B-211904.2, APR 23, 1984

B-211904.2 Apr 23, 1984
Jump To:
Skip to Highlights

Highlights

IT IS NOT THE FUNCTION OF GAO TO REEVALUATE PROPOSALS BUT RATHER TO DETERMINE IF THERE IS A REASONABLE BASIS FOR THE AGENCY'S TECHNICAL EVALUATION. 2. A PROTESTER FAILS TO PROVE THAT THE PROPOSAL EVALUATION PROCESS WAS BIASED OR THAT TECHNICAL EVALUATIONS WERE UNREASONABLE WHERE NO INDEPENDENT EVIDENCE OF BIAS IS PROVIDED AND THE RECORD REASONABLY SUPPORTS THE CONTRACTING AGENCY'S TECHNICAL JUDGMENT. 3. COST/TECHNICAL TRADE-OFFS MAY BE MADE AS LONG AS THE AWARD DETERMINATION IS REASONABLE IN LIGHT OF THE SOLICITATION'S EVALUATION SCHEME. A-E SYSTEMS COMPLAINS THAT THE EVALUATION OF BOTH ITS PROPOSAL AND THAT OF MATHETICS WAS BIASED. THE FIRM ALSO ASSERTS THAT AWARD TO MATHETICS AT A HIGHER COST WAS NOT JUSTIFIED.

View Decision

B-211904.2, APR 23, 1984

DIGEST: 1. WHERE A PROTESTER CHALLENGES A CONTRACTING AGENCY'S EVALUATION OF TECHNICAL PROPOSALS IN A NEGOTIATED PROCUREMENT, IT IS NOT THE FUNCTION OF GAO TO REEVALUATE PROPOSALS BUT RATHER TO DETERMINE IF THERE IS A REASONABLE BASIS FOR THE AGENCY'S TECHNICAL EVALUATION. 2. A PROTESTER FAILS TO PROVE THAT THE PROPOSAL EVALUATION PROCESS WAS BIASED OR THAT TECHNICAL EVALUATIONS WERE UNREASONABLE WHERE NO INDEPENDENT EVIDENCE OF BIAS IS PROVIDED AND THE RECORD REASONABLY SUPPORTS THE CONTRACTING AGENCY'S TECHNICAL JUDGMENT. 3. IN A NEGOTIATED PROCUREMENT, AWARD NEED NOT BE BASED ON LOW COST; RATHER, COST/TECHNICAL TRADE-OFFS MAY BE MADE AS LONG AS THE AWARD DETERMINATION IS REASONABLE IN LIGHT OF THE SOLICITATION'S EVALUATION SCHEME.

A-E SYSTEMS MANAGEMENT, INC.:

A-E SYSTEMS MANAGEMENT, INC. PROTESTS THE AWARD OF A CONTRACT TO MATHETICS INC. UNDER REQUEST FOR PROPOSALS NO. N61339-82-R-0098 ISSUED BY THE NAVAL TRAINING EQUIPMENT CENTER (NTEC). THE SOLICITATION SOUGHT TECHNICAL SERVICES FOR THE DEVELOPMENT AND EVALUATION OF EQUIPMENT TRAINING MANUALS, THE UPDATING OF TRAINING SPECIFICATIONS AND CURRICULA, AND THE PREPARATION OF PARTS CATALOGS. A-E SYSTEMS COMPLAINS THAT THE EVALUATION OF BOTH ITS PROPOSAL AND THAT OF MATHETICS WAS BIASED. THE FIRM ALSO ASSERTS THAT AWARD TO MATHETICS AT A HIGHER COST WAS NOT JUSTIFIED.

WE DENY THE PROTEST.

BACKGROUND

THE SOLICITATION WAS ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE, TO WHICH 20 OFFERORS RESPONDED. AN INDEFINITE-QUANTITY, COST REIMBURSEMENT CONTRACT WAS TO BE AWARDED. SECTION M OF THE SOLICITATION PROVIDED THAT, FOR PURPOSES OF AWARD, TECHNICAL FACTORS WERE MORE IMPORTANT THAN COST FACTORS BY A RATIO OF 2 TO 1. THAT SECTION ALSO NOTED THAT AN OFFEROR'S PRICE FOR PURPOSES OF AWARD WAS THE PRICE FOR THE BASE YEAR PLUS THE PRICES FOR THE TWO 1-YEAR OPTIONS.

