B-298249.6, B-298249.7, B-298249.8, B-298249.9, B-298249.10, 298249.11, B-298249.12, B-298249.13, B-298249.14, B-298249.15, 298249.16, B-298249.17, B-298249.18, B-298249.19, B-298249.20, Multimax, Inc.; NCI Information Systems, Inc.; BAE Systems Information Technology LLC; Northrop Grumman Information Technology, Inc.; Pragmatics, Inc., October 24, 2006
DOCUMENT FOR PUBLIC RELEASE
The decision issued on the date below was subject to a GAO Protective Order. This redacted version has been approved for public release.
Matter of: Multimax, Inc.; NCI Information Systems, Inc.; BAE Systems Information Technology LLC; Northrop Grumman Information Technology, Inc.; Pragmatics, Inc.
File: B-298249.6, B-298249.7, B-298249.8, B-298249.9, B-298249.10, 298249.11, B-298249.12, B-298249.13, B-298249.14, B-298249.15, 298249.16, B-298249.17, B-298249.18, B-298249.19, B-298249.20
David S. Cohen, Esq., John J. O’Brien, Esq., Rowena Laxa,
Esq., Laurel Hockey, Esq., and Catherine Kroll, Esq., Cohen Mohr, for Multimax,
Inc.; Shelly L. Ewald, Esq., Timothy E. Heffernan,
Esq., Louis B. Antonacci, Esq., Meghan
M. DiPerna, Esq., and Justin M. Hargrove, Esq., Watt, Tieder,
Hoffar & Fitzgerald, for NCI Information Systems, Inc; Drew A. Harker, Esq., Matthew H. Solomson, Esq.,
Carl J. Peckinpaugh, Esq., and Helaine G. Elderkin, Esq., Computer Sciences Corporation; Richard J. Webber, Esq., Lisa K. Miller, Esq., and Craig S. King, Esq., Arent Fox, for CACI‑ISS, Inc.; Richard O. Duvall, Esq., David S. Black, Esq., Eric L. Yeo, Esq., and Caitlin K. Cloonan, Esq., Holland & Knight, for Booz Allen Hamilton; Alexander J. Brittin, Esq., and Margaret A. Dillenburg, Esq., for Science Applications International Corporation; Gerald H. Werfel, Esq., Pompan, Murray & Werfel, for STG, Inc.; Richard J. Conway, Esq., David M. Adler, Esq., and Joseph R. Berger, Esq., Dickstein Shapiro, for Apptis, Inc.; and Grant H. Willis, Esq., and Peter F. Garvin, III, Esq., Jones Day, for Electronic Data Systems, the intervenors.
Raymond M. Saunders, Esq., Karl M. Ellcessor, Esq., and Lt.
Col. Frank A. March, Department of the Army, for the agency.
David
A. Ashen, Esq., and John M. Melody, Esq., Office of the General Counsel, GAO,
participated in the preparation of the decision.
DIGEST
Where agency identified certain proposed hourly labor rates as significantly higher than independent government cost estimate (IGCE) labor rates, offerors reasonably deduced--incorrectly, as record shows--that rates not identified were not significantly higher than IGCE rates, which led offerors to leave those rates unchanged in their final proposal revisions; discussions therefore were misleading and protest is sustained on that basis.
DECISION
Multimax, Inc., NCI Information Systems, Inc., BAE Systems Information Technology LLC, Northrop Grumman Information Technology, Inc. (NGI), and Pragmatics, Inc. protest the Department of the Army’s award of 11 contracts to other offerors, under request for proposals (RFP) No. W91QUZ-05-R-0004, under the agency’s Information Technology Enterprise Solutions‑2 Services (ITES-2S) procurement for information technology (IT) services. The protesters assert that the agency failed to conduct meaningful discussions, and that its evaluation of proposals and resulting source selection were unreasonable.
