Analysis of Bonneville Power Administration's Estimate To Bury Segments of Transmission Line in Montana

EMD-82-80 Published: May 07, 1982. Publicly Released: Jun 07, 1982.
Jump To:
Skip to Highlights

Highlights

GAO was requested to review the Bonneville Power Administration's (BPA) cost estimates to bury segments of high voltage transmission lines in Montana. Specifically, GAO was asked to: (1) evaluate the validity of the BPA cost data for burying portions of a "twin" 500 KV transmission line; and (2) analyze the general engineering reliability and safety considerations of burying such lines.

Full Report

Office of Public Affairs

Topics

Cost analysisElectric power transmissionElectrical engineeringEnergy suppliesSafety standardsStandards evaluationEngineeringCost estimatesActual costsMinerals