B-311000.2; B-311000.3; B-311000.4, Blackwater Lodge and Training Center, Inc., November 10, 2008
DOCUMENT FOR PUBLIC RELEASE
The decision issued on the date below was subject to a GAO Protective Order. This redacted version has been approved for public release.
Matter of: Blackwater Lodge and Training Center, Inc.
File: B-311000.2; B-311000.3; B-311000.4
Robert E. Korroch, Esq., and Francis E. Purcell, Esq., Williams Mullen, for the protester.
William
W. Goodrich, Esq., Lisa K. Miller, Esq., and Kavitha Babu, Esq., Arent Fox,
LLP, for Automation Precision
Technology, Inc., an intervenor.
Sharon H. Sachs, Esq., Department of the Navy, for the agency.
Mary G. Curcio, Esq., and John M. Melody, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision.
DIGEST
1. Protest that agency's assigning protester's and awardee's technical proposals same evaluation rating was unreasonable where protester, but not awardee, offered to provide all training at its own facility within desired driving distance is denied, where protester's proposal was credited with strength on this basis, and evaluation rating was not based solely on ownership and location of facility.
2. Protest that agency's evaluation unreasonably failed to take into account alleged safety concerns arising in connection with awardee's performance under prior contracts is denied where agency was aware of and considered safety concerns, but determined that awardee had adequately addressed the concerns during performance of the contracts.
DECISION
Blackwater Lodge and Training
Center, Inc., of Moyock, North Carolina, protests the award of a contract to
Automation Precision Technology, Inc. (APT), of Norfolk, Virginia, under
request for proposals (RFP) No. N61339-07-R-0039, issued by the Department of
the Navy for a contractor to provide a training program for small arms live
fire. Blackwater argues that the agency improperly evaluated APT's technical capability and past performance.
The RFP sought a contractor to provide training for the M9
pistol, 12-gauge shotgun, M16 rifle, and M60 medium machine gun. The RFP provided for the award of a contract
on a "best value" basis considering the following factors (in descending order
of importance): technical/management
(with subfactors for technical understanding, technical capability, and
management), past performance, and price.
RFP at 72-77. [1] The agency received four proposals. After the evaluation of initial proposals, discussions,
and the submission and evaluation of final proposal revisions (FPR), Blackwater's
and APT's proposals both were rated highly satisfactory with low performance
risk under each of the technical subfactors.
Agency Report (AR) at 17.
Blackwater's past performance was rated very low risk and APT's low
risk. Id. Blackwater proposed a price of
$22,195,142.34, and APT $20,179,016.00. Id. The agency determined that APT's lower price
was sufficient to offset Blackwater's higher past performance rating, concluded
that APT's proposal thus represented the best value, and made award to APT.
Blackwater raises numerous challenges to the evaluation of
APT's technical and past performance proposals.
In reviewing a protest against an agency's proposal evaluation, our role
is limited to ensuring that the evaluation was reasonable and consistent with
the terms of the solicitation and applicable statutes and regulations. Phillips
Med. Sys. of N. Am., B-293945.2, June 17, 2004, 2004 CPD para. 129 at 2. We have reviewed the record and find that
Blackwater's arguments are without merit.
We discuss several of those arguments below.
TECHNICAL FACTOR EVALUATION
Blackwater's overriding complaint regarding the evaluation of APT's technical proposal concerns the location of the firing range where APT will conduct live fire training for the M60 machine gun. The solicitation provided that "[i]t is highly desirable that contractor facilities are located within one-hour driving distance from the main gates or student pick-up point . . ." RFP at 14. Blackwater offered to provide all training (33 days) at its own facility, which is within the desired 1 hour driving distance from the pick-up point. APT also offered to provide all training at its own facility within the 1-hour desired driving distance, except for 1 day of live fire training for the M60 machine gun, which APT proposed to provide at an Army base (Fort Pickett) approximately 2.5 hours away from the pick-up point. Source Selection Decision Document (SSDD) at 9. As noted, the agency assigned both proposals the same highly satisfactory/low risk rating under the technical factor.
Blackwater asserts that APT's proposed use of an Army
facility for M60 machine gun training made APT's proposal less advantageous
than its own, since the Army facility is beyond the desired 1-hour distance,
and APT may not be given unfettered access to the range. Blackwater concludes that its proposal should
have received a higher technical rating than APT's.
The evaluation in this area was unobjectionable. Blackwater attaches unwarranted weight to the
adjectival ratings, which serve only as a guide to intelligent decision making.
Chapman Law Firm, LPA, B-293105.6
et al., Nov. 15, 2004, 2004 CPD para. 233 at 5. The essence of the evaluation is reflected in
the evaluation record itself, not the adjectival ratings. In this regard, while the source selection
evaluation board (SSEB) assigned Blackwater's and APT's proposals the same
adjectival and risk ratings, the record shows that this was with full knowledge
of the relative merits of the proposals.
Specifically, in its report to the source selection authority (SSA), the
SSEB listed as Blackwater's unique strengths that it would conduct all training
within the highly desirable driving range, and that Blackwater has no risk of
being denied access because it would conduct all training at a Blackwater-owned
facility.[2]
SSEB Report at 29. The SSA likewise recognized these unique
strengths in Blackwater's proposal.
