partially concurred with this recommendation, and has completed a study reviewing our findings. The study, conducted by the CNA Analysis and Solutions, found that our recommendations were well founded and appropriate. In response to our report and the study, the Navy states it will include separate contract line items for FAR-type warranties in at least two solicitations for ship construction. In addition, the Navy states that it plans to revise data requirements to better gather and track contractor responsible defects, and then develop analytical methods to help make better determinations in the future as to the optimal guaranty duration and limit of liability. They expect to complete these activities by December 2017.
    Director: Anne-Marie Fennell
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: To help ensure the completeness and accuracy of cost and cost-related data for maintenance dredging contracts in the Corps' Dredging Information System database, the Secretary of Defense should direct the Director of Civil Works of the U.S. Army Corps of Engineers to require that its district offices establish systematic quality controls to regularly verify the completeness and accuracy of their maintenance dredging contract data, including processes for ensuring that corrections are made when errors or omissions may be identified, such as through headquarters reviews.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, GAO is awaiting action by the agency to implement this recommendation.
    Director: Johana Ayers
    Phone: (202) 512-5741

    2 open recommendations
    Recommendation: To help manage the risks from changes in conference participation and any potential effects on the defense S&T enterprise, the Secretary of Defense should direct the Assistant Secretary of Defense for Research and Engineering, in consultation with the Office of the DCMO, to develop a plan to analyze and periodically reevaluate the risks from changes in participation at S&T conferences for any potential effects on DOD's ability to meet its scientific mission, including identifying and collecting additional information needed to conduct this analysis.

    Agency: Department of Defense
    Status: Open

    Comments: In September 2015, DOD updated its conference approval guidelines. According to DOD, these guidelines were designed to facilitate conference participation and attendance by DOD employees. The updated guidelines now treat conference attendance as Temporary Duty/Temporary Assigned Duty, and delegate approval authority to the lowest level possible. However, DOD has not yet implemented a requirement to develop a plan and periodically reevaluate the risks from changes in participation at S&T conferences as of June 2016 because officials in the Office of the Deputy Chief Management Officer believe this recommendation in GAO-15-278 is no longer applicable as a result of its updated conference approval guidelines. We disagree and believe this recommendation continues to have merit in order for DOD to better understand and manage the risks to achieving its S&T mission from any future changes in conference participation, and to determine if any future actions to adjust its conference approval guidelines are warranted.
    Recommendation: To help manage the risks from changes in conference participation and any potential effects on the defense S&T enterprise, the Secretary of Energy should direct the Administrator of NNSA and the relevant national lab directors, in consultation with DOE's Office of Management, to develop a plan to analyze and periodically reevaluate the risks from changes in participation at S&T conferences for any potential effects on NNSA's ability to meet its scientific mission, including identifying and collecting additional information needed to conduct this analysis.

    Agency: Department of Energy
    Status: Open

    Comments: In August 2015, DOE updated its conference management policies and procedures to, among other things, expedite the conference attendance approval process by establishing timeframes for review and approval. According to DOE, as of September 2016, streamlining the conference approval process eliminates the need to periodically evaluate risks from changes in participation at S&T conferences. We disagree and believe this recommendation continues to have merit in order for DOE to better understand and manage the risks to achieving its S&T mission from any future changes in conference participation, and to determine if any future actions to adjust its conference approval guidelines are warranted.
    Director: Beryl H. Davis
    Phone: (202) 512-2623

    3 open recommendations
    Recommendation: To help reduce the risk that improper payment estimates related to DRAA funding developed and reported by selected agencies may not be accurate or reliable, and to help ensure that DOT produces reliable estimates of its DRAA improper payments, as applicable to each administration, the Secretary of Transportation should direct the Administrators of the Federal Aviation Administration, Federal Highway Administration, Federal Railroad Administration, and Federal Transit Administration to revise their policies and procedures for estimating improper payments by: (1) clearly identifying roles and responsibilities for estimating improper payments; (2) defining improper payments consistently with IPIA, as amended, and OMB Circular No. A-123, Appendix C; (3) requiring payments to federal employees to be included in populations for testing as required by IPIA, as amended; (4) including steps to assess the completeness of the population of transactions used for selecting the samples to be tested; (5) requiring the agency to maintain sufficient documentation to support improper payment estimates; (6) requiring that the sampling methodologies meet the precision requirements outlined in OMB Circular No. A-123, Appendix C; and (7) requiring a consultation with a statistician to ensure the validity of sample design, sample size, and measurement methodology.