AS A RESULT OF THE TECHNICAL EVALUATIONS, A-E SYSTEMS TECHNICAL PROPOSAL RECEIVED 291 POINTS OUT OF A POSSIBLE 400, WHILE MATHETICS RECEIVED 395. EACH PROPOSAL WAS THEN ASSIGNED A TECHNICAL SCORE, WHICH WAS EQUAL TO 1/2 OF THE POINTS RECEIVED DURING EVALUATION. A-E SYSTEMS' SCORE WAS 146, WHICH RANKED 17TH AMONG OFFERORS, WHILE MATHETICS' WAS 197, WHICH RANKED SECOND. COST PROPOSALS WERE SCORED BY ASSIGNING 100 POINTS TO THE LOWEST- PRICED, TECHNICALLY ACCEPTABLE PROPOSAL AS THE BASE COST, AND THEREAFTER COMPUTING THE OTHER COST PROPOSALS' SCORES AS FOLLOWS:

BASE COST X 100 NUMERICAL SCORE

PROPOSED COST A-E SYSTEMS' PROPOSED COST WAS $1,337,590, AND ITS COST PROPOSAL RECEIVED 76 POINTS; MATHETICS' PROPOSED COST WAS $1,758,535, AND ITS PROPOSAL RECEIVED 55 POINTS.

A-E SYSTEMS' TOTAL SCORE OF 222 RANKED 14TH AMONG OFFERORS, WHILE MATHETICS' TOTAL SCORE OF 252 RANKED FIFTH. NEITHER FIRM WAS SELECTED AS THE PROSPECTIVE AWARDEE. AFTER THE CONTRACTING OFFICER SENT PREAWARD NOTICES TO THE UNSUCCESSFUL OFFERORS, ONE FIRM PROTESTED THE SMALL BUSINESS SIZE STATUS OF THE PROPOSED AWARDEE. THE CONTRACTING OFFICER FORWARDED THE PROTEST TO THE APPROPRIATE REGIONAL OFFICE OF THE SMALL BUSINESS ADMINISTRATION (SBA), WHICH DETERMINED THAT NTEC HAD USED THE INCORRECT SIZE STANDARD IN THE SOLICITATION, AND THAT THE AWARDEE WAS NOT A SMALL BUSINESS CONCERN UNDER THAT SIZE STANDARD. THE SBA'S SIZE APPEALS BOARD THEREAFTER AFFIRMED THAT DETERMINATION.

NTEC AMENDED THE SOLICITATION TO REVISE THE SIZE STANDARD AND REQUESTED THOSE OFFERORS WHO MET THE NEW STANDARD TO RECERTIFY THEIR SMALL BUSINESS SIZE STATUS. SIX OFFERORS DID SO. AMONG THE SIX OFFERORS, MATHETICS RANKED FIRST BOTH TECHNICALLY AND OVERALL; A-E SYSTEMS RANKED FOURTH BOTH TECHNICALLY AND OVERALL. (TWO OFFERORS TIED FOR THIRD.) THEREAFTER, A-E SYSTEMS WAS NOTIFIED OF THE IMPENDING AWARD TO MATHETICS; IT THEN PROTESTED THE AWARD TO THE CONTRACTING OFFICER, WHO DENIED THE PROTEST. -E SYSTEMS SUBSEQUENTLY FILED THIS PROTEST WITH OUR OFFICE.