We sustain the protests.BACKGROUND
The solicitation provided for award of multiple indefinite-delivery/indefinite-quantity contracts for a 3-year base period, with three 2-year options, to furnish IT services worldwide in support of Army enterprise infrastructure goals. Specifically, as set forth in the solicitation’s statement of objectives (SOO),
ITES-2S contemplates services-based solutions under which contractors may be required to provide a full range of IT equipment. Therefore, end-to-end solutions to satisfy worldwide development, deployment, operation, maintenance, and sustainment requirements are included. Additionally included is support to analyze requirements, develop and implement recommended solutions, and operate and maintain legacy systems, and equipment. It is the intention of the Government to establish a scope that is broad, sufficiently flexible to satisfy requirements that may change over the period of performance, and fully comprehensive so as to embrace the full complement of services that relate to IT.
SOO at C.2.0. The solicitation provided for work to be accomplished through the issuance of task orders, primarily on a fixed-price or time-and-materials basis, awarded generally on the basis of a competition among the ITES-2S contract holders. RFP sect. J, attach. 4, Task Order Procedures.
Offerors were required to propose fully-loaded hourly labor rates for a minimum of 104 required labor categories at both a government site and a contractor site (for a total of 208 rates in the base year), which would be used by the contractors in competing for task orders (unless the contractors proposed lower rates). These rates, subject to an annual escalation rate proposed by each offeror, were applied to the annual estimated hourly requirements for each labor category, with the resulting totals combined with annual other direct costs (ODC) as specified in the solicitation and increased by a fixed markup proposed by each offeror for each ODC category, to yield an overall Total Proposed Contract Price (TPCP).
Eight awards were contemplated (including up to four to small businesses), but the RFP also stated that “[t]he Government reserves the right to make no, one or multiple awards; the Government also reserves the right to make more than eight awards.” RFP sect. M.1. The awards were to be made to the offerors whose proposals were determined to be the “best value” on the basis of three evaluation factors: (1) mission support (with subfactors for performance-based approach, performance-based task approach, and small business participation); (2) performance risk (past performance, corporate experience, and financial; and (3) price. The non-price factors were significantly more important than price.
Seventeen proposals were received. The Army entered into discussions with all 17 offerors, issuing written items for negotiation (IFN) and affording each offeror the opportunity to make an oral presentation. Subsequently, the agency determined that all proposals (one offeror withdrew) had no weaknesses or deficiencies, and that none of the TPCPs was unreasonably high, and requested final proposal revisions (FPR). Based on her evaluation of the FPRs, the source selection authority (SSA) selected 11 proposals for award: Apptis, Inc., Booz Allen Hamilton (BAH), CACI-ISS, Inc., Computer Sciences Corporation (CSC), QSS, STG, Inc., EDS Corporation, General Dynamics, IBM, Inc., Lockheed Martin (LM), and SAIC, Inc.