    Agency: Department of Transportation
    Status: Open

    Comments: On April 14, 2017, we were informed that the Office of the Chief Financial Officer has oversight over the Department of Transportation's (DOT) improper payments implementation and is revising DOT's policies for estimating improper payments. DOT plans to complete this action by 10/31/2017. We will continue to monitor the status of this recommendation.
    Recommendation: To help reduce the risk that improper payment estimates related to DRAA funding developed and reported by selected agencies may not be accurate or reliable, and to help ensure that the Department of Housing and Urban Development produces reliable estimates of its DRAA improper payments, the Secretary of Housing and Urban Development should direct appropriate officials to revise its policies and procedures for estimating improper payments by (1) requiring payments to federal employees to be included in populations for testing as required by the Improper Payments Information Act of 2002 (IPIA), as amended, and (2) including steps to assess the completeness of the population of transactions used for selecting the samples to be tested.

    Agency: Department of Housing and Urban Development
    Status: Open

    Comments: Overall, we believe the Department of Housing and Urban Development (HUD) is on track for taking corrective actions that meet the intent of GAO recommendation. For example, we believe HUD has met the intent of this recommendation with regards to HUD revising its policies and procedures for estimating improper payments. Specifically, we have reviewed HUD's updated recapture audit plan dated June 26, 2015, and verified it requires payments to federal employees to be included in populations for testing. However, we do not believe HUD has met the intent of this recommendation with regards to including steps to assess the completeness of the population of transactions used for selecting the samples to be tested. Specifically, we have not seen where HUD's policies and procedures show how HUD ensures that it is selecting from a complete list of grantee files when conducting tests related to estimating improper payments. On July 19, 2017, a HUD official explained that HUD does not have controls in place to ensure that the grantee files are complete. Further, the HUD official indicated that the grantee files come from the grantee, and HUD relies on the grantees to provide a complete list of files. However, HUD does not currently have a way to verify that this list is complete. According to the HUD official, HUD he will explore options HUD can implement for ensuring that grantee files are complete, including possibly having grantees to sign a statement certifying that their grantee files are complete when provided to HUD. We will continue to monitor the agency's actions to address this recommendation.
    Recommendation: To help reduce the risk that improper payment estimates related to DRAA funding developed and reported by selected agencies may not be accurate or reliable, and to help ensure that the U.S. Army Corps of Engineers (USACE) produces reliable estimates of its DRAA improper payments, the Secretary of the Army should direct the Chief of Engineers and Commanding General of USACE to revise policies and procedures for estimating improper payments by: (1) defining improper payments consistently with IPIA, as amended, and OMB Circular No. A-123, Appendix C; (2) requiring payments to federal employees to be included in populations for testing as required by IPIA, as amended; (3) including steps to assess the completeness of the population of transactions used for selecting the samples to be tested; (4) providing sufficient procedures for determining an error and what documentation is necessary to substantiate payment; and (5) requiring the agency to maintain sufficient documentation to support improper payment estimates.

    Agency: Department of Defense: Department of the Army
    Status: Open

    Comments: As of June 5, 2017, no updated information has been provided by the Department of Defense. We will continue to monitor the status of this recommendation.
    Director: Anne-Marie Fennell
    Phone: (202) 512-3841

    7 open recommendations
    Recommendation: To ensure that the Corps meets the statutory requirements related to deauthorization of projects, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to establish and implement a written policy to ensure all authorized projects are entered into the agency's database and tracked.