However, the SSA determined that these considerations did not represent
significant differences in the proposals, and thus concluded that Blackwater's
proposal was only slightly superior to APT's regarding the training site. SSA report at 9, 10. In the final analysis, the SSA concluded that
this slight advantage, together with Blackwater's past performance advantage,
was not sufficient to warrant paying Blackwater's 10 percent higher price. Id. at 10. While Blackwater disagrees with the agency's
judgment in this regard, the evaluation was in no way inconsistent with
anything in the solicitation, and Blackwater has not established that it was
otherwise unreasonable.
NORFOLK FLEET CONCENTRATION AREA (FCA)
In listing the purpose of the contract, the solicitation provided that training will be conducted in the "Norfolk, Virginia FCA." Statement of Work at 1. APT offered to perform 32 of 33 training days at its facility within the Norfolk FCA and (as discussed above) 1 day of M60 machine gun training at the Army facility located outside the Norfolk FCA. Blackwater asserts that this constituted a deviation from the RFP requirements, and that APT's proposal thus should have been rejected.
Our Office will not sustain a protest absent a showing of
competitive prejudice. Thus, where a protester
argues that an agency improperly relaxed a solicitation requirement for another
offeror, the protester must demonstrate that, had it known of the relaxed
requirement, it would have altered its proposal to its competitive
advantage. Federal Computer Corp.,
B-239432, Aug. 29, 1990, 90-2 CPD para. 175 at 8.
Blackwater does not assert that it would have proposed a different
training facility, or would have otherwise altered its technical or price
proposal, had it known that the Navy would allow an offeror to propose training
outside the Norfolk FCA for 1 day.
Accordingly, there is no basis for finding that any relaxation of the
requirements relating to the location of performance resulted in prejudice to
Blackwater.
PAST PERFORMANCE
Blackwater maintains that, in assigning APT a low risk
rating for past performance, the agency improperly failed to consider APT's
safety record under prior contracts.
This argument is without merit because the record shows
that the agency was fully aware of, and considered, safety issues related to
APT's performance of prior contracts. The
agency rated APT's past performance based on questionnaire's submitted by APT's
references and information provided by contracting personnel involved in APT's
current contract for small arms training.
AR at 46-48. During the initial
evaluation, the agency found that APT had a strong background, with directly
relevant past performance, exceptional past performance with respect to meeting
schedules, personnel retention, and management of personnel, and good past
performance with respect to quality of services and products. However, the agency assigned APT a moderate
risk rating for past performance based on information regarding APT's current
training contract that raised safety concerns.
Id. at 48‑49. Specifically,
contracting personnel reported a May 2005 incident involving an explosive
mishap with a 12-gauge shotgun, a May 2007 incident that involved the discharge
of a 9mm pistol during a classroom training demonstration, and questions
concerning weapons maintenance. Id.
The Navy brought these incidents to APT's attention during discussions, and requested that the firm provide information addressing systematic improvement plans to ensure that policies and procedures are in place to mitigate safety risks, ensure proper maintenance of weapons, ensure instructors meet all required qualifications regarding safety and maintenance, and provide for timely reporting of mishaps to the government. Id. APT responded with a list of its policies and procedures responsive to these issues. APT also specifically noted that it arranged for training so that instructors will understand the M60 weapon and how to maintain it to manufacturer specifications; that instructors are no longer authorized to have functional weapons or ammunition at locations other than the firing range; and that it investigated the explosive mishap, learned that the ammunition was faulty, reported the defect to the manufacturer--which agreed to adopt stricter quality controls--and now tests all ammunition before students discharge firearms. Response to Discussion Questions. In addition, APT noted that it continually evaluates and updates its procedures to enhance its safety program. Id. The SSEB determined that this response was sufficient to address its concerns, and raised APT's past performance rating from moderate to low risk.
We conclude that, contrary to Blackwater's assertion, the agency's evaluation did take into account the safety concerns related to APT's prior contracts.
Blackwater asserts that the SSA incorrectly indicated in the
SSDD that APT expanded its policies and procedures in order to address the
safety issues raised during discussions, Protester Comments at 20; Blackwater maintains
that, in fact, APT only listed its existing policies and that APT presented no
information demonstrating that it expanded or modified any policies or
procedures in response to the agency's concerns. We disagree.
As noted, APT's response to the agency's concerns included, in addition
to a listing of its policies and procedures, four specific actions it had taken
in response to the safety issues that had been raised, for example, as noted,
that APT now checks ammunition prior to use as a result of the explosive
mishap. We think the agency reasonably
viewed these actions as changes in policy or procedures in response to the
problems that occurred under its current contract.[3] We thus find no basis to question the
reasonableness of the agency's conclusion that APT's proposal presented a low
performance risk. See Firestorm
Wildland Fire Suppression, Inc., B-310136, Nov. 26, 2007, 2007 CPD para. 218 at
3.
The protest is denied.
Gary L. Kepplinger
General Counsel
[1]Technical proposals were assigned an adjectival rating of outstanding, highly satisfactory, satisfactory, marginal or unsatisfactory, and a risk rating of low, medium or high. Past performance ratings were assigned in terms of risk--very low, low, moderate, high, or very high.
[2] We also note that ratings were not based solely on the location of the training facilities; APT's proposal was assigned strengths unique to its proposal that resulted in its overall highly satisfactory/low risk ratings.
[3] Blackwater argues that, in discussing APT's past performance, the SSA acknowledged only two safety issues concerning APT, rather than the three on which the SSEB based its moderate risk rating. The record shows, however, that, in fact, the SSEB based APT's final past performance on two safety concerns. SSEB Report at 28; SSDD at 4.