Upon learning of the awards, Multimax, NCI, BAE, NGI, and
Pragmatics filed protests in our Office (B-298249.1, B-298249.2, B-298249.3, B‑298249.4,
B‑298249.5). The Army subsequently
advised us that its evaluation ratings for the financial subfactor under the
performance risk evaluation factor failed to account for all information
received during discussions, and that it thus would reevaluate the proposals
and make new price/technical tradeoff decisions. We dismissed the protests as academic on
The agency’s reevaluation led to the following results:
|
(Performance, Performance/Task, Small Business) |
Performance Risk (Past Performance, Corporate Experience, Financial) |
TPCP |
|
|
BAH |
Good (Good, Outstanding, Good) |
Low (Low, Very Low, Low) |
$12,891,797,818 |
|
Apptis |
Good (Good, Good, Good) |
Low (Very Low, Low, Low) |
13,048,326,171 |
|
QSS |
Good (Good, Good, Outstanding) |
Low (Moderate, Very Low, Low) |
13,121,880,799 |
|
CACI-ISS |
Good (Good, Good, Good) |
Very Low (Very Low, Low, Low) |
13,391,706,671 |
|
IBM |
Good (Good, Good, Outstanding) |
Low (Low, Very Low, Low) |
13,709,298,174 |
|
CSC |
Good (Good, Outstanding, Outstanding) |
Low (Low, Low, Low) |
13,788,431,819 |
|
STG |
Good (Good, Good, Acceptable) |
Very Low (Very Low, Very Low, Very Low) |
13,848,350,913 |
|
Pragmatics |
[REDACTED] |
[REDACTED] |
[REDACTED] |
|
EDS |
Good (Good, Good, Outstanding) |
Low (Moderate, Low, Low) |
14,109,977,896 |
|
Lockheed Martin |
Good (Good, Outstanding, Acceptable) |
Very Low (Very Low, Very Low, Very Low) |
14,306,616,917 |
|
General Dynamics |
Good (Good, Good, Good) |
Low (Very Low, Low, Low) |
14,421,393,555 |
|
SAIC |
Good (Good, Outstanding, Acceptable) |
Low (Low, Low, Low) |
$14,554,346,258 |
|
Multimax |
[REDACTED] |
[REDACTED] |
[REDACTED] |
|
BAE |
[REDACTED] |
[REDACTED] |
[REDACTED] |
|
NGI |
[REDACTED] |
[REDACTED] |
[REDACTED] |
|
NCI |
[REDACTED] |
[REDACTED] |
[REDACTED] |
Based on her review of the revised evaluation reports and a new series of 77 head-to-head comparisons among the proposals, the SSA made awards to the 11 original awardees. Multimax, NCI, BAE, NGI, and Pragmatics thereupon filed these protests with our Office.
CHANGE IN REQUIREMENTS
Multimax, NCI, BAE and NGI assert that the Army improperly
failed to amend the solicitation to reflect an increase in its requirements and
permit offerors to submit revised proposals.
The protesters maintain that the Army was required to amend the
solicitation because it apparently decided to mandate, rather than merely
authorize, use of ITES-2S for the acquisition of IT services. In this regard, in the source selection
decision (SSD), the SSA explained her determination to award 11 rather
than 8 contracts as based, in part, on the fact that “it has come to my
attention that senior leadership within the Army is considering the possibility
of mandating the use of ITES-2S for information technology services
acquisitions. If that scenario were to
arise, there is a possibility that more work might be performed under ITES-2S
than was estimated when the Government developed its acquisition
strategy.” SSD at 28. According to the SSA, “[h]aving three
additional contractors would provide the Army a larger base of contractors to
handle this potential increase in workload.”
Where an agency’s requirements change materially after a solicitation has been issued, it must issue an amendment notifying offerors of the change and affording them an opportunity to respond. Federal Acquisition Regulation (FAR) sect. 15.206(a); Northrop Grumman Info. Tech., Inc. et al., B-295526 et al., Mar. 16, 2005, 2005 CPD para. 45 at 13; Symetrics Indus., Inc., B-274246.3 et al., Aug. 20, 1997, 97-2 CPD para. 59 at 6. This rule applies even after the submission of final proposal revisions, up until the
time of award. Northrop
Grumman Info. Tech., Inc. et al., supra; Digital Techs., Inc.,
B‑291657.3, Nov. 18, 2004, 2004 CPD para. 235 at 3; NV Servs.,
B-284119.2, Feb. 25, 2000, 2000 CPD para. 64 at 17.
Amending the solicitation provides offerors an opportunity to submit
revised proposals on a common basis that reflects the agency’s actual
needs. Dairy Maid Dairy, Inc., B‑251758.3
et al.,
We find that there was no material change in the Army’s
requirements. While it is clear from the
SSD that the SSA believed there was a possibility that use of the contract
would be made mandatory, there is no evidence that this ever occurred. The Army states that “[t]here is not currently
nor was there ever any proposal or initiative to make use of ITES-2S
mandatory,” Agency Comments,
The Director of the Army Small Computer Program (ASCP), which includes the ITES‑2S procurement, also states that she was never advised that use of the ITES-2S was to be mandatory. She has submitted a declaration in which she states as follows:
I am unaware of any Army policy or initiative that mandates the use of ITES-2S for Army IT services procurements. To my knowledge, the Army is not currently planning any proposed policy or initiative that would require ITES‑2S to be used for IT services procurements. Nor, to my knowledge, has such a policy previously been under development. It is highly unlikely, in my view, that such a policy will ever be implemented, as there are serious questions about its desirability and feasibility.