    Agency: Department of Defense
    Status: Open

    Comments: The Corps has developed a database on authorized construction projects and has used it for deauthorization activities, but the database is not yet on an Automated Information System platform due to contract capacity constraints for the software developers. Once data are included on an Automated Information System platform, guidance will be issued on data entry and updating of the data.
    Recommendation: To ensure that the Corps meets the statutory requirements related to deauthorization of projects, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to determine what projects are eligible for deauthorization, transmit the list to Congress, and publish projects that are deauthorized in the Federal Register once the new database includes all authorized projects.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, GAO is reviewing actions by the agency to implement this recommendation.
    Recommendation: To ensure that the Corps meets the statutory requirements related to deauthorization of projects, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to establish and implement written policies and procedures documenting the project deauthorization process, from initial compilation of a list of eligible projects to submitting the list to Congress and publishing the projects that are deauthorized in the Federal Register.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, GAO is reviewing actions by the agency to implement this recommendation.
    Recommendation: To ensure that the Corps meets the statutory requirements related to deauthorization of projects, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to establish and implement a policy for record-keeping to ensure that documents related to deauthorization are maintained as federal records.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, GAO is reviewing actions by the agency to implement this recommendation.
    Recommendation: To ensure that the Corps meets the statutory requirements related to deauthorization of incomplete water resources studies, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to establish a mechanism for tracking all authorized studies and establish and implement a written policy to ensure all authorized studies are tracked.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, a task order has been awarded for a contractor to prepare a comprehensive inventory of studies authorized by statute. Once the comprehensive inventory of studies is complete, the Corps will move the inventory to an automated information system platform and issue guidance on data entry and updating the data.
    Recommendation: To ensure that the Corps meets the statutory requirements related to deauthorization of incomplete water resources studies, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to establish and implement policies and procedures documenting the deauthorization process for studies, from initial compilation of a list of eligible studies to submitting the list to Congress.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, a task order has been awarded for a contractor to prepare a comprehensive inventory of studies authorized by statute. Once the comprehensive inventory of studies is complete, the Corps will develop policies and procedures for the study deauthorization process.
    Recommendation: To ensure that the Corps meets the statutory requirements related to deauthorization of incomplete water resources studies, the Secretary of Defense should direct the Secretary of the Army to direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers to determine what studies are eligible for deauthorization and transmit the list to Congress.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, a task order has been awarded for a contractor to prepare a comprehensive inventory of studies authorized by statute. Once the comprehensive inventory of studies is complete, the Corps will develop policies and procedures for the study deauthorization process and those policies and procedures will be used to carry out the process of deauthorizing studies.
    Director: Fennell, Anne-marie Lasowski
    Phone: (202) 512-3841

    1 open recommendations
    Recommendation: To improve communication between the Corps and nonfederal sponsors of flood control projects, the Secretary of Defense should direct the Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers take steps to ensure that flood control project delivery teams comply with agency guidance to develop communications plans for flood control projects.

    Agency: Department of Defense
    Status: Open

    Comments: As of December 2016, GAO is awaiting action by the agency to implement this recommendation.
    Director: Farrell, Brenda S
    Phone: (202) 512-3604

    6 open recommendations
    Recommendation: To help ensure that OSD, the military services, and congressional decision makers have a comprehensive understanding of whether ROTC programs are achieving desired results in a cost-effective and efficient manner, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in conjunction with the Secretaries of the military services, to establish a systematic process to routinely evaluate ROTC program performance that includes establishing performance measures that are clearly defined and include cost components.

    Agency: Department of Defense
    Status: Open

    Comments: As of April 2016, this recommendation is addressed in the current working draft of Department of Defense Instruction (DoDI) 1215.08, "Senior Reserves Officers' Training Corps (ROTC) Programs." A joint Services and DOD working group has finalized updates addressing this recommendation in the draft instruction, but DOD anticipates formal coordination will be delayed until after the 2017 change in the Presidential Administration. This recommendation will remain open until the DoDI addressing this recommendation has been finalized and published.
    Recommendation: To help ensure that OSD, the military services, and congressional decision makers have a comprehensive understanding of whether ROTC programs are achieving desired results in a cost-effective and efficient manner, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in conjunction with the Secretaries of the military services, to establish a systematic process to routinely evaluate ROTC program performance that includes requiring routine evaluations of ROTC programs that measure progress against the strategic goals and objectives of ROTC programs.

    Agency: Department of Defense
    Status: Open

    Comments: As of April 2016, this recommendation is addressed in the current working draft of Department of Defense Instruction (DoDI) 1215.08, "Senior Reserves Officers' Training Corps (ROTC) Programs." A joint Services and DOD working group has finalized updates addressing this recommendation in the draft instruction, but DOD anticipates formal coordination will be delayed until after the 2017 change in the Presidential Administration. This recommendation will remain open until the DoDI addressing this recommendation has been finalized and published.
    Recommendation: To help ensure that OSD, the military services, and congressional decision makers have a comprehensive understanding of whether ROTC programs are achieving desired results in a cost-effective and efficient manner, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness, in conjunction with the Secretaries of the military services, to establish a systematic process to routinely evaluate ROTC program performance that includes using the performance information resulting from ROTC program evaluations to assess and document the need for the existing number of units,

