Bid Acceptance Period Is Material Requirement
B-187666
Dec 06, 1976
Skip to Highlights
Highlights
Rejection of low bid for spot-site preparation as nonresponsive because it did not comply with the bid acceptance period required was protested. Rejection of the bid was proper as the bid acceptance period was a material requirement, and failure to comply rendered the bid nonresponsive.