Declaration of Director of ASCP,
Finally, the Deputy Principal Director for Governance,
Acquisition and Chief Knowledge Office, Office of the Army CIO, who is
responsible for initiating and developing IT contracting policy for the Army,
has submitted a declaration in which he states that he is “unaware of any
proposal or initiative to make use of the ITES-2S contract mandatory‑‑either
. . . as of July 12, 2006, or at any time in the past. In fact, if such a proposal or initiative
existed, my office would either have the lead or be actively involved.” Declaration of Deputy Principal Director,
The protesters note that current Army policy establishes such a strong preference for the use of ASCP contract vehicles such as ITES-2S, that its use is tantamount to mandatory. In this regard, for example, a draft version of the agency’s “Department of the Army IT Purchasing Guide: How to Procure Commercial Information Technology Hardware, Software and Services,” dated Summer 2006, provides that “the ASCP office is the primary source for hardware, software and services,” and that
[i]f your purchase is other IT products [‑‑i.e.,
other than software, desktops or notebooks‑‑] or services and the
cost is greater than $25K, or if the required item or service is available on
an ASCP contract, but you have justification, such as better pricing, for
purchasing the item or service from another source, you must request a waiver
from ASCP. See [Department of the Army
Pamphlet]
Army IT Purchasing Guide at 5-6.
As noted by the Army, however, the draft Army IT Purchasing Guide reflects the same policy as it existed prior to the closing date for receipt of FPRs (March 27, 2006). Thus, for example, the November 2005 version of Army Pamphlet 25‑1‑1, referenced above in the draft Army IT Purchasing Guide, provides as follows:
Army customers must look to meet their requirements using ASCP contracts before making commercial IT purchases from other sources.
. . . . .
If there is an existing ASCP indefinite delivery indefinite quantity contract or blanket purchase agreement (BPA) available, the system or service is obtained from that contract to the maximum extent practical.
. . . . .
The ASCP is the main source for commercial IT purchases greater than $25K. ASCP has an array of fully competed contract vehicles to meet most Army requirements. These contract vehicles must be considered before buying from contract vehicles from other sources. If an Army customer chooses other than an ASCP contract vehicle, ASCP must first grant a waiver.
Army Pamphlet
We conclude that there is no evidence that, at the time of the awards, there was any likelihood of a material change in existing Army policy favoring use of ITES‑2S. It follows that there was no significant change in the Army’s requirements that would necessitate amending the ITES-2S solicitation and affording offerors an opportunity to propose to the new requirements.
PRICE
The protesters assert that the Army applied an unreasonable, mechanistic formula in evaluating proposed labor rates. In addition, they assert that this resulted in a failure to conduct meaningful discussions. We agree.
Price Evaluation Methodology
Multimax, BAE and Pragmatics assert that the Army’s evaluation of proposed labor rates was unreasonable. In this regard, the Army reports that it employed a two‑step approach to evaluating labor rates for purposes of determining price reasonableness, detecting unbalanced pricing, and identifying labor rates to question during discussions: first, it compared an offeror’s rate for a labor category to the IGCE rate for that category, and then it compared the rate to the mean of all offerors’ evaluated rates for each labor category using a two‑standard‑deviation measure. The agency’s price evaluator explained the second step as follows:
Next, the Price
evaluation team calculated the mean of all offerors’ evaluated labor rates for
each labor category. The mean evaluated
labor rates were then used to calculate the standard deviation from the mean. In order to determine the most appropriate
measure of comparison, the following were calculated: mean plus and minus one standard deviation,
mean plus and minus two standard deviations, and mean plus and minus three
standard deviations. A comparison was
made, using the three separate standard deviations, to determine which
offerors’ average labor rates for each labor category fall outside the range of
each standard deviation. The majority of
the offerors’ average labor rates fell outside the range of one standard
deviation and no offeror’s average labor rates fell outside the range of three
standard deviations. Therefore, it was
determined that two standard deviations was the most appropriate measure of
comparison to use for the reasonableness assessment.