TECHNICAL EVALUATION

A-E SYSTEMS COMPLAINS THAT THE EVALUATIONS OF ITS TECHNICAL PROPOSAL AND THAT OF MATHETICS WERE BIASED. THE FIRM QUESTIONS A NUMBER OF AREAS WHERE IT BELIEVES EVALUATOR W.E. MOSBLECH IMPROPERLY DOWNGRADED ITS PROPOSAL, CHARGING THAT HE "APPEARS TO HAVE A LOVE AFFAIR WITH MATHETICS DUE TO HIS KNOWLEDGE OF ITS PERSONNEL." A-E SYSTEMS REQUESTS THAT WE CONDUCT A "PROPER" EVALUATION OF BOTH ITS AND MATHETICS' PROPOSAL. FN1

IT IS NOT OUR FUNCTION TO REEVALUATE PROPOSALS WHERE A PROTESTER CHALLENGES A CONTRACTING AGENCY'S TECHNICAL EVALUATION. OCEAN DATA EQUIPMENT DIVISION OF DATA INSTRUMENTS, INC., B-209776, SEPTEMBER 29, 1983, 83-2 CPD 387. RATHER, OUR ROLE IN SUCH INSTANCES IS TO DETERMINE IF THERE IS A REASONABLE BASIS FOR THE EVALUATION. AQUA-TECH, INC., B-210593, JULY 14, 1983, 83-2 CPD 91. A PROTESTER ALLEGING THAT THE EVALUATION PROCESS WAS BIASED HAS THE BURDEN OF PROVING THAT OFFERORS IN THE COMPETITION WERE NOT TREATED FAIRLY AND EQUALLY. GOULD DEFENSE SYSTEMS, INC. ET AL., B-199392.3, B-199392.4, AUGUST 8, 1983, 83-2 CPD 174.

WE HAVE EXAMINED THE RECORD IN THIS CASE AND FIND NO EVIDENCE TO SUPPORT A-E SYSTEMS' ALLEGATIONS OF BIAS. A-E SYSTEMS ASSERTS, FOR INSTANCE, THAT THE SOLICITATION DID NOT REQUIRE PROPOSALS TO FOLLOW A PARTICULAR PARAGRAPH NUMBERING FORMAT AND THAT MR. MOSBLECH'S DEDUCTION OF 1 POINT (OF 20) FROM THE FIRM'S SCORE FOR ITS FAILURE TO DO SO WAS UNFAIR. A-E SYSTEMS' ASSERTION IS INCORRECT. SECTION 2.1 OF THE TECHNICAL PROGRAM REQUIREMENTS (TPR) PORTION OF THE SOLICITATION SPECIFICALLY REQUIRED A PROPOSAL'S PARAGRAPH NUMBERING SYSTEM TO CORRESPOND TO THAT OF THE TPR.

A-E SYSTEMS ALSO QUESTIONS MR. MOSBLECH'S DEDUCTION OF 8 POINTS (OF 40) FOR THE FIRM'S FAILURE TO DISCUSS BUDGET SLIPPAGE. FN2 SECTION 2.1.2(C) OF THE TPR STATED THAT:

"THE PROPOSED SYSTEM OF ADMINISTRATIVE CONTROLS SHALL BE DESCRIBED IN DETAIL IN TERMS OF PROGRAM PLANNING, SCHEDULE AND BUDGET MAINTENANCE AND REPORTING, AND PLANNING/MANAGEMENT FOR TEAM EFFORTS. COMPLETE DISCUSSION OF THESE AREAS WITH PLANS FOR CORRECTIVE ACTION IN THE EVENT OF SCHEDULE OR BUDGET SLIPPAGE WILL RECEIVE THE HIGHEST SCORE. DISCUSSION WILL RESULT IN NO SCORE."

A-E SYSTEMS' PROPOSAL, HOWEVER, MERELY PROMISED THAT THE FIRM WOULD "USE SOUND, COST-EFFECTIVE ADMINISTRATIVE CONTROLS TO ENSURE OPTIMUM PROGRAM PLANNING, SCHEDULE, BUDGET MAINTENANCE, AND REPORTING ... INCLUDING PLANS FOR CORRECTIVE ACTION IN THE EVENT OF SCHEDULE AND BUDGET SLIPPAGE." MR. MOSBLECH CONCLUDED THAT A-E SYSTEMS' PROPOSAL IN THIS REGARD WAS NOT DETAILED AND ONLY PARAPHRASED THE PROVISIONS OF THE TPR. IN LIGHT OF THE TPR'S CLEAR WARNING THAT THE DISCUSSION SHOULD BE COMPLETE, WE FIND NOTHING IMPROPER IN MR. MOSBLECH'S CONCLUSION. FN3