    Agency: Department of Defense
    Status: Open

    Comments: As of April 2016, this recommendation is addressed in the current working draft of Department of Defense Instruction (DoDI) 1215.08, "Senior Reserves Officers' Training Corps (ROTC) Programs." A joint Services and DOD working group has finalized updates addressing this recommendation in the draft instruction, but DOD anticipates formal coordination will be delayed until after the 2017 change in the Presidential Administration. The Services have reviewed and adjusted their current procedures and metrics to better measure and evaluate their ROTC programs prior to the projected DoDI publication date. This recommendation will remain open until the DoDI addressing this recommendation has been finalized and published.
    Recommendation: To help improve the oversight and accountability of the military services' ROTC programs, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness to reexamine and clarify DOD Instruction 1215.08 to clearly delineate roles and responsibilities for oversight of ROTC programs.

    Agency: Department of Defense
    Status: Open

    Comments: As of April 2016, this recommendation is addressed in the current working draft of Department of Defense Instruction (DoDI) 1215.08, "Senior Reserves Officers' Training Corps (ROTC) Programs." A joint Services and DOD working group has finalized updates addressing this recommendation in the draft instruction, but DOD anticipates formal coordination will be delayed until after the 2017 change in the Presidential Administration. This recommendation will remain open until the DoDI addressing this recommendation has been finalized and published.
    Recommendation: To help improve the oversight and accountability of the military services' ROTC programs, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness to coordinate with the military services to ensure that service ROTC guidance aligns with the updated DOD instruction.

    Agency: Department of Defense
    Status: Open

    Comments: As of April 2016, this recommendation is addressed in the current working draft of Department of Defense Instruction (DoDI) 1215.08, "Senior Reserves Officers' Training Corps (ROTC) Programs." A joint Services and DOD working group has finalized updates addressing this recommendation in the draft instruction, but DOD anticipates formal coordination will be delayed until after the 2017 change in the Presidential Administration. The Services have reviewed and adjusted their current procedures and metrics to better measure and evaluate their ROTC programs prior to the projected DoDI publication date. This recommendation will remain open until the DoDI addressing this recommendation has been finalized and published.
    Recommendation: To help improve the oversight and accountability of the military services' ROTC programs, the Secretary of Defense should direct the Under Secretary of Defense for Personnel and Readiness to develop and implement, in conjunction with the Secretaries of the military services, a strategy to periodically communicate with Congress and other key stakeholders on ROTC program performance.

    Agency: Department of Defense
    Status: Open

    Comments: As of April 2016, this recommendation is addressed in the current working draft of Department of Defense Instruction (DoDI) 1215.08, "Senior Reserves Officers' Training Corps (ROTC) Programs." A joint Services and DOD working group has finalized updates addressing this recommendation in the draft instruction, but DOD anticipates formal coordination will be delayed until after the 2017 change in the Presidential Administration. This recommendation will remain open until the DoDI addressing this recommendation has been finalized and published.
    Director: Wise, David J
    Phone: (202) 512-2834

    1 open recommendations
    Recommendation: To enhance transparency and allow for more informed decision making related to the appropriate role of leasing in GSA's real property portfolio, the Administrator of GSA should include in the lease prospectus a description of the length of time that an agency estimates it will need the space, an historical account of how long the agency has been in the particular building it is occupying at the time of the prospectus, and any major investments the agency will have to make to the leased space to meet its mission. For those spaces for which the agency has a long-term projected need, also include an appropriate form of cost-to-lease versus cost-to-own analysis.

    Agency: General Services Administration
    Status: Open

    Comments: As of March 2017, GSA had not incorporated the recommended information into its fiscal year 2016 lease prospectuses and did not plan to do so in future prospectuses. GSA officials stated that GSA may not know how long an agency will need the space or the amount of investment that will be needed, so this information would be difficult to incorporate. However, in its 2013 review, GAO found that 9 of the 12 case study leases included space for long-term or mission critical space needs for tenant agencies. Some of the tenant agencies in these leases had been housed in multiple successive leases far longer than the statutory term limit of 20 years for a single GSA lease-situations that would lend themselves to analyzing the extent to which it would be more cost-effective for the government to own rather than lease. Moreover, GSA and the agency are likely to have general information on the complexity and likely investment needed to meet an agency's mission-related needs in leased space that could be included in the prospectus. Including the recommended information would increase transparency and facilitate more informed decision making by Congress.