Memorandum of Agency
Price Evaluator to Source Selection Evaluation Board (SSEB) Chairperson,
Under this two-step
approach, the agency would issue an IFN to an offeror questioning a proposed
labor rate as significantly overstated (or understated) only if the rate both
exceeded (or was lower than) the IGCE rate, and was more than two standard
deviations greater (or less) than the mean rate of all offerors for that
category. According to the contracting
officer (who was responsible for conducting discussions and determining overall
price reasonableness), the two-step evaluation was used to identify
“extraordinary outlier rates,” that is, “rates that were significantly
overstated or understated and which might pose a risk to the Government of
paying an unreasonable amount during performance. . . . Rates that did not meet
[both] tests were not considered outliers and were not questioned.” Second Declaration of Contracting Officer at
1; see Agency Comments, Sept. 8, 2006, 3-8, 16; Agency Comments,
Sept. 21, 2006, at 3; Declaration of Agency Price Evaluator, Aug. 18,
2006, at 1.[3]
The
two-standard-deviation formula resulted in an extremely wide range of
acceptable rates for the labor categories.[4] For example, looking just at the initial
labor rates for government site labor, some of the more extreme ranges were as
follows:
|
IGCE Rate |
Acceptable Range Mean-plus-two-standard-deviation Test |
|
|
Program Manager-Senior |
$[REDACTED] |
$[REDACTED] |
|
Project Administrator |
[REDACTED] |
[REDACTED] |
|
Applications
Systems Analyst-Senior |
[REDACTED] |
[REDACTED] |
|
Systems
Engineer-Senior |
[REDACTED] |
[REDACTED] |
|
Software
Engineer-Senior |
[REDACTED] |
[REDACTED] |
|
Software
Engineer-Intermediate |
[REDACTED] |
[REDACTED] |
|
Software
Engineer-Associate |
[REDACTED] |
[REDACTED] |
|
IT Certified
Professional-Senior |
[REDACTED] |
[REDACTED] |
|
Disaster Recovery
Contingency Administrator |
[REDACTED] |
[REDACTED] |
|
Information Security
Specialist-Senior |
[REDACTED] |
[REDACTED] |
|
Information Security
Specialist-Intermediate |
[REDACTED] |
[REDACTED] |
|
Information Security
Specialist-Associate |
[REDACTED] |
[REDACTED] |
|
Systems
Administrator-Senior |
[REDACTED] |
[REDACTED] |
SSA Initial Briefing
Materials,
As illustrated by the
chart, the upper end of the range was significantly above the IGCE for some of
the labor categories, and in some instances was nearly, or more than, twice the
IGCE (such as $[REDACTED] versus the
$[REDACTED] IGCE rate for
Application System Analyst-Senior, $[REDACTED] versus the $[REDACTED] IGCE
rate for Software Engineer-Senior, and $[REDACTED] versus the $[REDACTED] IGCE rate for Information Security
Specialist-Senior). Likewise, the lower
end, in some instances, was below the federal minimum wage or was even a
negative number (such as $[REDACTED]
for Project Administrator, $[REDACTED] for Information Security Specialist-Senior, and $[REDACTED] for Information Security Specialist‑Associate). There
is no indication that the agency ever reviewed the results of the formula to
assure that the prices at the extreme end of the ranges reflected reasonable
pricing; rather, the agency mechanistically applied the formula and accepted
the results without further analysis. We
conclude that the agency’s methodology did not provide a valid means for identifying
“outlier” (questionable) rates, and this aspect of the evaluation therefore was
unreasonable. See generally
Metro Mach. Corp., B‑297879.2, May 3, 2006, 2006 CPD para. 80
at 9‑10 (mechanical application of an agency’s own estimates for
labor hours or costs to determine evaluated costs, without the exercise of
informed judgment by the contracting agency in independently analyzing the
offeror’s proposed costs based upon its particular approach and circumstances,
was unreasonable); The Jonathan Corp.; Metro Machine Corp., B-251698.3,
B-251698.4, May 17, 1993, 93-2 CPD para. 174 at 11-13; United Int’l
Eng’g, Inc. et al., B-245448.3 et al., Jan. 29, 1992, 92-1 CPD para. 122
at 11. We therefore sustain the
protests of Multimax, BAE and Pragmatics on the basis that the Army failed to
reasonably evaluate proposed labor rates.