A-E SYSTEMS VIEWS AS BIASED THE FACT THAT MR. MOSBLECH CRITICIZED ITS PROPOSAL BECAUSE THE FIRM NAMED ITS CORPORATE PRESIDENT AS THE INDIVIDUAL WHO WOULD PERFORM THE FULL-TIME DUTIES OF THE MANAGEMENT ANALYST, OR CHIEF PROJECT ADMINISTRATOR, OF THE CONTRACT. THE FIRM CONCLUDES THAT ITS PROPOSAL WAS SUBJECTED TO UNEQUAL TREATMENT SINCE NO POINTS WERE DEDUCTED FROM MATHETICS' PROPOSAL EVEN THOUGH ONE EVALUATOR STATED THAT HE "WOULD LIKE CONFIRMATION OF AVAILABILITY OF SOME KEY SUBCONTRACTOR PERSONNEL WHO ARE PRINCIPALS IN OWN COMPANY."

WE DO NOT SEE ANYTHING INCONGRUOUS IN THE TREATMENT OF A-E SYSTEMS' PROPOSAL IN THIS REGARD, NOR DO WE FIND ANY EVIDENCE OF BIAS. THE RECORD SHOWS THAT MATHETICS DID NOT PROPOSE TO APPOINT ITS PRESIDENT AS THE MANAGEMENT ANALYST BUT INSTEAD SELECTED THE VICE-PRESIDENT OF ONE OF ITS BRANCH OFFICES TO SERVE IN THAT POSITION. IN ADDITION, THE SUBCONTRACTOR PERSONNEL THAT THE FIRM PROPOSED TO USE WHO WERE COMPANY PRINCIPALS WERE NOT SLOTTED TO POSITIONS THAT THE SOLICITATION REQUIRED TO BE FULL-TIME. WE ALSO NOTE THAT A-E SYSTEMS' CHOICE FOR THE MANAGEMENT ANALYST POSITION WAS QUESTIONED NOT ONLY BY MR. MOSBLECH BUT BY ANOTHER EVALUATOR AS WELL. IN VIEW OF THE IMPORTANT RESPONSIBILITIES THAT THE SOLICITATION PLACED ON THE INDIVIDUAL IN THAT POSITION, WE DO NOT BELIEVE THAT IT WAS UNREASONABLE FOR POINTS TO BE DEDUCTED FROM A-E SYSTEMS' PROPOSAL WHEN THEY WERE NOT DEDUCTED FROM MATHETICS'.

A-E SYSTEMS IMPLIES THAT MATHETICS' PROPOSAL SHOULD HAVE BEEN SUBSTANTIALLY DOWNGRADED BECAUSE THE FIRM PROPOSED TO USE 13 SUBCONTRACTORS. THE RECORD SHOWS THAT, WHILE SOME EVALUATORS DEDUCTED POINTS FROM THE FIRM'S PROPOSAL DUE TO ITS EXTENSIVE SUBCONTRACTING, OTHER EVALUATORS BELIEVED THAT MATHETICS' MANAGEMENT PLAN WAS SUPERIOR. OUR SCRUTINY OF MATHETICS' PROPOSAL REVEALED THAT THE FIRM SET FORTH ITS MANAGEMENT PLAN IN A 20-PAGE LENGTHY DISCUSSION, WITH ILLUSTRATIONS, THAT DESCRIBED THE STRUCTURAL RELATIONSHIP OF THE COMPANIES INVOLVED, THE RESPONSIBILITIES OF VARIOUS KEY INDIVIDUALS, AND THE MECHANICS OF RESPONDING TO EACH NTEC DELIVERY ORDER. IN LIGHT OF THAT DETAIL, WE ARE UNABLE TO FIND THAT THE DETERMINATIONS OF THE EVALUATORS WHO DID NOT DEDUCT POINTS FROM MATHETICS' PROPOSAL WERE UNREASONABLE.

