GAO discussed the U.S. strategic triad, focusing on the cost-effectiveness of the principal weapon system upgrades in the triad's air, land, and sea legs. GAO noted that: (1) strategic bombers have added a stabilizing effect on the triad's air leg, since they are able to be recalled after deployment and incapable of effecting a surprise attack; (2) the B-2 aircraft's overall performance is difficult to assess because of the limited number and nature of flight tests; (3) air leg armament upgrades have not significantly contributed to the cruise missile's operational performance or capabilities; (4) the sea leg is the strongest, most cost-effective component of the triad; (5) the vulnerability of the triad's land leg has been overstated because of incorrect assumptions regarding Soviet capabilities; (6) there is a lack of reliable data concerning intercontinental ballistic missile performance; (7) problems in the Department of Defense's (DOD) strategic program evaluations have included threat forecasting, testing, and reporting; and (8) comparative studies are needed to justify a proposed system's threat and performance capabilities and relative costs.

Recommendations for Executive Action

  1. Status: Closed - Not Implemented

    Comments: DOD has determined that it will continue D-5 testing at a reduced rate.

    Recommendation: Given the importance of the D-5 missile to the sea leg of the triad, and given the importance of flight testing to achieve an understanding of missile performance, the Secretary of Defense should ensure that: (1) D-5 SLBM flight testing continues; and (2) the D-5 test rate is not from levels required to confidently assess weapon system capability.

    Agency Affected: Department of Defense

  2. Status: Closed - Not Implemented

    Comments: DOD has determined that it will retain the Minuteman III force for the duration of its life cycle.

    Recommendation: The Secretary of Defense should reconsider DOD funding needs for and the cost-effectiveness of extensive major life-service upgrades for the Minuteman III force, taking into consideration the: (1) Air Force's $23-billion estimate for upgrading and maintaining the Minuteman III through 2020; (2) reduced-threat environment; and (3) likelihood that substantive modifications will require robust flight test programs that would quickly use up limited test assets.

    Agency Affected: Department of Defense

  3. Status: Closed - Implemented

    Comments: DOD rejected GAO's analysis that B-1B range had not been reliably tested. Standard follow-on test and evaluation tests for reliability and electronic countermeasures are being conducted but did not adequately address these other issues.

    Recommendation: The Secretary of Defense should require further operational testing of the B-1B to: (1) verify that scheduled improvements in reliability and electronic countermeasures are achieved; and (2) remove remaining uncertainties concerning range performance.

    Agency Affected: Department of Defense

  4. Status: Closed - Implemented

    Comments: DOD requested funding for five more B-2s, for a force of 20. Congress concurred with DOD's budget request for five more B-2 aircraft.

    Recommendation: Because there are no strategic grounds for acquiring five more B-2s, adding such capability to the B-2 strategic bomber design will be complex, time-consuming, and extremely costly, its capability to perform intended conventional and strategic missions remains unproven, and other alternatives exist, the Secretary of Defense should not procure five more B-2s.

    Agency Affected: Department of Defense

  5. Status: Closed - Not Implemented

    Comments: It is not yet clear that testing has addressed the identified problems. No GAO work has been done to examine the realism of subsequent ACM/ALCM testing; therefore, it has not been determined by GAO whether subsequent testing has met the recommendation.

    Recommendation: To ensure the effectiveness of the cruise missile inventory, the Secretary of Defense should ensure that more realistic flight tests are performed of air-launched cruise missile (ALCM) survivability and of both ALCM and advanced cruise missile performance over terrain that has not been pretested.

    Agency Affected: Department of Defense

 

Explore the full database of GAO's Open Recommendations »

Sep 22, 2016

Sep 21, 2016

Sep 19, 2016

Sep 12, 2016

Sep 8, 2016

Sep 7, 2016

Sep 6, 2016

Aug 25, 2016

Looking for more? Browse all our products here