Misleading Price
Discussions
The price evaluation also is problematic because the results
of the agency’s analysis were used to determine which prices to bring to
offerors’ attention during discussions as possibly being unreasonably high, and
thus potentially determined which prices offerors would adjust in their
FPRs. In this regard, NGI and Multimax assert that the price IFNs they received
during discussions failed to reasonably advise them of numerous labor rates
that should have been brought to their attention as significantly overstated
and, moreover, that they were misled into believing that only the few rates
identified in the IFNs significantly exceeded the IGCE rates. The protesters maintain that, had they known
that numerous of their proposed rates not identified during discussions were
significantly higher than the corresponding IGCE rates, they would have reduced
those rates in their FPRs, just as they reduced the rates that were identified in
the IFNs as overstated.
It is a fundamental precept of negotiated procurements that
discussions, when conducted, must be meaningful; that is, discussions must
identify deficiencies and significant weaknesses in each offeror’s proposal
that could reasonably be addressed so as to materially enhance the offeror’s
potential for receiving award. PAI
Corp., B‑298349,
Here, in the discussions questions issued to NGI and Multimax (as well as to other offerors such as BAE) questioning the proposed rates for particular labor categories as significantly overstated, the agency advised as follows: “Your proposed labor rates are significantly higher than the Independent Government Cost Estimate (IGCE) rates for the following labor categories . . . . The offeror should consider revising the price proposal. If you do not revise the identified rates, please provide an explanation for the basis of the rate.” See IFN to NGI no. 51, Nov. 3, 2005; IFN to NGI no. 298, Jan. 6, 2006; IFN to BAE no. 50, Nov. 3, 2005; IFN to BAE no. 297, Jan. 6, 2006; IFN to Multimax no. 49, Nov. 11, 2006. Thus, there was no reference in the IFNs to the agency’s reliance on the two-standard-deviation calculation, but instead only to the proposed labor rate being “significantly higher than” the IGCE as the basis for the IFN.
The Army’s price discussions with NGI and Multimax (as well as with BAE) were inadequate because,
due to the agency’s reliance on the two-standard-deviation formula to identify
“outlier” rates--and the broad range of acceptable prices resulting from the
formula--it failed to bring to the protesters’ attention numerous rates that
reasonably should have been considered significantly overstated. In this regard, the record shows that proposed rates that were not questioned in the
IFNs could actually exceed the IGCE rates by a greater percentage than the
rates that were identified. Thus, for
example, although NGI’s rate for [REDACTED] at the contractor site was [REDACTED] percent higher than the IGCE rate, this rate was not identified in an
IFN because it was within the wide range of acceptable prices established under
the formula. At the same time, although
NGI’s proposed rate for [REDACTED]
at the contractor site was only [REDACTED] percent higher than the IGCE rate, because it fell outside the
range established by the two-standard-deviation test, NGI was advised that its
rate was “significantly higher” than the IGCE.