A-E SYSTEMS ARGUES THAT MR. MOSBLECH WAS GENERALLY BIASED IN FAVOR OF MATHETICS' PROPOSAL BECAUSE OF HIS ALLEGED FAMILIARITY WITH THE FIRM'S PERSONNEL. THE RECORD, HOWEVER, DOES NOT SUPPORT THIS ALLEGATION. IT IS TRUE THAT AMONG THE PERSONNEL MATHETICS PROPOSED TO USE WERE FORMER NTEC CONTRACTORS AND EMPLOYEES. THAT FACT ALONE, HOWEVER, DOES NOT SUPPORT A PRESUMPTION THAT MR. MOSBLECH WAS BIASED IN FAVOR OF THOSE PERSONNEL. WHILE MATHETICS MAY HAVE GAINED A COMPETITIVE ADVANTAGE IN THIS REGARD DUE TO THE EXTENSIVE NTEC EXPERIENCE OF THOSE INDIVIDUALS, EVALUATORS WERE NOT REQUIRED TO IGNORE THAT EXPERIENCE IN RATING THE FIRM'S TECHNICAL PROPOSAL. SEE LINGTEC, INCORPORATED, B-208777, AUGUST 30, 1983, 83-2 CPD 279. FURTHER, WE NOTE THAT, WHILE MR. MOSBLECH GAVE MATHETICS' PROPOSAL A PERFECT TECHNICAL SCORE OF 400 POINTS, HE WAS NOT THE ONLY EVALUATOR TO DO SO.

A-E SYSTEMS HAS NOT OFFERED ANY FURTHER SUPPORT FOR ITS ARGUMENT, AND WE FIND NO EVIDENCE IN THIS CASE OF BIAS. INSTEAD, WE BELIEVE THAT THE RECORD SUPPORTS A FINDING THAT THE EVALUATIONS OF A-E SYSTEMS' AND MATHETICS' PROPOSALS WERE REASONABLE.

COST EVALUATION

A-E SYSTEMS ARGUES THAT MATHETICS' COST ARE UNREALISTIC. IN THIS REGARD, THE FIRM ASSERTS THAT CONTRACT PERFORMANCE REQUIRES THE CONTRACTOR TO BE PRESENT FREQUENTLY AT NTEC HEADQUARTERS IN FLORIDA. THUS, A-E SYSTEMS CONCLUDES, MATHETICS, A CALIFORNIA FIRM, EITHER IMPROPERLY INCLUDED RELOCATION COSTS IN ITS PROPOSAL, OR WILL INCUR SUBSTANTIALLY MORE TRAVEL COSTS DURING PERFORMANCE THAN IT PROJECTED.

A-E SYSTEMS' ARGUMENT IS ERRONEOUS. THE SOLICITATION CLEARLY PROVIDED THROUGHOUT ITS STATEMENT-OF-WORK PROVISIONS THAT THE CONTRACTOR WOULD PERFORM THE CONTRACT EITHER AT TRAINING EQUIPMENT SITES OR AT THE FACILITIES OF THE PRIME NTEC CONTRACTORS DEVELOPING THE TRAINING DEVICES, WHICH, THE NAVY STATES, ARE LOCATED THROUGHOUT THE COUNTRY. THUS, THERE IS NO EVIDENCE TO SUPPORT A-E SYSTEMS' ASSERTION THAT THE SOLICITATION INTENDED CONTRACTOR PERSONNEL TO BE LOCATED IN FLORIDA. (WE NOTE, IN ANY EVENT, THAT MATHETICS MAINTAINS A FLORIDA OFFICE.)

MOREOVER, THE RECORD SHOWS THAT THE CONTRACTING OFFICER EXAMINED MATHETICS' COSTS IN ACCORDANCE WITH THE SOLICITATION AND FOUND THEM TO BE REALISTIC. OUR REVIEW OF COST REALISM ASSESSMENTS IS LIMITED TO A DETERMINATION OF WHETHER AN AGENCY'S EVALUATION WAS REASONABLE, THAT IS, NOT ARBITRARY, CAPRICIOUS OR IN VIOLATION OF PROCUREMENT REGULATIONS. SEE VARIAN ASSOCIATES, INC., B-209658, JUNE 15, 1983, 83-1 CPD 658. SINCE A-E SYSTEMS HAS PRESENTED NO EVIDENCE HERE THAT THE CONTRACTING OFFICER'S DETERMINATION WAS UNREASONABLE, WE HAVE NO BASIS ON WHICH TO QUESTION THAT DETERMINATION.