There simply is no reasonable basis for bringing the former rate to the
offeror’s attention, but not the latter.
The above example is not
an isolated one. NGI calculates that [REDACTED] of its proposed labor rates that were not
identified during price discussions were similar to this example--they exceeded
the corresponding IGCE rate by a higher percentage than one or more of the
rates identified in its price IFNs. NGI
notes further that [REDACTED] of its
unquestioned rates exceeded the IGCE rates by a greater percentage than did some
rates that were questioned in other offerors’ IFNs. Likewise, the record indicates that Multimax
was not advised that its proposed rates for a significant number of labor
categories were higher than the corresponding IGCE rates, despite the fact that
these proposed rates deviated from the IGCE by a greater percentage than rates
that were identified in discussions with Multimax or other offerors. Multimax calculates that [REDACTED] of its unquestioned rates (only [REDACTED] of its rates were identified in IFNs) exceeded
the IGCE rates by a greater percentage than the rates that were questioned in
other offerors’ IFNs (during initial price discussions).
We conclude that not
only were offerors not adequately advised of all of their significantly
overstated rates, but the agency’s failure to identify the additional rates
actually misled the offerors into believing that those rates did not require
further adjustment.[6] In these
circumstances, we conclude that the agency failed to conduct meaningful
discussions with the protesters.
The Army questions
whether the protesters have established that they suffered competitive
prejudice as a result of the agency’s approach to discussions. A reasonable possibility of prejudice
is a sufficient basis for sustaining a protest.
McDonald-Bradley, B-270126,
The Army argues that,
had it advised the protesters of additional labor rates that significantly
exceeded the IGCE rates, it also would have provided similar information to the
awardees, thus affording them a similar opportunity to reduce their rates. The Army suggests that the result would have
been a “wash.” However, the
Army’s speculation as to what would have occurred if all offerors had been
provided the same opportunity to revise their proposals is insufficient to
rebut the apparent prejudice to the protesters from the misleading
discussions. See Creative
Info. Tech., Inc., supra; The Jonathan Corp.; Metro Mach. Corp.,
supra, at 10. Accordingly, we
sustain NGI’s and Multimax’s protests on
the ground that the agency provided inadequate, misleading discussions.
Unequal Discussions
NCI and BAE assert that
they were not afforded meaningful discussions with respect to their proposed
labor rates, and instead were denied the opportunity provided other offerors to
enhance their proposals’ potential for award by addressing labor rates that
significantly exceeded the IGCE rates.
We agree.
During discussions, the
Army identified as significantly higher than the corresponding IGCE rates
proposed rates that were as little as 3.67 percent (during the initial price
discussions) or 3.27 percent (during the second round of price discussions)
higher than the IGCE rates. Meanwhile,
as alluded to above, the agency did not identify other labor rates that were
very much higher than the IGCE rates.[7] For example, [REDACTED] of NCI’s initially proposed labor rates was
identified as significantly higher than the IGCE rates, despite the fact that
NCI proposed rates that exceeded the IGCE by as much as [REDACTED] percent.
Likewise, only [REDACTED] of
BAE’s proposed rates were identified as significantly higher than the
corresponding IGCE rates, despite the fact that other of BAE’s proposed rates
exceeded the IGCE by as much as [REDACTED] percent. In contrast, one of
the awardees had 69 of its proposed rates identified as significantly higher
than the IGCE rates, another had 27 rates identified, and another 20 rates.
Again, this example is
not an isolated one. NCI calculates that
[REDACTED], and BAE [REDACTED], of their unquestioned labor rates exceeded the
IGCE rate by a higher percentage than rates brought to the attention of other
offerors. NCI has calculated that it
would have lowered its labor rates in a manner that would have reduced its TPCP
by $[REDACTED] had it been advised
of these additional overstated rates; BAE calculates that it would have reduced
its price by $[REDACTED]. These price reductions--which have not been
brought into question by the agency--would have resulted in the protesters’
prices being lower than those of one or more awardees with equal or lower
technical ratings. NCI Comments,
RECOMMENDATION
We recommend that the Army reopen discussions with offerors, consistent with our conclusions above, and then request revised proposals. The agency may then determine the number of awards it deems appropriate. If the evaluation of revised proposals results in a determination that one or more of the current awardees’ proposals no longer represent the best value to the government, the agency should terminate such contracts. We also recommended that Multimax, NCI, BAE, NGI, and Pragmatics be reimbursed their costs of filing and pursuing their protests, including reasonable attorneys’ fees, with regard to the price evaluation and discussions issues. 4 C.F.R. sect. 21.8(2)(1) (2006). In accordance with 4 C.F.R. sect. 21.8(f)(1), the protesters’ certified claims for such costs, detailing the time expended and costs
incurred, must be submitted directly to the agency within 60 days after receipt of this decision.
The protests are sustained.
Gary L. Kepplinger
General Counsel
[1]
The SSA has further stated that there was no intention to raise the
$20 billion contract ceiling set forth in the solicitation. Declaration of SSA,
[2] According to the Department of Defense’s (DOD) Contract Pricing Reference Guides, the standard deviation is a measure of dispersion of the samples or observations using the square root of the variance (with the variance of a sample being the average of the squared deviations between each observation and the mean). In a distribution that is approximately normal, plus or minus one deviation will include approximately 68 percent of the total observations in the sample; plus or minus two deviations will include approximately 95 percent of the total observations; and plus or minus three deviations will include approximately 99.7 percent of the total observations. However, of particular importance here, because all values are squared, a single observation that is far away from the mean can substantially affect both the variance and the standard deviation. DOD Contract Pricing Reference Guides, vol. 2, ch. 3.3.
[3]
The record indicates that, in a limited
number of instances during the first of the two rounds of price discussions,
the agency questioned an offeror’s rate for a particular labor category as
being overstated even though it did not exceed the IGCE rate for that
category. Specifically, during the
initial round of price discussions, the Army questioned 123 of the offerors’
over 3,500 labor rates as being significantly higher than the IGCE rates for
the categories questioned (as well as 28 labor rates for being significantly
understated); in 9 of these cases, however, the rates were questioned as being
significantly in excess of the IGCE even though they only exceeded the range of
acceptable rates established by the mean-plus-two-standard-deviation test, and
in fact were not higher than the IGCE rates for those categories. Agency Comments,
[4] The extremely wide range of acceptable labor rates appears to have resulted from the fact that, as noted above, rates that were far from the mean disproportionately increased the range described by the two-standard-deviation calculation.
[5]
Application of the formula also resulted in
a wide range of acceptable hourly rates for some labor categories at contractor
sites, such as, for example, $[REDACTED] to $[REDACTED] for Program
Manager-Intermediate, where the IGCE was $[REDACTED]. SSA
Initial Briefing Materials,
[6]
We note that, with respect to NGI, the
agency confirmed during discussions that only the identified labor rates were
overstated. Specifically, during NGI’s
oral presentation, the contracting officer explained the IFN to NGI as
follows: “We’re basically identifying
the proposed labor rates that are significantly higher than the IGCE
rates.” Videotape of NGI Oral
Presentation/Discussions at
NGI : . . .
I was just curious what significantly meant in terms of the delta
between the cost estimate and what you saw here.
Contracting
Officer: Yeah . . . we generally . . . I
mean . . . we can’t really give you that.
NGI: Right, but I guess my question is, is it just
these [REDACTED] rates?
Contracting
Officer: It’s just the rates we’ve identified.
[7]
The reference above to labor rates identified during discussions as being
overstated but exceeding the IGCE rates by as little as 3.27 and 3.67
percentage does not account for the proposed labor rates identified during
discussions as being overstated but which in fact were less than the IGCE
rates. The Army maintains that these
rates were erroneously identified as being overstated. Agency Comments,