SELECTION DECISION

A-E SYSTEMS CONTENDS THAT, EVEN IF MATHETICS' PROPOSAL WAS TECHNICALLY SUPERIOR, THE EXCESS CONTRACT COSTS ASSOCIATED WITH THE PROPOSAL CANNOT BE JUSTIFIED. IN THIS RESPECT, IN A NEGOTIATED PROCUREMENT TECHNICAL FACTORS MAY BE GIVEN GREATER WEIGHT FOR PURPOSES OF AWARD THAN COST FACTORS. SEE RIGGINS & WILLIAMSON MACHINE COMPANY, INC.; ENSEC SERVICE CORPORATION, 54 COMP.GEN. 783 (1975), 75-1 CPD 168. THE COST/TECHNICAL TRADE-OFF, HOWEVER, MUST BE APPROPRIATE IN LIGHT OF THE SOLICITATION'S EVALUATION SCHEME. SEE ALBERT J. HAENER; E.H. LADUM, B-206642, B-206642.2, OCTOBER 29, 1982, 82-2 CPD 381.

HERE, THE SOLICITATION PROVIDED THAT TECHNICAL FACTORS WERE TWICE AS IMPORTANT AS COST FACTORS. AS WE HAVE ALREADY NOTED, THERE IS NOTHING IN THE RECORD TO SUGGEST THAT THE TECHNICAL EVALUATIONS OF A-E SYSTEMS' AND MATHETICS' PROPOSALS WERE UNREASONABLE. SINCE MATHETICS' TECHNICAL PROPOSAL WAS RATED SUBSTANTIALLY HIGHER THAN A-E SYSTEMS', AND IN VIEW OF THE SOLICITATION'S SELECTION FORMULA, WE SEE NOTHING WRONG WITH AWARDING A CONTRACT TO MATHETICS EVEN THOUGH ITS PROPOSED COST WAS MORE THAN THAT OF A-E SYSTEMS. IF A-E SYSTEMS IS SUGGESTING THAT AWARD SHOULD HAVE BEEN BASED ON THE LOWEST COST, NOT ONLY SHOULD THE FIRM HAVE MADE THAT SUGGESTION BEFORE PROPOSALS WERE DUE, 4 C.F.R. SEC. 21.2(B)(1) (1983), BUT WE NOTE THAT A-E SYSTEMS' PROPOSAL WAS NOT THE LOWEST-COST, TECHNICALLY ACCEPTABLE OFFER IN ANY EVENT. WE FIND NTEC'S AWARD TO MATHETICS AT A HIGHER COST THEREFORE TO BE LEGALLY UNOBJECTIONABLE.

THE PROTEST IS DENIED.

FN1 TECHNICAL PROPOSALS IN THIS CASE WERE FIRST EVALUATED BY A TEAM OF FOUR PROJECT ENGINEERS AND THE ACQUISITION DIRECTOR. THEREAFTER, THE LEAD ENGINEER, MR. MOSBLECH, AND THE ACQUISITION DIRECTOR REVIEWED THE EVALUATIONS AND AGREED UPON A TECHNICAL SCORE FOR EACH PROPOSAL. THE RECORD CONTAINS THE INDIVIDUAL SCORE SHEETS OF MR. MOSBLECH AND THE ACQUISITION DIRECTOR, A COMPOSITE SCORE SHEET OF THE OTHER ENGINEERS' EVALUATIONS, AND THE FINAL SCORE SHEET. FN2 WHILE A-E SYSTEMS NOW ASKS WHAT "BUDGET SLIPPAGE" IS, WE NOTE THAT THE FIRM HAD AMPLE OPPORTUNITY TO CLARIFY THE TERM BEFORE SUBMITTING THE PROPOSAL. (NTEC DEFINES "BUDGET SLIPPAGE" AS EXCESS EXPENDITURES IN RELATION TO THE PERCENTAGE OF JOB COMPLETION.)

FN3 THE RECORD SHOWS THAT ANOTHER EVALUATOR ALSO DEDUCTED 8 POINTS FROM A -E SYSTEMS' PROPOSAL DUE TO ITS FAILURE TO DISCUSS SCHEDULE AND BUDGET SLIPPAGE.